Loading...
HomeMy WebLinkAboutLower Valley Transfer Station_Reccomendation of Award_final_R1 2405 140th Ave. NE, Suite 107, Bellevue, WA 98005 | 425-746-4600 | eFax 503-684-6948 Environmental Consultants & Contractors August 8, 2024 Project No. 01222292.00 Patti Stacey, Director Kittitas County Solid Waste/Facility Maintenance Director 925 Industrial Way Ellensburg, WA 98926 Subject: Lower Valley Transfer Station Recommendation for Award Dear Ms. Stacey: On Friday, August 2, 2024, two (2) bids were received and opened for the Kittitas County Lower Valley Transfer Station project. SCS Engineers (SCS) has reviewed all submitted bid documents for accuracy and conformity to the requirements listed in the Instruction to Bidders. Bid Tabulations Bids were received from two bidders: 1. Belsaas and Smith Construction, Inc., Ellensburg, WA, 2: Apollo, Inc., Kennewick, WA. Both bidders had attended the mandatory pre-bid meeting. All requirements for submittal of bids were met and all bids were thus deemed responsive. Following the bid opening, an independent summary and arithmetic check was performed on all bids. All bids were arithmetically correct, with one minor exception on the bid from Belsaas and Smith, which did not change the bid amount. Belsaas and Smith is the apparent low bidder with an extended price of $16,734,939.80 (not including State of Washington Sales Tax). Please see the attached sheets for a bid summary and their proposed prices. SCS’s Opinion of Probable Cost is $16,081,657.00. Review of Bidder’s Qualifications and Proposal Upon confirmation of Belsaas and Smith, Inc. as the apparent low bidder. SCS reviewed the Bid Form and determined that all items were completed. Our review confirmed that Belsaas and Smith, Inc. currently possess required State of Washington contractors’ licenses and registrations. Kittitas County Lower Valley Transfer Station August 8, 2024 Page 2 Recommendation for Award Based upon our review, SCS recommends Kittitas County award the contract to Belsaas and Smith, Inc. in the amount of $16,734,939.80 (Not Including Sales Tax). Additive options will be added as funding becomes available. Please contact SCS if you should have any questions. Sincerely, Thomas D. Parker, PE, BCEE Project Director SCS Engineers