HomeMy WebLinkAboutResolution_Revised2024VantageHwyProspectus (2)KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: August 6, 2024
ACTION REQUESTED: Request to Approve a Resolution authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the 2024 Vantage Highway Paving CRP
320-24.
BACKGROUND: In April, Kittitas County was informed that there may be a
surplus of Surface Transportation Block Grant (STBG)
funds available to Local Agencies that have shovel ready
projects able to obligate funding by mid -September of this
year.
Public Works identified the repaving of Vantage Highway
from No. 81 Road (MP 6.56) to the Old Sunset Highway
(MP 11.17) as a project that meets the criteria of this
funding.
The project design is being performed by Kittitas County
Public Works. This project will require a 13.5 percent
match in local funds for construction. The current estimated
total construction cost of the project is $2,461,000.00 with
$332,000.00 being the local match.
Public Works is preparing to advertise for construction in
October 2024, for construction in Spring of 2025.
To obligate the Federal funds through WSDOT for the
project, the Local Agency Federal Aid Project Prospectus
needs to be signed and approved by the Chair of the BOCC.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
2024 Vantage Highway Paving CRP 320-24.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Cameron Curtis, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2024 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID
PROJECT PROSPECTUS FOR THE 2024 VANTAGE HIGHWAY PAVING, CRP 320-24
WHEREAS: Public Works has received notification of State Transportation Block Grant (STBG)
redistribution funding for the 2024 Vantage Highway Paving Project; and
WHEREAS: Kittitas County Engineering staff is currently finalizing design of construction plans for
advertisement; and
WHEREAS: In preparation to advertise construction phase work in 2024 Kittitas County Public Works
is requesting the Washington State Department of Transportation release the federal
funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby approve the Chair's signature on the Local Agency Federal
Aid Project Prospectus for the 2024 Vantage Highway Paving, CRP 320-24.
DATED this 6th day of August 2024, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Laura Osiadacz, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissioner
AIW
Washington State
Department of Transportation
Prefix
Federal Aid
P"ect Number
Local Agency RC2299/CRP 320-24
Project Number
Local Agency Federal Aid
_ Project Prospectus
Route ( ) Date 7/30/2024
Agency CAAgency
Kittitas County Public Works W Yes [INo
Project Title
2024 Vantage Highway Paving
Project Termini From -To
6.56
1
DUNS Number 01-020-2547
WSDOT Federal Employer 91-601349
Use Only Tax ID Number
Federal Program Title
_Z 20.205 ❑ Other ,
Start Latitude N 47.000559 Start Longitude W 120.412095
End Latitude N 47.001247 End Longitude W-120-315203
Nearest City Name Project Zip Code (+4)
11.17 Ellensburg 98926-9081
Begin Mile Post End Mile Post Length of Project 1 Award Type
6.56 11.17 4.61 ✓❑ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
6.56 11.17 ! 19 Kittitas
WSDOT Region Legislative District(s) - Congressional District(s) Urban Area Number
South Central Region 13 8
Phase
Total
Estimated Cost
Local Agency
Fundina
P.E. _ ___--
R/W
Const_._ 2,461,300.00 332,300.00
Total 2,461,300.00 332,300.00
(-- Phase Start
Federal Funds I Date
2,129,000.00
2,129,000.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
28' - 42' 2-3
Existing roadway structure is failing and in need of rehab.
2024
Year
Description of Proposed wom
Description of Proposed Work (Attach additional sheet(s) if necessary)
Grind and overlay of asphalt on Vantage Highway within the existing pavement limits along with temporary
and permanent pavement marking for repair, rehabilitation, and preservation.
Local Agency Contact Person
Darren Case
Mailing Address
411 North Ruby Street, Suite 1
By ---
Project Prospectus
I
DOT Form 140-101
Revised 01/2022
Title County Engineer
Title Phone
Construction Manager 509-962-7019
City State Zip Code
Ellensburg WA 98926
Approving Authority
- — Date"%k��
-- Pa
Previous Editions Obsolete
y
tas County Public Works
r
�ProjectTiflaentj Date
ge Highway Paving 7/30/2024
Type of Proposed Work
_
Project Type (Check all that Apply)
Roadway Width Number of Lanes
❑ New Construction ❑ Path / Trail ❑ 3-R 28'
2
❑ Reconstruction ❑ Pedestrian / Facilities ❑✓ 2-R
❑ Railroad ❑ Parking
❑ Other
❑ Bridge
----
Geometric Design Data__
—
-
Descri_p_tion _
Through Route
Crossroad
__ _
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban ❑ Minor Arterial
❑ Collector
❑ Urban ❑ Minor Arterial
Collector
Functional
❑✓ Rural � Major Collector
❑NHS
� Rural � Major Collector
❑NHS
Classification
❑ Minor Collector
✓0 Minor Collector
❑ Local Access
_ ❑ Local Access
f Terrain _
❑✓ Flat ❑ Roll ❑ Mountain
W Flat ❑ Roll ❑ Mountain
Posted Speed 150 mph
Design Speed 50 mph
Existing ADT 376-1983
Design Year ADT _ _ -
Design Year
Design Hourly Volume (DHV) _
Performance of Work
Preliminary Engineering Will Be Performed By
County
Construction Will Be Performed By
Contract
Environmental Classification
❑ Class I --Environmental Impact Statement (EIS)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
❑ Class III - Environmental Assessment (EA)
j ❑ Project Involves NEPA/SEPA Section 404
L— Interagency Agreements
Environmental Considerations
Others
Contract
100
Class II - Categorically Excluded (CE)
❑ Projects Requiring Documentation
(Documented CE)
Form Revised 01/2 140-1022 Previous Editions Obsolete
Agency
100
Agency
Page 2
rK
Project Title Date
as County Public Works 2024 Vantage Highway Paving 7/30/2024
Right_o_f Way
❑✓ No Right of Way Needed _ ❑ Right of Way Needed
*All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities
❑✓ No utility work required
❑ All utility work will be completed prior to the start
f th t t' t act
Railroad
Z✓ No railroad work required
❑ All railroad work will be completed prior to the start of
o e cons ruc ion con r the construction contract
❑ All utility work will be completed incoordination ❑ All the railroad work will be completed incoordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
L
rFAA Involvement
Is
y airport located within 3.2 kilometers I
Remarks
miles) of the
project? ❑ Yes ❑✓ No
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete