Loading...
HomeMy WebLinkAboutResolution 2024-142BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2024 - 14 A AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY F'EDERAL AID PROJECT PROSPECTUS F'OR TIJE 2024 VAI\ITAGE HIGFTWAY PAVINGO CRP 320-24 WIIEREAS: Public Works has received notification of State Transportation Block Grant (STBG) redistribution funding for the 2024 Yantage Highway Paving Project; and WHEREAS: Kittitas County Engineering staff is currently finalizing design of construction plans for advertisement; and WHEREAS: In preparation to advertise construction phase work in 2024Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for construction; and WHEREAS:A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the 2024Yantage Highway Paving, CRP 320-24. DATED this 6th day of August2024, at Ellensburg, Washington. BOARD OF COMMISSIONERS KITTITAS ,w Chairman Julie Kjorsvik V Cory Wright, Commissroner c0i tr Deputy Clerk of thg Board- Mandy Buchholz ulr /: ^-.w Washington State Department of Transportation Local Agency Federal Aid Project Prospectus Date 713012024 DUNS Number 0t-020-2541 Federal Employer Tax lD Number 9t-601349WSDOT Use Only Prefix Route () FederalAid Proiect Number Local Agency Project Number RC2299|CRP 320-24 No CAAgency M Yes Federal Program Title Vzo.zos n otn"t Agency Kittitas County Public Works Start Latitude trt 47.000559 End Latitude N47.001241 Start Longitude W -120.412095 End Lonoitude W -120.315203 Project Title 2024 Y antage Highway Paving Proyect Zip Code (++1 98926-9081 Project Term in i From-To 6.56 tl.t] Nearest City Name Ellensburg End Mile Post 11.t7 Length of Project 4.6t f, locat ! tocat Forces ! Award Type RailroadState Begin Mile Post 6.56 County Name Kittitas Route lD Begin Mile Point 6.56 End Mile Point tt.t7 City Number County Number t9 Congressional District(s) 8 Urban Area NumberWSDOT Region South Central Region Legislative Dishict(s) l3 Phase Total Estimated Gost (Nearest Hundred Dollar) Local Agency Funding (Nearest Hundred Dollar) Federal Funds (Nearest Hundred Dollar) Phase Start Date Month Year P.E R/W Const 2,461,300.00 332,300.00 2,129,000.00 September 2024 Total 2,461,300.00 332,300.00 2,129,000.00 Description of Existing Facilit1t (Existing Design and Present Gondition) Roadway Width 28' - 42' Number of Lanes 2-3 Existing roadway structure is failing and in need of rehab. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Grind and overlay of asphalt on Vantage Highway within the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation, and preservation. 140-101 Title Construction Manager Phone 509-962-10r9 Local Agency Contact Person Darren Case State WA Zip Code 98926 Mailing Address 411 North Ruby Street, Suite 1 City Ellensburg By C--L," Approving AuthorityProject Prospectus 1;116 County Engineer oate/ /zq /z'/ Revised 0112022 Previous Editions 0bsolete Agency Kittitas County Public Works Project Title 2024 Y antage Highway Paving Date 713012024 Type of Proposed Work Prolect Type (Check all that Apply) I t{ew Construction n Path / Trail E s-n Vz-a E otrer f Reconstruction Pedestrian / Facilities ParkingRailroad Bridge Roadway Width 28', Number of Lanes 2 Geometric Design Data Description Through Route Crossroad Federal Functional Classification n uroan Z Rural n ruHs E PrincipalArterial n UinorArterial ! Collector Z Vlajor Collector ! Vtinor Collector I tocat Access ! uruan Z Rural I rrrHs ! erincipalArterial ! vinorArterial ! collector Z wlajor Collector Minor Collector Local Access { Terrain M rtat Roll Mountain Z rt"t Roll E Mountain Posted Speed 50 mph Design Speed 50 mph Existing ADT 316-1983 Design YearADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By County Others o//o Agency 100 % Construction Will Be Performed By Contract Contract 100 o//o Agency o//o Environ mental Classification f] Ctass I - Environmental lmpact Statement (ElS) Project lnvolves NEPA/SEPA Section 404 lnteragency Agreement n Ctass lll - EnvironmentalAssessment (EA) f] Project lnvolves NEPA/SEPA Section 404 I nteragency Agreements Z Ctass ll - Categorically Excluded (CE) ! Projects Requiring Documentation (Documented CE) Environmental Considerations t Revised 01l2O22 Previous Editions Obsolete Agency Kittitas County Public Works Prqect Title 2024 Y antage Highway Paving Date 713012024 Right of Way Z ruo Right of Way Needed * All construction required by the contract can be accomplished within the existing right of way. Right of Way Needed n ruo Relocation ! Retocation Required Utilities Railroad M tlo utility work required f]nt utility work will be completed prior to the start of the construction contract nrut utility work will be completed in coordination with the construction contract M ruo railroad work required nrut railroad work will be completed prior to the start of the construction contract nrut the railroad work will be completed in coordination with the construction contract Description of Utility Relocation orAdjustments and Existing Major Skuctures lnvolved in the Pqect FAA lnvolvement ls any airport located within 3.2 kilometers (2 miles) of the proposed project? ! Ves Z No Remarks This project has been reviewed by the leg islative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehe lan for commun ity development. Date Agency By Mayor/Chairperson DOT Form 140-101 Revised 0112022 Previous Editions Obsolete I "ul Page 3