HomeMy WebLinkAboutResolution_TO5_WSEKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: May 7, 2024 ACTION REQUESTED: Request to Approve a Resolution to Authorize the Chair's Signature on Watershed Science and Engineering, Inc. Task Order No. 5 - Ellensburg Urban Flooding Hydraulic Analysis. BACKGROUND: The City of Ellensburg was awarded Flood Control Account Assistance Program (FCAAP) funding by the Department of Ecology. This grant will fund a city -led effort to improve flood risk information associated with Whiskey and Mercer Creeks in the city and identify flood mitigation actions. The City has asked the Flood Control Zone District to provide matching contributions valued at $100,000 in the form of District staff time and tasking our on -call consultant with integration of the City's work with County -led flood risk assessment. Task Order No. 5 - Ellensburg Urban Flooding Hydraulic Analysis tasks our on -call consultant with this work. The value of Task Order No. 5 exceeds the contract authorization amount currently provided to the Public Works Director. At the April 8, 2024 Study Session, the Board of County Commissioners provided staff with direction to proceed to support the City's FCAAP project. INTERACTION: Public Works RECOMMENDATION: Approve a Resolution to Authorize the Chair's Signature on Watershed Science and Engineering, Inc. Task Order No. 5 - Ellensburg Urban Flooding Hydraulic Analysis. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution; Task Order No. 5 LEAD STAFF: Arden Thomas Public Works Water Resource Manager BOARD OF COUNTY COMMISSI4 COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2024- AUTHORIZING CHAIR SIGNATURE ON WATERSHED SCIENCE AND ENGINEERING, INC. TASK ORDER NO.5 — ELLENSBURG URBAN FLOODING HYDRAULIC ANALYSIS WHEREAS: Kittitas County desires to participate in a City of Ellensburg project that will improve information available about flood risk from Whiskey and Mercer Creeks in the city and identify effective mitigation actions; and WHEREAS: The Kittitas County Flood Control Zone District will participate in the City's project for the purposes of coordinating this effort with District -led floodplain mapping and flood - risk reduction projects; and WHEREAS: The Department of Public Works procured on -call professional hydraulic and hydrologic engineering services from Watershed Science and Engineering, Inc. consistent with state law and county code in December 2022; and WHEREAS: Watershed Science and Engineering, Inc. prepared a scope of work and fee proposal to provide technical floodplain hydraulic analysis and to of coordinate this effort with District -led floodplain mapping and flood -risk reduction projects; and WHEREAS: The value of Task Order No. 5 exceeds the contract authorization amount currently provided to the Public Works Director; NOW THEREFORE, BE IT RESOLVED The Board of County Commissioners of Kittitas County, Washington, in the best interest of the public, does hereby authorize Chair signature on Watershed Science and Engineering, Inc. Task Order No. 5 - Ellensburg Urban Flooding Hydraulic Analysis. DATED this 7' day of May 2024, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner ova_ ro �p "�� n6' KITTZTAS COUNTY DEPARTMENT OF PUBLIC WORKS KITnITAS COIN V Formal Task ( hr Document Watershed Science and Engineering, Inc. Task Order Number 5 Maximum Amount Payable $104,999 Completion Date 06/30/2025 The general provisions and clauses of the 2023 - 2025 Task Order Master Contract for Hydraulic and Hydrology Professional Consulting Services shall be in full force and effect for this Task Order. Location of Project: Whiskey and Mercer Creeks Project Title: Ellensburg Urban Flooding Hydraulic Analysis Description of Work: See the attached Scope of Work. Cost Breakdown: See the budget included in the attached Scope of Work. Project Schedule: The project is scheduled to be completed by 06/30/2025. Agency Signature: Date: Consultant Signature: Livl+il' l �^ Date: 5/01/2024 le-WWATERSHED SCIENCE & ENGINEERING April 30, 2024 Scope of Work Ellensburg Urban Flooding Hydraulic Analysis Kittitas County, WA Background The City of Ellensburg (City) is conducting an in-depth analysis within the Ellensburg Urban Growth Area (UGA) and city limits to support an updated stormwater model for the current floodplain map update process led by Kittitas County, focused on urban flooding caused by Whiskey and Mercer Creeks. The modeling will also support future flood map updates proposed for Wilson Creek, increase understanding of flooding in the city, and identify mitigation actions. With this knowledge, the City will be more prepared for flood events, and residents within the City and its UGA--especially those in areas with a high probability of flooding during a 1%annual chance flood --will be better equipped to take additional precautions or mitigate against the risk of flooding. The consultant team is led by Perteet with support from Evergreen H2O and Watershed Science & Engineering (WSE). The following tasks will be completed by WSE under a contract with Kittitas County Public Works (County) and are structured to be consistent with tasks contracted between the City and Perteet. Task 2. Data Collection and Modeling The goal of Task 2 is to gather all information required to increase the City's and County's understanding of flooding within the UGA, prepare the stormwater model, and increase the accuracy of the hydraulic model and/or increase the City's level of certainty in the hydraulic model, which can be used to support a Letter of Map Revision (LOMR). Task 2.1. Core Planning Team and Project Management This task is dedicated to the overall management of the project. WSE's work elements include: • Attending up to 20 Core Planning Team (CPT) meetings • Preparing monthly progress reports for the County Assumptions: • CPT meetings with be virtual • WSE's staff engineer will attend all 20 meetings. WSE's senior engineer will attend up to 10 of the meetings as needed. • The project duration will be 14 months Deliverables: • Monthly progress reports Task 2.2. Data Collection This task will provide the data necessary to evaluate the stormwater system and flooding in the Ellensburg UGA to support the development of current baseline conditions updates to the flood model, development of the stormwater model, and define the projected climate change scenario for precipitation and flooding that will be used in this project. The consultant team will review existing data and determine what additional data must be collected to inform the project and document current baseline conditions. Data to be collected may include ie a► WATERSHED SCIENCE 6 ENGINEERING April 30, 2024 information about the City's stormwater system, roads, bridges, culverts, watercourse data, ground elevations, changes in the terrain, records of flooding, and climate change predictions. Perteet will prepare a City Conditions Memo that describes the current conditions in the City and the data collection process, provides an inventory of data collected and its quality, and identifies the system or capacity needs within Ellensburg to support future mitigation strategy development. The memo will also identify recommendations for additional data collection and discuss any assumptions that were made about the collected data or its use. The following tasks will be completed by WSE: • Review the collected data that pertains to surface water flooding. • Participate in a one -day field investigation to support data collection. • Provide input on surface water flooding issues for the City Conditions Memo. Assumptions: Two WSE staff will participate in a one -day field investigation to verify existing data and/or collect additional data. Deliverables: • WSE contributions to the draft and final City Conditions Memo Task 2.3. Floodplain Analysis The consultant team and Tech Team will review the current draft flood maps and compare extents to photos or accounts of past flooding events. Perteet will gather information about past flooding events to develop a greater understanding of flood dynamics and what influences flow paths through the City. Depending on the availability, completeness, and level of confidence of the flow paths and past flooding data, Perteet may map past event flood extents in ISIS and prepare a flood history map. The consultant team will identify where there have been changes to the built environment that may affect flood flows since the most recent UDAR was collected in 2019 (e.g. new road cuts through the Cascades to Palouse trail embankment, new curbs, or other changes the terrain). This may include meetings with City maintenance staff to better understand the performance of the existing stormwater system or past flooding. The results of the data collection, summary of flood dynamics, and effects of climate change will be included in the Task 2.2 City Conditions Memo. The following tasks will be completed by WSE: Review background data and mapping and contribute to the review and comparison of past flooding to the current flood model results. Coordinate with FEMA to discuss methods of identifying flow paths in urban alluvial fans (e.g. method used to map Wenatchee Number 2 Canyon) and when Zone X should be used for areas with very shallow flooding. The consultant team will analyze how the selected climate change scenario will affect the City. Provide input on past flooding comparison to existing hydraulic model results for Task 2.2 City Conditions Memo Q 0, WATERSHED SCIENCE & ENGINEERING April 30, 2024 Assumptions: • City and County staff and the CPT will support the collection of data, photos, and accounts of flooding. • Except for GIS flood history data, no new data will be created in this task. • The climate change evaluation will be qualitative and descriptive and will not be modeled unless it is determined necessary and sufficient budget remains, as directed by the City's and County's project manager. Deliverables: • WSE contributions to the draft and final City Conditions Memo. Task 2.4. Stormwater Model WSE will not have any specific tasks related to the stormwater model Task 2.5. Update Hydraulic Model WSE will update and refine the existing HEC-RAS 2D hydraulic model of Whiskey and Mercer Creek within the City of Ellensburg using data gathered in Tasks 2.2 and 2.3. The model will comply with the FEMA guidelines and standards for flood risk analysis and mapping. WSE will update the model to: • Incorporate new topographic data and survey identified or collected In Task 2.2 • Refine model mesh to improve model resolution based on flood mapping analysis completed in Task 2.3 • Incorporate significant stormwater inflow and/or outflow locations modeled in Task 2.4 WSE will then run the model for the 100-year flood event and one other flood event determined through coordination with the Tech Team. Model results will be presented to the Tech Team in Task 2.1 to assess the level of accuracy, identify primary flow paths, and compare to the results of stormwater modeling completed in Task 2.4. WSE will complete additional model refinements, if necessary, based on stakeholder input. WSE will create a topographic workmap of the resulting 100-year inundation mapping and develop a brief technical memo to document the model updates. Assumptions: • Modeling will be completed by updating Whiskey -Mercer HEC-RAS 21) model that was most recently updated in 2023. Deliverables: • Updated HEC-RAS model that complies with FEMA guidelines and specifications for flood risk assessment and mapping. • A topographic workmap showing draft 100-year inundation extents based on most current FEMA methods as determined in Task 2.3. 0 Brief technical memo documenting model updates o� WATERSHED SCIENCE & ENGINEERING April 30, 2024 Task 3. Identify Mitigation Actions and Public Outreach The goal of Task 3 is to identify priority mitigation actions that will provide the greatest reduction in flood risk in the studied areas within the UGA and City while being feasible, resilient to changing conditions, equitable, and cost-effective. The actions will be identified using the most current and accurate information, in a collaborative environment with shared goals. Action development and alternatives analysis will be consistent with CFHMP guidance. Task 3 will result in a list of prioritized mitigation actions that will be added to the County's and/or City's CFHMP or HMP. After the mitigation actions are identified, the City and County will have a unified mitigation strategy and can work towards implementation of the actions for reduced flood risk associated with Whiskey Creek, Mercer Creek, and Wilson Creek. Task 3 also includes a robust public outreach process to involve the public in the project and create awareness of potential flooding scenarios, highest risk areas, and notify affected property owners of proposed updates to the Flood Insurance Rate Maps. Task 3.1. Technical Stakeholder Team Perteet will support the City's formation of a Technical Stakeholder Team (Tech Team) that will be active throughout the project to help guide the City in decision -making processes, floodplain analysis, identification of potential mitigation actions, public outreach efforts, and data collection efforts. The Tech Team will include, but not be limited to, staff from the City, County, and County Flood Control Zone District, consultant team members, and other agencies or entities that have an interest in flood reduction (e.g. CWU, WDFW, Kittitas Conservation District, Ecology, etc.), or provide support to vulnerable populations within the City. At the onset of the Tech Team meetings, the Tech Team will identify goals which can be used to measure success of this project and the identification of mitigation actions. The following tasks will be completed by WSE: • WSE's senior and staff engineer will participate in Tech Team meetings. Assumptions: • The Tech Team will meet as needed and no more than monthly throughout the duration of the project (14 months). • WSE staff will attend Tech Team meetings virtually. Task 3.2. Public Outreach Perteet will lead the development of accessible, engaging, and educational outreach events using various methods, including websites, story map, and in -person events. Public outreach will include the whole community, but some outreach will be targeted towards residents of properties that are identified as being in the high -risk flood zone and are affected by the proposed map change in the City and UGA. The outreach will focus on flood education and notification of potential future map changes and will meet the Federal Emergency Management Agency (FEMA) requirements for LOMR outreach. Perteet will support the City in developing materials for and hosting joint open house events in which the public can learn more about the project and discuss their specific concerns. o� WATERSHED SCIENCE & ENGINEERING April 30, 2024 After the flood model is refined (Task 2.5), the City will host an outreach event for the whole community and targeted towards properties that are identified as being in the high -risk flood zone. The outreach will focus on flood education and notification of potential future map changes and will meet the FEMA requirements for LOMR outreach. During the analysis of mitigation alternatives (Task 3.4), the City will host public outreach to present the results of the alternatives analysis and solicit the public's opinion on their preferred alternatives. The following tasks will be completed by WSE: • Attend and/or provide information to support meeting material preparation for the open house meetings and the public outreach meeting. Assumptions: • Two WSE staff will participate in up to three in -person meetings to support public outreach. Deliverables: • Information to support public outreach materials. Task 3.3. Floodplain-Stormwater Model Results Analysis After tasks 2.4 and 2.5 are completed, the consultant team, with support from the CPT and Tech Team, will evaluate the model results to support the development of mitigation actions. The evaluation will include comparing the effective floodplain, previous flood model results, and updated flood model results; identifying areas where the stormwater system helps reduce flooding or adds to the flooding, such as moving stormwater from one area of the City to another; and to discuss where potential interactions occur between the flood waters and the stormwater system. The results of the evaluation will support the determination of mitigation measures in Task 3.4 and will be summarized in a floodplain-stormwater analysis technical memo. This task also provides an opportunity for the City to more thoroughly review the floodplain model to increase the City's level of certainty in the model results and the identified floodplain boundaries. WSE will: • Provide floodplain information and input to support an evaluation comparing the existing flood model results to potential updates incorporating the stormwater model and stormwater/floodway interactions. • Provide floodplain information for the technical memo. Assumptions: • Any identified interactions, effects, or other results of the analysis will be assessed further in Task 3.4. Deliverables: • WSE contributions to draft and final floodplain-stormwater analysis technical memo Task 3.4. Mitigation Actions The consultant team and Tech Team will evaluate the results of the updated hydraulic model, the new stormwater model, and the technical memo prepared in Task 3.3 to identify potential mitigation �e_WWATERSHED SCIENCE & ENGINEERING April 30, 2024 measures. The evaluation will focus on identifying actions that will provide the greatest benefit to the public and are feasible, cost-effective, resilient, and equitable, and meet the goals of this project. Certain actions that modify flooding and/or stormwater will be modeled to determine the effectiveness. Actions that also benefit the habitat within the City and UGA will be identified as multiple benefit actions. Actions may include, but not be limited to: acquisitions; identifying and protecting primary flow paths or flood storage areas; improvements to the stormwater system, such as regional stormwater facilities; outreach and education; regulation updates; staff training; conservation/flood easements; emergency response measures; and/or home elevations or property acquisitions. Some actions may also identify future planning needs, such as additional alternatives analyses or feasibility studies. After the action alternatives are identified, the actions will undergo an alternatives analysis pursuant to Comprehensive Flood Hazard Management Plan (CFHMP) guidance. The actions will be prioritized, grouped into strategies, and a funding and partnership strategy will be developed. The actions and strategies will be added to the Kittitas County Hazard Mitigation Plan (HMP) which also serves at the County's CFHMP. All in -water actions will undergo an alternatives analysis and evaluation of effects in compliance with WAC 173-145-040. The actions and strategies will also include all information necessary to meet FEMA HMP requirements, per the Local Mitigation Planning Policy Guide, effective April 19, 2023 (FP 206-21-0002). All mitigation actions considered will be described in a memo. The Mitigation Actions Memo will address all actions and describe the alternatives analysis process and why certain actions were or were not prioritized. A list of prioritized mitigation actions will be prepared in a format that facilitates adding the actions into the HMP. The following tasks will be completed by WSE: • Update the hydraulic model to reflect up to 4 separate mitigation action scenarios, and run each scenario model to simulate the 100-year flood. • Produce figures comparing 100-year water surface extents and elevations for mitigated conditions to existing conditions flooding. • Provide text and figures to describe modeling updates and results for the Mitigation Actions Memo. Assumptions: • The Tech Team will identify which actions should be modeled to determine effectiveness. • Each alternative actions will represent single project or combinations of minor project that can reasonably be easily incorporated into the hydraulic model in 4 hours of staff engineer time. • Information necessary to update the model, such as grading surfaces or adjusted flow inputs due to stormwater changes, will be provided to WSE by the Tech Team for incorporation into the model. • If budget remains after simulating 4 mitigation alternatives, the City and/or County may request more modeling. Deliverables: 0 WSE contributions to the Mitigation Actions Memo. t-WWATERSHED SCIENCE & ENGINEERING Task 4. Administrative Reserve April 30, 2024 An administrative reserve is included to allow WSE to address additional questions or issues that may arise during project review or coordination with the County, City, CPT, and/or Tech Team. This may include additional analysis, modeling, meetings, presentations, documentation, and/or discussion. Administrative reserve funds will only be used if authorized by the County. Cost See attached spreadsheet. 40AL WATERSHED _. SCIENCE & ENGINEERING 506 2nd Ave, Suite 2700 Seattle, WA 98104 Tel. (206)521-3000 Estimate of Professional Services Prepared for: Kittitas County Public Works Project: Ellensburg Urban Flooding Hydraulic Analysis Date: April 30, 2024 Prepared By: Chris Frei TASK DESCRIPTION Hours Totals Principal Sr. Eng.1 Sr. Geom. Eng. Jr. Eng Atlmin .e. 2 loans Collection and Modeling 2.1 Core Planning Team and Prow Management 1 20 16 8 $ 7998 2.2 Data Collection 8 40 16 $ 9.766 2.3 Floodiplain Analysis 8 40 $ 7,954 2.4 Stormwatsr Model IS 2.5 Update Hraulic Model 24 160 24 IS 32,710 Subtotal 1 60 0 256 40 8 $ 58,429 3 Identify Mitigation Actions and Public Outreach 3.1 Technical Stakeholder Team 16 16 $ 6'� 3.2 Public Outreach 24 40 $ 11,599 3.3 Floodplain-Stormwater Model Results Analysis 16 24 S 7,324 3.4 Mitigation Actions 16 80 IS15908 Subtotal 0 72 0 160 0 0 S 40,929 4 lAdininistratfive Reserve 5000 .... ..®..............,......e..............o...............L.................................... Total Hours and Direct Labor Cost(DL) 1.0 132.0 0.0 416.0 40.0 8.0 Labor Rate($/hr, July 2023 WSDOT OH 157.22%,30%profit on DL) 1 $241.65 1 $227.84 $185.04 $163.28 $113.23 $93.35 TOTAL LABOR COST $242 $30,075 $0 $63,764 54,529 $747 $ 104,357 Direct Expense Detail Units Rate Cost Mileage 980 $0.655 $ 642 Total $ 642 Cost Summary Total Labor Total Dire Direct Expenses $ $ Total $ D4,357 642 642 104,999