Loading...
HomeMy WebLinkAbout2024-05-14-minutes-solid-waste-and-maintenanceKITTITAS COUNTY SOLID WASTE AND MAINTENANCE MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Regular Meeting TUESDAY 2:00 PM I Ma 14, 2024 Board members present: Chairman Brett Wachsmith-Absent, Laura Osiadacz Vice - Chairman and Cory Wright Commissioner Others: Patti Stacey, Lisa Lawrence, and Christopher Whitsett Call to Order at 2:05 p.m. Citizen Comments (1 min. time limit) None Ratify Chair's signature on McKinstry Change Order #1: Patti informed the Board that this was on the last agenda but originally the wrong person at McKinstry signed the document and therefore Chairman Wachsmith had to re-sign the document. Commissioner Wright moved to ratify Chair signature, Vice Chairman Osiadacz seconded the motion, Motion passed. 2-0. Request Board Approval for Chair's Signature on Agreement with Knit for Construction and Design for the Jail Renovation: Patti informed the Board that this is for on -call Architect services not to exceed $402,000 for the Jail Renovation Project. Discussion was held on in-house cost savings with the recently hired Project Manager. Commissioner Wright moved to approve Vice Chairmans signature. Vice Chairman Osiadacz seconded the motion. Motion passed. 2-0 Discussion on Project Management Software: Patti informed the Board that she has been evaluating software to assist with keeping track of projects and that she would bring back an official proposal later. Discussion was held on record retention and maintaining as builts more efficiently, IT approval and taking it to the Central Services Committee. Solid Waste Updates: Patti let the Board know that corrections have been made and submitted to the city for the new Transfer Station and that she is still hoping to go out to bid on the project June 41h. Patti informed the Board that the Lagoon at Ryegrass is still not dried out enough to repair. Patti le the Board know that we land applied 257,000 gallons last month and received 270,000 gallons. Discussion was held on the Vantage Homeowners Association and their sewage treatment plant, septic haulers and a proposed decant facility in Ellensburg. 2024-05-14 MINUTES 1 Request Board Approval to move forward on Flooring Project in Auditors Office: Patti presented the Board with a quote in the amount of $21,509.99 to remove existing flooring, which contains asbestos, and replace with carpet tiles in the Auditors office vault room and informed them that the work would be completed on a weekend. OTHER BUSINESS -No Action to be taken A brief discussion was held on the Limited Purpose closure project. Meeting Concluded at 2:27 p.m. Lisa wrence 2024-05-14 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman G"U u u ffAS COUH u Y COOMMOHERS SoHd Waste and GvWntenance Regular Meeting Tuesday May 14, 2024 0 2 0 00 PH BOCC Conference Room 205 West 5th Room 108 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Ratify Chair's Signature on McKinstry Change Order #1 4. Request Board Approval for Chair's Signature on Agreement with Knit for Construction, Design for Jail Renovation 5. Discussion on Project Management Software 6. Solid Waste Updates 7. Request Boards Approval to move forward on Flooring Project in Auditor's Office 8. Other Business - No Action to be taken 9. Concluded Created on 5/10/2024 10:41:31 AM Kittitas C ouna y Bolin! Wasa e Programs And Maintenance Project Management Office 925 Industrial Way, Ellensburg, WA 98926 Telephone: (509) 962-7542 Fax: (509) 962-7087 April 11, 2024 McKinstry 850 E. Spokane Falls Blvd #100 Spokane, WA 99202 RE: Change Order 1 At this time Kittitas County would like to accept the proposal for adding an additional 10Ton RTU to the Assessors Treasures wing of the Courthouse to replace the failed unit. Description: 1) Additional 10T RTU, labor installation and commissioning $110,158.50 See attached quote 206119-004 Please sign and return. Approval Kittitas County Boarof Commissioners Na TITLE: avYcwt; SS "C ,'-C DATE:_ Z- AV McKinstry BY: Name:, � ��� TITLE:Y`y (� AI .S r Al ��ll�i/'.� DATE:_ KNIT Nevada Utah Washington Idaho knitstudios.com April 29, 2024 Patti Stacey, Director Facilities and Waste Operations 925 Industrial Way Ellensburg, WA 98926 Re: Kittitas County On -Call Task 1 Jail Renovation CD and CA Dear Patti, KNIT recognizes design and construction is complex. We are here to help. As a team we develop whole project approaches to design, budget, schedule, project, and construction management to meet your needs. Your solutions should be dynamic, our relationship should be simple. Project Description Renovate portions of the existing Kittitas County Jail Complex including the annex based on the pre -design documents and as addressed in the scoping documents. Basic Services The following usual and customary design services are included in our proposal for your Project. Services not listed below are Supplemental or Additional Services. • Architectural Design • Structural Engineering • Mechanical Engineering • Plumbing Engineering • Electrical Engineering Supplemental Services The following supplemental services are included in our proposal for your Project: • Cost Estimating Owner Provided Services The following services shall be retained and provided by the Owner: 0 Permitting Fees KNIT Nevada Utah Washington Idaho Imitstudios.com Excluded Services Any services not specifically listed above, including but not limited to the following are excluded from our scope of work and fees: • Programming • Space Schematics & Flor Diagrams • Measured Drawings • Existing Facility Surveys • Environmental Studies and Reports • Fast -Track Design Services • Dry Utility Coordination • Interior Design FF&E Services Renderings Sustainable Project Services Lighting Design Signage and Wayfinding Building Envelope Design Accessibility Services Demolition Services Audio -Video Communication Design Electronic Safety and Security Design Access Control Design Video Surveillance Design Security Detection, Alarm and Monitoring Design KNIT General Management and Administration Project Management and Administrative Services — The Architect shall manage the Architect's services, coordinate services with those services provided by the owner and the Owner's consultants, coordinate with users, attend project meetings virtually or in person as mutually agreed, communicate with members of the project team and report progress to the Owner. o The Architect shall establish an initial schedule for Architect's services, design, reviews, and approvals of authorities having jurisdiction (Kittitas County), contracting and construction, substantial and final completion. Schematic Design Phase o Complete under Pre -Design Phase Design Development Phase Design Development — Preparation of Design Development documents that illustrate and describe the size and character of the Project including plans, sections, elevations, and typical construction details, and diagrammatic layouts of building systems. o Structural systems o Drawings and details to establish the mechanical and plumbing systems including approximate sizes and capacities, equipment layouts, required space for equipment, required chases and clearances. o Drawings and details to establish the electrical systems including approximate sizes and capacities, equipment layouts, required space for equipment, required chases and clearances. o IECC Prescriptive approach to Energy Code compliance, where applicable • IECC envelop calculations and analyses. • IECC mechanical calculations and analyses. • IEEC electrical calculations and analyses Outline Specifications - Outline specifications and documents that identify major materials and systems and establish in general their quality levels. Construction Documents Phase Construction Documents — Final Construction Documents detailing the requirements for the work, quality levels of materials, systems, and other requirements for the construction of the Project. o Final Architectural construction documents. o Final Structural construction documents and engineering calculations. o Final Mechanical & Plumbing construction documents and engineering calculations. o Final Electrical construction documents and engineering calculations. o Design -build performance specifications for fire detection and alarm systems. Electrical drawings will indicate the location of fire alarm / life safety panels and equipment. Device layout and designs shall be provided by Design -build contractors. Specifications - Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. Project Manual — Assisting the Owner with the development and preparation of procurement information, form of agreement between Owner and Contractor, and Conditions of the Contract for Construction and compiles them into a Project Manual. Permit Phase • Building Permits and Approvals - The Architect shall assist the Owner in preparing applications, supporting documents, coordination of supporting documents that are the KNIT responsibility of the Owner or the Owner's consultants, and facilitate submittals of applications for building permit(s). Bidding or Negotiation Phase Negotiated Proposals - Design Assist & Construction Manager (CMGC or CMAR) o Organization, handling, and distribution of Proposal Documents. o Organize and participate in selection interviews with prospective contractors. o Prepare and distribute responses to questions and requests for clarifications to all prospective proposers in the form of an addenda. o Analysis of Bid Alternates and Substitutions — Upon Owner's authorization, the Architect shall, with additional compensation, consider request for substitutions and distribute addenda identifying approved substitutions. o Participate in negotiations with prospective contractors and prepare a summary report of the negotiation results, as directed by Owner. Compensation • The above services (DD, CD, Permit ad Bidding) shall be performed on a lump sum basis. Construction Phase Services • The Architect shall provide administration of the Contract between the Owner per the general conditions of the contract. • Evaluations of the Work - Visits to the site to become generally familiar with the progress and quality of the Work completed and to determine in general if the Work when completed will be in accordance with Contract Documents, preparing related reports and communications. o Visits will be conducted monthly or at intervals appropriate to the stage of the work, and mutually agreed to with the Owner. o Estimated construction duration, 6 months. o Should the construction duration or site visits exceed the time duration above the Architect shall be entitled to additional compensation. • Certificates for Payment - Review and certify the amounts due the Contractor and issue certificates of payments for the Work that has progressed in accordance with the Contract Documents. • Submittals - Processing of submittals, including receipt, review of, and appropriate action on Shop Drawings, Product Data, Samples, and other submittals required by the Contract Documents. Maximum of two (2) reviews per submittal. Additional reviews shall be billed as additional compensation. • Evaluations of Substitutions — Review and evaluation of substitutions proposed after award of contracts for construction will be billed as additional compensation. • Request for Interpretations and Information — Review and respond to requests for information about the Contract Documents. The Architects response to such requests shall be made with reasonable promptness, 10 days, unless otherwise agreed upon in writing. KNIT Supplemental Documents - Preparation, reproduction and distribution of supplemental Drawings, Specifications, and interpretations in response to requests for clarification by Contractor(s) or the Owner. Changes in the Work — Proposal Requests, Change Order Requests and Change Orders. o Proposal Requests - Review of proposals from Contractor(s) for reasonableness of quantities and costs of labor and materials, o Change Order Requests - Preparation, reproduction and distribution of Drawings and Specifications to describe Work to be added, deleted, or modified. o Change Orders -Assisting in the preparation of appropriate Modifications of the Contract(s) for Construction. ■ Review and recommendations relative to changes in time for Substantial Completion ■ Negotiations with Contractor(s) on Owner's behalf relative to costs of Work proposed to be added, deleted, or modified. o Coordination of communications, approvals, notifications, and record - keeping relative to changes in the Work. o Substantial Completion - An inspection with the Owner's representative for conformity of the Work to the Contract Documents to verify the list submitted by the Contractor(s) of items to be completed or corrected. Determination of the amounts to be withheld until final completion. Receipt and transmittal of warranties and Issuance of Certificate(s) of Substantial. Final Completion - Final inspection with the Owner's representative to verify final completion of the Work and Issuance of final Certificate(s) for Payment. Compensation • The Construction Administration services shall be performed on an hourly not to exceed basis. 3 KNIT Supplemental Services The following services, which are in addition to the usual and customary basic design services, are proposed for your project. • Cost Estimating - Quantity take -offs and unit cost pricing of materials, labor, tools, equipment, and services required for the Work plus estimates for the Contractor's supervision cost, Work required by General and Supplementary Conditions, and an allowance for a reasonable Contractor's overhead and profit. Supplementary Services shall be performed during the Construction Documents Phase Fee Schedule The fee schedule less Reimbursable cost for the proposed services are as follows: Description Method of Compensation Fee DID and Construction Documents, Permit and Bidding -Arch Fixed Fee $ 157,500.00 Cost Estimating Fixed Fee $5,600.00 MEP Fixed Fee $31,935.00 Structural Fixed Fee $26,000.00 Consultant Mark Up @10% Fixed Fee $ 6,353.50 Construction Administration -Arch Hourly $135,000.00 MEP Hourly $20,169.00 Structural Hourly $16,000.00 Consultant Mark Up @10% Percentage $3,616.90 TOTAL $402,174.40 Hourly Fee with estimated maximum — The fee for this work will be billed on a time and materials basis per the attached rate schedule. The actual total fee billed will be based on the scope of services provided. If the scope of services to be billed will exceed the estimated maximum amount before the scope is completed, the Architect will endeavor to notify you prior to expending services beyond the estimated maximum. Monthly invoices will provide you with an ongoing and updated actual fee for the work. "' Reimbursable — Fees will be billed at 1.10 times the cost incurred by the Architect. Compensation for Reimbursable Expenses Reimbursable will be billed at 1.10 times the cost incurred by the Architect or the Architect's consultants for: o Transportation mileage • Authorized out-of-town travel and subsistence. o Fees paid for securing approval of authorities having jurisdiction over the Project. o Printing, reproductions, and plots, except those used for office use of the Architect and its Consultants. o Postage, handling, and delivery It is recommended that the Owner establish an allowance of $2,500.00 CD Phase CA Phase $6,000.00 Contingencies It is recommended that the Owner establish appropriate contingencies for design services not identified herein or required for the completion of the project whether performed by the Architect, the Architect's Consultants, or the Owners Consultants. Construction Cost and the Owner's Budget The Design and Construction process is not perfect. KNIT performs its services consistent with the professional skill and care ordinarily provided by an Architect providing similar services for a similar project under similar circumstances. KNIT does not warrant that any design services or work product will be completely error or omission free. Therefore, the Owner in establishing the Construction Budget for the Cost of the Work shall include appropriate contingencies for errors or inconsistencies in the construction documents, and unforeseen conditions. i< Closing KNIT The Services outlined above will facilitate a smooth project delivery process. Upon receipt of your contract and Notice to Proceed, we will proceed with the work outlined here and in the Scoping Document attached. These fees are valid for 30 days. Please contact our office if you have any further questions. Sincerely, Rhonda Gillogly, AIA-Partner KNIT 909 S. 336t' Street Suite 202A Federal Way, WA 98003 rgillogiynaknitstudios.com 253-572-5511 ACCEPTED BY: DATE: NAME: TITLE: V�r'�' (/'/Jz �, 11' Acker consfflUng selivice s Information Generated front Practical Experience in the Current Alfarket Place PHONE (360) 895-1756 • FAX (360) 874-2062 P.O. BOX 1213 GIG HARBOR, WA 98335 LICENSE I.D. #601 251 567 April 22, 2024 Knit Designing Community 909 S. 336t' Street, Suite 107 Federal Way, WA 98003 Dear Rhonda Gillogly: "Thank you for considering the use of my services to provide a construction documents level estimate and review for renovations at the Kittitas County Jail. I am assuming the scope will be similar to a Task 1 rough -order -of magnitude estimate done in February. Being of a cut-up nature, with specialty components, and security, access and other logistical concerns to address, there is going to be much more review time involved in this estimate update. As such I am proposing an estimate and review fee of $5,600, which will breakout the major scope areas as was done in the previous estimate, but with greater clarity and detail. As before, all construction costs will be covered. I thank you for the consideration. Please do not hesitate to call if you have any questions, or additional information is desired. Sincerely, Bill Acker HuLTz BHU e n g i n e e r s i n c April 25, 2024 KNIT 909 South 33611 Street, Suite 107 Federal Way, WA 98003 Attention: Rhonda Gillogly Subject: Kittitas County Jail Facility Renovations Engineering Services Proposal (Revision 2) Dear Rhonda: Thank you for this opportunity to submit our proposal to furnish mechanical and electrical engineering services for this project. Proiect Description Improvements at the Kittitas County Jail Facility. Work requiring mechanical and electrical engineering: 1. Jail: Provide power and controls for new public entry doors. 2. Jail: Replace entire wet pipe fire sprinkler system with new; repair dry system (alternate bid). 3. Jail: Renovate pluming at kitchen/mop area. 4. Jail: Correct shower room valve access at K-Module. 5. Jail: Clean outdoor rec area drains and drain lines. 6. Jai: Add heaters in stairwells adjacent to rec yards. 7. Jail: Add heaters in MEP spaces at rec yards. 8. Jail: Add corner exterior light. 9. Annex: Modify MEP as required for barrier at guard station. 10. Annex: Replace rooftop HVAC unit (alternate bid). Scone of Services General: Our scope of work is for systems covered under Division 21 (fire sprinkler), Division 22 (plumbing), Division 23 (HVAC), Division 26 (electrical power, lighting), Division 27 (low voltage systems), and Division 28 (fire alarm) of the Construction Specification Institute (CSI) Manual of Practice. Design Phase: Visit the site to review existing conditions, provide mechanical and electrical engineering, construction drawings, and technical specifications for the project. Provide energy code forms and assist with permit forms. Provide cost estimates for work in our scope. Bid Phase: Respond to bidder questions, review substitutions, and prepare addenda as needed. Construction Phase and Closeout: Respond to contractor questions, review submittals, review pay requests, punchlist review, provide up to six site visits, attend periodic meetings as needed, and review closeout items. 1111 Fawcett Avenue, Suite 100 • Tacoma, Washington 98402 T 253.383.3257 . F 253.383.3283 • general@hultzbhu.com April 25, 2024 KNIT Kittitas County Jail Facility Renovations Page 2 Proposed Fee Design and Bid Phases: We propose to provide our design phase services on a lump sum fee basis as follows: Discipline Design Bid Total Mechanical $ 20,448 $ 925 $ 21,373 Electrical $ 9,243 $ 515 $ 9,758 Total $ 29,690 $ 1,440 $ 31,130 Reimbursable for design and bid phases: Miles Total Cost Item # Trips per Trip Miles Per Mile Amt Mileage 3 276 828 0.67 $555 Printing - - - - $250 Total $805 Total fee for design phase = $ 31,935 Construction/Closeout Phases: We propose to provide our construction and closeout phase services on an hourly charge basis, not to exceed (NTE) our authorized fee without your prior permission. Discipline CA CO Total Mechanical $14,380 $ 225 $ 14,605 Electrical $ 4,120 $ 150 $ 4,270 Total $18,500 $ 375 $18,875 Reimbursable for onstruction, closeout phases: Miles Total Cost Phase # Trips per Trip Miles Per Mile Amt CA 7 276 1932 0.67 $1,294 Total NTE fee for bid/construction/closeout phases = $ 20,169 See the attached for expected tasks, hours, and hourly rates. Assumptions/Qualifiers 1. We assume we will be provided AutoCAD (or Revit) compatible backgrounds of the building. 2. We assume that mechanical, electrical, and plumbing as-builts will be provided to us, and that they are reasonably accurate. 3. Fire sprinkler systems will be covered by a performance specification and drawing notes with final with design by the installing contractor. 4. Electrical metering of existing loads is not included. 5. We assume that any design phase meetings will be the virtual type. April 25, 2024 KNIT Kittitas County Jail Facility Renovations Page 3 6. Our design phase work is complete after submitting for permit and resolving permit comments related to our scope. 7. No structural engineering or design of seismic anchorage for MEP systems is included in our scope (these can be specified as bidder designed where not covered by the structural engineer or others). 8. Commissioning specifications and services are not included in our scope. 9. Attendance at any pre -bid or pre -construction meetings is not included. 10. Preparation of as-builts is not included. 11. If we are not retained for construction phase services (site visits, submittal reviews, RFI responses, etc.), claims shall be waived that might have been prevented had we provided such services. 12. Hazardous materials work (survey, evaluation, reports, abatement, etc.) is not included in our scope. 13. If there are Owner or tenant standards we are to adhere to, we will be provided those in writing prior to us starting our design. 14. We assume that the Owner (and other interested parties) will review our progress submittals and final design documents to confirm their design intent is being met. Sincerely, HultzIBHU Engiineers' Inc. Rick Hultz, PE Principal HuIWBHU Engineers ENGINEERING HOURS 1253) 383-3257 Cansu.T.ng Engineers 42512C24 Project: Kittitas Jail Improvements Work: Mechanical Engineering DESIGN PHASE - Assoc Senior Senior Project Project Senior CAD Task Principal Principal Engr Pro Mgr Engr Mgr Designer Tech Clerical Site Visit/Field Investigation 16 Review As-Buihs 2 1 Review Scope/Requirements 1 1 0.5 M#-Legend/General Notes 2 2 M#-Schedules 2 3 Mtt_Plumbing/Fire Plans 0.5 12 16 M#-Plumbing/Fire Details 8 4 M#-HVAC Plan(s) 0.5 8 4 M#-HVAC Details 12 6 Update Backgrounds 2 Catalog Cuts & Revisions NIC System Narratives NIC Specifications - Technical 1 8 2 Farmat Specifications 1 Arch/Engr/Owner Coordination 1 2 Schedule Review 1 Meetings 4 Correspondence Review 2 QC Review 4 2 1 Progress Submittal(s) 1 2 1 Cost Estimate(s) 8 Respond to Review Comments 1 Mech Energy Code Fortes 1 Permit Forms Assistance 1 Hour Total 9 0 0 0 95 0 0 42 3.5 Labor Hourly Rate 1 $220.00 1 S185.00 $160.00 $145.00 S150.00 $135.00 S120.00 $95.00 $65 Labor Cost Sub -Totals $1.980 1 $0 $0 50 514.250 50 $o $3,990 5228 DESIGN PHASE TOTAL: $20,448 BID PHASE Task - Principal Assoc Principal Senior Engr Senior Pro' Mgr Project Engr Project Mgr Senior Designer CAD Tech Clerical Pre -Bid Meeting Substitution Request Review Bidder Questions Addenda NIC 0.5 2 2 1 1 Hour Total 0.5 0 0 0 5 0 0 0 1 Labor HourlyRate $220.00 S185.00 5160.00 5145.00 $150.00 $135.00 S120.00 S95.00 $65.00 Labor Cost Sub -Totals $110 1 s0 1 30 1 so 1 $750 SO s0 s0 $65 BID PHASE TOTAL: $925 CONSTRUCTION PHASE - Assoc Senior Senior Project Project Senior CAD - Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre -Con Meeting NIC Submi tat Reviews 16 Submittal Re -Reviews 2 Submittal Coordination/Usts NIC Correspondence Review 1 2 Field Reports/Minutes Reviews NIC 6 She Visits 48 RFrs 2 3 Changes/COP/CP Reviews 1 1 Pay Reviews 4 Punchlist 8 Backcheck NIC Hour Total 4 0 0 0 90 0 0 0 0 Labor Hourly Rate $720.00 S185.00 S160.00 $145.00 $150.00 $135.00 S720.00 $95.00 $65.00 Labor Cost Sub -Totals $880 so s0 s0 $13.500 So s0 50 s0 CONSTRUCTION PHASE TOTAL: $14,380 CLOSEOUT PHASE - Assoc Senior Senior Project Project Senior CAD Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Closeout Review - As-Builts 0.5 Closeout Review - O&M 0.5 Closeout Review - Balancing 0.5 Closeout Review - Commissioning NIC And As-Builts NIC Hour Total 0 0 0 0 1,5 0 0 0 0 Labor Hou Rale 5220.00 5785.00 $160.00 $145.00 $150.00 $135.00 $120.00 $95.00 $65,00 Labor Cost Sub -Totals s0 so so s0 $225 $ $0 $0 1 $0 CLOSEOUT PHASE TOTAL: $225 TOTAL ALL PHASES: $35,978 Hultz'9HU Engineers ENGINEERING HOURS (253) 333-3257 Ccnsmling Engineers 42511024 Project: Kittitas Jail Improvements Work: Electrical Engineering DESIGN PHASE - Assoc Senior Senior Project Project Senior CAD - Task Pnncioal Pnncioal Engr Proj Mgr Engr Mgr Designer Tech Clerical Site Visit/Field Invesfigation 8 Review As.Builts 1 0.5 Review Scope/Requirements 0.5 E#-Legend/General Notes 1 1 E#-Floor Plan(s) 10 10 E#-Delails/Panel Schedules 4 6 Load Calcis (Healers) 3 Update backgrounds 1 Catalog Cuts & Revisions NIC System Narratives NIC Specifications - Technical 3 1 Formal Specifications 1 Arch/Engr/Owner Coordination 1 1 Schedule Review 0.5 Meetings 1 Correspondence Review 1 QC Review 2 1 0.5 Progress Submittal(s) 0.5 2 1 Cost Estimate(s) 3 Respond to Review Comments 0.5 0.5 0.5 Lighting Energy Code Forms 1 Permit Forms Assistance 0.5 Hour Total 4 0 0 1 0 1 42 0 0 20 2.5 Labor Hourty Rate $220.00 $185.00 $160.00 $145.00 1 $150.00 1 $135.00 $120.00 $95.00 $65 Labor Cost Sub -Totals $880 SO 30 30 1 $6,300 1 $0 $0 $1,900 1 $163 DESIGN PHASE TOTAL: $9,243 BID PHASE - Assoc Senior Senior Project Project Senior CAD - Task Principal Principal Engr Pro' M r En r Mgr Designer Tech Clerical Pre -Bid Meeting NIC Correspondence Review NIC Substitution Request Review 1 Bidder Questions 1 Addenda 1 1 Hour Total 0 0 0 0 3 0 0 0 1 Labor Houd Rate $220.00 $185.00 $160.00 $145.00 $150.00 $135.00 5120.00 595.00 S65.00 Labor Cost Sub -Totals 1 $0 1 SO I SO 1 $0 1 $450 $0 so I so 1 $65 BID PHASE TOTAL: $515 CONSTRUCTION PHASE - Assoc Senior Senior Project Project Senior CAD Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre -Con Meeting NIC Submittal Reviews 8 Re-Subnuttal Reviews 2 Submittal Coordination/Lists NIC Correspondence Review 2 Meeting Minutes Reviews 2 Site Visits SEE MECHANICAL RFI's 1 2 Changes/COP/CP Reviews NIC Pay Reviews 2 Punchlisl 8 Backcheck NIC Hour Total 1 1 0 0 0 26 0 0 0 0 Labor Houd Rate S220.00 S185.00 $160.00 $145.00 $150.00 S135.00 S120.00 $95.00 $65.00 Labor Cost Sub -Totals $220 1 $0 SO 1 $0 1 $3,900 1 $0 1 $0 1 $0 1 50 CONSTRUCTION PHASE TOTAL: $4,120 CLOSEOUT PHASE Task - Principal Assoc Principal Senior Engr Senior Pro M r Project En r Project Mgr Senior Designer CAD Tech - Clerical Closeout Review-As-Builts Closeout Review - O&M Closeout Review -Elec Tests Acad As-Builts NIC NIC 0.5 0.5 Hour Total D 0 0 1 0 1 t 1 0 10 0 0 Labor Hourly Rate 1 S220.00 1 $185.00 $160.00 $145.00 $150.00 $135.00 $120.00 1 $95.00 1 $65.00 Labor Cost Sub -Totals SO I so so $0 $150 SO s0 I $0 I SO CLOSEOUT PHASE TOTAL: $150 TOTAL ALL PHASES: $14,028 Hourly Rates Assoc Senior Senior Project Project Senior CAD - Princioal Principal Engr Proj Mgr Engr M r Desi ner ITech Clerical $220.00 1 $185.00 $160.00 1 $145.00 $150.00 $135.00 1 $120.00 1 $95.00 1 365.00 � X F, 0 U�' A S' Structural Solutions Seattle 1011 western A�enua, Srste 8tO V �a!Je, i:' 981U4 i 2 F 292.5G7c Tacoma 1250 Pacific Avenue, SWe 701 ! Taccsna. WA 98402 i 253.383.2797 Portland 101 SW M n Strut. Suite 28D e Port'ar7. OR 97204 i 503.232.3746 www.pcs-strucDwaLcom March 29, 2024 KNIT 909 S 33611 St, Suite 107 Federal Way, WA 98003 ATTN: Rhonda Gillogly RE: Kittitas County Jail Renovations — CD/CA Phase Dear Rhonda: Thank you for this opportunity to propose our Structural Engineering services for the Kittitas County Jail Renovations CD/CA Phase. SCOPE OF SERVICES We will provide all structural design, calculations, and marked -up drawings as required toward obtaining the Building Permit for the structural portion of this project. Post permit changes can be provided at additional cost on an hourly basis. Our scope of services and resulting fees are based on the following scope: • Exterior/interior concrete panel cracking repairs. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 16 hours anticipated. • Jail Entry Doors. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 8 hours anticipated. • Mop room/kitchen wall repairs. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 4 hours anticipated. • Rec Yard topping slab. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 4 hours anticipated. • Annex slab on grade repairs. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 4 hours anticipated. • Annex railing extension. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 8 hours anticipated. • Annex control booth enclosure. o Review of architectural pre -design options. Up to 8 hours anticipated. o Coordination with KNIT. Structural drawings are not anticipated, but we will support KNIT with notes/sketches. Up to 24 hours anticipated. OPCSI Structural Solutions Connected Teams. Bold Solutions. KNIT Rhonda Gillogly Kittitas County Jail Renovations — CD/CA Phase • Rooftop unit o Check existing framing to support new mechanical unit. Anchorage to support structure to be bidder designed. Any structural upgrades will be shown on structural drawings/details. • Maximum of two site visits during design for coordination and to observe existing conditions as needed. • Virtual team coordination meetings as needed throughout design phase (8 meeting assumed). • Construction phase service to include submittal review, structural observation site visits and answering contractor questions. One structural observation site visit is anticipated. • Design schedule is anticipated through end of 2024 and construction phase is anticipated to be 12 months. • Record drawings can be provided on an hourly basis. FEES Our fee proposal for the Structural Engineering services on the above -referenced project is as follows: • Design Phase • CA $ 26,000 16,000 Total $ 42,000 Billing will be on a percentage of completion basis. The fee amount may be modified only with prior written approval if the scope of services is changed. Thank you for this opportunity to be of continued service. If there are any questions regarding this proposal, please feel free to call. We look forward to hearing from you. Very truly yours, PCS STRUCT AL OLUTIONS Wes Neeley, S.E. Associate Principal WJNeml 23-702 23702 pro -MCA 2024-03-29 An KNIT March 26, 2024 Nevada Washington Patti Stacey, Director Utah Idaho Facilities and Waste Operations KnitStudios.com 925 Industrial Way Ellensburg, WA 98926 RE: County Jail Facility Renovations -Task 1 B Jail TI Build Out Knit- On -Call Services DRAFT-Scoping Document Patti, Thank you for taking time to review the pre -design documents with us and discussing next steps to develop your Jail TI project. Below you will find our understanding of the project scope to be addressed under Task Order 1 B for our On -Call Services Contract. Please review and make any modifications or clarifications that should be included or removed from our scope. Once we reach a final consensus, we will develop a fee proposal based on the approved scope. The below items are to be included into construction documents with some items being identified as Add Alternates. Our scope of work will include development of construction documents and specifications, assist with bidding and contractor bid review, participation in construction administration services and project closeout. Let me know if you have any questions. Respectfully, Rhonda Gillogly, AIA Partner KNIT SCOPING DOCUMENTATION Project Notes: The county plans on relocating to a new facility in approximately 10 years. New repairs or products are to meet durability requirements needed to maintain the facility in good condition for this duration at a minimum. Construction Documents The development of construction documents is based on the 90%pre-design package developed under Task 1-Jail TI-Pre-Design. JAIL Exterior finish / coating repairs A. Existing sanded exterior paint coating on existing concrete surfaces is failing. The coating should be removed and refinished, after concrete panel cracking repairs. New finishes may include new painted surfaces with high quality concrete sealing products, EIFS or other panel system. B. The existing exterior concrete panels are cracking in several locations and are not limited to one area of the facility. Cracking occurs in spiderweb fashion and horizontally at floor levels. In some instances, cracking can be seen on both the exterior and interior surfaces. A structural evaluation will need to occur to determine causes and repair solutions. C. Remove existing vertical and horizontal expansion joints, including backer rods. Replace joints with new backer rods and durable sealants. D. Clean top of concrete wall caps at roof parapets. Install new treated wood blocking and provide new sheet metal coping caps. 2. Interior repairs A. The existing interior concrete panels are cracking in several locations and are not limited to one area of the facility. Cracking occurs in spiderweb fashion and horizontally at floor levels. In some instances, cracking can be seen on both the exterior and interior surfaces. A structural evaluation will need to occur to determine causes and repair solutions. B. Remove existing vertical and horizontal expansion joints, including backer rods. Replace joints with new backer rods and durable sealants. 3. Jail Public Entry Doors A. The existing hollow metal double doors and side-lites are failing. Remove and replace with identical secure system with ADA controllers. It's possible that the sidewalls can be infilled with a wall system and replace the double doors with a single 4'-0" wide secure hollow metal door and frame and ADA controllers. B. Remove interior vestibule doors and side-lites. Patch and repair walls and ceilings. C. Remove exterior steel railings and provide 1 to 3 concrete filled steel pipe bollards in front of the jail entry doors to prohibit vehicle ramming of the building. 4. Fire Sprinklers -Bid Alternate A. Remove existing fire sprinkler system and replace. B. Repair dry system as needed. 5. Omitted -Booking Area A. P.n.Adn n suspended gFid system and peFfeFate d metal panel 5 .stem !'eAtF-.EteF would be r Fed +n ,- eFdiR@te eleaRun of ...i..,S —;;Rd— iR_s#—,11 of y c,,, nno arps; ,-RAT 6. Mop room / kitchen Repair existing wall studs. Renovate plumbing. Relocate electrical. KNIT New wall finishes and wall base at mop room. Repair wall finishes at kitchen sink. 7. Fix shower room plumbing access to valves and provide ventilation in K-Module. 8. Recreation Yard Repairs a. Grind down existing concrete flooring surface for drainage. Clean out existing drains and drain lines. Recoat with Slip Resistant Epoxy coating suitable for exposure to weather. 9. New Heater in Stairwells adjacent to recreation yards. 10. New Heaters in MEP spaces in Rec yard JAIL ANNEX 12. Repair floor to wall joints @ Annex. 13. Secure barrier @ guard station. a. Modify design to save costs. May include maintaining original circular shape. Additional design work needed and Owner approval before moving into construction documents. 14. Replace existing Rooftop HVAC unit (Bid Alternate) Assist with permitting and bidding 1. Assist the county with issuance of documents to local county for permit review rather than city. 2. Assist County with issuance of bid documents, answer bidder questions and issue addenda. The A&E team shall attend the Pre -Bid Conference if requested by County. 3. Review Bid data received and review with County for contractor bid award. Assist with Construction Administration and Project Closeout Services 1. Attend Virtual Pre -Construction Conference 2. Maintain regular construction meeting minutes if requested by the County. 3. A&E team to attend in person and perform field visit once a month for the duration of construction the regular construction meetings with the Owner and Contractor. Estimated 6 months construction duration. ( 6 on site meetings) 4. Attend virtually on a weekly basis, regular construction meetings with Owner and Contractor. Estimated 6 months construction duration. (roughly 20 meetings). 5. Perform an on -site punch list walk with Owner and Contractor. 6. Owner shall provide punch list back check. 7. Review contractor submittals. 8. Address RFI's (Request for Information) 9. Assist with monthly review of Contractor pay applications with the Owner. 10. Issue a certificate of Substantial Completion. 11. Assist with development and issuance of Change Orders. 12. Assist with development and issuance of Proposal Requests to the Contractor and review Contractor proposals with the Owner. 13. Review Contractor O&M manuals as part of project closeout. 14. Provide letter of recommendation for final completion to the Owner. 15. CAD as-builts are not included. KNIT Kittitas county Maintenance Department Customer: Kittitas County Auditors Attention: BOCC Prepared By: Cody Cupp Date: 4/14/2024 01.UNc vi vvvi a. Pull and replace carpet tiles in Auditor office vault room. Asbestos Quote $16,330.26 +TAX Color Quote $3,512.90 +TAX 0 Authorization Signature Perma Material Cost $19,843.16 Labor Cost $0.00 Sales Tax $1,666.83 Our Cost for the Above Scope of Work $21,509.99 Date Printed Name Date