My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_FCZD_ Inter-fluve
>
Meetings
>
2024
>
08. August
>
2024-08-20 10:00 AM - Commissioners' Agenda
>
Resolution_FCZD_ Inter-fluve
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 12:09:20 PM
Creation date
8/15/2024 12:08:51 PM
Metadata
Fields
Template:
Meeting
Date
8/20/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Selection of Inter-fluve,Inc. for the Lower Kittitas Reach Floodplain Reconnection Project and Authorize the Public Works Water Resource Manager to Negotiate and to Sign the Professional Services Agreement
Order
13
Placement
Consent Agenda
Row ID
121365
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />2024 AGENDA STAFF REPORT <br />AGENDA DATE: August 20, 2024 <br />ACTION REQUESTED: Authorize the selection of Inter-Fluve, Inc. for the Lower <br />Kittitas Reach Floodplain Reconnection Project and <br />Authorize the Public Works Water Resource Manager to <br />Negotiate and Sign the Professional Services Agreement <br />BACKGROUND: The Kittitas County Flood Control Zone District has <br />purchased over 400 acres of flood prone property located <br />behind the failing Hansen Pits Levee. These lands were <br />purchased for floodplain management purposes, including <br />flood risk reduction, habitat restoration, and maintaining <br />flood compatible agricultural and open space uses. The <br />U.S. Bureau of Reclamation previously provided donated <br />services to develop conceptual restoration designs. <br />Additional design, engineering, hydraulic analysis, and <br />permitting is required to advance the project to final design. <br />On June 4th, 2024 the Board of County Commissioners <br />approved a request for Qualifications / Proposals. Proposals <br />were due on July 8th, 2024. Three (3) qualified firms <br />submitted their qualifications for review. A review team of <br />Kittitas County Public Works, U.S. Bureau of Reclamation, <br />and Mid -Columbia Fisheries Enhancement Group staff <br />reviewed the submittals and recommends Interfluve, Inc. be <br />selected for the Lower Kittitas Reach Floodplain <br />Reconnection Project. <br />This project is identified in the Flood Control Zone District <br />6-year work program and 2024 annual budget. Funding has <br />been secured from the Salmon Recovery Funding Board <br />and Yakima Basin Integrated Plan. <br />INTERACTION: Public Works. <br />RECOMMENDATION: Authorize the selection of Inter-Fluve, Inc. for the Lower <br />Kittitas Reach Floodplain Reconnection Project and <br />Authorizing the Public Works Water Resource Manager to <br />Negotiate and Sign the Professional Services Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.