Loading...
HomeMy WebLinkAboutAmendment No 2 _07312024Kittitas County Solid Waste Programs 925 Industrial Way, Ellensburg, WA 98926 Telephone: (509) 962-7542 July 30, 2024 Parametrix Attention: Tiffany Neier 60 Washington Avenue, Suite 390 Bremerton, WA 98337 RE: Amendment No. 2 to Professional Service Agreement This Amendment will amend Task 2, 4, 7, 8, 9, and adds task 10 and 11 per attached scope of work dated June 2024, to the Professional Service Agreement for the Ryegrass Landfill Facility. Original Professional Service Agreement $237,242.40 Amendment #1 $293,109.64 Amendment #2 $186,934.76 Total Adjust Service Contract Amount not to exceed. $717,286.80 I have enclosed four copies of this change, please sign and return. Approval Kittitas County Chair Board of Commissioners Parametrix BY: BY: Name: Name: TITLE: DATE: TITLE: DATE: Parametrik Scope of Work let's create tomorrow, together Kittitas County Solid Waste Ryegrass LPL and Future Uses Amendment 02 This scope of work identifies the additional effort beyond the original scope of work for project 553- 1763-010. The following tasks included more work than anticipated due to the Department of Ecology's (Ecology's) changing regulatory requirements and additional work and meetings needed to satisfy their requirements: • Task 02 - LPL Closure Design Services • Task 04 - Evaluation of Borrow Soils for Other Uses • Task 05 - Expansion of Biosolids Land Application Area • Task 09 - Annual Environmental Monitoring Report Two additional tasks are being added to this contract to meet Ecology's requirements • Task 10 - 2024 Annual Environmental Monitoring Reporting • Task 11 - Air Monitoring and Reporting The changes in the tasks and additional items are outlined below. Schedule We are prepared to begin this project upon written authorization to proceed with the assumption of a June 2024 start. The project duration is proposed through May 2025. If the projects extend past May 2025, an amendment will be requested. • No changes to this task or budget. Objective Work under this task that has been completed includes: • Closure/Post-Closure Plan Update for changes in the Financial Assurance calculation needs Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 1 June 2024 Amendment 02 Parametrik Scope of Work • Update of proposed final fill • Update life -cycle analysis • Update closure and post -closure cost estimates • Text edits to clarify unclear portions of the 2024 plan • Description of the potential for a partial closure of portions of the landfill that have reached grade • Fill map with clear coordinates for the top of refuse • Clarification of the stormwater ditch locations • Permit submittal of the 90% Plans, Specifications and Cost Estimate for the closure of the LPL • Permit submittal of the 90% Construction Quality Assurance Plan • Multiple meetings with the regulators to determine what they were looking for in the closure documentation The only work assumed to be remaining in the task is coordination with the County, Ecology, and the Department of Health to clarify that the updates to the Closure/Post-Closure Plan were within the scope of the WAC and did not modify the substance of the existing, permitted plan. Assumptions • The assumptions for this task include: o No further design work will be completed under this task o Additional requests beyond the budget of this task will be covered under Task 08 - Unanticipated Critical Work o No additional calculations or writeups are needed under this task Deliverable • Letter explaining the updates to the Limited Purpose Landfill (LPL) Closure/Post-Closure Plan for Health This task is closed. Construction will not occur during this amendment period. Majority of this work has been completed. Additional tasks that were completed include: Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 2 June 2024 Amendment 02 Parametrik Scope of Work • Site visit to assess borrow soil at the transfer station site that is under construction for use as LPL cover soil • Review of the soil test results from the biosolids and borrow soils from the transfer station site • Mass balance to determine an approximate ratio for soils from transfer station and biosolids • Research and working with the client on how to handle permitting for using biosolids in the cover soil for the LPL closure system The last items in this task that need to be completed are: • Prepare a letter outlining the biosolids to soil ratio calculations that were completed • Review HWA's Soil Assessment Report Deliverable • Letter outlining the calculations that were performed to determine biosolids to borrow soil ratio needed to create appropriate topsoil mix for the LPL cover system. eSRk 0'q P`�-zsa �ORcsec ) This task has been completed and will be closed. This task has been completed and will be closed. Additional work to be added to this task includes: Based upon initial review of the LPL as part of the NOC application with Department of Ecology, a Tier 2 analysis of landfill gas generation from the LPL will be required. This work is being included under Task 11 of this scope. The results from Task 11 will be utilized to modify the NOC application. Modification and resubmission of the NOC application will be performed under this task with no additional budget allotment requested. Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 3 June 2024 Amendment 02 Parametrik Scope of Work 'fU - �i.4:�.L',�I��'l '') l� �� -9..� ��d�,•!vl7, !.,� J....:'� .6., ) If unanticipated, critical work activity becomes necessary that is not within the authorized scope of services, the County may authorize additional services utilizing the budget established in this task. An allowance of $10,000 has again been allocated to this task. Work that has been completed under this task include: • Assistance with measures that could be taken to dry out the leaking septage lagoon • Revised the landfill gas monitoring plan for the Balefill to comply with WAC 173-351-200 • Revised the landfill gas monitoring plan for the LPL to comply with WAC 173-350-400 • Developed a new environmental monitoring plan for the Ryegrass facility as part of the LPL permit including quarterly reporting of data • Completed first quarter perimeter landfill gas monitoring of the LPL Work for this task that was completed outside of the scope included: • Revised and updated site maps and figures showing important Ryegrass facility features related to the environmental monitoring of the LPL and the Balefill, and historical and current operations of the Biosolids program • Reviewed historical Ecology files regarding the background of MTCA cleanups for the facility • Coordinated with HWA and laboratories to compile and evaluate historical groundwater quality data • Compiled and conducted quality control and data validation of historical groundwater data • Purchased of the Sanitas® Software License and data tabulation of historical data • Uploaded historical and 2023 monitoring data into the Sanitas® software • Evaluated outliers, perform statistical analysis of the groundwater data in compliance with the EPA's unified guidance and developed upper prediction limits for the landfill • Evaluated historical sources of nitrates, background water quality, and interpretation of results • Coordinated with HWA for the first and second quarters regarding changes to the groundwater monitoring program including the updated Sampling and Analysis Plan • Started on the first quarter 2024 data validation and tabulation. This task is complete and will be closed out. Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 4 June 2024 Amendment02 Parametrik Objective Scope of Work The goal of this task is to perform, coordinate, conduct, and report for the 2024 environmental monitoring at the Ryegrass Facility for the Balefill and the LPL in accordance with the updated Environmental Monitoring Plan and WAC 173-351 and WAC 173-350-400. This work will be performed through the 2024 annual environmental monitoring report due to agencies by April 1, 2025. Activities For this task we will complete the following: • Project management and monthly progress reports • Coordinate with HWA regarding groundwater monitoring • Collect quarterly LFG measurements from 17 perimeter monitoring locations surrounding the LPL (GM-1 thru GM-8) and the Balefill (GMB-1 thru GMB-9) in accordance with the Draft LFG Monitoring Plan • Modify the 26 Balefill gas vents to add a ball valve and labcock valve for sampling • Collect quarterly LFG measurements from the 26 gas vents of the Balefill in accordance with the Draft LFG Monitoring Plan • Conduct follow-up actions in accordance with the Draft LFG Monitoring Plan if necessary • Tabulate and report LFG concentrations to regulatory agencies • Tabulate and perform data validation on quarterly groundwater monitoring data • Upload data into the Sanitas® software program and perform analysis consistent with the SAP • Prepare a report for each of the First, Second, and Third quarters. • Prepare groundwater data for submittal into Ecology's Environmental Information Management (EIM) database. • Coordinate with field staff and review sampling documentation and procedures. • Coordinate with agencies regarding quarterly groundwater and landfill gas results. • Prepare the 2024 annual environmental monitoring report. The annual report will include evaluating the data in accordance with the statistical approach presented in the Draft SAP and 2023 Annual Report Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 5 June 2024 Amendment02 Parametrik Deliverables Scope of Work Draft and Final Environmental Monitoring Reports for the First, Second and Third Quarters of 2024. The quarterly data will be submitted to Ecology's EIM database. Draft and Final Environmental Monitoring Annual Report for 2024. The final report will be submitted by April 1, 2025. The data for Fourth Quarter 2024 will be submitted to Ecology's EIM database following submittal of the final annual report. The Environmental Monitoring Reports will include: • Laboratory reports and field data sheets • A data validation summary report • Tabulated groundwater results • Time -series plots • Static water level measurements and potentiometric surface maps • Groundwater flow velocity calculations • A summary of statistical comparisons in accordance with the Draft SAP • Geochemical evaluation, including cation -anion balancing and trilinear and/or stiff diagraming noting any changes or trends in water chemistry for each well • LFG Monitoring Sheets • Tabulated LFG monitoring data suitable for quarterly reporting A draft and final summary letter report detailing the Balefill gas vent modifications Objective Based upon initial review of the LPL as part of the NOC application with Department of Ecology, a Tier 2 analysis of landfill gas generation from the LPL will be required. This results from Toxic/Hazardous Air Pollutants (TAPs/HAPs) being above the Small Quantity Emissions Rate (SQER) and Acceptable Source Impact Level (ASIL), per the LandGEM modeling. It is believed that the speciation and generation rate calculated by the LandGEM modeling is overestimating these values and thus not representative of the actual gas generation by the LPL. This work is being included to provide Tier 2 analysis of the LPL and will generate a site -specific characterization of the landfill gas generation from the LPL that will be utilized to modify the NOC application (Task 07). Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 6 June 2024 Amendment 02 Parametrik Activities Scope of Work Preparation and execution of a site -specific work plan for the sampling of landfill gas generated by the LPL. This will include work plan development by Parametrix staff as well as correspondence with Ecology to address comments prior to execution of the work plan. Execution of the sampling will be performed by Parametrix with laboratory analysis of the samples performed by a third -party laboratory. Deliverables • One draft and one final sampling work plan. • Laboratory reports of gas sampling Assumptions • Work plan will require one instance of comments and review by Department of Ecology. • Execution of work plan will occur within one 10-hour workday plus travel. • Parametrix staff will execute the field work • Additional analysis and modification to the NOC application will be completed under the existing Task 7 scope and budget. Activities • Provide input regarding processes for mixing suitable borrow soils for use in the Phase 1 Closure • Review available information regarding borrow soils to be available from construction at the new Kittitas Transfer Station. • Perform one site visit to the Kittitas Transfer Station and Ryegrass LPL for observation of the proposed borrow materials • Estimate approximate volumes of soils in the stockpiles present at the Kittitas Transfer Station on the day of the site visit • Prepare a report presenting a summary of observations, estimated volumes and considerations for processing of soils to be used in the Phase 1 Closure. Deliverables • Technical memorandum or letter presenting a summary of observations, estimated volumes, and considerations for processing of soils to be used in the Phase 1 Closure Kittitas County Solid Waste 553-1763-010 Ryegrass LPL and Future Uses 7 June 2024 Amendment 02 Parametrik Scope of Work BUDGET We estimate that the scope of services described herein will require the below budget modifications. Parametrix agrees not to exceed the budget without the County's authorization. However, if during the work, a level of effort beyond the scope of our work appears necessary, Parametrix will contact the County immediately to discuss any necessary modifications to the scope of services and/or budget estimate. The budget presented in this proposal reflects an estimate based on our current understanding of the project requirements for a scope of work developed from information provided. Parametrix reserves the right to transfer hours and budget dollars between tasks to satisfy project requirements. The budget also reflects estimated direct costs to the project. Parametrix may also transfer funds allocated for direct costs to professional/technical hours, or vice versa, to satisfy project requirements. Budget Project: 5531763010 - Ryegrass LPL & Future Uses Task: 01 - New Groundwater Monitoring Well Task: 02 - LPL Closure Design Services Task: 03 - LPL Closure Engineering Services Task: 04 - Evaluation of Borrow Soils for Other Uses Task: 05 - Expansion of Biosolids Land Application Area Task: 06 - SEPA Checklist and Critical Areas Report Update Task: 07 - Air Permitting Task: 08 - Unanticipated, Critical Work Allowance Task: 09 - Annual Environmental Monitoring Report Task: 10 - 2024 Annual Environmental Monitoring Task: 11 - LPL Site Specific LFG Sampling for NOC Application Task: HWA - HWA GeoSciences, Inc. Total Amendment Fee Fee Resulting Available Fee $- $32,513.81 $12,086.29 $1,752.40 $3,000.35 $963.59 $- $23,904.88 $8,006.86 $10,000.00 $33,137.85 $- $101,467.24 $101,467.24 $20,799.43 $20,799.43 $8,436.75 $6,404.39 $186,934.76 Kittitas County Solid Waste 553-1763-01-0 Ryegrass LPL and Future Uses 8 June 2024 Amendment 02