HomeMy WebLinkAboutResolution 2024-142BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2024 - 14 A
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY F'EDERAL AID
PROJECT PROSPECTUS F'OR TIJE 2024 VAI\ITAGE HIGFTWAY PAVINGO CRP 320-24
WIIEREAS: Public Works has received notification of State Transportation Block Grant (STBG)
redistribution funding for the 2024 Yantage Highway Paving Project; and
WHEREAS: Kittitas County Engineering staff is currently finalizing design of construction plans for
advertisement; and
WHEREAS: In preparation to advertise construction phase work in 2024Kittitas County Public Works
is requesting the Washington State Department of Transportation release the federal
funds for construction; and
WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby approve the Chair's signature on the Local Agency Federal
Aid Project Prospectus for the 2024Yantage Highway Paving, CRP 320-24.
DATED this 6th day of August2024, at Ellensburg, Washington.
BOARD OF COMMISSIONERS
KITTITAS ,w
Chairman
Julie Kjorsvik
V
Cory Wright, Commissroner
c0i
tr Deputy Clerk of thg Board- Mandy Buchholz
ulr
/:
^-.w Washington State
Department of Transportation Local Agency Federal Aid
Project Prospectus
Date 713012024
DUNS Number 0t-020-2541
Federal Employer
Tax lD Number 9t-601349WSDOT
Use Only
Prefix Route ()
FederalAid
Proiect Number
Local Agency
Project Number RC2299|CRP 320-24
No
CAAgency
M Yes
Federal Program Title
Vzo.zos n otn"t
Agency
Kittitas County Public Works
Start Latitude trt 47.000559
End Latitude N47.001241
Start Longitude W -120.412095
End Lonoitude W -120.315203
Project Title
2024 Y antage Highway Paving
Proyect Zip Code (++1
98926-9081
Project Term in i From-To
6.56 tl.t]
Nearest City Name
Ellensburg
End Mile Post
11.t7
Length of Project
4.6t f, locat ! tocat Forces !
Award Type
RailroadState
Begin Mile Post
6.56
County Name
Kittitas
Route lD Begin Mile Point
6.56
End Mile Point
tt.t7
City Number County Number
t9
Congressional District(s)
8
Urban Area NumberWSDOT Region
South Central Region
Legislative Dishict(s)
l3
Phase
Total
Estimated Gost
(Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date
Month Year
P.E
R/W
Const 2,461,300.00 332,300.00 2,129,000.00 September 2024
Total 2,461,300.00 332,300.00 2,129,000.00
Description of Existing Facilit1t (Existing Design and Present Gondition)
Roadway Width
28' - 42'
Number of Lanes
2-3
Existing roadway structure is failing and in need of rehab.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Grind and overlay of asphalt on Vantage Highway within the existing pavement limits along with temporary
and permanent pavement marking for repair, rehabilitation, and preservation.
140-101
Title
Construction Manager
Phone
509-962-10r9
Local Agency Contact Person
Darren Case
State
WA
Zip Code
98926
Mailing Address
411 North Ruby Street, Suite 1
City
Ellensburg
By
C--L," Approving AuthorityProject Prospectus
1;116 County Engineer oate/ /zq /z'/
Revised 0112022 Previous Editions 0bsolete
Agency
Kittitas County Public Works
Project Title
2024 Y antage Highway Paving
Date
713012024
Type of Proposed Work
Prolect Type (Check all that Apply)
I t{ew Construction n Path / Trail E s-n
Vz-a
E otrer
f Reconstruction Pedestrian / Facilities
ParkingRailroad
Bridge
Roadway Width
28',
Number of Lanes
2
Geometric Design Data
Description Through Route Crossroad
Federal
Functional
Classification
n uroan
Z Rural
n ruHs
E PrincipalArterial
n UinorArterial
! Collector
Z Vlajor Collector
! Vtinor Collector
I tocat Access
! uruan
Z Rural
I rrrHs
! erincipalArterial
! vinorArterial
! collector
Z wlajor Collector
Minor Collector
Local Access
{
Terrain M rtat Roll Mountain Z rt"t Roll E Mountain
Posted Speed 50 mph
Design Speed 50 mph
Existing ADT 316-1983
Design YearADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
County
Others
o//o
Agency
100 %
Construction Will Be Performed By
Contract
Contract
100 o//o
Agency
o//o
Environ mental Classification
f] Ctass I - Environmental lmpact Statement (ElS)
Project lnvolves NEPA/SEPA Section 404
lnteragency Agreement
n Ctass lll - EnvironmentalAssessment (EA)
f] Project lnvolves NEPA/SEPA Section 404
I nteragency Agreements
Z Ctass ll - Categorically Excluded (CE)
! Projects Requiring Documentation
(Documented CE)
Environmental Considerations
t
Revised 01l2O22 Previous Editions Obsolete
Agency
Kittitas County Public Works
Prqect Title
2024 Y antage Highway Paving
Date
713012024
Right of Way
Z ruo Right of Way Needed
* All construction required by the
contract can be accomplished
within the existing right of way.
Right of Way Needed
n ruo Relocation ! Retocation Required
Utilities Railroad
M tlo utility work required
f]nt utility work will be completed prior to the start
of the construction contract
nrut utility work will be completed in coordination
with the construction contract
M ruo railroad work required
nrut railroad work will be completed prior to the start of
the construction contract
nrut the railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Skuctures lnvolved in the Pqect
FAA lnvolvement
ls any airport located within 3.2 kilometers (2 miles) of the proposed project? ! Ves Z No
Remarks
This project has been reviewed by the leg islative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehe lan for commun ity development.
Date
Agency
By
Mayor/Chairperson
DOT Form 140-101
Revised 0112022 Previous Editions Obsolete
I
"ul
Page 3