HomeMy WebLinkAboutRFQ_LowerKittitasReachFloodplainRestorationKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: June 4, 2024
ACTION REQUESTED: Request to Approve a Request for Qualifications/Proposals
for Lower Kittitas Reach Floodplain Reconnection Project
Restoration Engineering, Design, and Permitting Services.
BACKGROUND: The Kittitas County Flood Control Zone District has
purchased over 400 acres of flood prone property located
behind the failing Hansen Pits Levee. These lands were
purchased for floodplain management purposes, including
flood risk reduction, habitat restoration, and maintaining
flood compatible agricultural and open space uses. The
U.S. Bureau of Reclamation previously provided donated
services to develop conceptual restoration designs.
Additional design, hydraulic analysis, and permitting is
required to advance the project to final design. Kittitas
County Public Works developed a Request for
Qualifications / Proposals to solicit for required services.
This project is identified in the Flood Control Zone District
6-year work program and 2024 annual budget. Funding has
been secured from the Salmon Recovery Funding Board
and Yakima Basin Integrated Plan.
INTERACTION: Public Works.
RECOMMENDATION: Approve a Request for Qualifications / Proposals for Lower
Kittitas Reach Floodplain Reconnection Project Restoration
Engineering, Design, and Permitting Services.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Notice of Request for Qualifications/Proposals; Request for
Qualifications/Proposals.
LEAD STAFF: Arden Thomas, Water Resource Manager.
5/29/24, 2:24 PM newspaper -text (22).html
Public Notice
Kittitas County, Ellensburg WA
REQUEST FOR QUALIFICATIONS / PROPOSALS:
Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services
All submittals received after 5:00 PM Monday, July S, 2024 will be discarded
PURPOSE
Kittitas County is seeking professional engineering, design, hydraulic analysis and permitting services for an instream and
floodplain restoration project along the Yakima River within the Lower Kittitas Reach in Kittitas County, Washington. The
700-acre project area includes 2.7 miles of the Yakima River, located between Hansen Pits and Ringer Loop Road, just south
of Ellensburg. The Lower Kittitas Reach Floodplain Reconnection Project aims to remove failing flood protection
infrastructure to activate property purchased for floodplain management, habitat restoration, and open space protection
purposes while mitigating off -site flood risk, addressing former gravel mining pits habitat degradation, and restoring habitat
and habitat -forming processes. Additional project background is available in the Lower Kittitas Reach Floodplain
Reconnection Project Concept Basis of Design report, along with additional reach -scale background information is available
online by visiting the Kittitas County Flood Study and Reports webpage (https://www.co.kittitas.wa.us/public-
works/flood/reports.aspx). Please see material posted under the "Yakima River Multiple Benefit Flood Hazard Reduction &
Habitat Restoration" heading.
SCOPE OF PROJECT
The scope of work to be completed under a negotiated contract executed for this RFQ/P includes all or portions of the design
engineering, hydraulic analysis, and environmental permitting for the Lower Kittitas Reach Floodplain Reconnection
Project. The County Reserves the right to retain the services of the successful firm for any subsequent phases (such as
construction) associated with this project.
The scope of work detailed below is preliminary and provided for the purpose of submitting a statement of qualifications
and proposal. Adjustments will be made subsequent to negotiated items of work and execution of a contract for professional
services.
The work to be performed under this contract consists of the following general tasks.
Project Management and Coordination
• Identify a single Project Manager for the contract who will manage all internal and subcontracted resources,
coordinate with Kittitas County, and maintain a project management plan with current project schedule.
• Prepare and submit monthly progress reports and updated schedule to designated Kittitas County contact.
• Coordinate and attend monthly design review meeting with the design team, which includes representatives from
Kittitas County, Mid -Columbia Regional Fisheries Enhancement Group (MCF), and U.S. Bureau of Reclamation
representatives.
• Geotechnical Investigation Coordination - Kittitas County has initiated geotechnical test pit explorations and relevant
analysis across the project area, which are scheduled to commence this summer. The selected contractor will
coordinate with the County through the design phase to identify additional geotechnical needs.
• Vegetation Restoration Design Coordination — MCF is developing an overall -all site revegetation plan. This
revegetation strategy will be coordinated and integrated with the design process and is expected to inform design
elements and restoration plans, specifications, and cost estimates.
• Coordinate and attend four (4) Technical Advisory Group Meetings where representatives with habitat restoration
technical design expertise provide feedback on project design. One of these Technical Advisory Group Meetings will
be convened as a "mid -design" check -in between the 30% and 80% design deliverables.
• Coordinate with county, state, and federal personnel and departments to provide information required for project
permits.
Site Visits
file:///C:/Users/candie.leader/Downloads/newspaper-text (22).html 1/5
5/29/24, 2:24 PM
newspaper -text (22).html
• Initial Site Visit — Participate in an initial site visit to meet with the design team, gain familiarity with the site, and
dedicate a portion of the visit to discuss the previously completed concept and next steps to achieve project objectives
with the design team.
• Data Collection Site Visits — Visit the site to collect additional pertinent topographic, bathymetric, geomorphic, and
physical data beyond the existing dataset that may be required to validate the design and hydraulic modeling. Control
point data collected by the County will be available if the Contractor needs to utilize GPS for data collection.
• Draft 30% Design Review — Participate in a site visit at the draft 30% design milestone to review design elements, as
well as meet with the Technical Advisory Group to convey the current state of the design, discuss proposed project
elements, and solicit feedback.
• Draft 80% Design Review — Participate in a site visit at the draft 80% design milestone to review design elements, as
well as meet with the Technical Advisory Group to convey the current state of the design, discuss proposed project
elements, and solicit feedback.
Conceptual Design Review and Geomorphic Analysis
• Review the existing conceptual design and supporting data.
• Conduct Geomorphic Analysis to vet and inform the design approach.
• Identify additional data collection needs.
Draft (30%) Design Development
• Integrate conceptual design review comments
• Finalize design criteria
• Hydraulic modeling and analysis
• Basis of Design Report
• Draft 30% design drawings for review
• Draft design cost construction estimates based on quantities derived from the design process.
Draft (80% Design Development
• Integrate comments received during the Draft 30% design review and mid -design check -in with the Technical
Advisory Group.
• Refine hydraulic modeling and analysis.
• Basis of Design Report
• Draft 80% design drawings for review
• Meet the qualifications for construction permit applications with local, state, and federal agencies.
• Design level cost estimate based on latest design updates.
Final Plan (10001o), Specifications, and Estimate
Final design incorporates technical comments from stakeholders, fenders, and permitters into a stand-alone and
comprehensive set of final drawings, a Basis of Design report, and technical specifications for project construction. The final
design process must address and resolve all substantial issues raised in the permitting and stakeholder review process so that
all stakeholders agree on the final plans and result in 100% construction ready documents.
• Final Basis of Design Report
• Final plans
• Final special provisions
• Final quantities and engineer's estimate
Environmental Permitting
• Conduct necessary surveys, coordinate with regulatory agencies, prepare permit applications, and inform the project
team about potential streamline or programmatic restoration approaches to address local, state, and federal
environmental and cultural permitting needs.
A review team will evaluate each submittal based on the scoring criteria provided below:
Qualifications and Relevant Experience (30 points): Discuss the overall experience of your firm working on this type of
project and provide comparable examples. Provide the name and phone number for at least three (3) references of past
file:///C:/Users/candie.leader/Downloads/newspaper-text (22).html 2/5
5/29/24, 2:24 PM newspaper -text (22).html
clients for similar projects. Highest scores will be given to consultants that demonstrate relevant qualifications for key
members of the team, and for firms that demonstrate they have a coherent team that has worked together on similar projects.
Project Understanding and Methodology (50 points): Specify how the design methodology will address the goals and
objectives identified in the Lower Kittitas Reach Floodplain Recormection Project Concept Basis of Design report. Discuss
how the goals and objectives along with site opportunities and constraints inform the restoration approach. The restoration
approach discussion should directly address process -based techniques (including, but not limited to, stage-0) and more
engineered/hardened approaches. Identify site constraints, technical, and regulatory challenges you anticipate and how they
will be addressed.
Tasks, Schedule, and Past Contract Performance (20 points): Identify necessary tasks to complete the scope of work and
provide a schedule for the tasks previously identified. Provide documentation your ability to complete projects on time and
within budget for similarly scoped projects.
Responders are encouraged to address each item listed in the scoring criteria above in their response to this solicitation.
PROCEDURES FOR SUBMITTAL
A mandatory online virtual site visit will be held at 1:30 PM Pacific Time on Wednesday, June 12, 2024. Attendance
at the virtual site visit by personnel who would be substantially involved in the project is required to submit a
proposal. You must RSVP by 5 pm on June 11th with the Project Manager to attend the site visit. Contact Project Manager
at (509) 962-7523 or arden.thomas@co.kittitas.wa.us.
Submittals shall be titled "Lower Kittitas Reach Floodplain Reconnection Project Engineering, Design, and Permitting
Services" and shall include three (3) hard copies of submittal documents mailed to:
Arden Thomas
Kittitas County Public Works
411 N. Ruby St, Suite 1; Ellensburg, WA 98926
Submittals shall include a one -page cover letter with the firm name and contact information. Submittals will not exceed
twenty (20) pages in length (single sided) and must be a minimum font size of 11. The twenty (20) pages may be doubled
sided with a single double -sided page counted as two pages for a total of ten (10) pages double sided.
Proposals will be received until 5:00 p.m. local time on Monday July 8, 2024. Any proposals received after the scheduled
closing time for receipt of proposals shall be deemed ineligible for award consideration.
The submittal should provide a straightforward, concise description of proponent's capabilities to satisfy the requirements of
this RFQ/P. Emphasis should be on completeness and clarity of content.
The County Reserves the Right to:
1. Reject any and all proposals received in response to this RFQ/P, if deemed to be in the best interest of the project.
2. Waive or modify any irregularities in proposals received, after prior notification to the proponent.
3. Consider proposals or modifications received at any time before the award is made, if such action is in the best
interest of the County.
4. Seek clarification of each firm's proposal.
The County is not liable for any costs incurred by the Consultant in the preparation or presentation of the statement of
qualification and proposal.
For your records, the County will provide a confirmation email to the contacts provided in the submittal confirming receipt
of your submittal. Submittals received after 5:00 PM on July 8, 2024 will be disregarded.
Addenda
In the event it becomes necessary to revise any part of this RFQ/P, addenda will be provided to all attendees of the June 12,
2024 virtual site visit.
file:///C:/Users/candie.leader/Downloads/newspaper-text (22).html 3/5
5/29/24, 2:24 PM newspaper -text (22).html
SELECTION PROCESS AND PROPOSED SCHEDULE
Kittitas County's selection will be based on the review and ranking of qualifications and proposals submitted. Proposals will
be evaluated immediately with interviews and reference checks tentatively scheduled for final selection targeted for July 26,
2024.
Anticipated Dates and Tasks
July 8, 2024 - Deadline for SOQ/P submittals
July 15, 2024 - Selection of firms to Interview
July 26, 2024 - Selected firm identified
August 6, 2024 - BOCC Award of Contracts
The above noted schedule is tentative and may be changed based on the number of statements received. Firms will be
selected to interview if the selection committee decides that interviews are required.
AGREEMENT OF SERVICES
The selected contractor will be required to enter into a Professional Services Agreement with the County. Insurance
requirements are included in that agreement. Selected contractor(s) must comply with all federal, state, and local laws and
regulations governing the performance of the business or activity.
Disqualification
In compliance with Executive Order 12549, the County will not award a contract to any contractor or subcontractor that has
been debarred or suspended or otherwise excluded from participation by Executive Order 12549. Contractors will be asked
to state that they have not been debarred, suspended or otherwise excluded.
Americans with Disabilities Act (ADA) Information
Kittitas County in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities
Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be
made available in an alternate format by emailing Arden Thomas at arden.thomas@co.kittitas.wa.us or by calling collect
509-962-7523.
Title VI Statement
Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Star. 252, 42 U.S.C. 2000d to 2000d-4 and
Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21,
nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby
notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement,
disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response
to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration
for an award."
INQUIRIES
Direct all inquiries regarding this request for services to Arden Thomas, Public Works Water Resource Manager at (509)
962-7523, or via e-mail: arden.thomas@co.kittitas.wa.us
Clerk of the Board
file:///C:/Users/candie.leader/Downloads/newspaper-text (22).html 4/5
5/29/24, 2:24 PM newspaper -text (22).html
Publish:
Daily Record: 06/06/2024; 06/13/2024; 06/20/2024
Daily Journal of Commerce: 06/06/2024; 06/13/2024; 06/20/2024
file:///C:/Users/candie.leader/Downloads/newspaper-text (22).html 5/5
5129124, 2:24 PM www-text (22).html
For more information, contact Public Works
Kittitas County shall evaluate statements of qualifications and performance data submitted by firms regarding
the proposed project. Following the evaluation, the county may invite one or more firms to meet with county
officials to discuss the project and the relative benefits of various methods of providing the desired services. The
county then selects from among those firms the one "most highly qualified" to provide the required services.
County procedures and guidelines are to include a plan to ensure that women, minority, and veteran -owned firms
have the maximum opportunity to compete for the contract. The level of firm participation should be consistent
with their availability within the relevant professional community.
After choosing the most qualified firm, the county then negotiates with that firm for a contract at a price the
county determines is fair and reasonable, considering the estimated value of the services to be rendered, as well
as the scope and complexity of the project. If a satisfactory contract cannot be negotiated, the county formally
terminates the negotiations with that firm and attempts to negotiate a contract with the next most qualified firm.
The process continues until an agreement is reached or the search is terminated.
In emergency situations, the process outlined above for procuring services maybe dispensed with upon a finding
by the county that an emergency requires the immediate execution of the work involved.
All submittals shall become the property of Kittitas County.
Kittitas County reserves the right to reject all submittals and re -advertise if necessary.
file:///C:/Users/c ndie.leader/Downloads/www-text (22).html ill
o Ma
KITTITAS COUFTY
KZTTZTAli3 COUNTY
DEPARTMENT OF PUBLIC WORKS
Joshua Fredrickson, Director
REQUEST FOR QUALIFICATIONS / PROPOSALS:
Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and
Permitting Services
All submittals received after 5:00 PM Monday, July 8, 2024 will be discarded
PURPOSE
Kittitas County is seeking professional engineering, design, hydraulic analysis and permitting
services for an instream and floodplain restoration project along the Yakima River within the
Lower Kittitas Reach in Kittitas County, Washington. The 700-acre project area includes 2.7
miles of the Yakima River, located between Hansen Pits and Ringer Loop Road, just south of
Ellensburg. The Lower Kittitas Reach Floodplain Reconnection Project aims to remove failing
flood protection infrastructure to activate property purchased for floodplain management, habitat
restoration, and open space protection purposes while mitigating off -site flood risk, addressing
former gravel mining pits habitat degradation, and restoring habitat and habitat -forming
processes. Additional project background is available in the Lower Kittitas Reach Floodplain
Reconnection Project Concept Basis of Design report, along with additional reach -scale
background information is available online by visiting the Kittitas County Flood Study and
Reports webpage (https://www.co.kittitas.wa.us/public-works/flood/reports.asp . Please see
material posted under the "Yakima River Multiple Benefit Flood Hazard Reduction & Habitat
Restoration" heading.
SCOPE OF PROTECT
The scope of work to be completed under a negotiated contract executed for this RFQ/P includes
all or portions of the design engineering, hydraulic analysis, and environmental permitting for
the Lower Kittitas Reach Floodplain Reconnection Project. The County Reserves the right to
retain the services of the successful firm for any subsequent phases (such as construction)
associated with this project.
The scope of work detailed below is preliminary and provided for the purpose of submitting a
statement of qualifications and proposal. Adjustments will be made subsequent to negotiated
items of work and execution of a contract for professional services.
The work to be performed under this contract consists of the following general tasks.
1) Project Management and Coordination
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
a. Identify a single Project Manager for the contract who will manage all internal
and subcontracted resources, coordinate with Kittitas County, and maintain a
project management plan with current project schedule.
b. Prepare and submit monthly progress reports and updated schedule to designated
Kittitas County contact.
c. Coordinate and attend monthly design review meeting with the design team,
which includes representatives from Kittitas County, Mid -Columbia Regional
Fisheries Enhancement Group (MCF), and U.S. Bureau of Reclamation
representatives.
d. Geotechnical Investigation Coordination - Kittitas County has initiated
geotechnical test pit explorations and relevant analysis across the project area,
which are scheduled to commence this summer. The selected contractor will
coordinate with the County through the design phase to identify additional
geotechnical needs.
e. Vegetation Restoration Design Coordination — MCF is developing an overall -all
site revegetation plan. This revegetation strategy will be coordinated and
integrated with the design process and is expected to inform design elements and
restoration plans, specifications, and cost estimates.
f. Coordinate and attend four (4) Technical Advisory Group Meetings where
representatives with habitat restoration technical design expertise provide
feedback on project design. One of these Technical Advisory Group Meetings
will be convened as a "mid -design" check -in between the 30% and 80% design
deliverables.
g. Coordinate with county, state, and federal personnel and departments to provide
information required for project permits.
2) Site Visits
a. Initial Site Visit — Participate in an initial site visit to meet with the design team,
gain familiarity with the site, and dedicate a portion of the visit to discuss the
previously completed concept and next steps to achieve project objectives with
the design team.
b. Data Collection Site Visits — Visit the site to collect additional pertinent
topographic, bathymetric, geomorphic, and physical data beyond the existing
dataset that may be required to validate the design and hydraulic modeling.
Control point data collected by the County will be available if the Contractor
needs to utilize GPS for data collection.
c. Draft 30% Design Review — Participate in a site visit at the draft 30% design
milestone to review design elements, as well as meet with the Technical Advisory
Group to convey the current state of the design, discuss proposed project
elements, and solicit feedback.
d. Draft 80% Design Review — Participate in a site visit at the draft 80% design
milestone to review design elements, as well as meet with the Technical Advisory
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 3
Group to convey the current state of the design, discuss proposed project
elements, and solicit feedback.
3) Conceptual Design Review and Geomorphic Analysis
a. Review the existing conceptual design and supporting data.
b. Conduct Geomorphic Analysis to vet and inform the design approach.
c. Identify additional data collection needs.
4) Draft (30%) Design Development
a. Integrate conceptual design review comments
b. Finalize design criteria
c. Hydraulic modeling and analysis
d. Basis of Design Report
e. Draft 30% design drawings for review
f Draft design cost construction estimates based on quantities derived from the
design process.
5) Draft (80%) Design Development
a. Integrate comments received during the Draft 30% design review and mid -design
check -in with the Technical Advisory Group.
b. Refine hydraulic modeling and analysis.
c. Basis of Design Report
d. Draft 80% design drawings for review
e. Meet the qualifications for construction permit applications with local, state, and
federal agencies.
f. Design level cost estimate based on latest design updates.
6) Final Plan (100%), Specifications, and Estimate
Final design incorporates technical comments from stakeholders, funders, and permitters
into a stand-alone and comprehensive set of final drawings, a Basis of Design report, and
technical specifications for project construction. The final design process must address
and resolve all substantial issues raised in the permitting and stakeholder review process
so that all stakeholders agree on the final plans and result in 100% construction ready
documents.
a. Final Basis of Design Report
b. Final plans
c. Final special provisions
d. Final quantities and engineer's estimate
7) Environmental Permitting
Conduct necessary surveys, coordinate with regulatory agencies, prepare permit
applications, and inform the project team about potential streamline or programmatic
restoration approaches to address local, state, and federal environmental and cultural
permitting needs.
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509)962-7663
Dept. of Public Works
Page 4
A review team will evaluate each submittal based on the scoring criteria provided below
Qualifications and Relevant Experience (30 points): Discuss the overall experience of your
firm working on this type of project and provide comparable examples. Provide the name and
phone number for at least three (3) references of past clients for similar projects. Highest scores
will be given to consultants that demonstrate relevant qualifications for key members of the
team, and for firms that demonstrate they have a coherent team that has worked together on
similar projects.
Project Understanding and Methodology (50 points): Specify how the design methodology
will address the goals and objectives identified in the Lower Kittitas Reach Floodplain
Reconnection Project Concept Basis of Design report. Discuss how the goals and objectives
along with site opportunities and constraints inform the restoration approach. The restoration
approach discussion should directly address process -based techniques (including, but not limited
to, stage-0) and more engineered/hardened approaches. Identify site constraints, technical, and
regulatory challenges you anticipate and how they will be addressed.
Tasks, Schedule, and Past Contract Performance (20 points): Identify necessary tasks to
complete the scope of work and provide a schedule for the tasks previously identified. Provide
documentation your ability to complete projects on time and within budget for similarly scoped
projects.
Responders are encouraged to address each item listed in the scoring criteria above in their
response to this solicitation.
PROCEDURES FOR SUBMITTAL
A mandatory online virtual site visit will be held at 1:30 PM Pacific Time on Wednesday,
June 12, 2024. Attendance at the virtual site visit by personnel who would be substantially
involved in the project is required to submit a proposal. You must RSVP by 5 pm on June
1 Ith with the Project Manager to attend the site visit. Contact Project Manager at (509) 962-7523
or arden.thomas@co.kittitas.wa.us.
Submittals shall be titled "Lower Kittitas Reach Floodplain Reconnection Project Engineering,
Design, and Permitting Services" and shall include three (3) hard copies of submittal documents
mailed to:
Arden Thomas
Kittitas County Public Works
411 N. Ruby St, Suite 1; Ellensburg, WA 98926
Submittals shall include a one -page cover letter with the firm name and contact information.
Submittals will not exceed twenty (20) pages in length (single sided) and must be a minimum
font size of 11. The twenty (20) pages may be doubled sided with a single double -sided page
counted as two pages for a total of ten (10) pages double sided.
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 5
Proposals will be received until 5:00 p.m. local time on Monday July 8, 2024. Any proposals
received after the scheduled closing time for receipt of proposals shall be deemed ineligible for
award consideration.
The submittal should provide a straightforward, concise description of proponent's capabilities to
satisfy the requirements of this RFQ/P. Emphasis should be on completeness and clarity of
content.
The County Reserves the Right to:
a) Reject any and all proposals received in response to this RFQ/P, if deemed to be in the best
interest of the project.
b) Waive or modify any irregularities in proposals received, after prior notification to the
proponent.
c) Consider proposals or modifications received at any time before the award is made, if such
action is in the best interest of the County.
d) Seek clarification of each firm's proposal.
The County is not liable for any costs incurred by the Consultant in the preparation or
presentation of the statement of qualification and proposal.
For your records, the County will provide a confirmation email to the contacts provided in the
submittal confirming receipt of your submittal. Submittals received after 5:00 PM on July 8,
2024 will be disregarded.
Addenda
In the event it becomes necessary to revise any part of this RFQ/P, addenda will be provided to
all attendees of the June 12, 2024 virtual site visit.
SELECTION PROCESS AND PROPOSED SCHEDULE
Kittitas County's selection will be based on the review and ranking of qualifications and
proposals submitted. Proposals will be evaluated immediately with interviews and reference
checks tentatively scheduled for final selection targeted for July 26, 2024.
Anticipated Dates and Tasks
July 8, 2024 - Deadline for SOQ/P submittals
July 15, 2024 - Selection of firms to Interview
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 6
July 26, 2024 - Selected firm identified
August 6, 2024 - BOCC Award of Contracts
The above noted schedule is tentative and may be changed based on the number of statements
received. Firms will be selected to interview if the selection committee decides that interviews
are required.
AGREEMENT OF SERVICES
The selected contractor will be required to enter into a Professional Services Agreement with the
County. Insurance requirements are included in that agreement. Selected contractor(s) must
comply with all federal, state, and local laws and regulations governing the performance of the
business or activity.
Disqualification
In compliance with Executive Order 12549, the County will not award a contract to any
contractor or subcontractor that has been debarred or suspended or otherwise excluded from
participation by Executive Order 12549. Contractors will be asked to state that they have not
been debarred, suspended or otherwise excluded.
Americans with Disabilities Act (ADA) Information
Kittitas County in accordance with Section 504 of the Rehabilitation Act (Section 504) and the
Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability,
in all of its programs and activities. This material can be made available in an alternate format by
emailing Arden Thomas at arden.thomas@co.kittitas.wa.us or by calling collect 509-962-7523.
Title VI Statement
Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42
U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of
Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally
assisted programs of the Department of Transportation issued pursuant to such Act, hereby
notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to
this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be
afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, national origin, or sex in consideration for an
award."
Direct all inquiries regarding this request for services to Arden Thomas, Public Works Water
Resource Manager at (509) 962-7523, or via e-mail: arden.thomas@co.kittitas.wa.us
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663