HomeMy WebLinkAbout2024-05-14-minutes-solid-waste-and-maintenanceKITTITAS COUNTY
SOLID WASTE AND MAINTENANCE MINUTES
BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG
Regular Meeting
TUESDAY 2:00 PM I Ma 14, 2024
Board members present: Chairman Brett Wachsmith-Absent, Laura Osiadacz Vice -
Chairman and Cory Wright Commissioner
Others: Patti Stacey, Lisa Lawrence, and Christopher Whitsett
Call to Order at 2:05 p.m.
Citizen Comments (1 min. time limit) None
Ratify Chair's signature on McKinstry Change Order #1: Patti informed the Board that this
was on the last agenda but originally the wrong person at McKinstry signed the document and
therefore Chairman Wachsmith had to re-sign the document. Commissioner Wright moved to
ratify Chair signature, Vice Chairman Osiadacz seconded the motion, Motion passed. 2-0.
Request Board Approval for Chair's Signature on Agreement with Knit for Construction
and Design for the Jail Renovation: Patti informed the Board that this is for on -call Architect
services not to exceed $402,000 for the Jail Renovation Project. Discussion was held on in-house
cost savings with the recently hired Project Manager. Commissioner Wright moved to approve
Vice Chairmans signature. Vice Chairman Osiadacz seconded the motion. Motion passed. 2-0
Discussion on Project Management Software: Patti informed the Board that she has been
evaluating software to assist with keeping track of projects and that she would bring back an
official proposal later. Discussion was held on record retention and maintaining as builts more
efficiently, IT approval and taking it to the Central Services Committee.
Solid Waste Updates: Patti let the Board know that corrections have been made and submitted
to the city for the new Transfer Station and that she is still hoping to go out to bid on the project
June 41h. Patti informed the Board that the Lagoon at Ryegrass is still not dried out enough to
repair. Patti le the Board know that we land applied 257,000 gallons last month and received
270,000 gallons. Discussion was held on the Vantage Homeowners Association and their sewage
treatment plant, septic haulers and a proposed decant facility in Ellensburg.
2024-05-14 MINUTES 1
Request Board Approval to move forward on Flooring Project in Auditors Office: Patti
presented the Board with a quote in the amount of $21,509.99 to remove existing flooring, which
contains asbestos, and replace with carpet tiles in the Auditors office vault room and informed
them that the work would be completed on a weekend.
OTHER BUSINESS -No Action to be taken A brief discussion was held on the Limited
Purpose closure project.
Meeting Concluded at 2:27 p.m.
Lisa wrence
2024-05-14 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
G"U u u ffAS COUH u Y COOMMOHERS
SoHd Waste and GvWntenance
Regular Meeting
Tuesday May 14, 2024 0 2 0 00 PH
BOCC Conference Room
205 West 5th Room 108 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Ratify Chair's Signature on McKinstry Change Order #1
4. Request Board Approval for Chair's Signature on Agreement with Knit for Construction,
Design for Jail Renovation
5. Discussion on Project Management Software
6. Solid Waste Updates
7. Request Boards Approval to move forward on Flooring Project in Auditor's Office
8. Other Business - No Action to be taken
9. Concluded
Created on 5/10/2024 10:41:31 AM
Kittitas C ouna y Bolin! Wasa e Programs
And
Maintenance Project Management Office
925 Industrial Way, Ellensburg, WA 98926
Telephone: (509) 962-7542
Fax: (509) 962-7087
April 11, 2024
McKinstry
850 E. Spokane Falls Blvd #100
Spokane, WA 99202
RE: Change Order 1
At this time Kittitas County would like to accept the proposal for adding an additional 10Ton
RTU to the Assessors Treasures wing of the Courthouse to replace the failed unit.
Description:
1) Additional 10T RTU, labor installation and commissioning $110,158.50
See attached quote 206119-004
Please sign and return.
Approval Kittitas County Boarof Commissioners
Na
TITLE: avYcwt; SS "C ,'-C
DATE:_ Z- AV
McKinstry
BY:
Name:, � ���
TITLE:Y`y (� AI .S r Al ��ll�i/'.�
DATE:_
KNIT
Nevada
Utah
Washington
Idaho
knitstudios.com
April 29, 2024
Patti Stacey, Director
Facilities and Waste Operations
925 Industrial Way
Ellensburg, WA 98926
Re: Kittitas County On -Call Task 1 Jail Renovation CD and CA
Dear Patti,
KNIT recognizes design and construction is complex. We are here to help. As a team we
develop whole project approaches to design, budget, schedule, project, and construction
management to meet your needs. Your solutions should be dynamic, our relationship should
be simple.
Project Description
Renovate portions of the existing Kittitas County Jail Complex including the annex based on
the pre -design documents and as addressed in the scoping documents.
Basic Services
The following usual and customary design services are included in our proposal for your
Project. Services not listed below are Supplemental or Additional Services.
• Architectural Design
• Structural Engineering
• Mechanical Engineering
• Plumbing Engineering
• Electrical Engineering
Supplemental Services
The following supplemental services are included in our proposal for your Project:
• Cost Estimating
Owner Provided Services
The following services shall be retained and provided by the Owner:
0 Permitting Fees
KNIT
Nevada
Utah
Washington
Idaho
Imitstudios.com
Excluded Services
Any services not specifically listed above, including but not limited to the following are excluded
from our scope of work and fees:
• Programming
• Space Schematics & Flor Diagrams
• Measured Drawings
• Existing Facility Surveys
• Environmental Studies and Reports
• Fast -Track Design Services
• Dry Utility Coordination
• Interior Design
FF&E Services
Renderings
Sustainable Project Services
Lighting Design
Signage and Wayfinding
Building Envelope Design
Accessibility Services
Demolition Services
Audio -Video Communication Design
Electronic Safety and Security Design
Access Control Design
Video Surveillance Design
Security Detection, Alarm and Monitoring Design
KNIT
General Management and Administration
Project Management and Administrative Services — The Architect shall manage the
Architect's services, coordinate services with those services provided by the owner and
the Owner's consultants, coordinate with users, attend project meetings virtually or in
person as mutually agreed, communicate with members of the project team and report
progress to the Owner.
o The Architect shall establish an initial schedule for Architect's services,
design, reviews, and approvals of authorities having jurisdiction (Kittitas
County), contracting and construction, substantial and final completion.
Schematic Design Phase
o Complete under Pre -Design Phase
Design Development Phase
Design Development — Preparation of Design Development documents that illustrate and
describe the size and character of the Project including plans, sections, elevations, and
typical construction details, and diagrammatic layouts of building systems.
o Structural systems
o Drawings and details to establish the mechanical and plumbing systems
including approximate sizes and capacities, equipment layouts, required
space for equipment, required chases and clearances.
o Drawings and details to establish the electrical systems including
approximate sizes and capacities, equipment layouts, required space for
equipment, required chases and clearances.
o IECC Prescriptive approach to Energy Code compliance, where applicable
• IECC envelop calculations and analyses.
• IECC mechanical calculations and analyses.
• IEEC electrical calculations and analyses
Outline Specifications - Outline specifications and documents that identify major materials
and systems and establish in general their quality levels.
Construction Documents Phase
Construction Documents — Final Construction Documents detailing the requirements for
the work, quality levels of materials, systems, and other requirements for the construction
of the Project.
o Final Architectural construction documents.
o Final Structural construction documents and engineering calculations.
o Final Mechanical & Plumbing construction documents and engineering
calculations.
o Final Electrical construction documents and engineering calculations.
o Design -build performance specifications for fire detection and alarm
systems. Electrical drawings will indicate the location of fire alarm / life
safety panels and equipment. Device layout and designs shall be provided
by Design -build contractors.
Specifications - Specifications setting forth in detail the quality levels and performance
criteria of materials and systems and other requirements for the construction of the Work.
Project Manual — Assisting the Owner with the development and preparation of
procurement information, form of agreement between Owner and Contractor, and
Conditions of the Contract for Construction and compiles them into a Project Manual.
Permit Phase
• Building Permits and Approvals - The Architect shall assist the Owner in preparing
applications, supporting documents, coordination of supporting documents that are the
KNIT responsibility of the Owner or the Owner's consultants, and facilitate submittals of
applications for building permit(s).
Bidding or Negotiation Phase
Negotiated Proposals - Design Assist & Construction Manager (CMGC or CMAR)
o Organization, handling, and distribution of Proposal Documents.
o Organize and participate in selection interviews with prospective
contractors.
o Prepare and distribute responses to questions and requests for clarifications
to all prospective proposers in the form of an addenda.
o Analysis of Bid Alternates and Substitutions — Upon Owner's authorization,
the Architect shall, with additional compensation, consider request for
substitutions and distribute addenda identifying approved substitutions.
o Participate in negotiations with prospective contractors and prepare a
summary report of the negotiation results, as directed by Owner.
Compensation
• The above services (DD, CD, Permit ad Bidding) shall be performed on a lump sum basis.
Construction Phase Services
• The Architect shall provide administration of the Contract between the Owner per the
general conditions of the contract.
• Evaluations of the Work - Visits to the site to become generally familiar with the progress
and quality of the Work completed and to determine in general if the Work when completed
will be in accordance with Contract Documents, preparing related reports and
communications.
o Visits will be conducted monthly or at intervals appropriate to the stage of
the work, and mutually agreed to with the Owner.
o Estimated construction duration, 6 months.
o Should the construction duration or site visits exceed the time duration
above the Architect shall be entitled to additional compensation.
• Certificates for Payment - Review and certify the amounts due the Contractor and issue
certificates of payments for the Work that has progressed in accordance with the Contract
Documents.
• Submittals - Processing of submittals, including receipt, review of, and appropriate action
on Shop Drawings, Product Data, Samples, and other submittals required by the Contract
Documents. Maximum of two (2) reviews per submittal. Additional reviews shall be billed
as additional compensation.
• Evaluations of Substitutions — Review and evaluation of substitutions proposed after
award of contracts for construction will be billed as additional compensation.
• Request for Interpretations and Information — Review and respond to requests for
information about the Contract Documents. The Architects response to such requests
shall be made with reasonable promptness, 10 days, unless otherwise agreed upon in
writing.
KNIT
Supplemental Documents - Preparation, reproduction and distribution of supplemental
Drawings, Specifications, and interpretations in response to requests for clarification by
Contractor(s) or the Owner.
Changes in the Work — Proposal Requests, Change Order Requests and Change Orders.
o Proposal Requests - Review of proposals from Contractor(s) for
reasonableness of quantities and costs of labor and materials,
o Change Order Requests - Preparation, reproduction and distribution of
Drawings and Specifications to describe Work to be added, deleted, or
modified.
o Change Orders -Assisting in the preparation of appropriate Modifications of
the Contract(s) for Construction.
■ Review and recommendations relative to changes in time for
Substantial Completion
■ Negotiations with Contractor(s) on Owner's behalf relative to costs
of Work proposed to be added, deleted, or modified.
o Coordination of communications, approvals, notifications, and record -
keeping relative to changes in the Work.
o Substantial Completion - An inspection with the Owner's representative for
conformity of the Work to the Contract Documents to verify the list submitted
by the Contractor(s) of items to be completed or corrected. Determination of
the amounts to be withheld until final completion. Receipt and transmittal of
warranties and Issuance of Certificate(s) of Substantial.
Final Completion - Final inspection with the Owner's representative to verify final completion
of the Work and Issuance of final Certificate(s) for Payment.
Compensation
• The Construction Administration services shall be performed on an hourly not to exceed
basis.
3
KNIT
Supplemental Services
The following services, which are in addition to the usual and customary basic design services, are
proposed for your project.
• Cost Estimating - Quantity take -offs and unit cost pricing of materials, labor, tools, equipment, and
services required for the Work plus estimates for the Contractor's supervision cost, Work required
by General and Supplementary Conditions, and an allowance for a reasonable Contractor's
overhead and profit. Supplementary Services shall be performed during the Construction
Documents Phase
Fee Schedule
The fee schedule less Reimbursable cost for the proposed services are as follows:
Description
Method of
Compensation
Fee
DID and Construction Documents, Permit and
Bidding -Arch
Fixed Fee
$ 157,500.00
Cost Estimating
Fixed Fee
$5,600.00
MEP
Fixed Fee
$31,935.00
Structural
Fixed Fee
$26,000.00
Consultant Mark Up @10%
Fixed Fee
$ 6,353.50
Construction Administration -Arch
Hourly
$135,000.00
MEP
Hourly
$20,169.00
Structural
Hourly
$16,000.00
Consultant Mark Up @10%
Percentage
$3,616.90
TOTAL
$402,174.40
Hourly Fee with estimated maximum — The fee for this work will be billed on a time and materials
basis per the attached rate schedule. The actual total fee billed will be based on the scope of services
provided. If the scope of services to be billed will exceed the estimated maximum amount before the
scope is completed, the Architect will endeavor to notify you prior to expending services beyond the
estimated maximum. Monthly invoices will provide you with an ongoing and updated actual fee for the
work.
"' Reimbursable — Fees will be billed at 1.10 times the cost incurred by the Architect.
Compensation for Reimbursable Expenses
Reimbursable will be billed at 1.10 times the cost incurred by the Architect or the Architect's consultants
for:
o Transportation mileage
• Authorized out-of-town travel and subsistence.
o Fees paid for securing approval of authorities having jurisdiction over the Project.
o Printing, reproductions, and plots, except those used for office use of the Architect and its
Consultants.
o Postage, handling, and delivery
It is recommended that the Owner establish an allowance of
$2,500.00
CD Phase
CA Phase
$6,000.00
Contingencies
It is recommended that the Owner establish appropriate contingencies for design services not identified
herein or required for the completion of the project whether performed by the Architect, the Architect's
Consultants, or the Owners Consultants.
Construction Cost and the Owner's Budget
The Design and Construction process is not perfect. KNIT performs its services consistent with the
professional skill and care ordinarily provided by an Architect providing similar services for a similar
project under similar circumstances. KNIT does not warrant that any design services or work product
will be completely error or omission free. Therefore, the Owner in establishing the Construction Budget
for the Cost of the Work shall include appropriate contingencies for errors or inconsistencies in the
construction documents, and unforeseen conditions.
i<
Closing
KNIT The Services outlined above will facilitate a smooth project delivery process. Upon receipt of your
contract and Notice to Proceed, we will proceed with the work outlined here and in the Scoping
Document attached. These fees are valid for 30 days.
Please contact our office if you have any further questions.
Sincerely,
Rhonda Gillogly, AIA-Partner
KNIT
909 S. 336t' Street
Suite 202A
Federal Way, WA 98003
rgillogiynaknitstudios.com
253-572-5511
ACCEPTED BY:
DATE:
NAME:
TITLE: V�r'�' (/'/Jz �,
11' Acker consfflUng selivice s
Information Generated front Practical Experience in the Current Alfarket Place
PHONE (360) 895-1756 • FAX (360) 874-2062
P.O. BOX 1213
GIG HARBOR, WA 98335
LICENSE I.D. #601 251 567
April 22, 2024
Knit Designing Community
909 S. 336t' Street, Suite 107
Federal Way, WA 98003
Dear Rhonda Gillogly:
"Thank you for considering the use of my services to provide a construction documents level
estimate and review for renovations at the Kittitas County Jail. I am assuming the scope will be
similar to a Task 1 rough -order -of magnitude estimate done in February.
Being of a cut-up nature, with specialty components, and security, access and other logistical
concerns to address, there is going to be much more review time involved in this estimate update.
As such I am proposing an estimate and review fee of $5,600, which will breakout the major
scope areas as was done in the previous estimate, but with greater clarity and detail. As before,
all construction costs will be covered.
I thank you for the consideration. Please do not hesitate to call if you have any questions, or
additional information is desired.
Sincerely,
Bill Acker
HuLTz BHU
e n g i n e e r s i n c
April 25, 2024
KNIT
909 South 33611 Street, Suite 107
Federal Way, WA 98003
Attention: Rhonda Gillogly
Subject: Kittitas County Jail Facility Renovations
Engineering Services Proposal (Revision 2)
Dear Rhonda:
Thank you for this opportunity to submit our proposal to furnish mechanical and electrical engineering
services for this project.
Proiect Description
Improvements at the Kittitas County Jail Facility. Work requiring mechanical and electrical engineering:
1. Jail: Provide power and controls for new public entry doors.
2. Jail: Replace entire wet pipe fire sprinkler system with new; repair dry system (alternate bid).
3. Jail: Renovate pluming at kitchen/mop area.
4. Jail: Correct shower room valve access at K-Module.
5. Jail: Clean outdoor rec area drains and drain lines.
6. Jai: Add heaters in stairwells adjacent to rec yards.
7. Jail: Add heaters in MEP spaces at rec yards.
8. Jail: Add corner exterior light.
9. Annex: Modify MEP as required for barrier at guard station.
10. Annex: Replace rooftop HVAC unit (alternate bid).
Scone of Services
General: Our scope of work is for systems covered under Division 21 (fire sprinkler), Division 22
(plumbing), Division 23 (HVAC), Division 26 (electrical power, lighting), Division 27 (low voltage systems),
and Division 28 (fire alarm) of the Construction Specification Institute (CSI) Manual of Practice.
Design Phase: Visit the site to review existing conditions, provide mechanical and electrical engineering,
construction drawings, and technical specifications for the project. Provide energy code forms and
assist with permit forms. Provide cost estimates for work in our scope.
Bid Phase: Respond to bidder questions, review substitutions, and prepare addenda as needed.
Construction Phase and Closeout: Respond to contractor questions, review submittals, review pay
requests, punchlist review, provide up to six site visits, attend periodic meetings as needed, and review
closeout items.
1111 Fawcett Avenue, Suite 100 • Tacoma, Washington 98402
T 253.383.3257 . F 253.383.3283 • general@hultzbhu.com
April 25, 2024
KNIT
Kittitas County Jail Facility Renovations
Page 2
Proposed Fee
Design and Bid Phases: We propose to provide our design phase services on a lump sum fee basis as
follows:
Discipline
Design
Bid
Total
Mechanical
$ 20,448
$ 925
$ 21,373
Electrical
$ 9,243
$ 515
$ 9,758
Total
$ 29,690
$ 1,440
$ 31,130
Reimbursable
for design and bid phases:
Miles
Total Cost
Item
# Trips
per Trip
Miles Per Mile
Amt
Mileage
3
276
828 0.67
$555
Printing
-
-
- -
$250
Total
$805
Total fee for design phase = $ 31,935
Construction/Closeout Phases: We propose to provide our construction and closeout phase services on
an hourly charge basis, not to exceed (NTE) our authorized fee without your prior permission.
Discipline
CA
CO Total
Mechanical
$14,380
$ 225 $ 14,605
Electrical
$ 4,120
$ 150 $ 4,270
Total
$18,500
$ 375 $18,875
Reimbursable for onstruction, closeout phases:
Miles Total Cost
Phase # Trips per Trip Miles Per Mile Amt
CA 7 276 1932 0.67 $1,294
Total NTE fee for bid/construction/closeout phases = $ 20,169
See the attached for expected tasks, hours, and hourly rates.
Assumptions/Qualifiers
1. We assume we will be provided AutoCAD (or Revit) compatible backgrounds of the building.
2. We assume that mechanical, electrical, and plumbing as-builts will be provided to us, and that they
are reasonably accurate.
3. Fire sprinkler systems will be covered by a performance specification and drawing notes with final
with design by the installing contractor.
4. Electrical metering of existing loads is not included.
5. We assume that any design phase meetings will be the virtual type.
April 25, 2024
KNIT
Kittitas County Jail Facility Renovations
Page 3
6. Our design phase work is complete after submitting for permit and resolving permit comments
related to our scope.
7. No structural engineering or design of seismic anchorage for MEP systems is included in our scope
(these can be specified as bidder designed where not covered by the structural engineer or others).
8. Commissioning specifications and services are not included in our scope.
9. Attendance at any pre -bid or pre -construction meetings is not included.
10. Preparation of as-builts is not included.
11. If we are not retained for construction phase services (site visits, submittal reviews, RFI responses,
etc.), claims shall be waived that might have been prevented had we provided such services.
12. Hazardous materials work (survey, evaluation, reports, abatement, etc.) is not included in our
scope.
13. If there are Owner or tenant standards we are to adhere to, we will be provided those in writing
prior to us starting our design.
14. We assume that the Owner (and other interested parties) will review our progress submittals and
final design documents to confirm their design intent is being met.
Sincerely,
HultzIBHU Engiineers' Inc.
Rick Hultz, PE
Principal
HuIWBHU Engineers ENGINEERING HOURS 1253) 383-3257
Cansu.T.ng Engineers 42512C24
Project: Kittitas Jail Improvements
Work: Mechanical Engineering
DESIGN
PHASE
-
Assoc
Senior
Senior
Project
Project
Senior
CAD
Task
Principal
Principal
Engr
Pro Mgr
Engr
Mgr
Designer
Tech
Clerical
Site Visit/Field Investigation
16
Review As-Buihs
2
1
Review Scope/Requirements
1
1
0.5
M#-Legend/General Notes
2
2
M#-Schedules
2
3
Mtt_Plumbing/Fire Plans
0.5
12
16
M#-Plumbing/Fire Details
8
4
M#-HVAC Plan(s)
0.5
8
4
M#-HVAC Details
12
6
Update Backgrounds
2
Catalog Cuts & Revisions
NIC
System Narratives
NIC
Specifications - Technical
1
8
2
Farmat Specifications
1
Arch/Engr/Owner Coordination
1
2
Schedule Review
1
Meetings
4
Correspondence Review
2
QC Review
4
2
1
Progress Submittal(s)
1
2
1
Cost Estimate(s)
8
Respond to Review Comments
1
Mech Energy Code Fortes
1
Permit Forms Assistance
1
Hour Total
9
0
0
0
95
0
0
42
3.5
Labor Hourly Rate
1 $220.00
1 S185.00
$160.00
$145.00
S150.00
$135.00
S120.00
$95.00
$65
Labor Cost Sub -Totals
$1.980
1 $0
$0
50
514.250
50
$o
$3,990
5228
DESIGN
PHASE
TOTAL:
$20,448
BID PHASE
Task
-
Principal
Assoc
Principal
Senior
Engr
Senior
Pro' Mgr
Project
Engr
Project
Mgr
Senior
Designer
CAD
Tech
Clerical
Pre -Bid Meeting
Substitution Request Review
Bidder Questions
Addenda
NIC
0.5
2
2
1
1
Hour Total
0.5
0
0
0
5
0
0
0
1
Labor HourlyRate
$220.00
S185.00
5160.00
5145.00
$150.00
$135.00
S120.00
S95.00
$65.00
Labor Cost Sub -Totals
$110
1 s0
1 30
1 so
1 $750
SO
s0
s0
$65
BID PHASE
TOTAL: $925
CONSTRUCTION PHASE
-
Assoc
Senior
Senior
Project
Project
Senior
CAD
-
Task
Principal
Principal
Engr
Proj Mgr
Engr
Mgr
Designer
Tech
Clerical
Pre -Con Meeting
NIC
Submi tat Reviews
16
Submittal Re -Reviews
2
Submittal Coordination/Usts
NIC
Correspondence Review
1
2
Field Reports/Minutes Reviews
NIC
6
She Visits
48
RFrs
2
3
Changes/COP/CP Reviews
1
1
Pay Reviews
4
Punchlist
8
Backcheck
NIC
Hour Total
4
0
0
0
90
0
0
0
0
Labor Hourly Rate
$720.00
S185.00
S160.00
$145.00
$150.00
$135.00
S720.00
$95.00
$65.00
Labor Cost Sub -Totals
$880
so
s0
s0
$13.500
So
s0
50
s0
CONSTRUCTION
PHASE
TOTAL:
$14,380
CLOSEOUT PHASE
-
Assoc
Senior
Senior
Project
Project
Senior
CAD
Task
Principal
Principal
Engr
Proj Mgr
Engr
Mgr
Designer
Tech
Clerical
Closeout Review - As-Builts
0.5
Closeout Review - O&M
0.5
Closeout Review - Balancing
0.5
Closeout Review - Commissioning
NIC
And As-Builts
NIC
Hour Total
0
0
0
0
1,5
0
0
0
0
Labor Hou Rale
5220.00
5785.00
$160.00
$145.00
$150.00
$135.00
$120.00
$95.00
$65,00
Labor Cost Sub -Totals
s0
so
so
s0
$225
$
$0
$0
1 $0
CLOSEOUT
PHASE
TOTAL:
$225
TOTAL ALL PHASES: $35,978
Hultz'9HU Engineers ENGINEERING HOURS (253) 333-3257
Ccnsmling Engineers 42511024
Project: Kittitas Jail Improvements
Work: Electrical Engineering
DESIGN PHASE
-
Assoc
Senior
Senior
Project
Project
Senior
CAD
-
Task
Pnncioal
Pnncioal
Engr
Proj Mgr
Engr
Mgr
Designer
Tech
Clerical
Site Visit/Field Invesfigation
8
Review As.Builts
1
0.5
Review Scope/Requirements
0.5
E#-Legend/General Notes
1
1
E#-Floor Plan(s)
10
10
E#-Delails/Panel Schedules
4
6
Load Calcis (Healers)
3
Update backgrounds
1
Catalog Cuts & Revisions
NIC
System Narratives
NIC
Specifications - Technical
3
1
Formal Specifications
1
Arch/Engr/Owner Coordination
1
1
Schedule Review
0.5
Meetings
1
Correspondence Review
1
QC Review
2
1
0.5
Progress Submittal(s)
0.5
2
1
Cost Estimate(s)
3
Respond to Review Comments
0.5
0.5
0.5
Lighting Energy Code Forms
1
Permit Forms Assistance
0.5
Hour Total
4
0
0
1 0
1 42
0
0
20
2.5
Labor Hourty Rate
$220.00
$185.00
$160.00
$145.00
1 $150.00
1 $135.00
$120.00
$95.00
$65
Labor Cost Sub -Totals
$880
SO
30
30
1 $6,300
1 $0
$0
$1,900
1 $163
DESIGN
PHASE
TOTAL: $9,243
BID PHASE
-
Assoc
Senior
Senior
Project
Project
Senior
CAD
-
Task
Principal
Principal
Engr
Pro' M r
En r
Mgr
Designer
Tech
Clerical
Pre -Bid Meeting
NIC
Correspondence Review
NIC
Substitution Request Review
1
Bidder Questions
1
Addenda
1
1
Hour Total
0
0
0
0
3
0
0
0
1
Labor Houd Rate
$220.00
$185.00
$160.00
$145.00
$150.00
$135.00
5120.00
595.00
S65.00
Labor Cost Sub -Totals
1 $0
1 SO
I SO
1 $0
1 $450
$0
so
I so
1 $65
BID PHASE
TOTAL: $515
CONSTRUCTION PHASE
-
Assoc
Senior
Senior
Project
Project
Senior
CAD
Task
Principal
Principal
Engr
Proj Mgr
Engr
Mgr
Designer
Tech
Clerical
Pre -Con Meeting
NIC
Submittal Reviews
8
Re-Subnuttal Reviews
2
Submittal Coordination/Lists
NIC
Correspondence Review
2
Meeting Minutes Reviews
2
Site Visits
SEE MECHANICAL
RFI's
1
2
Changes/COP/CP Reviews
NIC
Pay Reviews
2
Punchlisl
8
Backcheck
NIC
Hour Total
1
1 0
0
0
26
0
0
0
0
Labor Houd Rate
S220.00
S185.00
$160.00
$145.00
$150.00
S135.00
S120.00
$95.00
$65.00
Labor Cost Sub -Totals
$220
1 $0
SO
1 $0
1 $3,900
1 $0
1 $0
1 $0
1 50
CONSTRUCTION PHASE
TOTAL: $4,120
CLOSEOUT PHASE
Task
-
Principal
Assoc
Principal
Senior
Engr
Senior
Pro M r
Project
En r
Project
Mgr
Senior
Designer
CAD
Tech
-
Clerical
Closeout Review-As-Builts
Closeout Review - O&M
Closeout Review -Elec Tests
Acad As-Builts
NIC
NIC
0.5
0.5
Hour Total
D
0
0
1 0
1 t
1 0
10
0
0
Labor Hourly Rate
1 S220.00
1 $185.00
$160.00
$145.00
$150.00
$135.00
$120.00
1 $95.00
1 $65.00
Labor Cost Sub -Totals
SO
I so
so
$0
$150
SO
s0
I $0
I SO
CLOSEOUT
PHASE
TOTAL:
$150
TOTAL ALL PHASES: $14,028
Hourly Rates
Assoc Senior Senior Project Project Senior CAD -
Princioal Principal Engr Proj Mgr Engr M r Desi ner ITech Clerical
$220.00 1 $185.00 $160.00 1 $145.00 $150.00 $135.00 1 $120.00 1 $95.00 1 365.00
� X F, 0 U�' A S'
Structural Solutions
Seattle 1011 western A�enua, Srste 8tO V �a!Je, i:' 981U4 i 2 F 292.5G7c
Tacoma 1250 Pacific Avenue, SWe 701 ! Taccsna. WA 98402 i 253.383.2797
Portland 101 SW M n Strut. Suite 28D e Port'ar7. OR 97204 i 503.232.3746
www.pcs-strucDwaLcom
March 29, 2024
KNIT
909 S 33611 St, Suite 107
Federal Way, WA 98003
ATTN: Rhonda Gillogly
RE: Kittitas County Jail Renovations — CD/CA Phase
Dear Rhonda:
Thank you for this opportunity to propose our Structural Engineering services for the Kittitas
County Jail Renovations CD/CA Phase.
SCOPE OF SERVICES
We will provide all structural design, calculations, and marked -up drawings as required
toward obtaining the Building Permit for the structural portion of this project. Post permit
changes can be provided at additional cost on an hourly basis.
Our scope of services and resulting fees are based on the following scope:
• Exterior/interior concrete panel cracking repairs.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 16 hours anticipated.
• Jail Entry Doors.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 8 hours anticipated.
• Mop room/kitchen wall repairs.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 4 hours anticipated.
• Rec Yard topping slab.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 4 hours anticipated.
• Annex slab on grade repairs.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 4 hours anticipated.
• Annex railing extension.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 8 hours anticipated.
• Annex control booth enclosure.
o Review of architectural pre -design options. Up to 8 hours anticipated.
o Coordination with KNIT. Structural drawings are not anticipated, but we will
support KNIT with notes/sketches. Up to 24 hours anticipated.
OPCSI
Structural Solutions Connected Teams.
Bold Solutions.
KNIT
Rhonda Gillogly
Kittitas County Jail Renovations — CD/CA Phase
• Rooftop unit
o Check existing framing to support new mechanical unit. Anchorage to support
structure to be bidder designed. Any structural upgrades will be shown on
structural drawings/details.
• Maximum of two site visits during design for coordination and to observe existing
conditions as needed.
• Virtual team coordination meetings as needed throughout design phase (8 meeting
assumed).
• Construction phase service to include submittal review, structural observation site
visits and answering contractor questions. One structural observation site visit is
anticipated.
• Design schedule is anticipated through end of 2024 and construction phase is
anticipated to be 12 months.
• Record drawings can be provided on an hourly basis.
FEES
Our fee proposal for the Structural Engineering services on the above -referenced project is
as follows:
• Design Phase
• CA
$ 26,000
16,000
Total $ 42,000
Billing will be on a percentage of completion basis. The fee amount may be modified only
with prior written approval if the scope of services is changed.
Thank you for this opportunity to be of continued service. If there are any questions
regarding this proposal, please feel free to call. We look forward to hearing from you.
Very truly yours,
PCS STRUCT AL OLUTIONS
Wes Neeley, S.E.
Associate Principal
WJNeml
23-702 23702 pro -MCA 2024-03-29 An
KNIT March 26, 2024
Nevada
Washington Patti Stacey, Director
Utah
Idaho Facilities and Waste Operations
KnitStudios.com 925 Industrial Way
Ellensburg, WA 98926
RE: County Jail Facility Renovations -Task 1 B Jail TI Build Out
Knit- On -Call Services
DRAFT-Scoping Document
Patti,
Thank you for taking time to review the pre -design documents with us and discussing next
steps to develop your Jail TI project. Below you will find our understanding of the project
scope to be addressed under Task Order 1 B for our On -Call Services Contract. Please
review and make any modifications or clarifications that should be included or removed from
our scope. Once we reach a final consensus, we will develop a fee proposal based on the
approved scope.
The below items are to be included into construction documents with some items being
identified as Add Alternates. Our scope of work will include development of construction
documents and specifications, assist with bidding and contractor bid review, participation in
construction administration services and project closeout.
Let me know if you have any questions.
Respectfully,
Rhonda Gillogly, AIA
Partner
KNIT
SCOPING DOCUMENTATION
Project Notes: The county plans on relocating to a new facility in approximately 10 years. New repairs
or products are to meet durability requirements needed to maintain the facility in good condition for
this duration at a minimum.
Construction Documents
The development of construction documents is based on the 90%pre-design package
developed under Task 1-Jail TI-Pre-Design.
JAIL
Exterior finish / coating repairs
A. Existing sanded exterior paint coating on existing concrete surfaces is failing.
The coating should be removed and refinished, after concrete panel cracking
repairs. New finishes may include new painted surfaces with high quality
concrete sealing products, EIFS or other panel system.
B. The existing exterior concrete panels are cracking in several locations and are
not limited to one area of the facility. Cracking occurs in spiderweb fashion
and horizontally at floor levels. In some instances, cracking can be seen on
both the exterior and interior surfaces. A structural evaluation will need to
occur to determine causes and repair solutions.
C. Remove existing vertical and horizontal expansion joints, including backer
rods. Replace joints with new backer rods and durable sealants.
D. Clean top of concrete wall caps at roof parapets. Install new treated wood
blocking and provide new sheet metal coping caps.
2. Interior repairs
A. The existing interior concrete panels are cracking in several locations and are
not limited to one area of the facility. Cracking occurs in spiderweb fashion
and horizontally at floor levels. In some instances, cracking can be seen on
both the exterior and interior surfaces. A structural evaluation will need to
occur to determine causes and repair solutions.
B. Remove existing vertical and horizontal expansion joints, including backer
rods. Replace joints with new backer rods and durable sealants.
3. Jail Public Entry Doors
A. The existing hollow metal double doors and side-lites are failing. Remove and
replace with identical secure system with ADA controllers. It's possible that
the sidewalls can be infilled with a wall system and replace the double doors
with a single 4'-0" wide secure hollow metal door and frame and ADA
controllers.
B. Remove interior vestibule doors and side-lites. Patch and repair walls and
ceilings.
C. Remove exterior steel railings and provide 1 to 3 concrete filled steel pipe
bollards in front of the jail entry doors to prohibit vehicle ramming of the
building.
4. Fire Sprinklers -Bid Alternate
A. Remove existing fire sprinkler system and replace.
B. Repair dry system as needed.
5. Omitted -Booking Area
A. P.n.Adn n suspended gFid system and peFfeFate d metal panel 5 .stem
!'eAtF-.EteF would be r Fed +n ,- eFdiR@te eleaRun of ...i..,S —;;Rd— iR_s#—,11 of
y
c,,, nno arps;
,-RAT
6. Mop room / kitchen
Repair existing wall studs.
Renovate plumbing.
Relocate electrical.
KNIT
New wall finishes and wall base at mop room.
Repair wall finishes at kitchen sink.
7. Fix shower room plumbing access to valves and provide ventilation in K-Module.
8. Recreation Yard Repairs
a. Grind down existing concrete flooring surface for drainage. Clean out
existing drains and drain lines. Recoat with Slip Resistant Epoxy coating
suitable for exposure to weather.
9. New Heater in Stairwells adjacent to recreation yards.
10. New Heaters in MEP spaces in Rec yard
JAIL ANNEX
12. Repair floor to wall joints @ Annex.
13. Secure barrier @ guard station.
a. Modify design to save costs. May include maintaining original circular
shape. Additional design work needed and Owner approval before moving
into construction documents.
14. Replace existing Rooftop HVAC unit (Bid Alternate)
Assist with permitting and bidding
1. Assist the county with issuance of documents to local county for permit review
rather than city.
2. Assist County with issuance of bid documents, answer bidder questions and issue
addenda. The A&E team shall attend the Pre -Bid Conference if requested by
County.
3. Review Bid data received and review with County for contractor bid award.
Assist with Construction Administration and Project Closeout Services
1. Attend Virtual Pre -Construction Conference
2. Maintain regular construction meeting minutes if requested by the County.
3. A&E team to attend in person and perform field visit once a month for the
duration of construction the regular construction meetings with the Owner and
Contractor. Estimated 6 months construction duration. ( 6 on site meetings)
4. Attend virtually on a weekly basis, regular construction meetings with Owner and
Contractor. Estimated 6 months construction duration. (roughly 20 meetings).
5. Perform an on -site punch list walk with Owner and Contractor.
6. Owner shall provide punch list back check.
7. Review contractor submittals.
8. Address RFI's (Request for Information)
9. Assist with monthly review of Contractor pay applications with the Owner.
10. Issue a certificate of Substantial Completion.
11. Assist with development and issuance of Change Orders.
12. Assist with development and issuance of Proposal Requests to the Contractor and
review Contractor proposals with the Owner.
13. Review Contractor O&M manuals as part of project closeout.
14. Provide letter of recommendation for final completion to the Owner.
15. CAD as-builts are not included.
KNIT
Kittitas county Maintenance Department
Customer: Kittitas County Auditors
Attention: BOCC
Prepared By: Cody Cupp
Date: 4/14/2024
01.UNc vi vvvi a.
Pull and replace carpet tiles in Auditor office vault room.
Asbestos Quote $16,330.26 +TAX
Color Quote $3,512.90 +TAX
0
Authorization Signature
Perma
Material Cost $19,843.16
Labor Cost $0.00
Sales Tax $1,666.83
Our Cost for the Above Scope of Work $21,509.99
Date
Printed Name Date