Loading...
HomeMy WebLinkAbout2024-07-08-minutes-public-works-community-development-services-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works -Community Development Services Study Session Regular Meeting Monday July 8, 2024 -1:30 PM BoCC Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. CDS Ranch at Swauk Creek Development Agreement 4. Public Works Winch Road Vacation 5. Public Works Bowers Field T-Hangar Leasing and Wait List Policy 6. Public Works Upper County Traffic Calming 7. Public Works Broadband Planning 8. Other Business - No Action to be taken 9. Concluded Created on 7/3/2024 12:40:55 PM KITTITAS COUNTY PUBLIC WORKS -COMMUNITY DEVELOPMENT SERVICES STUDY SESSION MINUTES COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 Regular Meeting MONDAY 1:30 PM July 8, 2024 Board members present: Chairman Brett Wachsmith, Vice Chairman Laura Osiadacz, and Commissioner Cory Wright. Others: Josh Fredrickson, Cameron Curtis, Rebecca Cruse, Public Works; Jessica Miller, Chad Bala, Jamey Ayling, Community Development Services; 1 member of the public. At 1:30 PM Chairman Brett Wachsmith opened the Public Works and Community Development Services Study Session. CITIZEN COMMENTS Terry LaRue had comments for drafting the T-Hangar Policy and recommended allowance of temporary use of T-Hangars. RANCH AT SWAUK CREEK DEVELOPMENT AGREEMENT Jamey Ayling requested the Board of County Commissioners set a public hearing to consider the Ranch at Swauk Creek Development Agreement. Staff was directed to bring forward enabling documents for consideration and to set public hearing for August 6, 2024. WINCH ROAD VACATION Cameron Curtis briefed the Board of County Commissioners on the right of way history of roads in Lanigan Springs and unimproved Winch Road. Discussion pursued. Direction to staff to prepare enabling documents to set a public hearing. BOWERS FIELD T-HANGAR LEASING AND WAIT LIST POLICY Josh Fredrickson briefed the Board of County Commissioners on draft of T-Hangar waitlist policy and development of a consistent process for administrators and prospective lessees. The Board of County Commissioners directed staff to prepare enabling documents for consideration. UPPER COUNTY TRAFFIC CALMING Josh Fredrickson briefed the Board of County Commissioners on implementation of traffic calming measures recommended for identified roads in in Upper Kittitas County by Fehr and Peers. Josh Fredrickson provided the actions and installations Public Works completed. Discussion was had identifying why certain measures are not effective in rural or unincorporated areas such as Kittitas County due to snowplowing which will conflict with implementation. Josh Fredrickson answered questions about the holiday weekend traffic counter placements and stated these are to evaluate the level of traffic bypassing I-90. 2024-7-08 MINUTES BROADBAND PLANNING Josh Fredrickson briefed the Board of County Commissioners on grant funding for broadband expansion through the Public Works Board, the Washington State Broadband Office and through federal funding of BEAD. Staff is looking for a contractor to design, build, manage and provide service for each project. Josh Fredrickson stated public works drafted a statement of qualifications to help meet the needs of the county. Meeting concluded at 2:03 PM KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON 1 6 C"IL Rebecca Cruse, Administrative Brett Wachsmith, Chairman Assistant 2024-7-08 MINUTES KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES 411 N. Ruby St., Suite 2, Ellensburg, WA 98926 CDS@CO.KrnnAS. WA.US Office (509) 962-7506 r - — - -_- _ _wl AGENDA STAFF REPORT AGENDA DATE: July 8, 2024 ACTION REQUESTED: Request to set a public hearing for August 6, 2024 at 2:00 pm for the Board of County Commissioners to consider the Ranch at Swauk Creek Development Agreement (DA-24-00001). BACKGROUND: Mike Jones, authorized agent for Ranch at Swauk Creek, landowner, submitted an application for a 30 year development agreement for land that is zoned PUD. The proposed development was initially approved in 2006 under Ordinance 2006-59. In conformance with the Development Agreement procedures the applicant has provided a summary of the project with a request to set an actual project deadline date of 30 years all due to the ongoing processes, that are out of the applicants control, in obtaining and meeting conditions placed upon this project along with fluctuations in the financial markets. Kittitas County Community Development Staff requests that the Board of County Commissioners set a public hearing for August 6, 2024 at 2:00 pm to hear public testimony and consider the Ranch on Swauk Creek Development Agreement. INTERACTION: Community Development Services and Board of County Commissioners RECOMMENDATION: Approve request to set a public hearing for August 6, 2024 at 2:00 pm for BOCC consideration of the Ranch at Swauk Creek Development Agreement. ATTACHMENTS: Illustrative Master Plan LEAD STAFF: Jamey Ayling, Planning Manager COMMUNITY PLANNING - BUILDING INSPECTION - PLANS EXAMINATION - ADMINISTRATION - PERMIT SERVICES EXHIBIT C Ranch Road _ Swank Creek BurkeRoad �— State Hbt-ay 97 PUD Boundray Rghkey 97 ----- Equestrian Center go�sa�° F' F+ r primary Entrance Area > _ ExISMp irdgdon Dfmh 6 Pond Open SPA (26) Ho MUM - Guest Area ��we 7) Hamesibs ( 14) Recarded Platted Lots (7) Hwrteelm Common Open Space t (8) HDmesitea I I RV Campgotnd&E end Equestlancerw i(43 ) Homesites in Fre Affected area (12) Homealla u...---,.=--- Re Affected Area ILLustratLVe MAster J>Lc w .4 t>taN+�ud t.ua.tt aevttopwi.ev�.t o Ktttttas Go�cwta, wasl�twgtow RUD. Master Site Alan DroMnq Date. July2t, 2Di6 Design Group t� 9"„Fwt FtLA o P-*KSu hcW Q 7 P 3W.M W56 E : rW �ykmt6Rr�ROn Gan 71 JHl.R0.6S0 EmY: rp5yrylfnl@WRLB%Jgi lm ( 21 ) Homeskes ( 62 ) HoMO= ( 7) Homeeftes KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July 8, 2024 TOPIC: Winch Road Right of Way Proposed Vacation ACTION REQUESTED: Direct Staff LEAD STAFF: Cameron Curtis RECOMMENDATION: Schedule a public hearing receiving testimony regarding the proposed vacation of Winch Road Right of Way. BRIEFING SUMMARY: • In 2021, the Board of County Commissioners adopted the roads within Lanigan Springs Plat • An Active Code Enforcement Case against parcels no. 585035 and 475035 prompted Public Works to locate the Right of Way associated with Winch Road. • The road will require substantial capital improvements to meet county standards. • Road vacation may be considered, allowing adjacent properties to construct the access Winch Road provides access to parcel no. 575035. BACKGROUND: In the mid- 1970s, a record of survey was used to create the "unplatted" subdivision of Lanigan Springs. Easements were created supporting the internal road network. The individual tracts of land eventually came to the County via tax title foreclosure. The record of survey does not convey nor dedicate the land supporting the roadway network to the County or to anyone else. Increasingly, lending institutions are becoming aware of similar access issues throughout Kittitas County. Individuals have attempted to buy these lands as tax title properties through the Treasurer's Office. DISCUSSION: In 2021, the Board of County Commissioners adopted the roads within Lanigan Springs Plat, as shown in Exhibit 1, onto the County Road network. Through this previous action, the Board of County Commissioners protected County residents by ensuring private individuals were not able to purchase the road right-of-way as tax title for investment purposes. An active Code Enforcement Case against Nicholas Coby on parcels no. 585035 and 475035 prompted Public Works to locate the Right of Way associated with Winch Road. Page 1 of 4 Public Works "Work Session Staff Report", 2024 Mr. Coby owns parcels on either side of the right of way and has occupied the right of way for several years prior to the ROW being adopted onto the County Road Network. However, Winch Road does not function as a road, and a significant capital investment would be necessary to construct the road to current standards. The right of way provides little to no benefit to the public, and adjacent property owners would benefit by allowing them to make improvements to the road as necessary. Winch Road provides access to parcel no. 575035. Currently the parcel is accessed through an adjacent parcel accessing from Adobe Rd. Approximately two thirds of the road has not been constructed functions only as a driveway for one property owner. Right-of-way vacation at centerline would return to the adjacent property owner. Revised Code of Washington (RCW) 36.87 controls right-of-way vacation. Kittitas County Code 12. 10.0 1.0 10 references this RCW and authorizes that road vacation procedures may be initiated by either board resolution or freeholder petition. FISCAL IMPACTS: Vacation of Winch Road eliminates the demand for capital improvements from the Road Fund and benefits area property owners. ATTACHMENTS: EXHIBIT 1: Recorded survey of Lanigan Springs EXHIBIT 2: Winch Road survey conducted by Public Works Page 2 of 4 Public Works "Work Session Staff Report", 2024 EXHIBIT 1: RECORDED SURVEY OF LANIGAN SPRINGS Page 3 of 4 Public Works "Work Session Staff Report", 2024 Ml PAGE 1 OF SURVEY MAP OF UNIGAN SPRINGS (UNRA,TED) PORTIONS OF THE N�,SECTION 30, TOWNSHIP 20 NORTH, RANGE 16 EAST, W.M., I Kt ITTITAS COUNTY, WASHINGTON ��C7A1`�M2C/6£PH u.. `s 23 j u_ 4 3.R Am. 5.I 29 •b� •�� 8.3 Aam ba Tr 30 6.2 Ae« .S / AeruE.`r A 11 r i rb �� 4J1i �+ 5.3 Acn r 3zI 5.1 AR / a 8 / I5.2 Ae 26 33 5.1 A— I $ 27 5.9 A— e iJ avi �r�np��e�c ;+= 38 e —JtR3E ,,, aPi'pdez cc� 3g -- P 5.3 Ama ti c .3'bi•,,. 'as�e�li. Y4'd¢d a' 37 'tx� �•q 5.0 A— earl .. • 5 35 qs MAGa tAE 3 3-9 "5.3 A.- 5.1A— r� — mar 6.3 Aa uy 4 I 8 p ree 7,5 A— 1��3 L peT j 9me6 Ma �Da4 MIN �— SCALE 1^ - "^9K �,' . yy� ry •., t•��:1 �O �II�G •Sar SMa1 Red 2" pipe ap��'y fY IEOAY NWA5wx I NEASWW 0 216 PAGE SLIMY Mo OF UNIUN SPRINGS CUWLAMD) POUIONS OF THE Ni, SECTION - , TOWNSHIP 20 NORTH, RANGE 16 EAST,W.M., sr- 16 22 LEGAL DESCRIPTIONS FOR LANIGAN SPRINGS (unplatled) LOT 1 The portion a the Norther» Wet•ref Seel- 30, Tamsh;p 20 Noah, Rang 16 East, W.M., Klaims Ca,mry, Wa f wid See' which I, bounded by a Iin¢da, aloe m e Ewt : Beginning N the Eon quart¢. 661.9 of mid $en,, 30, thence N Or08R55 1 clang the tam point I .g raid Sedan S 667 c5 het; theca S 8them N 0 2194.5, fee,.9 the tone paint of beg;nn09 thence 5 89.22'23"W, 180.:p feet rhenc< N 0.3T/0"E, 522.94 he; .hence N 88°19'09'E, 396.74 feN; theme 105.40 fee mdi.s turn right, arc IengM 74.57 feet; It,— S O157127"E, 111,11 fear re the hoe point of b•gi,aiep. LOT 2 The portion of the Nartheat quad. N Se <t;on 33, Township 20 Noah, Range 16 East, W.M., Klnitm Cwny, Wahirghm which is bwMed by . )in. demrihd I. follows: Beginning at the End quarter comer of rid Section 30, Ihanae N 0°OB'25"E, alma the Eat boundary of mid Stele, 3D, 661.95 feet; thence 5 89°22'23"W, 1354.55 her to the hue point of bateeng; thence S 89.22'23'W, 840.00 hat; theme N Or57'27"W, 5D6.09 feN; thence 5 51°08'41"E, 197.79 fear; them. 20.00 feet mdim cqn, right, am length 13.06 feet, theme 45.00 fee mdtu, verve left, arc length 118.76 het; thence 5 R•38'IB"E, 625.51 fee; thence 5 1r0.954•E, 170.00 fear re the bee pent of b IIIMI g. LOT 3 TMr portlan of the Nertaer quarter of Seel- 3D, Township 20 North, Range 16 Ear, W.M., Kiniea. Cwnry, Wahingtae which I. bwdd by a line demrib,d a follow& Beal-1 p at the Eae quad,, comer of said Section M, thence N 0.08'25"E, a I .R the Eon Monde, of mid Section 30, 661.95 fee; thence S 89°22.23 V, 1354.55 fee; them• N 1°0954"W 170.D0 het to the ton, Fear of begieein thence N 28.41'38"W, 687.00 fee; theme N 86.17-37"W, 3D8.21 het; than,, S 18.4.57"W, 320.00 Feet; then,, 5 51•08'41"E, 111.79 Poet; thence 20.00 foot mdi., won left ea I"th 13.86 her, thence 45.00 W adios curve right, arc length 05.00 feet; thence S 72r38' 18"E, 625.51 het to the hue point of beginning. LOT That pod;on of the NEI ad th&MI el Seerion 30, Tawahip 20 North, Ro.q. 16 Set, W.M., Kirrite Cwny, Wahiepten which i, banded by a line d,,,Iwd a. follows: Begierine at the Eel q..ae comer of aid Section 3D, thence N 0.O6'25"E, .6ap tM.Eed bo.mdery of aid S.6- 30, 661.95 for; theme 5 89.22'23"W, 1354.. 55 hap them. N 1r0954-W 170.00 Net, then,, N 211r41'38'N7, 687.0D Fee; theme N 86.173TW, 308.21 Feel to ,he Irmpwro of batenf., It— N 74°35' 17"W, 905.55 feet, theme 191.28 feat mdim wive riots, m lerpth 139.75 fur; theca 5 U156115'M', 49.32 fee,; Mats 20,00 fart ado. curve left, we length 41.79 fee; them, 5 62.4T25"E, 321.73 Fear, thence 5 0.37'40"W, 112.71 feet; thence N BBr i9'09% 334.27 her, theme 165.40 foot ref a cum right, era length 117.02 feet, theme 5 51r08'41•E, 86.00 feet, thence N 18°4757"E, 32D.DO het to the roe point of Imglnnirg. LOT That portion of the NEI and the NW}of5eerle 30, Toemhip 20 North, Reg, 16 Eat, W.M., K;nite Cwnry, Wehington which b b... dad by a line demribd a, fallow. 11.9iwdn9 or the End quarter roomer of laid Sttion 30, theme N 0"08.25"E, along the Set boundary of mid Sewle 3D, 661.95 fear; thence 5 89r22'23"W, 1354.55 fee; rhenc< N Ir0954"W 170.00 fears thence N 28°!1'38"W, 687.00 feN; Menge N SWIT37"W, 308.21 feet ro Ma trve pent of be im; them . N; 12'31rW, 440.05 feN; Gent. S 64.16'29"W, 140.00 feel; therm, 1 58. 39 foot radio turn right, am I"rh 117.64 her, theme N 73- 10, 11"W, 210.55 far, theme 214.65 fear adim turn right, arc IergM 119.51 fee, than,, N 42r53'51"W, 92.78 feet; etth em: foot radio, curve left, am 1-glh 40.55 fee; then,. S 56r18'29"W, 137.78 feet, thence 20.00 foot redl., curve left, am length 29.75 feel; that, S 2B°54'41"E, 104.80 fee; ,bete 191.28 feat redw. won right, am langth 146.86 feet, thee. S 74°WIPE, 005.55 feet to the toe pv;rd of bWienirg. LOT That portion of its N.Itheet quarter of Stelae 30, Tenwhip 20 North, Range 16 Eat, W.M., KIM- Cwnry, Wehingran which;. bwndd by a If.. dacri6d a fellow.: Begireing of the East qu.rt,r mew of mid Sea1;on 30, theca N O.081251E, .Ia rg the Eat bamdery of mid 5a0ion 30, 661.95 feet, thence S 89°2273"W, 1354.55 Feet; the., N 1°09544W 170.OD Feet; theme N 28-41'38"W, 6B7.0D fee ta the hue point of beginning; thence N 86.17-37"W, 308.21 Feet, them, N 9°72'31•W, 440.05 feet, the,- N 64.1929"E, 319.35 her, theme 329.56 foot mdim won right, arc length 91.07 feel; thea: N 80.06'29"E, 111.39 Mt, A= 20.00 fear adim ern right, am lane11120 .63 feet; rher. e 5 11.34'9"W, 639.27 Fecr to Its tea point of beginning. LOT 7 TMr e C tyrM Na,hear gWoder of ra d b 30, - d..,I 20 Nath, Range 16 Ear, W.M., K;If Cwny, W f.6don which 0 bcudd N a Iine 'E, .IbI.d a . e t : Beginnla d 1M End q n r comer of said Seeion 30, drrm¢ N D°OB•25"E, elect, Me Ead bwdory timid S.diw 30, .561.95 fee; +hence 5 89r22'23"W, 1354.55 het, theme N 1•0954-W, 170.00 fee; rhea thence N 21"4l'38"W, 523.00 fee to a -.point of begleinW then. N 28-41'38"W, 164.00 fed; thence N I1•34'57"E, 639,27 Net, thence 124.12 fear mdue won l.ft, ea IepA 103.94 feet; thence S 65°50'54"E., 378.OD feet; then. 358.64 fwr radius - Hot' arc length 91.78 Feet, thence S 47.24'52"W, 729.61 feet to Me woe point of bapineng. LOT 8 Th., Felten of the Igathemt quaaw of Section 3D, Towah;p 20 Noah, Rege 16 EI0, W.M., Kirtite Cwny, Wwh;ngron wHeh h bwdd by o Ilea d sertbad e. F,11w B onrleg a, the East quarter comer of mid Seodan 30, theme N 0°08125-E, along the Eat bae edey of aid S. Plan 30, 661.95 feet; thence S 89.22'23"W, 1354.55 fee, theme N 1.0954"W 170.00 fear; the- N 28.41138"W, 320.00 feet to tg rh he ton, pole of begianineum N 2r41'38"W,' 203.00 feel thence N 47°24'52"E, 729.61 feet; therm, S 51°11'12"E, 221.13 feel thence M.96 foot mdue won right, am length 66.31 het; thence 5 0r10159"W, 143.43 fee., theme S 6p33'37"W, 720.20 feN to the m,e poll, of beg;none. LOT That partial of the Northamo quarter of Sere 3D, Tewr.hip 20 N.rM, Rape 16 East, W.N. Kinite Cm in Wahingron which is bwdd by a line damri6d a follows: Beginning at the Eon quarter comer of laid Section 3D, them. N 0.0829'E, along Its Boot bwndary of aid Seriae 30, 661.95 felt; thence 5 89.22'23•W, 1354.55 fee; them- N 1°0954eW 170.00 feet m the hue paint of beginning; thence N 28.41'38"W, 320.00 feet thence N 62.33'37"E, 720.20 feet; theme 268.21 het radius carve right, om length 89.11 her; thence S 9°13'09'M19, 76. 59 her; lham. 103.04 feet mdue won left, am length 123.71 fee; thence S 49.34'01'T, 166.70 feet; than,, 20.00 foe redo, wm right, art Ieg,h 13.86 feet, theme S 70.06'18"W, 648.15 Feet to the tone point of 6a0ineinp, LOT 10 TMr portion N the Nartheed'Wetw of 5ectiw 30, TmxAip 20 Narh, Range 16 Eal, W.M., Kinim, Coonty, Wmh;ngron which is bwdd by a Ilea d.ladb.d m fof lava: Beginning a Seeiathe Ead quarter wmer ; mid Section 30, 3-W, N .00fee t, clap the Eat 6wdary of aid them. 30, 661.95 feN; thence S Bth .. N 1 435.00 fee ro the Imo pole. of N Mroeg; theca S r; then,, .00 f fee, rMnca N left, am l.6, 170.22 fee; thence N 4*43'08"E, 6/8.15 fear; .hew 45.OD fear adus verve left, von length 90.22 feN; .home 5 34.43'03'E, 427.24 Feat ro the boa Feint of b.Sinnhg. PAGE 3 OF 5 LOT Il Th. Portion of the Norther, goals of Section 3D, Townhip 20 North, Range 16 Eart, W.M., Kittim, Cwny, WeNneton which ;, banded by a Ilse d,ladbed a failows: BepimiN a the Earl geed., comer of raid Seation 30, them, N 0.08,25•1, .fang the Eet bwndary of laid Secrien 30, 661.95 feet la the hue Point of bplmlep; thee. N Or08'25"E, 307.00 feel; thence 5 89r33.31"W, 659.92 fee, throw 45.00 feet adiu, won right, arc length 41.92 fee; thence S 34.43103"E, 427.24 feet, therm. N 89.22'23"E, 435.00 feel re the tone point of bsgfeinp. LOT 12 The portie oft" No themt quarter of Stefan 30, Towruhip 20 North, Range 16 Eat, W.M., Kiaile Cwny, Wahingl-which I. b-Idd by a Ilea demrlbad an fdlom: Badenine al the N-heat caner of mid Section 3D, thrice S 0 •08'25"W, elan, the Eet, boadery.f raid Section 30, 1321.84 feet m the rive point of beginning; thence 5 0.08'25"W, 277.Wfeet, Memo 5 B9r33'31"W, 659.92 fear; theme 45.00 feN mdim wm left, am I"th 71.62 Fc; thee. 2D.DO foot mdu. won right, arc I"th 13.86 feet, Ihena. N 49.34'Ol"W, 106.70 feet; them. 43.D4 fee dF., am. right, am Ien91h 51.67 he; thence N.9rl3'09rE, 76.59 feet; theme N 89r4945% 832.12 fee. to the tone paint of beginning. LOT 13 That poatan of the North- q adw of Section 30, Towmhlp 2D North, Rage 16 Eel, W.M., K;rtime Canny, We,hingron which is bamd.d by o line deee,ibed e, follow.: Bagianinp of the Northman comer of mid SMion 30, theme 5 0r0t25"W, clang the Ea,t bwdory of mid Section 30, 895.84 feel ro the Mwpoinl of b.pinnine; ,heat. S Or06'25"W, 426.00 fee; theme 5 89.4945"W, 932.12 hat, f6ena. 328.21 heat radio, wee left, am length 109.05 het; thence N 68.24'37"E, 876.35 feet to the tone point of begi-IT. LOT 14 TM, Portion of 16 Netha.rt quarter of SeeOe 30, Tavahlp 20 North, Ranee 16 Eat, W.M., K1"Ite Cwny, WwWnptan which 1, I a dd by a lie, de -Abed a III— Beginning at the North -el earew of mid Stria. 3D, thence 5 0'08'26"W, clap the Ead bwnd.ry of aid Section 30, 895.84 het; thence 5 6Br24'37"W, 530.00 feet ro the tnmpaint of beginning; theme S 6W24'37"W, 346.35 fee; thence N Or10'S9"E, 143.43 Feet; them, 133.96 foot rod;.. verve left, am I-0h 120. 11 het rho¢. N 51.11.12"W, 221.13 fee; thence 418.64 feel radius wm left, am lapth 107.13 few; theme. N 69'38'05•E, 570.39 her, them. 5 9°52'D2"E, 567.17 feet to the roe point of b.gia;ep. LOT 15 The portion of the Nodhad pmaer of Seetian 30, Tawndip 20 North, Range 16 Foe, W. M., Kinitm Cwny, Woehingme which;, beondd by. Iine den i d a fall awes Beginning at the Narthmt wmer.f laid S,elan 3D, thence 5 Or0B'25'W, along the See bwndey of aid Sea;on 30, 895.84 fee, theme 5 6rU37rW, 530.O1) fee; Net- N 9°52'02"W, 567.17 feet to the feu, point of beginning; thence N 9°5702'N, 270.00 fee; thence 5 76°2P49"W, 171.83 feat; theme 4M. 18 fee radial aurae left, am Iepth 93.53 feet; theme 5 64.36' 12rW, 423.29 feel; theme 397.28 foot mdh, won right, we length 107.51 Mr; theme SWOW29"W, 108.38 heel; theme 2D.OD feN maim them, left, eon length 40.22 Fee; rhe, 64.12haN radius urve left, ea length 32.46 feet; therm, S 6A5054"E, 375.00 fee; the,- N 65-MOS"E, M.39 he le the Inn, point of begianinp. LOT 16 That portion .f the N-fl-quarter of Seo6co M, Towmh;p 20 North, Rerg. 16 Ear, W.M., KitHta Cwny, WbMiegme which is boarded by . lim demribd w fellow,: Begnniip at the Northead cmer of mid S,eivn 30, thence 5 0°DB'25N7, alas the Emt bwrdory N mid Seerlon 30,7895.94 he; thence S 6B°2!'37"W, 257.00 feet he the feu. Wt..f bp;e;g; theme S 68°2437"W, 273.00 led; N 9'52'02'W, 837. 17 feet; theme 195.95 fee radio. won right, .m Iegrh R5.35 foe; theme S 78°051"E, ISD.37 fee,; thane 127.13 fee maim w.v. left, am IepIh 120.BB feet; then,, 5 4.11'02% 73D. 50 feet M the w..pal,e of begfnnirg. LOT 17 The pertlon of the Nertheod water of Section 30, Teeahp 20 North, Smile 16 East, W.M., Kinaa Cwnry, Waehingron whkh 1. bwded by a Ilse d.mrthd d feilowe: Beginning at the Nad.ed mouser of mid S-flon 30, er which point 1, the fuse pole M IF bepinng; theca 5 0.08'25"W, 895.84 Fee; thence S 68r24'37"W, 257.00 feet; them. N 4.11'02"W, 730.50 feel thence N 46°4926"E, 382.42 fee; the-. N 89° 18'308E, 15.58 feN to the rive poiM of b.gie,;ne. LOT 18 TMr pert'ron of the Nolhod wet -,of Seeian 30, Tamsh;p 20 North, Rana 16 Ear, W_M., Kilirus Cwny, Wwhingron which Is hounded by a Iine dmA d a fallow.: Bodrmhg at the North.ad came of said Seolion 3D, theme S 89.It W-NV, 104.42 fall m the 1a. poll of b.ginnay thence 5 89rIW30rW, 1140.58 Feel thence S e•29'30-E, 399.62 fee; thane N 6476'12"E', 295.29 fee; thence 516.18 foe mdim won right, am Iegrh 105.80 feet; ,berme N 7B•2&49"E, 171.0 he; It• 255.95 fwr rd'n. tun. right, am 6l lh 111.48 Feet; them, S 78.41151"E, 150.37 fee, thence 67.13 fear mdlw ern left, am I"th 63.83 feel; them. N 46.4926"E, 316.90 het to the ruse pent of beginning. LOT 19 The pooran of the Northert goat,, of Section 30, Towmhip 20 North, Raze 16 Call, W.M., Klhitee Owny, WoM eSme whkh h beaded by a Iine d¢mribd a fellows: Beeinnlre at the NMhemt comer of mid Section 30, thence S 89r IB'30'W, along the Nedh bwmie, of mid Seel- 30, 1245.00 her to the pea point of baglnninp; the-. S Or 18'30"W, 435.00 fee; theme S r 1954rE, 520. 14 hat, Mee. N 80ww-E, 275.17 het,, Ihm, 337.28 foot mdim won left, am Iagth 91.27 feet theme, N 64.3912"E, 128.00 her, .hence N 8•29'30'W, 399.62 fear to the wvepainf of &pinning. LOT 20 The partial of the Northeaf quarter of $action 30, Toemhip 20 North, Rage 16 Ead, W.M., Kitt;me Cwny, Wehiapfen which;, bwndd by a It.. d.mdbd w hlfew,: Beginning N the N-1 e e Brener of laid Sttion 30, then. S 8P Iw30"W, along M, North imu dwy of mid Seelon 30, 1683.00 het m Ma tone Woe of beobmirg rharc, 5 89r 18.30•W, 482.00 het; thence 5 17r1951"E, 660.42 font; then e N 64"16'29"E, 174.35 fM; then.. 389.56 feN mdim ripM, am IerpM 7G7.65 fee; Mmce N 80°O6'29"E, fB.OD Fee; there e N 2• 1954"W, 520.14 feet he the true point of 6eg;-1.9. LOT 21 The porlon of the Northeast quamr of Section 30, Taen,hip 20 Narh, Rage 16 Eel, W.M., Klnitm Gooney, Wwh;ngtm which 1, bwddby a BM daadbd m fellow.: Bednniw a the Northma eomw of mid -,1.. 30, theme 5 89• I8.30"W, along the North baelley of said Sealien 30, 2162"' het to Me tone point of bnl-iN; theme 5 BP IS'30"W, 116.00 fee'; en thce S IT IV 04"W, 73D.05 Net; then,. S 73°I0'11"E, 210.55 feel thence 98.39 foot redlus curve left, am length 73,08 feel Mew N 64.16'29"E, 285.W her, these N I7-1951"W, 660.42 Feet to the taapo;rat of beSin.hp. LEGAL DESCRIPTIONS FOR LANIGAN SPRINGS ( vnplotled) LOT 22 Thal Porflm of the North half of Section 30, Townhip 20 Nedh, R,mge 16 Eoe, W.M., ,he N s Gwnty, Wmhine d which is bwndd by a line dncribed 16 fellW, long of ,he Nonhmsr wmer of told - 3D, 2280.00 8 -d rve to i theme S -,mint of 30"W, along the SNorth 89-bemdary of aid Section e e S0!23for w the .79 poet, ofome 88.7 theme S BYIght, , I3IA, be; theme h0,•2 S42-,'51"E, he; thence Bono - Toot 5111 rn right, arc lamth 125.16 fear thence 5 42N I7' "E, 4-E, 7 hey ,hence 154too (oor naive ern IeR, .m le¢rh 81.81 bar theme N IT 10'O6"E, 730.05 feet b the hue point of bgimirg. LOT 23 The portlm of the Neokweo gwnor of Seen- 30, 7-hip 20 North, Ronga 16 Emt, W.M., Kifti No Cwnry, Wmhingnm eMlh 4 boedd by 0line dewribd m Flung: 8eg1ane at the North -come, of mid Seel- 3D, theme N 8VUP30'E, .long the North boundary of mid Seca- 30, 1819.02 feet w the Me Point of beginning; theta. N 89' 18'30"E, 812.85 feet; theme 5 0023'08"W, 567.79 Not; theme S SW 18'29'W, 149.12f rythor- 2D.00 feet ,.dins ern dgh,, am I"lh 33.08 feet theme N 28'54'41•W, 275.64 Feel; theme 322.68 Foot rdf., ern left, one Iegth 1D9,20 foe; theme N 48' 18'01"W, 169.38 fee; them. 476.54 foe radius earn left, one length ID6.28 feet; then.. N 61.04'41'W, 276. 45 for to the tee Point of beginning. LOT 24 The potion of the Nethoed Won,, of Sectl- 3D, Township 2D North, Range 16 East, W.M., KIM- Coo-ly, Wehiegron which 1, boendd by a If.. dewribd m fellows: Beginning e V. Nmit.- come..F wid S.6- 30, ,hence N 89'1g'30'E, .Lora the North b-.k y o/ mid Seti- 30,1235.OD feet ro the rive point of beg onin0; theme N B9'18'30"E, /61.60 fee; thence 5 61004'41"E, 382.01 fiery rI-- S 39°3924"E, 49.47 fee; theca N 3T5902'W, 745.00 Feet to the hue point of beginning. LOT 25 The pond- of 'I. No»Frost "'ter of Seri- 30, Taeohip 20 hbrth, R-Re 16 Ewl, W.M., Kirriws Crony, Woshingre which I, bavndd by a line d-,Jl d a follow,: Beginning aI IF.Nonhwe. comer of id Section 30, thence N B9'IB'30% along ,he Nenh bo ndery of mid Section 30, 1235.00 fee; thence S 37°WOVE, 745.00 fot to the rive point of b.ginni.W then« S 375902'W, 340.D0 Fee; 11,- N 54°56' 13"E, 553.65 feet; theme N 28'SC41"W, 140.00 fee; theme 262.68 bor,odev, curve let, one lmgth 88.89 he; theme N 48°I1POl'W, 169.38 for thence 416.54 be nodfescum left, men length 92.89 fee; theme 5 39'3924"W, 529.47 fee w the rive Point of bagiminp. LOT 26 Thol port;- of the Northwet quaver of 5.111. 30, Township 20 North, Rene. 16 600, W.M., Ki.;ro, Crony, Wehingtm which i, 6wnded by a 11- dewrbed m Ulovn: Beginning a the Nethwo" comerof mid Section 30, theme N Br 18'30'E, eeng the North bwndery.f wid Section 3D, 1235.00 fee; thence 5 37.5902"E, 1085.00 for no the Irv. point of beaming; thence S 37'59'02"E, 443.99 hy thce (.It; N S056-15"E 359.62 feet; thence 131.20 hot no,jim.,rve Leh, are Irg .n. 196.70 fee; thence N 28-54-41'W, 34D.80 feet; theoe 5 54°56' 13'W, SW.65 feat to the bug point of beginnig. LOT 27 The Portico a the Not-e, IF- of Section 3D, To Atp 20 Nmh, Rmge 16 Eod, W.M. K!"Frm Crony, Wad,irgbn which h boded by o line di-Ilbad of fellows: Beginning of Ihe' North- comer of sad Section 30, thence N SrI8'30•E,.Iwg the North bwndory a to $.&ion 30, 1235.00 fee; thence S 37'59.02"E, 955.OD feet m Ihe true Point of beenoiny; thence S 37-59.02•E, S73.99 het; theme 248.39 fee mdim ern right, 171.321- them. N 83-32,41"W, 273.04 her, thence 91.52 fat rdios curve left, am ImWh 124.92 f-1,, tbeme 5 18'14.49'W, 42.60 feet, It-. ND For redrvs curve right, eon length 39.89 he; them. N 47'28'57•W, 222.76 Feet; theme ND feet .,dim wrv. 6.6; m length 188.51 f.eh, thence N 61032'56"E, 574.09 he to the Imo point of begi-eng. LOT 28 The Po01- of the Northwet querter of Seclim 30, Township 20 North, Rage 16 Emr, W.M., Kite Cony, Wm mhdngrm which d, bwndd by o line dec,ibd m fello: Beginning or the Nor/hwed eome of mid Smgon 30, theme N 89018'30"E, along the North 6wde, of cold Steffen 30, 1235.OD feet, theme 5 37659'02'E, 522,U0 feet Io the rive point of beginning; theme 537°S9'02"E, 433.0D foot; them. 561'32.56WF, 574.09 het; theme N28'ST 18"W, 405.OD Fee; thence N 59'03'1 i'E, 505.95 Not to the few poem of begdmirg. LOT 29 Thor po"i- of the Northwet good., of Seen- 30, Towmh;p 20 North, R-pe 16 Eer, W.M., K initn Crony, Wehingr- wWoh d, bwndd by a Ifne dncribd m fell.we Sedmirg a the Northwet cane, of mid Section 30, theme N 89018'30"E, ol-g the North bwde, of wed S,mAm 30, 436.W hot no the true poets of b.genning; if.. N 89'18'30•E, 798.40 fen; theme S 37'5902"E, 522.00 fee; Ihmce S 59'03'll"W, SD5.95 feet theme N 28'53'18"W, 102.00 her, thence 648.18 ree, ediw wive left, one length 207.71 (ee; thence N 46°41' SO-W, 343.33 fee; theme 528.93 low mdlu, wrv. left, am legth 105.67 fee; the me N 58. 09.23"W, 207.36 feet Mthe troe point.( baamlrg. LOT 30 Thar pool- of the Northwest quarter of Seei- 30, Torwnhip 20 North, R-pe 16 Eve; WM., Ki»ions County, WashinBM which i. bwddd by a tin. descnTod m fellowu Bepinntng a Ihe Northwet comerof wed SN-1, 30, a which id Se Is the true 25 0 of tF m them. N B.00 fee; t alone I North boundary of (mid Senn- 70, 325.04 fee; theme Fe 5, them" 120.00 her; them. S 19°13'41•W, 930.62 teary them. N 88°38'26"W, 130.00 heft thence N O'34'54"E, 935.06 het to the rive Point of 6opi-ion. LOT 31 The pe"lon of the Nonhwer gwrten of Sectl.n 30, T.wmhip M North, R-ge 16 Ealt, W.M., Kirf Crony, W..hdrg,.e w wW.h is bndd by a line deooribd a follow.: Beginning of the North -I or of wid Seca- 30, thee S 0°34'54•W, elms the Wert bo.dery dwid Section 30, 935.06 feet; them. S 88°38'26"E, 130.OD het a the frve Point of btginninp; theme S 88'38'26'E, 315.W fee; theme N 16040'54"E, 765.67 fret; theme 468.93 foot mddv, <urv. Leh, arc length 93.67 feet; them. N 58'0923'W, 101.41 For; them. S 19'13'41•W, M.62 feat ro the rrvo Pant of beglming. 2%ecv16 PAGE 4 OF 5 LOT 32 The oo"im of the North- game -of Section 30, To -,hip 20 North, $m;e 16 Emr, W.M., KIM- Cwnry, Wmhingron which I, bonnded by a If,, dew,lbd u fellow,: Beginning w the N.A.- oomer of wed Secti- 30, thence S 0034'54'W, aeon• the West bwndery amid Scrim 30, 935.06 feet; thence S fir 38'26"E, 445.00 Not to the - point of bop,-ing; ,hence 5 88e38'26•E, 60.00 feet; thence N 64°37'49"E, 630.W feet; theme N 28°53'18"W, 92.00 Foy thence 608.19 1- real., verve left, am length 189,06 het; them. N 46°0S8"W, 343.23 feat, thence S I6°4WS4'W, 765.67 feet to the .rve Point of b.gimfrg LOT 33 The portico of the Northwet ,,omen of Sacti- W, Town,hfp 20 North, Reg. 16 Emt, WM., KIM. Cwnry, W..M.Ster which is bonnded by a line described m follows; Baginninp at the North- wmer of told Seerl.n 30, theme S Oe34'54'W, .loop the Wel b.undory of mid Sect'- 30, 935.06 fee; thence 5 M'38.26"E, 505.00 feet to the fine Poie of beginning; thence N 64°37149"E, 630.30 he; thence S 288ST 18"E, 347.00 leery thence 5 61' I4'40"W, 593.d9 fiery theca N 7d°ll'Ol•W, 385.95 het ro the tine point of heginnirg. LOT 34 The Portlw of the North- 4,ador of Smile, 30, Tow»ship 20 North, Rm;o 16 Emt, WM., MAN. Cwnry, Wmhingtm which it bwndd by a line d-6bed m follows: Bedmi,g a th Northwet -meref told Section 30, theme 5 O'34'64"W, deg the Wed bwdmy of mid Sender 30, 935.06 Fe; thane. S 88°38'26"E, SD5.00 Not; them S 34° il'Ot"E, 385.95 feel to the ,rve Point of bagimbg; thence 5 34'11.01"E, 313,1.00 he; thence N 60042'40'E, 626.59 Not; ,Mena N 47°28' 57"W, 110,(10 feet; thence 640.91 foot redivs curve right, me length 207.98 foot; theme N 28°53' 18"W, 68.00 fee; theme. S 61.14'40'W, 593.49 fee, to the Irvo point of beginning. LOT 35 That p oim of the Neil -quarter of S-Im 30, Township 20 North, Rmp, 16 Eon, W.M. Kirtiros Crony, Woshingtm wWch bounded es by o line dncribed a, Foil- Beginning a the' Nenhwed ooze, of mid Sectim 30, theme 5 0°34'5-N, alma the Wet bumdery of mod Section 30, 935.06 fee; thence 5 88038126'E, 505.00 fee; theme 5 34' 11'Ol"E, 769.95 I-,,. the mnpo;nt of beginning; throw S 349I1'01"E, 374.00 fee; theme 343.97 foe .,dew wow right, arc length 93.38 het; theme N e6"3929"E, 337.45 het; thence 94.00 foor r,diw w,ve left, am length 72.06 feet, thence N 22'WO9"E, 92.51 feet; theme 147.11 foe radios woe IeR, eon length 80.95 her; thews N B-51.41'W 91.66 het, th.n.. 20.00 foot radius..... 1.0, am longrh 13.48 het; theme N47°28'57"W, 172.64 be; theme 5 60042'40'W, 626.39 fee m the true poin, of bepinnirg. LOT 36 The, ponie, F,h. N.11-0 Roeta of S.A. 30, Towmrlp 20 North, Rage 16 Eon, W.M., KI»it., Cwnry, Wmhdngbn whhh 4 bo-dd bye It.. de I" or follows: By;nning.r IF.=I- comer of wid Section 30, theme S 0034'54'W, .long tho Wnr b.und.ry of mid So- 3D, 935.06 Fee; thence S 88°38'26'E, 505.W %.I,, dxme 5 34.11'01"E, 673.95 foot to the two point of begtnningr theme 5 34' 11'OI"E, 470.00 ha; them. 343.97 feet rode., rve IeR, ,, 1-Bth 67.93 Fee, thence S 39'43' 19"W, 191.80 bah, thence 267.75 foot wdios rem left, arc length 107.70 fee; theme 20.00 Foot .,die.,rve right, am ImMI, 41.9E fret; rhea. N 41026'54'W, 560.64 he; thence 20.00 Foot reliv, curve right, am length 13.06 fee; Ihmce 45.00 fee rwdiu, curve left, one legfh 23.34 fee; theca N 58032'53"E, 440.02 her rotha hoe pele dbspiminp. LOT 37 Th.t portico of the Nertherm, ginner of Sectim 30, Township 20 North, Rmge 16 Ee, WM.' KIM- Cory, Wmhingvr, wW.h 1. bourAd by. line d-,ib.d es follow: Begiming a rho N.Ar,sr comer of wid Seeti- 30, theme 5 0134' 54"W, amp the Wed boo de y of mid Scrim W, 935.06 Feet; then S Ga. 38'26'E, 30.00 fee re the hie parr of be01menin theme S w-W 26"E, 138, 00 hat; theme S 34011'01"E, 673.95 fee; theme S 58032'53'W, 440.02 het; (hence 45.00 ken radius wive IeN, on, length 50.93 fee; theme N 7'1422'W, 775.35 foot to the .rve Point .f learning. LOT 38 The P.rthn of the North- wmer of Seelm 30, Tov hfp 2D North, Roge 16 EId, WM., KIM- C-ty, W.,hin,, n Wi,h b boudad by . Ifn. demribd m fell- Begming.t the Nerrhwnt come, of wed Seen- 3D, thence S 003d'54"W, alms the wad boundary of mid Seale 30, 935.D9 fee re, the rive point of beginning; theme 5 0°34.54•W, 250.00 fee; U 0or- S 3Y154•E, 574.06 fen; thence S 60858' 13'E, 140.00 fee; thence 45,00 foot rdh, e ri9M, one nc length 42.94 fee; thee N 7'15'22"W, 775.35 fee; theme N g8.38'26"W, 367.D0 fret to 0. to, point of beginning. LOT 39 The pedhn of the Northwet We le, of Seel- 30, Township 20 North, tinge 16 Cud, W.M., Kitime Cony, W.M.n - which h bwndd by . tine dec,lbd .. 1.11 : 8s0minB.1 the Went Roor,er come of mid Soelm 30, theme N D034'54"E, 480.00 feet to the true paint of beginning; theme N 0034154"E, 975.00 fee; thee 5 32644154"E, 574.06 fee,, them. 5 6 58'13"E, 140.00 het, them. 45.00 food mdiu, curve IeR, one [math 86.55 Fore, thence 20.00 hot rdlus.,rve right, ow length 13.86 Not; theme S 41.26. 54"E, 25.00 feet; thnc. S 56'33146' W, 603.65 het ro the too. Point of beginning. LO7 40 Thor "Ol.n of the Northwet quarto. of Sean- 30, Township 20 Nen h, Rmge 16 Eod, WM. MAIM, Crony, Wethinpt- whddh I, bwndd by. line dewrebed m follows: Uginang or the Wnl goorrer comer of mid Soar 30,'ot which point h the nu. point of bopiminy thee. N 0'34.54'E, 480.00 Feet, the'ee N 56'33'46"E, 378.65 her; them. S 18.40'31•E, 594.01 Fee; If- N 66'20'41•W, 129.02 het; thence 83.43 foot mW,, wive let, .m length 125.52 het; thew S 27°2728'W, 154.89 fee; Lhmc. S 89'23'40'W, 213.96 for to, the five point oF64m1W LOT 4I Thof Portion, of the Northwet quo".; of Semlm 30, Township 20 North, Romeo 16 Eoe, W.M., KinitosCony, Wmhimpe-whkh isbwddby.line dewAbedm fellows: B.pdrmfrgmrho Went V-, wmer of told Section 30, theme N BV7,3'40"E, alma the 5wth bwodey of said Nwfhwmr gaon<r 281.%Fee to the rue point of beglnni,g; these N 89° 23'/D"E, 1328.24 feet; Ihmce N 34'48103"W, 783. 80 fish, theme 5 3r,13'19"W, 191.80 feel; theme 227.75 foot mdi., wive IeR, arc lamrh 104.18 b.ry thmme 5 13030'49'W, 141.62 fwr, then- 130.27 Foot mdiv, curve doh; arc (moth 120.52 he; theme 5 66'31'19"W, 308.97 he; thence lU.d3 foe .dim curve right, am langfh 118.97 feet; thence N 66"20.41eW, 129.02 feet; theta. 23.d3 !oot bus curve left, arc length 35.23 feet; them. 5 27'2728'W, 122.90 I", I. the ,rve Point ebeginning. PAGE 5 OF 5 LEGAL DESCRIPTIONS FOR LA NIGAN 59RINO3(unplarted) m • LOT 41 Thor pall- of the Northwest gwnm of ScMm 30, To-okip 20 North, Re,ge 16 Eot, W.M., KiMiter Cwny, Wmi'l.g;m wbich it bwnded by a It.. d-lb.d a follow.: Begs-ine It th- Wad worter comer of Wd Section 30, therm N 0'34'wE, oloop the West bwndory of mid NW{, 480.00 het them. N 56'33'46"E, 378.65 her to the true point of beginning; thence N 56.33'46"E, 225.00 f-i thane S 41e26'54"E, 604.46 hey Merce 20.00 1-' mdiur curve riehr, orc 1-gM 19,19 hey them. S 13'3D49"W, 45." feet; thence 70.27 foe rodl.s verve right, orc eI.gtth ar h 65.01 het; thence S 66'31' 19'W, 308.97 key thence 84.63 bee ,.dim wrv. right, arc lem69.62 fe, therm, N 18'40'3l'M', 594.01 feet to the the pole of beeinnine. LOT 43 The for of the Northwest gwder of SwHm 30, T.-hip 20 Noah, Rmsee 16 Emt, W.M., K(ttim, Cwny, W=hl..,- which h bwded by a If.. demdbd 81 ft,11 : BeSi-iN the Went geeMr comer of aid Section 30, theme N W23.40-E , 1610.20 het ro tM trv. point of b.pimirrg; thrice N 89'23' W"E, -8.00 fey Mmce N 39'38'49"W, 1004.98 feet, them. 5 66'35'29"W, 140.00 feet, theme 283.97 hot mdlm curve IeR, arc Iegth In. 17 fse; It.- S 34.48'03"E, 783.80 het to the-. win" of bepirminp. LOT 44 Thr Peale of rhea Noahwat guoM of S-6- 30, Towvnhip 20 Noah, R.S. Id EM, WM., Ki Mite Cwny, WerhMpran whl,h it bwded by o lice described m 1611- B.gim(ng et the Watt genes comer of mid 5.e1- 30, theme N B9'23.40"E, elmg the South bwdary of mid NW), 2039.20 feet ro the ere point of beeinnine; .hen. N O'4S56'E, 511.66 Fay rh.nw N 473642'W, 56D.94 feet; themo 154.00 foot bus verve right, arc length M-05 fat, them: 566'35129'W, 197.45 fee; thence S 39'3BV9"E, 1004.98 tea to th_ pot, of bepinning. LOT 45 Thr psalm .f the Nodhwnt Qr-, of Sari- 90, T-hip 20 North, .glm Zito 16 Eod, W.M„ KIM - Cwny, Wmhing,m wMch is bwnd.d by .Ile. demcibod .t !.Alen: 8i, .1 the Wuf quorter comer of mid S.cti.n 30, thence N 89'23140"E, el" the Sw1h bwnd.y of mid NTYj, 2038.20 leer thence N 0'4556"E, 511.66 feet ro the tee point of b.gimtnp; theme N 014V 56"E, 810.00 hey thence N2'OS' ii' E, 6.62 fee, thrum. 308.39 feet 1di.. curve Aqh, men I_,h 23.52 het; th.e N 83.32'41"W 273.04 her, throe 31.52 hot ra6.. verve left, arc I,,h 43.02 ferry theme 5 IW 14'49'W, 112.77 fury theme S e°51'41'E , 101.95 fee,; thence 207.11 tow rmilm curve dght, arc length 113.97 he; them. 5 2Y40'09W, 92.51 far, thence 154.00 loot mdim curve dghf, oft length $3.00 feet, them. S 473642"E, 560.94 her to the two poi, of bepimirp. SURVEYORS CERTIFICATE Thi,-P oM legal doscripti-, wry Ly rcpmwt o wmay rmM by nu or ender my direction In amber-ce with the roWinmmtt of the Survey Aewrdirg Act er th requed oh. DAVID AMERINE (le, 42,43,44 6 45) FRED SWARTHOUT (l_ 38, 39, 40641) DOUG LES KILIAN V.. 31, 35,36 6 37) KENMORE SNOWMOBILE ASSOCIATION (loh 30,31,:,^ 6 33) DARWIN GOLDSMITH (1-27,28 6 29) ROGER DEW ITT Don 24, 25 6 26) O KENNETH L. GODENOW (loth 20,21,22 6 23) GERALD BEWIAY (lot. 15, 111, 6 19) INAKAY U" A (let, 13,14,16 & 17) HERB ABBOTT (Ian 9, 10, 11, 6 12) DARRELL GOLDSMITH (1.,. 5,6,7, 6 8) STEPHEN LYONS (Ian 1,2,3,6 4) In Juno of 1975. .. LEOHi enmdor I y ,mete No. 9606 June 26, 1975 �f�N4! EE18 $�F EASEMENT PROVISIONS MAIN ROAD Eowmat t, a 60 loot drip of lond which liar 30 fear edjee.? pomII,I toad oo tither side of the followirq demribd --rime: Bepiminp of a hint 247.96 feel, N 89'23'40"E of the Swthwed m o, of the N4 of Section 30, Towmhip 20 North, Rmge 16 Emr, W.M., I(Iff C - , W.thi.gtm, thme N 2727.28'E, along mid centerline, 1 38.89het; thane 53.43 foot rodl r curve right, arc Irgth 80.39 feet; them. S 66.20'41"E, 129.02 fat, theme 114.63 bet eediim curve I.ft, aim length 94.30 her, tbmce N 66'31'19'E, 309.97 hey thee. 10D.27 foot mdim curve lee, arc length 92.76 het; thence N 1313DV9'E, n.DO he a a point detigrwtd os POINT A, them. N 13.30'd9"E, 69.82 Feet, theme 257.75 foot edi.. corn dBht, orc Imgth 117.90 fury thence N 39'43'19'E, 191.80 feet, th.e 313.97 loot mdtu, wive right, orc I-th 147.24 h., "Mote N 66'3929"E, 337.45 feet; thence 124.00 feet "u, wrv, IeR, orc ImWh 95.05 lay rhea. N 22'40'OD"E, 92.51 het; theme 177. 11 foot radius wive left,arc I"th 97.46 her; We, N B-51'41-W, 109.18 feet to o point detipwfed m PONT 4 fhme N 19'14149"E, 120.00 het, thverve riorc en.. 61.52 foot mdiu, ght, I"rh 83.96 fat; theee S 83'32'41'E, 273.04 hey them. 278.39 foot ­17.m curve heft, arc length 192.01 het; theme N 56'S615"E, 224.16 feet w a point dedpmtd at POINT c, Mena. N 56'56'15'E, 135.45 feel; them* 161.28 feet rodh, curve left,orc length 241.65 hat, them. N 28e54'41'W, I... feet to a pefnt dmimmed o POINT D, then. N 56•18'29"E, 203.78 h.t theme 58.76 foot radius verve right, art Imgth 82.85 fee; thence S 42'53'51"E, 92.78 hey thence 1B/.85 foot radius wen IeR, orc length 1.. 11; thence 5 7i 10111"E, 210.55 hen; ihme 128.39 foot mdlw verve I.ft, ore I.V6 95.36 fen; theme N 6e 1629"E, 459.35 fat, them. 359.56 toot rdlm verve right, arc length 99.36 fee, them. N 80'06'29"E, 160.00 feet to a pair d.a, mt.d e. POINT E, them. N 80.Ob'29'E, 163.17 hN; them. 367.28 hot m6m rv. 1.11, me length 99.39 feet; th.. N 64.36'12'E, 423.29 f..t; theme 486.18 feet mdus eu rve tight, arc Iwgth 99.65 (eat; thence N 76.20'49"E, 171.83 fen; theme 225.95 foot rode, curve right, arc length 98.41 feet' theme S 7r,11'51"E, 150.37 fat; throe 97.13 foot sum wen left, arc Imgth 92.35 he; them. N 46'49'26'E, 349.66 het to the and of mid wtement. EASEMENT A Beginning at a Fein, dmigmrcd ar POINT A; th.nc. N 41'2654'W, 697.00 het to a pofM where .old oem-t It 45 h.t in ell direst',- t. form a wldmec, mid wIdm,m Wn th. end of mid Eminent A. EASEMENT 8 B,Inninp al a pole deslpnatad m POINT B, Mmce N 472857"W, 300.16 hen; thence 610.91 foot rvdbs wen rlphl, arc Imgth 196.24 NO; thence N 28'53'18"W, 5D7.00 fat; thmc. 6M*,,, bar mdim wen IeR, arc:-'tl 198.39 he, th.nee N 46'41'S8"W, 343.33 I. thence 498.93 foe; rodlu, wrn IeR, arc 1-prh 99.67 fee; thmu N 58' W'23'W, 254.38 fat ro th. -d of mid Easement B. EASEMENT C Beginning er o point di,19-d.. POINT C, show S 62;47'25'E,.389.33 Net, theme S 0'37'40"W, 115.41 Not, theme N 88' 1909"E, 365.51 fin' theme 135.40 hot ra - e right, me length 95,79 tap th-S 51.OW41'E, 2N.32 Fat to a point rhea mid e.aant 1, 45 het in ell 6ry 1., ro teem a wMome, mid wldaee Well the end of mid Eeseef C. EASEMENT D Bepfmhq lot a point dmIveled a, POINT D, theme N 28'54'11'W, 330.00 fee, theme 292.68 Foe mAim wive left, arc Imgth 99.04 hen; them. N 48.18'Ol"W, 169.38 het theme N6.54 foot emu, wrv. I.ft arc 6,11, 99.59 het; them. N 61-04-41'W, 329.23 h.t to th. .d of mid Ferment 0. EASEMENT BwimUp, a point d., of d m POINT E, thence 5 9'53'31'E, 30.00 h.r, the-. 94.12 feat w curve left, arc I.Mth 91.92 feet; thence S 67 W 54"E, 375,W her, thence 389.64 hem md,m wive riph, arc legth 99.45 fee; th., S 51'11-12'E, 221.13 f.n; thence IM.96 foe ra6u, verve tight, me length 93.21 heme et; thS O'10'S9"W, 143.43 he, thmc. 298.21 hot ,.do, corn dgh, arm I,g*h 99.O8 feet; thence 5 19°13'09'W, 76.59 fay thence 73.04 hot =wive left, orc leryth 87.69 he, thwu S 49'3Yhat to 208.23 hto a pee when ,aid ant it 45 fact In all dlr.cdm, to ben a-ldemc, told wldeme bel.g the erd of mid Eemomnt E. AUDITORS C 71 _ Hldlpr ,.cord fhi> I R .f19 99rr .fat Fog �� pd f iD .I�nguaat o J-7 E2OL6E-O'HARE. �Ty�UD B_ �... , EXHIBIT 2: WINCH ROAD SUVEY CONDUCTED BY PUBLIC WORKS Page 4 of 4 Public Works "Work Session Staff Report", 2024 � LLI c� a� C Z 0 N _a L N C 3 -a c cU 0 04 L O N N U 0 m � U) moo' O U 00 �. ' LLI j� J U Q = 0 i � F— w w w ryz-: � �� gQ0 O O w =m0 ( ( cwn0 i U) ` Q i i J � U (Y Ld F- w O i O ---- -_ • � J L� "�--------' (n O ii ii Ci ii o Qo w O z ow O`er ry U -M, KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July S, 2024 TOPIC• Bowers Field T-Hangar Leasing and Wait List Policy ACTION REQUESTED: Direct Staff LEAD STAFF: Joshua Fredrickson RECOMMENDATION: Direct staff to prepare Resolution for adoption of the Bowers Field T-Hangar Leasing and Wait List Policy. BRIEFING SUMMARY: • Kittitas County owns T-Hangars at Bowers Field Airport • T-Hangars are leased to tenants on a first -come, first -served basis • A waitlist policy has been developed to provide consistency to how available T- Hangars are filled BACKGROUND: Kittitas County owns T-Hangars at Bowers Field to support aviation purposes and use at the airport. T-Hangar space is leased to individuals, currently on a month -to -month basis. All of the County owned T-Hangars are occupied. Public Works receives requests from individuals to be placed on a waiting list. With the transition of the Airport to a division of Public Works, the wait list is unclear, with 12 individuals on the wait list. To provide consistency and guidance for those requesting to be on the wait list a policy regarding T- Hangar leasing and T-Hangar wait list has been developed. DISCUSSION: Kittitas County is the airport sponsor of Bowers Field with Public Works having the responsibility to lease County owned T-Hangars. To provide consistent guidance on leasing T-Hangar space a policy has been developed. In addition, requests are often received to be on a wait list for a T-Hangar. The current identified list has had individuals on the wait list for over three years. It is unclear if these individuals are continuing to seek a hangar or if the wait list is out of date. The wait list policy looks to keep the list current as well as maintain consistent guidance for T-Hangar leasing. The Airport Advisory Committee considered the T-Hangar leasing and wait list policy at their June 12, 2024, regular meeting. The AAC supported action to formalize the T- Hangar leasing and wait list policy and recommended this for consideration by the Board of County Commissioners. FISCAL IMPACT: Waitlist includes a $100 non-refundable processing and administrative fee. ATTACHMENTS: Exhibit 1: T-Hangar Wait List Policy Exhibit 1: T-Hangar Leasing and Wait List Policy GASopoES ... To DEPARTMENT OF PUBLIC WORKS -- Josh Fredrickson, Director ___. KI11'ITe1S COUNTY BOWERS FIELD T-HANGAR LEASING AND WAIT LIST POLICY DATE OF ADOPTION: Policies: 1. T-Hangar Leasing Purpose: Hangars owned by Kittitas County at Kittitas County Regional Airport — Bowers Field are to support aviation purposes and use of the airport. Applicability: o Kittitas County, as the airport sponsor of Bowers Field, has adopted this policy to provide guidance to leasing of County owned T-Hangars at Bowers Field. Authority: o Kittitas County is the airport sponsor of Bowers Field with responsibility to lease County owned T-Hangars. Effective Date: o Effective date of this policy is the date the Board of County Commissioners adopted by resolution. Policy: 1.1 Subletting is not allowed, including transfer of aircraft ownership due to the sale of the hangared aircraft. 1.2 The hangar tenant, whose name appears on the signed Hangar Permit 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 2 form must be the registered/insured owner of the hangared aircraft. A hangar tenant may also lease an aircraft provided the hangar tenant is the insured parry and provides lease documentation to the County. 1.3 Adequate insurance coverage must be provided to the Public Works Office at the time of occupancy, and a renewal certificate must be provided on an annual basis. 1.4 Hangar tenants must provide emergency contact information, along with aircraft registration information on an annual basis and/or when requested. 1.5 Hangar tenants must accompany the Kittitas County Fire Marshal during their annual fire inspection of the hangar facility. 1.6 During the annual fire inspection, Airport management staff will record all aircraft registration numbers stored in each County -owned hangar to verify that aircraft stored in each hangar are registered to the individual(s) leasing each hangar. Policies: 2. T-Hangar Wait List Purpose: The hangar wait list policy is to provide a simple and fair process for aircraft owners to be placed on a wait list for County owned T- Hangars at Kittitas County Regional Airport, Bowers Field. 0 o Due to the limited availability of T-Hangars coupled with demand often being greater than availability, only those on the wait list will be considered for a T-hangar lease. Applicability: o Kittitas County, as the airport sponsor of Bowers Field, has adopted this policy to provide guidance for a wait list of County owned T- Hangars at Bowers Field. 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 3 Authority: o Kittitas County is the airport sponsor of Bowers Field with responsibility to lease County owned T-Hangars. Effective Date: o Effective date of this policy is the date the Board of County Commissioners adopted by resolution. Policy: 2.1 Applications will be submitted, and hangars assigned by the County in the order in which a completed application was received, and in line with these policies. 2.2 The Public Works Office will maintain the official T-Hangar wait list. 2.3 The County does not guarantee that an applicant will be approved to rent a County -owned T-Hangar unit. 2.4 A one-time, non-refundable Processing and Administrative fee of one hundred dollars ($100) will be collected by the Public Works Office, from applicant placing their names on the hangar wait list. The one- time, non-refundable fee will not be applied to any rents at Bowers Field. 2.5 Individuals on the hangar wait list will provide the Public Works Office with an application with their current contact information as needed. Individuals are responsible for updating their contact information with the Public Works Office in the event of any changes. 2.6 Individuals will only be removed from the hangar wait list when they receive approval to rent a hangar, or when the Public Works Office receives a written request to be removed from that individual (will also be verbally verified). 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 4 2.7 Individuals on the hangar wait list who are offered an available hangar will have 14 calendar days to notify Public Works of their intent to accept or decline the hangar. Individuals which choose to decline the available hangar will be placed at the end of the hangar wait list. 2.8 Once an individual is approved to lease a County owned T-Hangar and accepts the terms of the rental agreement, their name will be removed from the list. 2.9 A wait list has previously been in place prior to adoption of this policy. Within three weeks of policy adoption, the Public Works Office will contact individuals on the current wait list and provide them with 14 calendar days to respond with a new application and deposit to keep their place on the new T-Hangar wait list. 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July 8, 2024 TOPIC: Upper County Traffic Calming ACTION REQUESTED: None Required LEAD STAFF: Joshua Fredrickson RECOMMENDATION: No action required. BRIEFING SUMMARY: • Fehr & Peers identified and evaluated possible traffic calming devices for various County roads in Upper County in 2021 • Over forty traffic calming measures or roadway modifications were discussed during the process • Eight traffic calming measures were recommended, with five being implemented - directly and two being modified for implementation • The Upper County Traffic Committee was disbanded November 15, 2021 • Efforts towards solving Upper Kittitas County long-term Interstate 90 traffic concerns are being placed with the STEER I-90 Coalition BACKGROUND: The Upper County Traffic Task Force spent most of 2018 and all of 2019 evaluating traffic impacts from growing congestion and associated safety issues along various transportation corridors in Upper County. That effort evolved into the Upper County Traffic Committee (UCTC) of the Board of County Commissioners. In 2020 Public Works solicited for professional services supporting transportation planning. Two firms were selected to provide services. Public Works solicited, the two planning firms to inventory County roads impacted by 1-90 weekend traffic and identify various traffic calming measures or roadway modifications on these corridors. Fehr & Peers was selected to perform said work within Upper County. A final memo from Fehr & Peers was provided in 2021. DISCUSSION: Fehr & Peers was contracted to identify specific county roads for evaluation of improved safety measure deployments focused on traffic calming. In addition, Fehr & Peers evaluated geometric characteristics and provided the recommendations to the Upper County Traffic Committee. Four presentations were made by Fehr & Peers to the UCTC, seeking feedback from committee members and how to prioritize traffic calming devices. Traffic counts and speed data were also collected for the week of Labor Day 2020. This data provided for an analysis of vehicle speeds and volumes on non -holiday weekends and Labor Day. Fehr & Peers met with the UCTC on January 20, 2021 to prioritize locations and specific traffic calming devices. The final recommendation memo dated February 11, 2021 included eight formal recommendations. Of the eight recommendations, five were directly implemented, two were implemented with modifications and one was not implemented. A memo summarizing the implementation activities is found in Exhibit 1. The evaluation and review performed by Fehr & Peers helped to identify the need for improvements on I-90. Improvement to the Interstate would allow for traffic to remain on I-90 and not bypass onto County roads seeking to avoid backups. The work program from the UCTC helped to guide the Board of County Commissioner efforts to create the STEER I-90 Coalition efforts towards solving Upper County long term traffic concerns. The Upper County Traffic Committee was then disbanded on November 15, 2021. FISCAL IMPACT: Implementation of recommended traffic calming measures is complete. Any additional traffic calming measure implementation will require additional funding. ATTACHMENTS: Exhibit 1: Upper County Traffic Calming Device Implementation Memo Exhibit 1: Upper County Traffic Calming Device Implementation Memo CPSOpDES ... TO 7,ICCIL v`G F�° y89 I=rrAS COUNTY KITTITgB CAZTI%TTX DEPARTMENT OF PUBLIC WORKS TO: Board of County Commissioners COPY: Cameron Curtis, County Engineer Kelee Hodges, Environmental/Transportation Planner DATE: July 8, 2024 FROM: Josh Fredrickson, Director RE: Upper County Traffic Calming Device Implementation Fehr and Peers provided a final memo dated February 11, 2021 for the Upper County Traffic Calming project. During project development, over forty calming devices were discussed or reviewed for their applicability and effectiveness within the project area. Of the over forty calming devices identified, eight were included in the final recommendation memo with input from the Upper County Traffic Committee (UCTC). Of the eight recommended traffic calming device types, five were directly implemented, two had modified implementation and one was not implemented. Below is a summary of the final recommendations as well as a description of their implementation status. To1,la 1 • RPrnmmr ndpil Traffic Calming Device Type Location Implemented Description School Zone Pavement Railroad St., Easton Yes Installed Markings Existing roadway has insufficient width Lane Narrowing (outside Nelson Siding Road to narrow with noticeable visual line brought towards Westside Road Modified change. Modified with installation of center) pavement edge markings RCW prohibits turns across solid 18" Widening Centerlines (18" Westside Road No lines, providing gaps would indicate solid yellow) safe to pass _ Clarification from Fehr & Peers, sign Blind Curve Signs Westside Road Modified not in MUTCD. Intended to be advanced curve signs. Advanced curve si -,ns installed. Speed Limit Pavement Westside Road Yes Installed Markings Advisory Seed Sims __— Westside Road Yes Installed Nelson Siding Road Installed, removed during winter Speed Feedback (Radar) Westside Road Yes months to reduce damage to electronic signs Upper Peoh Point Road signs. Drive Like You Live Here Individual Property Yes Distributed Sin-ns Owners _ - - 411 N. Ruby, Suite #1 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 Dept. of Public Works Page 2 Fehr & Peers made four different presentations regarding traffic calming alternatives in Upper County. Many of the alternatives were concept and were not part of the final recommendation. Based on the data obtained, site conditions and feedback from the Upper County Traffic Committee the recommendations included those listed in Table 1. Additional concepts and alternatives discussed during the project development are identified below in Table 2. Tohla 7• Traffic ('aiming Nnt Tno.1mied with Filial Recommendation Device Type Location Concept or Device Note Roundabout Nelson Siding at Golf Course Road Cost prohibitive at the time. Additional ROW Enforcement Various Identified with the Sheriff's Office Physical Barrier/Widened Center Line to avoid passing Westside Road Maintenance issues during winter Paint/Stripe Fogline on Outside Edge of Lane Westside Road Addressed through edge striping Optical Speed Bars Not identified Ongoing maintenance concerns Improve Sight Distance Not identified Concerns regardingri of -way ac uisition Convert to All Way Stop Control Not identified Not applicable, maintain flow on roadway main line Median Bulb -Out Not identified Winter maintenance concerns Horizontal Deflection Striping Not identified Shoulder width insufficient to install Center Island Narrowing Not identified Construction cos • Winter maintenance concerns Textured Pavement Not identified For intersections and crosswalks; maintenance; not applicable Speed Lump Not identified Maintenance concerns; winter operations Speed Table Not identified Maintenance concerns; winter operations Full Closures Not identified Concept Half Closures Not identified Concept Diagonal Diverters Not identified Concept Forced Turn Islands Not identified Concept Vertical Deflection Not identified Concept Horizontal Deflection Not identified Concept Raised Intersection Not identified Concept Chicanes Not identified Concept Pedestrian Islands Not identified Concept Angled Parking Not identified Concept Centerline or Edge line Bott's Dots Not identified Winter maintenance concerns High Visibility Crosswalk Not identified Applicable for urban intersections Road Diet Not identified Not applicable to two lane roadway Directional Median Openings to restrict left turns Not identified Urban intersection Curb Extensions Not identified Urban roadway section Radar Trailers Not identified Included as speed feedback signs Install Centerlines Not identified Concept Green Conflict Striping Not identified Concept Daylight Intersection Not identified Concept Traffic Circles Not identified Conc t Speed Legends Not identified Addressed with speed limit Pavement markings 205 West 5th, Rm 108 TEL (509) 962-7523 Ellensburg, WA 98926 FAX (509) 962-7663 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: July 8, 2024 TOPIC: Broadband Planning ACTION REQUESTED: None Required LEAD STAFF: Joshua. Fredrickson RECOMMENDATION: No action required. BRIEFING SUMMARY: • High speed internet, referred to as Broadband, is identified by the County as essential infrastructure • Sources of grant funding received by the County include the Washington State Public Works Broadband Program and the Washington State Broadband Office Broadband Infrastructure Grant • Additional funding is becoming available through the National Telecommunications and Information Administration Broadband Equity Access and Deployment Program. BACKGROUND: Funding for deployment of broadband services to areas within the County has been made available through the Public Works Board and the Washington State Broadband Office. Additional funding will become available through the National Telecommunications and Information Administration (NTIA) Broadband Equity Access and Deployment (BEAD) Program. Public Works has been working with the County's broadband consultant for development of these phases. DISCUSSION: Kittitas County adopted Resolution 2023-072 establishing policy standards for broadband infrastructure expansion under the authority of Kittitas County. Recognizing that high- speed internet (Broadband) is essential infrastructure and there are gaps in availability across the County, the County has taken the lead to expand broadband deployment. Funding has become available to help provide broadband infrastructure. This funding is focused on unserved and underserved broadband serviceable locations (BSL) located in the rural areas of the County. For example, unnerved BSL are locations without access to internet speeds of at least 25 Mbps download and 3 Mbps upload while underserved BSL are locations without access to internet speeds of at least 100 Mbps download and 20 Mbps upload. Kittitas County received funding through the Washington State Public Works Board Broadband Program. Funding is focused on servicing the communities of Thorp and Edgemont (Exhibit 1). Statement of Qualifications were received from qualified service providers and then scored. Lightcurve (formally Consolidated Communications of WA) was awarded the professional service agreement for the work associated with this funded project. Kittitas County has also received grant funding to expand broadband through the Washington State Broadband Office (WSBO) Broadband Infrastructure Grant. A statement of qualifications is currently advertised to qualify and select a service provider. The anticipated service area is identified in Exhibit 2. BEAD is expected to provide $42.45 billion nationwide to expand high-speed internet access. Washington State will be allocated $1.2 billion for BEAD. Funding is for planning and infrastructure deployment. The US Treasury released the Notice of Financial Offering (NOFO) which states the national guidance for BEAD. The State of Washington's guidance and final project areas are still pending; we expect those documents in August. Funding through BEAD is being made available to internet providers and public entities. BEAD funding will require a 25% match, with exceptions for high -cost areas as determined by the NTIA. The State of Washington has made match money available to public entities including Counties who are applying for BEAD funds to build out broadband infrastructure in project areas. Exhibit 3 identifies possible BEAD project areas. Washington is the only state currently which has made match money available. Public Works is anticipating a partnership with a provider, allowing the County to obtain match funding. The internet provider selected as a partner will need to demonstrate how they are able to meet the specifications of the funding. Public Works has developed a draft statement of qualification to select qualified service providers who want to partner with the County to apply for BEAD project areas. FISCAL IMPACT: Grant funding has been received and additional funding will be requested. ATTACHMENTS: Exhibit 1: Public Works Board Location Map Exhibit 2: WSBO Location Map Exhibit 3: Draft BEAD Project Areas Exhibit 1: Public Works Board Location Map Instructions: Phrase attach a MAP of the project area. (Use VASAARD with USA Topo Basemap background. Click HERE for Snipping Tool Tutorial. Draw an outline of the Area of Potential Effect (APE) that clearly delineates the project boundary. SECTION 7: NAP / Area of Potential Effect 1 WASHINGTON STATE PUBLIC WORKS BOARD (NFFASTRUCTURF IS FUNDAMENTAL mused Apd12021 M- r:. Exhibit 2: WSBO Location Map Exhibit 3: Draft BEAD Project Areas N V I" N Ma .A N N y V %0 a w o °D .00 � 06 0% r"