HomeMy WebLinkAboutAmendment No 2 _07312024Kittitas County Solid Waste Programs
925 Industrial Way, Ellensburg, WA 98926
Telephone: (509) 962-7542
July 30, 2024
Parametrix
Attention: Tiffany Neier
60 Washington Avenue,
Suite 390
Bremerton, WA 98337
RE: Amendment No. 2 to Professional Service Agreement
This Amendment will amend Task 2, 4, 7, 8, 9, and adds task 10 and 11 per attached
scope of work dated June 2024, to the Professional Service Agreement for the
Ryegrass Landfill Facility.
Original Professional Service Agreement $237,242.40
Amendment #1 $293,109.64
Amendment #2 $186,934.76
Total Adjust Service Contract Amount not to exceed. $717,286.80
I have enclosed four copies of this change, please sign and return.
Approval
Kittitas County Chair Board of Commissioners Parametrix
BY: BY:
Name: Name:
TITLE:
DATE:
TITLE:
DATE:
Parametrik Scope of Work
let's create tomorrow, together
Kittitas County Solid Waste
Ryegrass LPL and Future Uses
Amendment 02
This scope of work identifies the additional effort beyond the original scope of work for project 553-
1763-010. The following tasks included more work than anticipated due to the Department of
Ecology's (Ecology's) changing regulatory requirements and additional work and meetings needed to
satisfy their requirements:
• Task 02 - LPL Closure Design Services
• Task 04 - Evaluation of Borrow Soils for Other Uses
• Task 05 - Expansion of Biosolids Land Application Area
• Task 09 - Annual Environmental Monitoring Report
Two additional tasks are being added to this contract to meet Ecology's requirements
• Task 10 - 2024 Annual Environmental Monitoring Reporting
• Task 11 - Air Monitoring and Reporting
The changes in the tasks and additional items are outlined below.
Schedule
We are prepared to begin this project upon written authorization to proceed with the assumption of a
June 2024 start. The project duration is proposed through May 2025. If the projects extend past May
2025, an amendment will be requested.
• No changes to this task or budget.
Objective
Work under this task that has been completed includes:
• Closure/Post-Closure Plan Update for changes in the Financial Assurance calculation needs
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 1 June 2024
Amendment 02
Parametrik Scope of Work
• Update of proposed final fill
• Update life -cycle analysis
• Update closure and post -closure cost estimates
• Text edits to clarify unclear portions of the 2024 plan
• Description of the potential for a partial closure of portions of the landfill that have reached
grade
• Fill map with clear coordinates for the top of refuse
• Clarification of the stormwater ditch locations
• Permit submittal of the 90% Plans, Specifications and Cost Estimate for the closure of the
LPL
• Permit submittal of the 90% Construction Quality Assurance Plan
• Multiple meetings with the regulators to determine what they were looking for in the closure
documentation
The only work assumed to be remaining in the task is coordination with the County, Ecology, and the
Department of Health to clarify that the updates to the Closure/Post-Closure Plan were within the
scope of the WAC and did not modify the substance of the existing, permitted plan.
Assumptions
• The assumptions for this task include:
o No further design work will be completed under this task
o Additional requests beyond the budget of this task will be covered under Task 08 -
Unanticipated Critical Work
o No additional calculations or writeups are needed under this task
Deliverable
• Letter explaining the updates to the Limited Purpose Landfill (LPL) Closure/Post-Closure Plan
for Health
This task is closed. Construction will not occur during this amendment period.
Majority of this work has been completed. Additional tasks that were completed include:
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 2 June 2024
Amendment 02
Parametrik
Scope of Work
• Site visit to assess borrow soil at the transfer station site that is under construction for use
as LPL cover soil
• Review of the soil test results from the biosolids and borrow soils from the transfer station
site
• Mass balance to determine an approximate ratio for soils from transfer station and biosolids
• Research and working with the client on how to handle permitting for using biosolids in the
cover soil for the LPL closure system
The last items in this task that need to be completed are:
• Prepare a letter outlining the biosolids to soil ratio calculations that were completed
• Review HWA's Soil Assessment Report
Deliverable
• Letter outlining the calculations that were performed to determine biosolids to borrow soil
ratio needed to create appropriate topsoil mix for the LPL cover system.
eSRk 0'q
P`�-zsa �ORcsec )
This task has been completed and will be closed.
This task has been completed and will be closed.
Additional work to be added to this task includes:
Based upon initial review of the LPL as part of the NOC application with Department of Ecology, a
Tier 2 analysis of landfill gas generation from the LPL will be required. This work is being included
under Task 11 of this scope. The results from Task 11 will be utilized to modify the NOC application.
Modification and resubmission of the NOC application will be performed under this task with no
additional budget allotment requested.
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 3 June 2024
Amendment 02
Parametrik Scope of Work
'fU - �i.4:�.L',�I��'l '') l� �� -9..� ��d�,•!vl7, !.,� J....:'� .6., )
If unanticipated, critical work activity becomes necessary that is not within the authorized scope of
services, the County may authorize additional services utilizing the budget established in this task.
An allowance of $10,000 has again been allocated to this task.
Work that has been completed under this task include:
• Assistance with measures that could be taken to dry out the leaking septage lagoon
• Revised the landfill gas monitoring plan for the Balefill to comply with WAC 173-351-200
• Revised the landfill gas monitoring plan for the LPL to comply with WAC 173-350-400
• Developed a new environmental monitoring plan for the Ryegrass facility as part of the LPL
permit including quarterly reporting of data
• Completed first quarter perimeter landfill gas monitoring of the LPL
Work for this task that was completed outside of the scope included:
• Revised and updated site maps and figures showing important Ryegrass facility features
related to the environmental monitoring of the LPL and the Balefill, and historical and current
operations of the Biosolids program
• Reviewed historical Ecology files regarding the background of MTCA cleanups for the facility
• Coordinated with HWA and laboratories to compile and evaluate historical groundwater
quality data
• Compiled and conducted quality control and data validation of historical groundwater data
• Purchased of the Sanitas® Software License and data tabulation of historical data
• Uploaded historical and 2023 monitoring data into the Sanitas® software
• Evaluated outliers, perform statistical analysis of the groundwater data in compliance with
the EPA's unified guidance and developed upper prediction limits for the landfill
• Evaluated historical sources of nitrates, background water quality, and interpretation of
results
• Coordinated with HWA for the first and second quarters regarding changes to the
groundwater monitoring program including the updated Sampling and Analysis Plan
• Started on the first quarter 2024 data validation and tabulation.
This task is complete and will be closed out.
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 4 June 2024
Amendment02
Parametrik
Objective
Scope of Work
The goal of this task is to perform, coordinate, conduct, and report for the 2024 environmental
monitoring at the Ryegrass Facility for the Balefill and the LPL in accordance with the updated
Environmental Monitoring Plan and WAC 173-351 and WAC 173-350-400. This work will be
performed through the 2024 annual environmental monitoring report due to agencies by April 1,
2025.
Activities
For this task we will complete the following:
• Project management and monthly progress reports
• Coordinate with HWA regarding groundwater monitoring
• Collect quarterly LFG measurements from 17 perimeter monitoring locations surrounding the
LPL (GM-1 thru GM-8) and the Balefill (GMB-1 thru GMB-9) in accordance with the Draft LFG
Monitoring Plan
• Modify the 26 Balefill gas vents to add a ball valve and labcock valve for sampling
• Collect quarterly LFG measurements from the 26 gas vents of the Balefill in accordance with
the Draft LFG Monitoring Plan
• Conduct follow-up actions in accordance with the Draft LFG Monitoring Plan if necessary
• Tabulate and report LFG concentrations to regulatory agencies
• Tabulate and perform data validation on quarterly groundwater monitoring data
• Upload data into the Sanitas® software program and perform analysis consistent with the
SAP
• Prepare a report for each of the First, Second, and Third quarters.
• Prepare groundwater data for submittal into Ecology's Environmental Information
Management (EIM) database.
• Coordinate with field staff and review sampling documentation and procedures.
• Coordinate with agencies regarding quarterly groundwater and landfill gas results.
• Prepare the 2024 annual environmental monitoring report. The annual report will include
evaluating the data in accordance with the statistical approach presented in the Draft SAP
and 2023 Annual Report
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 5 June 2024
Amendment02
Parametrik
Deliverables
Scope of Work
Draft and Final Environmental Monitoring Reports for the First, Second and Third Quarters of 2024.
The quarterly data will be submitted to Ecology's EIM database.
Draft and Final Environmental Monitoring Annual Report for 2024. The final report will be submitted
by April 1, 2025. The data for Fourth Quarter 2024 will be submitted to Ecology's EIM database
following submittal of the final annual report.
The Environmental Monitoring Reports will include:
• Laboratory reports and field data sheets
• A data validation summary report
• Tabulated groundwater results
• Time -series plots
• Static water level measurements and potentiometric surface maps
• Groundwater flow velocity calculations
• A summary of statistical comparisons in accordance with the Draft SAP
• Geochemical evaluation, including cation -anion balancing and trilinear and/or stiff
diagraming noting any changes or trends in water chemistry for each well
• LFG Monitoring Sheets
• Tabulated LFG monitoring data suitable for quarterly reporting
A draft and final summary letter report detailing the Balefill gas vent modifications
Objective
Based upon initial review of the LPL as part of the NOC application with Department of Ecology, a
Tier 2 analysis of landfill gas generation from the LPL will be required. This results from
Toxic/Hazardous Air Pollutants (TAPs/HAPs) being above the Small Quantity Emissions Rate (SQER)
and Acceptable Source Impact Level (ASIL), per the LandGEM modeling. It is believed that the
speciation and generation rate calculated by the LandGEM modeling is overestimating these values
and thus not representative of the actual gas generation by the LPL. This work is being included to
provide Tier 2 analysis of the LPL and will generate a site -specific characterization of the landfill gas
generation from the LPL that will be utilized to modify the NOC application (Task 07).
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 6 June 2024
Amendment 02
Parametrik
Activities
Scope of Work
Preparation and execution of a site -specific work plan for the sampling of landfill gas generated by
the LPL. This will include work plan development by Parametrix staff as well as correspondence with
Ecology to address comments prior to execution of the work plan. Execution of the sampling will be
performed by Parametrix with laboratory analysis of the samples performed by a third -party
laboratory.
Deliverables
• One draft and one final sampling work plan.
• Laboratory reports of gas sampling
Assumptions
• Work plan will require one instance of comments and review by Department of Ecology.
• Execution of work plan will occur within one 10-hour workday plus travel.
• Parametrix staff will execute the field work
• Additional analysis and modification to the NOC application will be completed under the
existing Task 7 scope and budget.
Activities
• Provide input regarding processes for mixing suitable borrow soils for use in the Phase 1
Closure
• Review available information regarding borrow soils to be available from construction at the
new Kittitas Transfer Station.
• Perform one site visit to the Kittitas Transfer Station and Ryegrass LPL for observation of the
proposed borrow materials
• Estimate approximate volumes of soils in the stockpiles present at the Kittitas Transfer
Station on the day of the site visit
• Prepare a report presenting a summary of observations, estimated volumes and
considerations for processing of soils to be used in the Phase 1 Closure.
Deliverables
• Technical memorandum or letter presenting a summary of observations, estimated volumes,
and considerations for processing of soils to be used in the Phase 1 Closure
Kittitas County Solid Waste 553-1763-010
Ryegrass LPL and Future Uses 7 June 2024
Amendment 02
Parametrik Scope of Work
BUDGET
We estimate that the scope of services described herein will require the below budget modifications.
Parametrix agrees not to exceed the budget without the County's authorization. However, if during
the work, a level of effort beyond the scope of our work appears necessary, Parametrix will contact
the County immediately to discuss any necessary modifications to the scope of services and/or
budget estimate.
The budget presented in this proposal reflects an estimate based on our current understanding of
the project requirements for a scope of work developed from information provided. Parametrix
reserves the right to transfer hours and budget dollars between tasks to satisfy project requirements.
The budget also reflects estimated direct costs to the project. Parametrix may also transfer funds
allocated for direct costs to professional/technical hours, or vice versa, to satisfy project
requirements.
Budget
Project: 5531763010 - Ryegrass LPL & Future Uses
Task: 01 - New Groundwater Monitoring Well
Task: 02 - LPL Closure Design Services
Task: 03 - LPL Closure Engineering Services
Task: 04 - Evaluation of Borrow Soils for Other Uses
Task: 05 - Expansion of Biosolids Land Application Area
Task: 06 - SEPA Checklist and Critical Areas Report Update
Task: 07 - Air Permitting
Task: 08 - Unanticipated, Critical Work Allowance
Task: 09 - Annual Environmental Monitoring Report
Task: 10 - 2024 Annual Environmental Monitoring
Task: 11 - LPL Site Specific LFG Sampling for NOC Application
Task: HWA - HWA GeoSciences, Inc.
Total Amendment Fee
Fee Resulting Available Fee
$- $32,513.81
$12,086.29
$1,752.40
$3,000.35
$963.59
$-
$23,904.88
$8,006.86
$10,000.00
$33,137.85
$-
$101,467.24
$101,467.24
$20,799.43
$20,799.43
$8,436.75
$6,404.39
$186,934.76
Kittitas County Solid Waste 553-1763-01-0
Ryegrass LPL and Future Uses 8 June 2024
Amendment 02