HomeMy WebLinkAboutAmendment No. 2t'ifu.&*_ta Ju$ 34,2O24 Parametrix Attention: Tiffany Neier 60 Washington Avenue, Suite 390 Bremerton, WA 98337 RE: Amendment No. 2 to Professional Service Agreement This Amendment will amend Task 2, 4, 7, 8, 9, and adds task 10 and 1 1 per attached scope of work dated June 2O24, to the Professional Service Agreement for the Ryegrass Landfill Facility. Kittitas County Solid Waste Programs 925 lndustrialWay, Ellensburg, WA 98926 Telephone: (509) 962-7542 -Y- Original Professional Service Agreement Amendment #1 Amendment #2 TotalAdjust Service Contract Amount not to exceed Name: bper' I have enclosed four copies of this change, please sign and return Approval $237,242.40 $293,109.64 $186,934.76 $717,286,80 lnc. Name:@ EP&C Division M BY tT1 0 0 o Ju 31 2024 frarametrix Scope of Work let's creatG tomofrow' tqgstner Kittitas County Solid Waste Ryegrrass IrPL andFuture Uses Amendment 02 SmtrCIductiom This scope of work identifies the additional effort beyond the ori$nal scope of work for project 553- 1763-010. The following tasks included more work than anticipated due to the Department of Ecolost's (Ecologr's) changng regulatory requirements and additional work and meetings needed to satisfy their reguirements: r Task 02 - LPL Closure Design Services r Task O4 - Evaluation of Borrow Soils for Other Uses r Task O5 - Expansion of Biosolids Land Application Area r Task 09 - Annual Environmental Monitoring Report Two additional tasks are being added to this contract to meet Ecolos/'s requirements o Task LO - 2024 Annual Environmental Monitoring Reporting e Task 11 - Air Monitoring and Reporting The changes in the tasks and additional items are outlined below. Schedule We are prepared to begin this project upon written authorization to proceed with the assumption of a June 2024 start. The project duration is proposed through May 2025. lf the projects extend past May 2025, an amendment will be requested. Yask &1 - New Groundwater MonitorimE Well I No changes to this task CIr budget. Task SZ - Srp& Closure EesiEn $enrices ObJectlve Work urderthis task that has been completed includes: r Closure/Post-Closure Plan Update for changes in the FinancialAssurance calculation needs Kittitas Oounty Solid Waste Fyegtas LPL and Future tbes Aff€ndment02 L 5531763{10 lune2{}24 Parametrik Scope of Worlc r Update of proposed final fill . Update life-cycle analysis r Update closure and post{losure cost estimates e TeK edits to clariry unclear portions of the 2024 plan r Description of the potential for a partial closure of portions of the landfill that have reached grade . Fill map with clear coordinates for the top of refuse . Clarification of the stormwater ditch locatisns o Permit submiftal of the 90% Plans, Specifications and Cost Estimate for the closure of the LPL e Permit submittal of the 9O% Construction Quality Assurance Plan o Multiple meetings with the regulators to determine what they were looking for in the closure documentation The only work assumed to be remaining in the task is coordination with the County, Ecology, and the Department of Health to clarifu that the updates to the Closure/Post-Closure Plan were within the scope of the WAC and did not modify the substance of the existing, permitted plan. Ilssurnptlons r The assumptions for this task include: o No further design work will be completed under this task o Additional requests beyond the budget of this task will be covered under Task O8 * Unanticipated Cducal Work o No additional calculations or writeups are needed under thls task Ilellverable a Letter explainingthe updates to the Limited Purpose Landfill (LPL) Closure/Post-Closure Plan for Health S'asl< 03 - &PS, Closure HnEineering $erviees {Closed} This task is closed. Construction will not occur during this amendment period. Taslq 04 - Hvaluatf.on of, Borrow $oi.3,s for Other trIses Majonty of this work has been completed. Additionaltasksthat were completed include: Ki&itas County Solld Waste ftyegrass LPI and Futqre Lb6 Amendment02 2 5531763010 June2024 Parametrik Scope of Work r Site visit to assess borrow soil at the transfer station site that is under construction for use as LPL cover soil r Review of the soil test results from the biosolids and borrow soils from the transfer station site r Mass balance to determine an approximate ratio for soils from transfer station and biosolids o Research and working with the client on how to handle permitting for using biosolids in the cover soil for the LPL closure system The last items in this task that need to be completed are: . Prepare a letter outlining the biosolids to soil ratio calculations that were completed o Review HWA's Soil Assessment Report Deliverable o Letter outlining the calculations that were performed to determine biosolids to borrow soil ratio needed to create appropriate topsoil mix for the LPL cover system. Yp"sls SS * ffixpamsiCIua of &iosoS.ids [:ameX *tpgt]ieationt "S"sea {#}osed} This task has been completed and will be closed. X'aslq SS ^ $HPS, Chee3qSist amd #sit[eal SLseas Repalrt Wrodate (e.osed) This task has been completed and will be closed. T'aslc &? * f$i.r Fesxxa{*t'ng Additional work to be added to this task includes: Based upon initial review of the LPL as part of the NOC application with Department of Ecology, a Tier 2 analysis of landfill gas generat'lon from the LPL will be required. This work is beint included under Task 11 of this scope. The resutts from Task 11 will be utilized to modify the NOC application. Modification and resubmission of the NOC application will be performed under this task with no addltional budget allotment requested. Kittitas County Solid Waste Ryegrass LPL and Future Uses Amendment O2 3 5531763{10 June 2024 Parametrik Scope of Work '.t.' ai s .< '{} 8 -" "6J:n a:m't i a '. ;o ail e o?, t# l:f . i it e a 3. "*.Yer :r3,{ *il 3.svvasn c e lf unanticipated, critical work activity becomes necessary that is not within the authorized scope of services, the County may authorize additional services utilizing the budget established in this task. An allowance of $10,00O has again been allocated to this task. Work that has been completed under this task include: e Assistance with measures that could be taken to dry out the leaking septage lagoon . Revised the landfill gas monitoring plan for the Balefill to cornply with WAC 1-73-351-200 r Revised the landfill gas monitoring plan for the LPL to comply with WAC 173-350-400 o Developed a new environmental monitoring plan for the Ryegrass facility as part of the LPL permit including quarterly reporting of data r Completed first quarter perimeter landfill gas monitoring of the LPL 'f a s ;t< (} S * Si.nrmw aI Hs'*.vivo stlne mt ei. }'tr*i o nit auriu&g i*.e p o ri t {#3osed} Work for this task that was completed outside of the scope included: e Revised and updated site maps and figures showing important Ryegrass facility features related to the environmental monitoring of the LPL and the Balefill, and historical and current operations of the Biosolids program r Reviewed historical Ecologr files regardingthe background of MTCA cleanups for the facility r Coordinated with HWA and laboratories to compile and evaluate historical groundwater quality data . Cornpiled and conducted quality control and data validation of historicalgroundwater data . Purchased of the Sanitas@ Software License and data tabulation of historical data r Uploaded historical and 2023 monitoring data lnto the Sanitas@ software . Evaluated outliers. perform statistical analysis of the groundwater data in compliance with the EPA's unified guidance and developed upper prediction limits for the landfill o Evaluated historical sources of nitrates, background water quality, and interpretation of results o Coordinated with HWA for the first and second quarters regarding changes to the groundwater monitoring program includingthe updated Sampling and Analysis Plan r Started on the first quarter 2O24 data validation and tabulation. This task is complete and will be closed out. Kittitas County Solid Waste Riegrass LPL and Future Uses Amendment 02 4 553-1763010 June2A24 ParametriX Scope of Work '.,r'a\si,{ j.{} -- fi(}A{, g*"'",*.r:uit:ia.1. :,*nwi:.:*rirL-nes*t"="}. I'l.4ieln:i,"t'ru;;:i:trtcri {Ai'evir} Objective The goal of this task is to perform, coordinate, conduct, and report for the 2024 environmental monitoring at the Ryegrass Facility for the Balefill and the LPL in accordance with the updated Environmental Monitoring Plan and WAC 173351and WAC 173-350-400. This work will be performed through the 2024 annual environmental monitoring report due to agencies by April 1, 2425. S,ctivities For this task we will complete the following: . Project management and monthly progress reports r Coordinate with HWA regarding groundwater monitoring r Collect quarterly LFG measurements from 17 perimeter monitoring locations surrounding the LPL (GM-1thru GM-8) and the Balefill (GMB-Ithru GMB-9) in accordance with the Draft LFG Monitoring Plan r Modify the 26 Balefill gas vents to add a ball valve and labcock valve forsampling c Collect quarterly LFG measurements from the 26 gas vents of the Balefill in accordance with the Draft LFG Monitoring Plan r Conduct follow-up actions in accordance with the Draft LFG Monitoring Plan if necessary r Tabulate and report LFG concentrations to regulatory agencies r Tabulate and perform data validation on quarterly groundwater monitoring data . Upload data into the Sanitas@ software program and perform analysis consistent with the SAP e Prepare a report for each of the First, Second, and Third quarters. r Prepare groundwater data for submittal into Ecology's Environmental lnformation Management {ElM) database. . Coordinate with field staff and review sampling documentation and procedures. r Coordinate with agencies regarding quarterly groundwater and landfill gas results. . Prepare the 2O24 annual environmental monitoring report. The annual report will include evaluatingthe data in accordance with the statistical approach presented in the Draft SAP and2oZ3Annual Report Kiuitas County Solid Waste Hyegrass LPL and Future Uses Amendment 02 5 553-1763'010 )une2A24 Parametrik Scope of Work Deliverables Draft and Final Environmental Monitoring Reports forthe First, Second and Third Quarters af 2A24. The quarterly data will be submitted to Ecology's EIM database. Draft and Final Environmental MonitoringAnnual Report far 2A24. The final report will be submitted by April 1,,2A25. The data for Fourth Quarter 2024 will be submitted to Ecology's EIM database following submittal of the final annual report. The Environmental Monitoring Reports will include: e Laboratory reports and field data sheets r A data validation summary report r Tabulated groundwater results r Time-series plots . Static water level measurements and potentiometric surface rnaps o Groundwater flow velocity calculations r A summary of statistical comparisons in accordance with the Draft SAP o Geochemical evaluation, including cation-anion balancing and trilinear and/or stiff diagraming noting any changes or trends in water chemistry for each well r LFG Monitoring Sheets r Tabulated LFG monitoring data suitable for quarterly reporting A draft and final summary letter report detailing the Balefill gas vent modifications -'fa.s3e 3 3 - 3*F& $$.te $paeaffic 3*g# Sarrap"{ing :fatr l$ffi# &ppliaatfon {New} Objective Based upon initial review of the LPL as part of the NOC application with Department of Ecolog!, a Tier 2 analysis of landfill gas genemtion from the LPL wiil be required. This results from Toxic/Hazardous Air Pollutants {TAPs/HAPs) being above the Small Quantity Emissions Rate {SQER) and Acceptable Source lmpact Level (ASIL), per the LandGEM modeling. lt is believed that the speciation and generalion rate calculated by the LandGEM modeling is overestimating these values and thus not representative of the actual gas generation by the LPL This work is being included to provide Tier 2 analysis of the LPL and will generate a sitespecific characterization of the landfill gas generation from the LPL that will be utilized to modify the NOC application Oask O7). Kittitas Coung Solid Waste Ryegrass LPL and Future Uses Amendment 02 6 55&1763010 June2,A24 ParametriX Scope of Work "Ectivities Preparation and execution of a site-specific work plan for the sampling of landfill gas generated by the LPL. This will include work plan development by Parametrix staff as well as conespondence with EcoloS/ to address comments prior to execution of the work plan. Execution of the sampling will be performed by Parametrix with laboratory analysis of the samples performed by a third-party laboratory. Deliverables r One draft and one final sampling work plan. r Laboratory reports of gas sampling S,ssurnptions r Work plan will require one instance of comments and review by Department of Ecology. r Execution of work plan will occur within one 1O-hour workday plus travel. o Parametrix staff will execute the field work r Additional analysis and modification to the NOC application will be completed under the existing Task 7 scope and budget. ?as3q : Fg\ffiJL - ffi\erJ& Geqp$e$emces, Ke'uc" trctivities Provide input regarding processes for mixing suitable borrow soils for use in the Phase 1 Closure Review available information regarding bonow soils to be available from construction at the new Kifritas Transfer Station. e Perform one site visit to the Kittitas Transfer Station and Ryegrass LPL for observation of the proposed borrow materials . Estimate approximate volumes of soils in the stockpiles present at the Kittitas Transfer Station on the dayof the site visit r Prepare a report presenting a summary of observations, estimated volumes and considerations for processing of soils to be used in the Phase 1 Closure. Deliverables a Technical memorandum or letter presentinga summary of observations, estimated volumes, and considerations for processing of soils to be used in the Phase 1 Closure a a Kittita$ County Solld Waste Ryegrass LPL and Future [.!ses Amendment 02 7 553-1763010 June 2024 Parametrik Scope of Work BUDGET We estimate that the scope of services described herein will require the below budget modifications. Parametrix agrees not to exceed the budget without the County's authorization. However, if during the work, a level of effort beyond the scope of our work appears neeessary, Parametrix will contact the County immediately to discuss any necessary modifications to the scope of services and/or budget estimate. The budget presented in this proposal reflects an estimate based on our current understanding of the project requirements for a scope of work developed from information provided. Parametrix reserves the right to transfer hours and budget dollars between tasks to satisfy project requirements. The budget also reflects estimated direct costs to the project. Parametrix may also transfer funds allocated for direct costs to professiona/technical hours, or vice versa, to satisfy project requirements. Budget Project: 5531763010 - Ryegrass LPL 8t Future Uses Task: 01 - New Groundwater Monitoring Well Task: 02 - LPL Closure Design Services Task: 03 - LPL Closure Engineering Services Task: 04 - Evaluation of Borrow Soils for Other Uses Task ; 05 - Expansion of Biosolids Land Application Area Task: 06 - SEPA Checklist and Critical Areas Report Update Task: 07 - Air Permitting Task; 08 - Unanticipated, Critical Work Allowance Task:09 - Annual Environmental Monitoring Report Task: 10 - 2024 Annual Environmental Monitoring Task : 11 - LPL Site Specific LFG Sampling tor NOC Application Task: HWA - HWA GeoSciences, lnc. Fee Resulting Available Fee $- $12,086.29 $- $3,000.35 $- $- $- $8,006.86 $33,137.85 $101,467.24 $20,799.43 $8.436.7s $32.513.81 $r",752.40 $- $963.59 $- $- $23,904.88 $10,000.o0 $- $101,467.24 $20,799.43 $6,404.39 Total Amendmem Fee Klttitas Oounty Solid Wast€ Ryegrass LFL and Future tJses Amendment02 $186,934.76 I 5531763010 June 2024