Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Lower Valley TS_contract _2. A101-2017_R
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:36:58 PT on 07/15/2024 under Order No.4104243047 which expires on 09/08/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. 1 User Notes: (810440546) ® AIA Document A101® – 2017 Standard Form of Agreement Between Owner and Contractor AGREEMENT made as of the 3rd day of September in the year 2024. BETWEEN the Owner: Kittitas County 205 West 5th Avenue, Suite 108 Ellensburg, Washington 98926-2887 and the Contractor: Belsaas & Smith Construction, Inc. PO Box 926 Ellensburg, WA 98926 for the following Project: Lower Valley Transfer Station 2600 West Green Avenue Ellensburg, Washington 98950 The project includes the following components as defined by the contract documents, including, but not limited to: 1. Mobilization and demobilization of equipment and personnel for the project. 2. Construction layout and surveying, including location of existing, below grade and above grade utilities in the work area. 3. Establishment and maintenance of erosion and sediment control throughout the project. 4. Clear and grub work areas. 5. Removal of unsuitable soil. 6. Placement and compaction of soil embankment material. 7. Installation of water, sanitary sewer, electric, stormwater and fire suppression systems/structures. 8. Construction of Transfer Building, Scales, Scalehouse, MRW Building, Administration Building. 9. Rough grading, fine grading, geotextile installation, subgrade preparation, base course, and asphalt for road and parking lots. 10. Installation of fencing and gates, signage, and striping. 11. Construction Quality Control (CQC) testing. 12. Completion of record drawings and related documentation. 13. Repair/replacement of existing features impacted during construction. The Architect/Engineer: SCS Engineers 2405 140th Avenue NE, #107 Bellevue, Washington 98005 The Owner and Contractor agree as follows. TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS EXHIBIT A INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: September 3, 2024. § 3.2 The Contract Time shall be measured from the date of commencement of the Work. § 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work: [x] Not later than 450 calendar days from the date of commencement of the Work. § 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates: All work shall be substantially completed Not later Than 450 Calendar Days from the date of commencement of work § 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be $19,991,062.74, inclusive of State of Washington Sales Tax (8.4%), subject to additions and deductions as provided in the Contract Documents. § 4.2 Alternates § 4.2.1 Alternates included in the Contract Sum: Item Price Additive Alternative Bid Item No. A2 – MRW Building $1,707,000.00 Contractor agrees to hold bid prices for 30 Calendar days following issuance of Notice to Proceed for the following Additive Alternative bid items: Item Price 1. A1 – Administration Building $642,000.00 2. A3- Tire Drop-off Area $130,000,00 3. A4 – Hauling Soil to Ryegrass Landfill $784,000.00 § 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. None § 4.3 Allowances, if any, included in the Contract Sum: None § 4.4 Unit prices, if any: Unit Prices Listed in the Bid Schedule. § 4.5 Liquidated damages, if any: $500 Per Calendar Day § 4.6 Other: None ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: Other mutually agreed date by OWNER and Contractor. § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 7th day of a month, the Owner shall make payment of the amount certified to the Contractor not later than 30 calendar days. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than 45 calendar days after the Architect receives the Application for Payment. § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 In accordance with AIA Document A201™–2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: § 5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and .3 That portion of Construction Change Directives that the Architect determines, in the Architect’s professional judgment, to be reasonably justified. § 5.1.6.2 The amount of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner; .2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201–2017; .3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; .4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2017; and .5 Retainage withheld pursuant to Section 5.1.7. § 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: 5% 5.1.7.1.1 The following items are not subject to retainage: Not applicable. § 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows: Not applicable. § 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows: Not applicable. § 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201–2017. § 5.1.9 Except with the Owner’s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment. § 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201–2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker. Casey McFarlane, PE Project Manager Kittitas County § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201–2017, the method of binding dispute resolution shall be as follows: [ X ] Arbitration pursuant to Section 15.4 of AIA Document A201–2017 If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction. ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2017. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201–2017. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201–2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 The Owner’s representative: Casey McFarlane, PE Kittitas County 925 Industrial Way Ellensburg, WA 98926 casey.mcfarlane@co.kittitas.wa.us § 8.3 The Contractor’s representative: Brandon Drexler Belsaas & Smith Construction, Inc. PO Box 926 Ellensburg, WA 98926 § 8.4 Neither the Owner’s nor the Contractor’s representative shall be changed without ten days’ prior notice to the other party. § 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and Bonds, and elsewhere in the Contract Documents. § 8.5.2 The Contractor shall provide bonds as set forth in AIA Document A101™–2017 Exhibit A, and elsewhere in the Contract Documents. § 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201–2017, may be given in accordance with a building information modeling exhibit, if completed, or as otherwise set forth below: Not Applicable. § 8.7 Other provisions: Not Applicable. ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 This Agreement is comprised of the following documents: .1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor .2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds .3 AIA Document A201™–2017, General Conditions of the Contract for Construction .4 Drawings Conformed set of Drawings, dated August 30, 2024. .5 Specifications Conformed set of specifications dated August 30, 2024 .6 Addenda: Addendum No. 1 July 17, 2024 Addendum No. 2 July 23, 2024 Addendum No. 3 July 24, 2024 Addendum No. 4 July 29, 2024 .7 Other Exhibits: [ X] Supplementary and other Conditions of the Contract: Document Title Date Pages Instruction to Bidders Section 00 00 03 June 18, 2024 8 Supplementary Instruction to Bidders Bid Proposal Form Bid Schedule General Conditions Supplementary General Conditions Technical Specifications Unanticipated Find Plan Language Geotechnical Report - HWA Section 00 00 03.1 Section 00 00 04 Section 00 00 04.1 Section 00 00 05 Section 00 00 05.1 Attachment A Attachment B June 18, 2024 July 29, 2024 July 29, 2024 June 18, 2024 June 18, 2024 June 18, 2024 June 13, 2023 1 3 2 38 24 2 27 .9 Other documents, if any, listed below: None This Agreement entered into as of the day and year first written above. OWNER (Signature) CONTRACTOR (Signature) Brett Wachsmith, Chair, Board of County Commissioners Brian Nelson, Secretary (Printed name and title) (Printed name and title)