Loading...
HomeMy WebLinkAbout2024-07-09-minutes-solid-waste-and-maintenanceKITTITAS COUNTY SOLID WASTE AND MAINTENANCE MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Regular Meeting TUESDAY 1 2:00 PM Jul 9, 2024 Board members present: Chairman Brett Wachsmith, Laura Osiadacz Vice- Chairman and Cory Wright Commissioner Others: Patti Stacey, Lisa Lawrence, and Lisa Murray (Out at 2:11 p.m.) Call to Order at 2:01 p.m. At 2:01 p.m. Chairman Wachsmith announced that the Board would recess into executive session for 5 minutes with action anticipated. RCW 42.30.110 (c) To consider the minimum price at which real estate will be offered for sale or lease when public knowledge regarding such consideration would cause a likelihood of decreased price. However, final action selling or leasing public property shall be taken in a meeting open to the public. At 2:06 p.m. the Board reconveyed and announced they would recess into Executive Session for an additional 5 minutes. At 2:11 p.m., the Board reconveyed with directions to staff. Citizen Comments (1 min. time limit) None Solid Waste Updates: Patti presented the Board with a comparison worksheet of garbage tonnage to date this year compared to last year, stating that the numbers are down. Discussion was held on Waste Management expenses, tip fees and minimum fee increases. Further discussion included Yakima County fees and the fact that they own their Landfills. Patti informed the Board that the new Transfer Station Project is out to bid. Discussion was held on the ground water at the site, that there was a mandatory pre -bid meeting and a walk through was held. Request Board to Ratify Vice Chairs Signature on Contract with Hurst Construction, LLC: Chairman Wachsmith moved to approve Vice Chairs signature on Contract with Hurst Construction, LLC. Commisioner Wright seconded the motion. Motion passed 3-0. 2024-07-09 MINUTES Maintenance Updates: Patti informed the Board of the HVAC units failing at Superior Court, the Jail and the Morris Sorenson Building during the recent heat wave. Patti informed the Board that the North Parking Lot should be completed by September 171" depending on the delivery of the EV charging stations. Discussion was held on EV Charging stations in the City of Cle Elum, the usage of them at CWU and if Vantage would be interested in adding them. A brief discussion was held on solar panels. OTHER BUSINESS — No Action to be taken - A brief discussion was held on a column with the Daily Record and utilizing it to address Courthouse and Facility Maintenance costs. A brief discussion was held on the Road Fund Levy and Tax Assessments. Concluded at 2:31 p.m. R Lisa iLawrence 2024-07-09 MINUTES 2 KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman S®fud Vq\ aste and Wgai ntenanc e RegWar Meeting Tuesday JWy 9, 2024 o 2:00 PH BOCC Conference Room 205 West 5th Room 108 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Solid Waste Updates 4. Request Board to Ratify Vice Chairs Signature on Contract with Hurst Construction, LLC 5. Maintenance Updates 6. Executive Session-.RCW 42.30.110 (c) To consider the minimum price at which real estate will be offered for sale or lease when public knowledge regarding such consideration would cause a likelihood of decreased price. However, final action selling or leasing public property shall be taken in a meeting open to the public 7. Other Business - No Action to be taken 8. Concluded Created on 7/8/2024 9:24:31 AM 0 n G) m n, O p sy a sv cr CD OrCL CD v 1+ m � Co m o 3 3 sv Co 1+ O Q v CD CO W N N Cl) ` O OD cn CD -C3 CO O 1+ O N ,-+ O 3 v Cn 3 N h `r O O 3 3 O Cn -• W W N N N ODP W N O 3 Cn ,-+ 3 Cn CO O 3 cn Cl) (fl rr O Cn p 000 W CO O W Cp (JI 1+ rr V 1+ O O 00 (CD 03 (D O � C3i7 O 3 Cn 30 N Cn C7 CD Efl 64 69- 61� EH N — 4�,, V1 V 00 N O O O O 00 C." CONTRACT THIS AGREEMENT, made and entered into this /G day of li 1-7 e 202S between the Kittitas County, a municipal Corporation of the State of Washington, and /-furs { 111�011 s r-U L.," 1C , Hereinafter called the Contractor; WITNESSESTH: That in consideration of the payments, covenants, and agreements hereinafter mentioned and attached and made a part of this agreement to be made and performed by the parties hereto, the parties hereto covenant and agree as follows: 1. The contractor shall do all work and furnish all tools, materials, and equipment for the Correctional Facility Parking Lot & The North Parking Lot Charging Station Project, for the unit prices and lump sums set forth in the attached bid proposal, in accordance with and as described in the attached plans and specifications and in full compliance with the terms, conditions, and stipulations herein set forth and attached, now referred to and by such reference incorporated herein and made a part hereof as fully for all purposes as if set forth at length, and shall perform any alterations in, or additions to, the work covered by this contract and every part thereof and any force account work which may be ordered as provided in this contract and every part thereof. The Contractor shall provide and be at the expense of all materials, labor, carriage, tools, implements and conveniences, and things of every description that may be requisite for the transfer of materials and for construction and completing the work provided for in this contract and every part thereof, except such as mentioned in the specifications to be furnished by the Kittitas County. 2. The Kittitas County hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained, and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract and every part thereof. The Kittitas County further agrees to employ, and does employ the Contractor to perform any alterations or additions to the work covered by this contract and every part thereof and any force account work that may be ordered and to pay for the same under the terms of this contract and the attached plans and specifications. 3. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. 4. It is further provided that no liability shall attach to the Kittitas County by reason of entering into this contract, except as expressly provided for herein. Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents 5. In the event dispute between the parties regarding the interpretation or enforcement of this contract, the prevailing party shall be entitled to their reasonable attorney fees and costs incurred in any legal proceedings, including arbitration and appeal. Venue for any action shall be Kittitas County, Washington. IN WITNESS WHEREOF the said parties and each of them have caused these presents to be duly executed by its proper officers an in the proper person or persons, the day and year first above written. KITTITAS COUNTY Contractor CByL -- E 5s0- t;>i?, IDep(I Printed Name / Title Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents BRD PROPOSAL Bid Hurst Construction LLC (Name) 316 Urban Industrial Way East Wenatchee, Wa 98802 (Address) for the construction of the Correctional Facility Parking Lot & The North Parking Lot Charging Station Project and related work hereinafter referred to as the "Project". Kittitas County 205 W 5th Ave, Suite 210 Ellensburg, Washington 98926 Ladies & Gentlemen: We, the undersigned, having investigated the site of the Project and having examined the Invitation and Instruction to Bidders, and the Contract Documents for the construction of the Project, offer to construct, complete, and maintain the Project in conformity with said documents, and to enter into an agreement according to the form hereto attached, in consideration of the sum arrived at by the proper extension of units of work shown in the following Schedule of Prices, or such sum as may be ascertained in accordance with said documents. We acknowledge receipt, understanding, and full consideration of Addenda Number(s) 1,2 Addendum Number(s) y 7 ignature issued prior to the date for receipt of bids. Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents Should this be accepted, we agree to appear at the Kittitas County, within ten (10), Calendar Days from the date of the Notice of Acceptance and return the signed contracts (3) and to provide the Performance and Payment Bond and Certificate of Insurance. We agree to begin work within ONE (1) Calendar Day from the date of the Notice to Proceed, and to proceed so as to complete the project within the number of Working Days specified. Charged working days will begin when the contractor commences work but no later than ONE 1 Calendar Day after the date of the Notice to Proceed Unless and until the formal agreement is prepared and executed, we understand that this bid, together with your Notice to Acceptance, shall constitute a binding contract between us. Attached hereto is certified check, cashier's check, or bid bond in the amount of 5% of Total Bid Dollars ($ 5% ) payable to the order of the Kittitas County, this amount being five (5) percent of the total bid, based upon the approximate quantities at the above prices. DATED this 23 day of May 202-4 at East Wenatchee Washington. ADDRESS OF BIDDER (Principal Place of Business) 316 Urban Industrial Way East Wenatchee, Wa 98802 TELEPHONE 509-664-0173 FAX NO. 509-664-0175 Hurst Construction LLC Firm Name Signature Jesse Hurst, President Printed Name/Title (If the bidder is a corporation, this proposal much be executed by its duly authorized officials.) Contractor's State Registration No. State Industrial Insurance No. HURSTCL962DE 058, 747-00 Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents BID PROPOSAL BID PROPOSAL: Schedule A (SITE DEVELOPMENT W.S.S.T. RULE 170 APPLIES) ITEM NO. WSDOT SPEC ITEM DESCRIPTION CITY. UNIT Unit Price TOTAL PREPARATION 1 1.09 MOBILIZATION 1 L.S. 6 2 2-01 CLEARING AND GRUBBING -SITE 1 LS. % ! X ap 7/ 3_ °I 300 3 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 L.S. 7 2aa REMOVE EXISTING TREE 12 EACH Zo �— 6 N o `� � �V, (v0 8 2-o REMOVING PAVEMENT 1.017 S.Y. GRADING y v^� f I 0 9 2-03 ROADWAY EXCAVATION INCL HAUL 2.800 C.Y. 15 75 C.Y. 10 2-03 EMBANKMENT COMPACTION STORM SEWER 7700 9 ( OQ 11 7-05 CATCH BASIN TYPE 1 3 EACH SS--- q_� 12 7-04 SCHEDULE ASTORM SEWER PIPE 12 IN. DAM. 180 LF. 13 7-la STORM INTERCEPTOR STC 1200 1 EACH D�� U� Z- 60 LF. q 14 7-xa INFILTRATION TRENCH WATER LINES 15 7-15 SERVICE CONNECTION 1 IN. DIAM. 1 EACH " �v•r_ SURFACING '1 _{ �J Z J 06 $ 34, 628 16 4-04 CRUSHED SURFACING BASE COURSE 787 TON 17 4-04 CRUSHED SURFACING TOP COURSE 43 TON, d DA HOT MtX ASPHALT $77,964 18 5-04 COMMERCIAL HMA 634 TON DA IRRIGATION AND WATER DISTRIBUTION 19 8-03 IRRIGATION SYSTEM 1 LS. 00 •O�—� EROSION CONTROL AND ROADSIDE PLANTING 20 "1 INLET PROTECTION 9 EACH 10 a `� ` !(�6�J•� 21 8-01 STABILIZED CONSTRUCTION ENTRANCE 210 S.Y. ZO��,j O OOP` Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents BID PROPOSAL BID PROPOSAL: Schedule A (SITE DEVELOPMENT W.S.S.T. RULE 170 APPLIES) ITEM WSDOT ITEM DESCRIPTION CITY. UNIT Unit Price TOTAL NO. SPEC 22 8-01 SILT FENCE 930 L.F. 5586� 23 &roc LANDSCAPING 1 L.S. S_ s- 24 &%X TOP SOIL TYPE B 40 C.Y. ? z, bo TRAFFIC 26 8-04 CEMENT CONC. TRAFFIC CURB 1,840 L.F. ' 27 8-22 PAINT LINE 1,400 L.F. [�-O 28 8-22 PAINTED CROSSWALK LINE 80 S.F. LI D J 60 �f 29 8-22Z�22 PAINTED TRAFFIC ARROW 4 EACH q0 7 0—O ` l ''7 30 8-22 PAINTED ACCESS PARKING SPACE SYMBOL WITH BACKGROUND 3 EACH 31 &21 PERMANENT SIGNING 1 L.S. 1 L.S. (3600 34 &roc ELECTRICAL AND EV CHARGING OTHER ITEMS 35 6.04 WHEEL STOP 28 EACH L.., 36 1.05 ROADWAY SURVEYING 1 L.S. 10 37 &14 CEMENT CONC. SIDEWALK 235 S.Y. 39 7ACONNECTION TO DRAINAGE STRUCTURE 1 EACH 6700 l67=5 40 7-05 ADJUST CATCH BASIN 1 EACH s C 41 8-XX BLOCK WALL 820 S.F. V v 43 8-)a ABANDON EXISITNG WATER SERVICE 44 &got ABANDON EXISITNG SEWER SERVICE 3 EACH 5 EACH I. zS-CO�— � LamTo 0 — $731,760.30 Schedule A Subtotal = 7311 $61,467.87 Sales Tax (8.4%) = 6 l `I . S Schedule A Total DA $793,228.17 Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents BID PROPOSAL BID PROPOSAL: Schedule B (STREET CONSTRUCTION W.S.S.T. RULE 171 APPLIES) ITEM WSDOT ITEM DESCRIPTION CITY. UNIT Unit Price TOTAL NO. SPEC PREPARATION % 7 3 4 2-02 REMOVING CEMENT CONC. SIDEWALK 185 S.Y.y V 5 2.02 REMOVING CEMENT CONC. CURB AND GUTTER 28 L.F. - �-3 _ c,v 6 2-02 REMOVING CEMENT CONC. CURB 72 L.F. l q CrTJ i -3 6�5 TRAFFIC 25 8-04 CEMENT CONC. TRAFFIC CURB AND GUTTER 277 L.F. O � (I /� � 32 1.10 PROJECT TEMPORARY TRAFFIC CONTROL 1 L.S. °° 6 y oo' ( �CO- 33 1-10 PEDESTRIAN TRAFFIC CONTROL 1 L.S. I 0 i-- OTHER ITEMS v17 38 8-06 CEMENT CONC. DRIVEWAY ENTRANCE TYPE 3 130 S.Y. 1 O " 11,700) I 42 8-xx CEMENT CONC. DRIVEWAY APPROACH OPTION 1 21 S.Y. 45 8-m CEMENT CONC SIDEWALK - STREET 115 S.Y. -7 Schedule B Subtotal = `1 7 6 S• b0 Schedule B Total = y 7T 6 �o 00 Total Bid Price (Schedule A + Schedule B) = o • $840,793.17 Kittitas County Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents