Loading...
HomeMy WebLinkAboutResolution_Revised2024VantageHwyProspectus (2)KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: August 6, 2024 ACTION REQUESTED: Request to Approve a Resolution authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the 2024 Vantage Highway Paving CRP 320-24. BACKGROUND: In April, Kittitas County was informed that there may be a surplus of Surface Transportation Block Grant (STBG) funds available to Local Agencies that have shovel ready projects able to obligate funding by mid -September of this year. Public Works identified the repaving of Vantage Highway from No. 81 Road (MP 6.56) to the Old Sunset Highway (MP 11.17) as a project that meets the criteria of this funding. The project design is being performed by Kittitas County Public Works. This project will require a 13.5 percent match in local funds for construction. The current estimated total construction cost of the project is $2,461,000.00 with $332,000.00 being the local match. Public Works is preparing to advertise for construction in October 2024, for construction in Spring of 2025. To obligate the Federal funds through WSDOT for the project, the Local Agency Federal Aid Project Prospectus needs to be signed and approved by the Chair of the BOCC. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the 2024 Vantage Highway Paving CRP 320-24. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Cameron Curtis, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2024 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE 2024 VANTAGE HIGHWAY PAVING, CRP 320-24 WHEREAS: Public Works has received notification of State Transportation Block Grant (STBG) redistribution funding for the 2024 Vantage Highway Paving Project; and WHEREAS: Kittitas County Engineering staff is currently finalizing design of construction plans for advertisement; and WHEREAS: In preparation to advertise construction phase work in 2024 Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for construction; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the 2024 Vantage Highway Paving, CRP 320-24. DATED this 6th day of August 2024, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Attest: ❑ Clerk of the Board- Julie Kjorsvik Laura Osiadacz, Vice -Chairman ❑ Deputy Clerk of the Board- Mandy Buchholz Cory Wright, Commissioner AIW Washington State Department of Transportation Prefix Federal Aid P"ect Number Local Agency RC2299/CRP 320-24 Project Number Local Agency Federal Aid _ Project Prospectus Route ( ) Date 7/30/2024 Agency CAAgency Kittitas County Public Works W Yes [INo Project Title 2024 Vantage Highway Paving Project Termini From -To 6.56 1 DUNS Number 01-020-2547 WSDOT Federal Employer 91-601349 Use Only Tax ID Number Federal Program Title _Z 20.205 ❑ Other , Start Latitude N 47.000559 Start Longitude W 120.412095 End Latitude N 47.001247 End Longitude W-120-315203 Nearest City Name Project Zip Code (+4) 11.17 Ellensburg 98926-9081 Begin Mile Post End Mile Post Length of Project 1 Award Type 6.56 11.17 4.61 ✓❑ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 6.56 11.17 ! 19 Kittitas WSDOT Region Legislative District(s) - Congressional District(s) Urban Area Number South Central Region 13 8 Phase Total Estimated Cost Local Agency Fundina P.E. _ ___-- R/W Const_._ 2,461,300.00 332,300.00 Total 2,461,300.00 332,300.00 (-- Phase Start Federal Funds I Date 2,129,000.00 2,129,000.00 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 28' - 42' 2-3 Existing roadway structure is failing and in need of rehab. 2024 Year Description of Proposed wom Description of Proposed Work (Attach additional sheet(s) if necessary) Grind and overlay of asphalt on Vantage Highway within the existing pavement limits along with temporary and permanent pavement marking for repair, rehabilitation, and preservation. Local Agency Contact Person Darren Case Mailing Address 411 North Ruby Street, Suite 1 By --- Project Prospectus I DOT Form 140-101 Revised 01/2022 Title County Engineer Title Phone Construction Manager 509-962-7019 City State Zip Code Ellensburg WA 98926 Approving Authority - — Date"%k�� -- Pa Previous Editions Obsolete y tas County Public Works r �ProjectTiflaentj Date ge Highway Paving 7/30/2024 Type of Proposed Work _ Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 28' 2 ❑ Reconstruction ❑ Pedestrian / Facilities ❑✓ 2-R ❑ Railroad ❑ Parking ❑ Other ❑ Bridge ---- Geometric Design Data__ — - Descri_p_tion _ Through Route Crossroad __ _ ❑ Principal Arterial ❑ Principal Arterial Federal ❑ Urban ❑ Minor Arterial ❑ Collector ❑ Urban ❑ Minor Arterial Collector Functional ❑✓ Rural � Major Collector ❑NHS � Rural � Major Collector ❑NHS Classification ❑ Minor Collector ✓0 Minor Collector ❑ Local Access _ ❑ Local Access f Terrain _ ❑✓ Flat ❑ Roll ❑ Mountain W Flat ❑ Roll ❑ Mountain Posted Speed 150 mph Design Speed 50 mph Existing ADT 376-1983 Design Year ADT _ _ - Design Year Design Hourly Volume (DHV) _ Performance of Work Preliminary Engineering Will Be Performed By County Construction Will Be Performed By Contract Environmental Classification ❑ Class I --Environmental Impact Statement (EIS) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreement ❑ Class III - Environmental Assessment (EA) j ❑ Project Involves NEPA/SEPA Section 404 L— Interagency Agreements Environmental Considerations Others Contract 100 Class II - Categorically Excluded (CE) ❑ Projects Requiring Documentation (Documented CE) Form Revised 01/2 140-1022 Previous Editions Obsolete Agency 100 Agency Page 2 rK Project Title Date as County Public Works 2024 Vantage Highway Paving 7/30/2024 Right_o_f Way ❑✓ No Right of Way Needed _ ❑ Right of Way Needed *All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities ❑✓ No utility work required ❑ All utility work will be completed prior to the start f th t t' t act Railroad Z✓ No railroad work required ❑ All railroad work will be completed prior to the start of o e cons ruc ion con r the construction contract ❑ All utility work will be completed incoordination ❑ All the railroad work will be completed incoordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project L rFAA Involvement Is y airport located within 3.2 kilometers I Remarks miles) of the project? ❑ Yes ❑✓ No This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 01/2022 Previous Editions Obsolete