Loading...
HomeMy WebLinkAboutResolution_WSDOT Aviation Grant_East TaxilaneKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA SESSION STAFF REPORT AGENDA SESSION DATE: April 16, 2024 ACTION REQUESTED: Request to Approve a resolution submittal of an Airport Aid application for grant match funding to Washington State Department of Transportation Aviation Division for the Bowers Field East Taxilane Pavement Rehabilitation and Apron Reconfiguration project. BACKGROUND: Kittitas County has a pending grant award from the Federal Aviation Administration (FAA) for the East Taxilane Pavement Rehabilitation and Apron Reconfiguration project. The grant award amount for construction is $406,237.00. INTERACTION: This grant through the FAA requires a ten percent (10%) match required for the project. Washington State Department of Transportation (WSDOT) Aviation Division has posted notice of grant opportunities to assist with matching funds, reducing the County required match to five percent (5%). Matching funds are available in the Airport Fund. As part of the grant application to W SDOT Aviation, a resolution supporting the application and guaranteeing availability of matching grant funds is required. Public Works RECOMMENDATION: Approve a resolution submittal of an Airport Aid application for grant match funding to Washington State Department of Transportation Aviation Division for the Bowers Field East Taxilane Pavement Rehabilitation and Apron Reconfiguration project. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution, Airport Aid Application LEAD STAFF: Josh Fredrickson, Public Works Director BOARD OF COUNTY COMMISSI4 COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2024 - AUTHORIZE SUBMITTAL OF AIRPORT AID APPLICATION TO WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AVIATION DIVISION FOR BOWERS FIELD IMPROVEMENT PROJECT WHEREAS: The Federal Aviation Administration (FAA) is programming grant funding for the East Taxilane Pavement Rehabilitation and Apron Reconfiguration project at Bowers Field in the amount of $406,237; and WHEREAS: The County is required to match federal aviation funding with ten percent (10%) of the grant award amount; and WHEREAS: The Washington state Department of Transportation (WSDOT) Aviation Division noticed Public Works of airport aid application which can provide funds to be used as matching funds to the federal aviation funding; and WHEREAS: Public Works has prepared the aid application to submit to the Washington state Department of Transportation (WSDOT) Aviation Division for five percent (5%) grant match to federal funding; and WHEREAS: The state money lowers the County's match obligation from the Airport Fund in the amount of $22,568.97; and WHEREAS: The project is pending review from the FAA; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, after due consideration, does hereby authorize submitting the grant application for airport aid to WSDOT Aviation Division, and guarantees availability of matching funds to fulfill the local match contribution requirement. DATED on this 16th day of April 2024, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner Washington State Department of Transportation Aviation Division Airport Aid Application Forms Please indicate menu choice by clicking on the appropriate menu button. This document includes form fields which are used to complete the Airport Aid Application forms. Saving the .pdf document to your computer should allow you to save your entries and then edit the document at a later time. However - Depending on the Adobe Acrobat version that you are using, your work might NOT be saved. It is suggested that you make an entry, save the document, exit the document, and the re -open the document to see if your data saved. Ensure you have completed ALL field entries. Make sure to save your work frequently. If you are not able to save your work you will need to print the application before closing the document. Submitting your application: By Email - The airport sponsor's authorized representative can Email the application by attaching the completed fillable .pdf document and all other supporting documentation to: eric.johnson@wsdot.wa.gov Note: Other than completing the application's fields, do not edit or alter the form in any way (i.e., deleting the instruction pages, deleting unused pages for multiple projects, combining other .pdf documents, etc.). The data in the applications is extracted from the document, altering the form in any way will disable our ability to extract the information. For questions, please contact: WSDOT Aviation Division Eric Johnson, Construction & Grants Program Manager eric.johnson@wsdot.wa.gov (360)708-8970 •T_ Washington State i department of Transportation Aviation Division Airport Aid Application �W 7702 Terminal Street SW Date of Request Tumwater, Washington 98501-7264 1 Applicant: 2 Project to be Managed by: Kittitas County, Washington Company: J-U-B Engineers, Inc. Name: Spencer Stephens Applicant's Authorized Representative: Name: Josh Fredrickson Address: 999 W. Riverside Ave, Suite 700 Title: Airport Manager Address 2: Address: 411 North Ruby Street, Suite #1 City: Spokane State: WA Zip: 99201 Address 2: Phone: (509) 458-3727 Cell: (509) 280-8784 City: Ellensburg State: WA Zip:98926 Email: sstephens@jub.com Phone: (509) 962-7609 Cell: Email: josh.fredrickson@co.kittitas.wa.us Find your legislative and congressional district at: hnp.11anp.lezwa. zov/distr&dinde,/ National / Regional Legislative District: 13th 3 Airport: FAA Classification: �X NPIAS Non-NPIAS State Classification: Community Congressional District: 8th 4 Total Aviation Other Project Local Division Federal Funds No. Project Name and Description (list in order of priority) Cost Funds Funds Funds (Name Source) 1 East Taxilane Pavement Rehab and Apron Reconfig. Const. 451,374.94 22,568.97 22,568.97 406,237.00 2 3 Totals 451,374.94 22,568.97 22,568.97 406,237.00 0.00 rJ Does the airport have an up4o-date Master Plan or ALP Narrative Report? �X Yes []No Date: 8/31/2018 Does the airport have an approved Airport Layout Plan (ALP)? EDYes No Date: 8/31/2018 Was annual requirement to review and update Airport Information System EflYes ❑ No (AIS) data met for the preceeding calendar year? Does the airport sponsor have policies to reduce greenhouse gas emissions? [E]Yes []No - If yes, submit a copy of the policies. Submitting copy via: Emailing - Electronic Document Submit signed acceptance of Airport Aid Grant Assurances. Submitting signed grant assurances via: Emailing - Electronic Document Submit adopted resolution; 1) Authorizing submittal of grant application, Submitting copy via: Entailing - Electronic Document 2) Stating matching funds are available, and 3) Support of elected officials. 'Does not apply to private airport sponsors 6 Signature of Applicant's Authorized Representative A signed application is not required when the airport's authorized representative submits the completed application ((liable form _pdf document by email. DOT Form 900-030EF Revised 5/2023 Instructions for Airport Aid Application (DOT Form 900-030EF) Applicant The name of the municipality or person who legally owns and is responsible for managing the airport ..airport sponsor". The Applicant's Authorized Representative is that individual who may be duly authorized by the public entity to act on its' behalf in the performance of duties overseeing the airport. Typically this is a mayor, city manager, county commissioner, city councilperson, port director, or tribal council member. The authorized representative should be the same individual who will sign the Airport Aid grant agreement if awarded funding. The airport manager should only be listed if he or she has the authority to negotiate contracts on behalf of the applicant. Name, Title, Address, Phone, Cell, and Email Address. This should be the contact information for the applicant's authorized representative. 2. Project to be Managed by is the individual who will be responsible for the day-to-day management of the project and will be the appropriate contact for WSDOT Aviation to communicate matters relating to the grant. This person could be an employee of the airport sponsor. If the airport sponsor would like to authorize their consultant to communicate directly with WSDOT Aviation on their behalf, than this would be the that individual. 3. Airport is the approved name of the airport. Check if the airport is included in the National Plan of Integrated Airport Systems (NPIAS) or whether it is designated as a Non-NPIAS airport. Select the appropriate FAA and State classifications from the dropdown lists. Select the appropriate Legislative and Congressional districts for the airport from the dropdown lists (If you are unsure of your districts, click on the hyperlink and enter the airport sponsor's address). 4. Project Name and Description Listed by Priority, along with Project Funding Sources Number the projects 1, 2, 3, etc. in order of the priority (high to low). The Project Name should be descriptive and be similar to the Project Title entered in the State Capitol Improvement Program (SCIP). Projects submitted that are not included in the SCIP will not be considered for funding. Give a brief but accurate description of the project. You will have the opportunity to expand upon this in the Project Data Sheets to follow. Insert the full cost of the project, the amount the airport sponsor will contribute (a minimum of 5% of the total cost for projects without federal funding or a minimum of half the local share required of federal funds e.g. FAA 90% / Local 5% / WSDOT 5%), and the amount you are requesting from the Aviation Division. Include any other funds including the funding source (e.g. grant funds from another agency, private funds, etc.). The total of the first column must equal the total of all other columns. The totals for the columns will automatically be calculated. Please make these amounts as accurate as you can. Actual project bid amounts or negotiated consultant fees are preferable. If precise amounts are not yet available you are encouraged to use professional engineering estimates. If these estimates turn out to be an understatement and inadequate to cover the cost of the actual project, WSDOT Aviation may not be able to cover the additional costs which may have to be borne by the applicant. You will be asked to provide additional information supporting these costs and the source on the project data sheets. DOT Form 900-030EF - Instructions Page 1 of 2 Revised 5/2023 5. Other Questions and Required Documentation Master Plan / ALP Narrative Report - Please indicate if the airport has an approved Airport Master Plan or Airport Layout Plan (ALP) Narrative Report by checking 'Yes' or'No'. If 'Yes' insert the month and year the report is dated. Airport Layout Plan (ALP) - Please indicate if the airport has an approved Airport Layout Plan (ALP) by checking 'Yes' or'No'. If 'Yes' insert the month and year the plan was approved. The project you are requesting funding for must be shown on the ALP in order to be considered for funding. If the airport does not have an approved ALP, the only project the sponsor should request funding for is the preparation of an Airport Master Plan and ALP. Airport Information System (AIS) - Please indicate by checking 'Yes' or'No' if the airport sponsor met the requirement to review and update their data in the AIS for the preceding calendar year by the December 31 deadline. Greenhouse Gas Policy - RCW 70A.45, outlines fund distribution prerequisites for infrastructure and capital development projects, all airport sponsors should adopt a greenhouse gas emission reduction policy in accordance with this law. Please indicate by checking 'Yes' or'No' if the airport sponsor has an adopted policy. If 'Yes'submit a copy of the policy to WSDOT Aviation and indicate how you are submitting by selecting the appropriate response from the drop -down menu. For more information on this law, please visit Washington State Legislature's Revised Code of Washington (RCW) at https://apps.leg.wa.gov/rcw/default.aspx?cite=70A.45. While having a policy is currently not a requirement that determines grant eligibility, it is anticipated in the near future that this will be an added requirement. Airport Aid Grant Assurances - The airport's signed acceptance of WSDOT Aviation's Airport Aid Program Grant Assurances (Chapter 468-260 WAC) must be submitted with each Airport Aid Application. Please indicate how you are submitting the signed grant assurances by selecting the appropriate response from the drop -down menu. Please include the the grant assurances document in its entirety. Adopted Resolution - Publicly owned airport sponsors must submit a resolution adopted by its elected officials. The resolution shall 1) Authorize submittal of the application to WSDOT Aviation, 2) State that the sponsor has the required matching funds available, and 3) State the elected officials support of the application. Please indicate how you are submitting the signed grant assurances by selecting the appropriate response from the drop -down menu. 6. Signing and submitting the Grant Application WSDOT Aviation requests that airport sponsors submit the grant application and all supporting documentation electronically. The Airport Aid Application, Project Data Sheet(s), and Supplemental Justification Sheet(s) will need to be emailed from the Applicant's Authorized Representative as the saved fillable form .pdf file (do not edit or alter the form in any way). The email being sent directly from the Applicant's Authorized Representative will serve in lieu of an actual signature on a printed document. All application forms and supporting documentation must be received by WSDOT Aviation by the published deadline. WSDOT will reply to the email acknowledging receipt of the application. DOT Form 900-030EF - Instructions Page 2 of 2 Revised 5/2023 Amok State Washington �� Department of Transportation Aviation Dlaisbn Airport Aid Application Project Data Sheet A Steward br Washington's Arlation System' Complete a separate Project Data Sheet for each project listed from the Airport Aid Application (Form 900-030EF) Kittitas County, Washington - - Project No. 1 - East Taxilane Pavement Rehab and Apron Reconfig. Const. Project Category (Select One Only): Pavement ()Safety ®Planning ()Security ()Runway Safety ®Equipment oMaintenance ()Property ®Other ❑ Rehabilitation ❑ Runway Maintenance ❑Taxiway ❑ Reconstruction ❑ Apron ❑ New Construction ❑ Taxilane ❑ Helipad ❑ Other 2 Detailed Project Description / Approach to Accomplishing Project: The project will involve pavement rehabilitation of the east portion of Parallel Taxiway B, East General Aviation Apron, and the East Taxilanes. Pavement maintenance will consist of crack sealing for asphalt and concrete pavements, application of seal coat, and two applications of pavement markings. Also, the reconfiguration of the East General Aviation Apron will be included in this project. 3 Project Justification: Extend the service life of the taxilane and apron. Improve movement ability in and through the area by enhancing pavement markings and adjusting tie -down locations. 4 Cost Estimate Details: Source of Project Cost Estimate - Engineer's Estimate Construction: $351,414.94 Construction Administration: $99,960.00 5 Project Schedule: Expected Start of Project: 6/1/2024 Expected Completion of Project: 8/31/2024 Start of Work Covered by Grant: 6/1/2024 Completion of Work Covered by Grant: 12/31/2024 Submit a detailed proiect schedule (to include project milestones). Submitting project schedule via: Entailing - Electronic Document 6 Other Supporting project documentation (Required): Submit a spending plan identifying anticipated grant expenditures by month. Submitting via: Emailing - Electronic Document Submit job creation data using the Aviation Economic Impact Calculator. Submitting via: Emailing - Electronic Document 7 Other Supporting project documentation (As Applicable): Submit documentation supporting your consultant selection process. Submitting via: Emailing - Electronic Document Submit a copy of your consultant's Scope of Work. Submitting via: Emailing - Electronic Document Have project plans and specifications been prepared? ❑Yes []No Has a property appraisal been completed for property acquisition? []Yes ❑No FAA AIP Project Number:3-53-0026-023-2024 FAA Grant Contract Number: Other supporting documentation? SCIP Priority Score DOT Form 900-030A EF (WSDOT Use Only) Revised 5/2023 Airport Aid Application Aviation DNIsbn of TransparWlon Project Data Sheet A Steward for Washington's Aviation System" Complete a separate Project Data Sheet for each project listed from the Airport Aid Application (Form 900-030EF) Kittitas County, Washington - - Project No. 2 - Project Category (Select One Only): ()Pavement ®Safety oPlanning ©Security ()Runway Safety ©Equipment oMaintenance oProperty ©Other 2 Detailed Project Description / Approach to Accomplishing Project: 3 Project Justification: 4 Cost Estimate Details: Source of Project Cost Estimate - 5 Project Schedule: Expected Start of Project: Expected Completion of Project: Start of Work Covered by Grant: Completion of Work Covered by Grant: Submit a detailed project schedule (to include project milestones). Submitting project schedule via: 6 Other Supporting project documentation (Required): Submit a spending plan identifying anticipated grant expenditures by month. Submitting via: Submit job creation data using the Aviation Economic Impact Calculator. Submitting via: 7 Other Supporting project documentation (As Applicable): Submit documentation supporting your consultant selection process. Submitting via: Submit a copy of your consultant's Scope of Work. Submitting via: Have project plans and specifications been prepared? E]Yes ®No Hasa property appraisal been completed for property acquisition? EYes MNo FAA AIP Project Number: FAA Grant Contract Number: Other supporting documentation? SCIP Priority Score DOT Form900-030AEF (WSDOTUseOnly) Revised 5/2023 State YYashinpton �, Department of Transportation Aviation Division Airport Aid Application Project Data Sheet A Steward/or WashuVr 's AsWion System" Complete a separate Project Data Sheet for each project listed from the Airport Aid Application (Form 900-030EF) Kittitas County, Washington - - Project No. 3 - Project Category (Select One Only): oPavement 0Safety 0Planning 0Security ©Runway Safety ®Equipment 0Maintenance ©Property Other ❑ Rehabilitation ❑ Runway Maintenance ❑ Taxiway Reconstruction ❑ Apron ri New Construction ❑ Taxilane ❑ Helipad ❑ Other 2 Detailed Project Description / Approach to Accomplishing Project: 3 Project Justification: 4 Cost Estimate Details: Source of Project Cost Estimate - 5 Project Schedule: Expected Start of Project: Expected Completion of Project: Start of Work Covered by Grant: Completion of Work Covered by Grant: Submit a detailed project schedule (to include project milestones). Submitting project schedule via: 6 Other Supporting project documentation (Required: Submit a spending plan identifying anticipated grant expenditures by month. Submitting via: Submit job creation data using the Aviation Economic Impact Calculator. Submitting via: 7 Other Supporting project documentation (As Applicable): Submit documentation supporting your consultant selection process. Submitting via: Submit a copy of your. consultant's Scope of Work. Submitting via: Have project plans and specifications been prepared? ❑Yes ONO Has a property appraisal been completed for property acquisition? ❑Yes ❑No FAA AIP Project Number: FAA Grant Contract Number: Other supporting documentation? SCIP Priority Score DOT Form 900-030A EF (WSDOT Use Only) Revised 512023 Instructions for Project Data Sheet (DOT Form 900-030A) Complete a separate Project Data Sheet for each project listed from the Airport Aid Application (Form 900-030EF). Three individual sheets have been created and have automatically populated data for Airport Sponsor, Airport Name, Project No. and Title. If there are more than three projects, you will need to complete an additional application packet. 1. Project Category and Type - Mark the appropriate project category. Some categories will also expand asking for a more specifiec project type under that category (e.g. Category - Pavement, Project Type - Rehabilitation). Select only the category of the most prominent work element of your project. 2. Detailed Project Description - Provide a brief but descriptive narrative of the project to thoroughly explain what will be accomplished by the project. Please be as clear and specific as possible. Example: Runway 7/25 (3200' x 60') rehabilitation to include grinding top 1/2-inch of asphalt and overlaying with 2 inches of Class B hot mix asphalt (HMA). The project will also include markings and displacing Runway 7 by 100 feet. 3. Project Justification - Provide a brief narrative to justify why the project should receive state funding. Explain if it is a pavement project recommended by WSDOT Aviation's Airport Pavement Management System (provide details such as the specific pavement sections, PCI values, etc.), if a certain activity level at the airport has triggered the need for the improvements, or if the project is to correct an item of non-compliance found during a 5010 inspection or FAA compliance inspection. 4. Cost Estimate Details - Provide specific information as to how the project costs shown on the first page of the Airport Aid Application were arrived at including the source (i.e. bid tab, engineer's estimate, vendor quote, etc.). Be sure to include a detailed itemization of the specific costs (i.e. labor and overhead costs not just construction costs in your estimate (i.e. design engineering, environmental, project bidding, construction, construction observation, etc.) 5. Project Schedule - Indicate the expected start and completion of the project as well as the dates for when the work that would be included in the grant is beginning and ending. Note that these two sets of dates can be different based on the date advertised in which project work will be eligible. For example, WSDOT Aviation's grant cycle may be the first in the state's biennium and can only fund work that would take place after July 1st, but the airport is a NPIAS airport and has received a grant from the FAA and opted to begin the work in May as to not delay the project. In this example, only the work taking place after July 1 would be eligible for grant funds. Also submit a detailed project schedule that includes major milestones, key deliverables, specific actions, etc. 6. Other Supporting Project Documentation (Required) - 1) Submit a spending plan showing anticipated grant reimbursement amounts by month over the duration of the project, and 2) Submit information on jobs created by the project (WSDOT's Aviation Economic Impact Calculator is a good tool for this). Other supporting Project Documentation (As Applicable) - Provide any additional information as applicable that will help WSDOT Aviation fully understand your project. DOT Form 900-030A EF - Instructions Revised 5/2023 Adlbk 'aa P mfTransportation Aviation Division A Steward ter Washington's Aviation System' Airport Aid Application Supplemental Justification Complete a separate Supplemental Justification for each project listed from the Airport Aid Application (Form 900-030EF) Kittitas County, Washington - - Project No. 1 - East Taxilane Pavement Rehab and A 1. Will the project correct an identified airport safety hazard, deficiency, or non-standard design item? QX Yes []No If Yes, specifiy the correction(s). Currently safety areas on the apron are not sufficiently large enough for aircraft that utilize the area, the apron will be reconfigured to meet safety standards. Additionally, large cracks in the asphalt pose a safety issue and will be filled/repaired. 2. Does the project serve a vital community need? If Yes, specify the need(s). MYes [7No This project is a part of a larger overall program to improve the airport and provide positive economic impact County wide. This project will increase the overall utility of the airport for both local and transient users in and around the community. 3. Does the project promote economic development and financial sustainability for the airport? If Yes, please elaborate. Yes, the apron reconfiguration will facilitate transient aircraft of larger size. 4. Project Readiness: a. Has required environmental documentation (e.g. NIEPA/SEPA) been approved? b. Is project ready to proceed immediately? I LAND USE COMPATIBILITY 1. Does the local land use jurisdiction recognize the airport as an Essential Public Facility in its comprehensive plan? If Yes, provide reference to the specific location(s) in the plan. Kittitas County Comprehensive Plan adopted by ordinance No. 2016-013 2. Does the comprehensive plan include the airport in the 'Transportation System Inventory'? If Yes, provide reference to the specific location(s) in the plan. Kittitas County Comprehensive Plan adopted by ordinance No. 2016-013, Chapter 4 Transportation 3. Does the comprehensive plan include policies that discourages the development of incompatible land uses adjacent to the airport? If Yes, provide reference to the specific location(s) in the plan. Kittitas County, Chapter 17.58 Airport Zone and City of Ellensburg Chapter 15.350 Airport Overlay Zone (A-O) standards. 4. Are regulations in place that prohibit penetration of FAR Part 77 surfaces? If Yes, provide reference to the specific regulation(s). Kittitas County, Chapter 17.58 Airport Zone and City of Ellensburg Chapter 15.350 Airport Overlay Zone (A-O) standards. 5. Is zoning in place that discourages the development of incompatible land uses adjacent to the airport? If Yes, provide reference to the specific code(s). Kittitas County, Chapter 17.58 Airport Zone and City of Ellensburg Chapter 15.350 Airport Overlay Zone (A-O) standards. 6. Is zoning in place to regulate height hazards? If Yes, provide reference to the specific code(s). Kittitas County, Chapter 17.58 Airport Zone and City of Ellensburg Chapter 15.350 Airport Overlay Zone (A-O) standards. 7. Does the land use authority require aviation activity notices (e.g. title notice, notice on the plat)? QYes []No FYes FNo Yes FNo EgYes r7No QYes [:]No EDYes [:]No Yes ®No QYes F�No Yes FX�No DOT Form 900-030B EF Revised 5/2023 Amhl 17Washington State F' Department of Transportation Aviation Dhision Airport Aid Application Supplemental Justification 'A Stewxd for Ws&Nnoona Aviation System' Complete a separate Supplemental Justification for each project listed from the Airport Aid Application (Form 900-030EF) Kittitas County, Washington - - Project No.2 - 1. Will the project correct an identified airport safety hazard, deficiency, or non-standard design item? rlYes ❑No If Yes, specifiy the correction(s). 2. Does the project serve a vital community need? If Yes, specify the need(s). 3. Does the project promote economic development and financial sustainability for the airport? If Yes, please elaborate. 4. Project Readiness: a. Has required environmental documentation (e.g. NEPA/SEPA) been approved? b. Is project ready to proceed immediately? © Yes ©No © Yes [] No Yes FINo ®Yes MNo DOT Form 900-030e EF Revised 5/2023 Y Adak 7 Washington State Department of Transportation Aviation Division Airport Aid Application Supplemental Justification 'A Stewart/ for Washington§ Aviation System" Complete a separate Supplemental Justification for each project listed from the Airport Aid Application (Form 900-030EF) Khtitas County, Washington - - Project No.3 - 1. Will the project correct an identified airport safety hazard, deficiency, or non-standard design item? R Yes [-]No If Yes, specifiy the correction(s). 2. Does the project serve a vital community need? If Yes, specify the need(s). 3. Does the project promote economic development and financial sustainability for the airport? If Yes, please elaborate. 4. Project Readiness: a. Has required environmental documentation (e.g. NEPA/SEPA) been approved? b. Is project ready to proceed immediately? Q Yes 0 No Yes F� No Yes No Yes No DOT Form 900-030B EF Revised 5/2023 The following Airport Aid Program Grant Assurances are incorporated herewith and form a part of the sponsor's application for funding under the Airport Aid Grant Program. Signature of Applicant's Authorized Representative: Title of Representative: Date: Chapter 468-260 WAC Last Update: 3/14/13 AIRPORT AID PROGRAM GRANT ASSURANCES WAC Sections 468-260-010 General. 468-260-020 Duration and applicability. 468-260-030 Sponsor certification. 468-260-010 General. (1) Airport sponsors shall comply with these assurances pursuant to and for the purpose of carrying out the provisions of the state of Washington airport aid program grant agreements. (2) Airport sponsors will submit these assurances as part of the project application requesting funds under the provisions of RCW 47.68.090. As used herein, the term "public agency sponsor" means any municipality or municipalities acting jointly or any Indian tribe recognized by the federal government or such tribes acting jointly in the planning, acquisition, construction, improvement, maintenance, or operation of an airport, owned or controlled, or to be owned or controlled by such municipality or municipalities or Indian tribe or tribes, to be held available for the general use of the public; the term "private sponsor" means any person or persons acting jointly in the planning, acquisition, construction, improvement, maintenance, or operation of an airport, owned or controlled, or to be owned or controlled by such person or persons, to be held available for the general use of the public; and the term "sponsor" includes both public agency sponsors and private sponsors. (3) Upon a sponsor's acceptance of a grant offer by the department, these assurances are incorporated in and become part of the grant agreement. [Statutory Authority: RCW 47.68.090. 13-07-037, § 468-260-010, filed 3/14/13, effective 4114113.] 468-260-020 Duration and applicability. (1) Washington airport aid program projects undertaken by a sponsor. The terms, conditions, and assurances of this grant agreement shall remain in full force and effect throughout the useful life of the facilities developed or equipment acquired for an airport project, not to exceed twenty years from the date of acceptance of a grant offer of state funds for the project. However, there shall be no limit on the duration of the assurances regarding exclusive rights and airport revenue so long as the airport is used as an airport. There shall be no limit on the duration of the terms, conditions, and assurances with respect to real property acquired with state funds. (2) Airport planning undertaken by a sponsor. Unless otherwise specified in this grant agreement, only Assurances CA, 2, 3, 4, 6, 7, 8, 13, 20, 33, 34, and 35 apply to planning projects. The terms, conditions, and assurances of this grant agreement shall remain in full force and effect during the life of the project. [Statutory Authority: RCW 47.68.090. 13-07-037, § 468-260-020, filed 3/14113, effective 4/14113.) 468-260-030 Sponsor certification. The sponsor certifies, with respect to this grant that: (1) General state requirements. It will comply with all applicable Washington state laws, regulations, executive orders, policies, guidelines, and requirements as they relate to the application, acceptance and use of state funds for this project including, but not limited to, the following: (a) State legislation: L, Chapter 8.26 RCW (Relocation assistance -- Real property acquisition policy) ❑ Chapter 27_34 RCW (State historical societies -- Historic preservation) ❑ Chapter 2744 RCW (Indian graves and records) ❑ Chapter 27_48 RCW (Preservation of historical materials) F i RCW 29A.84.620 (Hindering or bribing voter) Chapter 36.70A RCW (Growth management -- Planning by selected counties and cities) ❑ Title 37 RCW (Federal areas -- Indians) F Chapter 39_12 RCW (Prevailing wages on public works) ❑ RCW 47.29.200 (Prevailing wages) El RCW 47.68.280 (Investigations, hearings, etc. -- Subpoenas -- Compelling attendance) RCW 47.68.310 (Enforcement of aeronautics laws) i i Title 49 RCW (Labor regulations) ❑ Title 64 RCW (Real property and conveyances) ❑ Chapter 70_94 RCW (Washington Clean Air Act) ❑ Title 86 RCW (Flood control) F_' Title 91 RCW (Waterways) Title 12 WAC (Transportation, department of (aeronautics commission)) ❑ Title 18 WAC (Air pollution) i i Title 25 WAC (Archaeology and historic preservation, department of) ❑ WAC 330-01-050 (dispositions, metropolitan municipal corporations) o Title 167 WAC (Drug abuse prevention office) Title 197 WAC (Ecology, department of (environmental policy, council on)) ❑ Title 198 WAC (Environmental and land use hearings office) ❑ Title 199 WAC (Environmental hearings office (environmental and land use hearings board)) FI Title 254 WAC (Historic preservation, advisory council on) ❑ Title 326 WAC (Minority and women's business enterprises, office of) n Chapter 330-01 WAC (Procedures for corridor and design public hearings under RCW 35.58.273) Chapter 468-100 WAC (Uniform relocation assistance and real property acquisition) ❑ WAC 468-100-008 (Compliance with other laws and regulations) ❑ Title 357 WAC (Financial management, office of — State human resources director) ❑ Title 508 WAC (Ecology, department of (water resources)) (b) Executive orders: Governor's Executive Order 92-01 (Establishing Govemor's Policy on a Drug -Free Work Place) Governor's Executive Order 96-04, Implementing the Americans with Disabilities Act and superseding Executive Order 93-03 ❑ Governor's Executive Order 05-05 (Archaeological and Cultural Resources) Governor's Executive Order 11-01, superseding Executive Order 09-04, Amending Washington Council on Aerospace 0 Governor's Executive Order 12-02 (Workforce Diversity and Inclusion) (2) General legal requirements. It will comply with all applicable laws and ordinances, orders, guidelines, policies, directives, rules and regulations of municipal, county, and federal governmental authorities or regulatory agencies. (3) Responsibility and authority of the sponsor. (a) Public agency sponsor: It has legal authority to apply for this grant, and to finance and carry out the proposed project; that a resolution, motion or similar action has been duly adopted or passed as an official act of the applicant's governing body authorizing the filing of the application, including all understandings and assurances contained therein, and directing and authorizing the person identified as the official representative of the applicant to act in connection with the application and to provide such additional information as may be required. (b) Private sponsor: It has legal authority to apply for this grant and to finance and carry out the proposed project and comply with all terms, conditions, and assurances of this grant agreement. It shall designate an official representative and shall in writing direct and authorize that person to file this application, including all understandings and assurances contained therein; to act in connection with this application; and to provide such additional information as may be required. (4) Sponsor fund availability. It has sufficient funds available for the portion of the project which is not paid by the state of Washington. It has sufficient funds available to assure operation and maintenance of items funded under this grant agreement which it will own or control. (5) Good title. It holds good title, satisfactory to the department, to the areas of the airport or site thereof necessary for aircraft takeoff and landing as well as those necessary for the movement of aircraft to and from the landing and takeoff areas, or gives assurances satisfactory to the department that good title will be acquired prior to accepting grant funds. (6) Preserving rights and powers. (a) It will not take or permit any action which would operate to deprive it of any of the rights and powers necessary to perform any or all of the terms, conditions, and assurances in this grant agreement without the written approval of the department, and will act promptly to acquire, extinguish or modify any outstanding rights or claims of right of others which would interfere with such performance by the sponsor. This shall be done in a manner acceptable to the department. (b) It will not sell, lease, encumber, or otherwise transfer or dispose of any part of its title or other interests in the property associated with this application or that portion of the property upon which state funds have been expended, for the duration of the terms, conditions, and assurances in this grant agreement without approval by the department. If the transferee is found by the department to be eligible to assume the obligations of this grant agreement and to have the power, authority, and financial resources to carry out all such obligations, the sponsor shall insert in the contract or document transferring or disposing of the sponsor's interest, and make binding upon the transferee all of the terms, conditions, and assurances contained in this grant agreement. (c) If the sponsor is a private sponsor, it will, to the department's satisfaction, ensure that the airport will continue to function as a public -use airport in accordance with these assurances for the duration of these assurances. (d) If an arrangement is made for management and operation of the airport by any agency or person other than the sponsor or an employee of the sponsor, the sponsor will, to the department's satisfaction, reserve and document in arrangements with said party sufficient rights and authority to ensure that the airport will be operated and maintained in accordance with the regulations and the terms, conditions, and assurances in this grant agreement and shall ensure that such arrangement also requires compliance therewith. (e) Sponsors of commercial service airports will not permit or enter into any arrangement that allows an owner or tenant of a property used as a residence, or zoned for residential use, to taxi an aircraft between that property and any location on airport. (f) Sponsors of general aviation airports entering into any arrangement that allows an owner of residential real property adjacent to or near the airport must comply with the requirements set forth in Section 136 of Public Law 112- 95. (7) Consistency with local plans. Certify, to the department's satisfaction, that the project is consistent with plans (existing at the time of submission of this application) of public agencies that are authorized to plan for the development of the area surrounding the airport. (8) Consideration of local interest. Certify, to the department's satisfaction, that it considered the interest of communities in or near where the project is located. (9) Consultation with users. Certify to the department's satisfaction that when it made a decision to undertake any project, that it consulted with affected parties using the airport. (10) Public hearings. In projects involving the location of an airport, an airport runway, or a major runway extension, it held public hearings for the purpose of considering the economic, social, and environmental effects of the airport or runway location and its consistency with goals and objectives of such planning as has been carried out by the community and it shall, when requested by the department, submit a copy of the transcript of such hearings to the department. Further, for such projects, its management board contain(s/ed) either voting representation from the communities where the project is located or it advised communities that they have the right to petition the department concerning a proposed project. (11) Air and water quality standards. In projects involving airport location, a major runway extension, or runway location, it will provide the department appropriate written certification that the project will be located, designed, constructed, and operated so as to comply with applicable federal, state, and local air and water quality standards. In any case where such standards have not been approved and where applicable air and water quality standards have been promulgated by the administrator of the Environmental Protection Agency, or the secretary of the Department of Ecology, certification shall be obtained. Notice of certification or refusal to certify shall be provided within sixty days after the project application has been received by the department. (12) Pavement preventive maintenance. With respect to a project for the replacement or reconstruction of airport pavement, it assures or certifies to the department's satisfaction that it has implemented an effective airport pavement maintenance -management program and it assures that it will use such program for the useful life of any pavement constructed, reconstructed or repaired with state financial assistance at the airport. It will provide such reports on pavement condition and pavement management programs as the department determines may be useful. (13) Accounting system, audit, and recordkeeping requirements. (a) It shall keep all project accounts and records which fully disclose the amount and disposition of the proceeds of this grant, the total cost of the project in connection with which this grant is given or used, and the amount or nature of that portion of the cost of the project supplied by other sources, and such other financial records pertinent to the project. The accounts and records shall be kept in accordance with RCW 43.09.200 and the Washington state budgetary, accounting, and reporting system (BARS) manuals and financial reporting packages. (b) It shall make available to the department and the Washington state auditor's office, or any of their duly authorized representatives, for the purpose of audit and examination, any books, documents, papers, and records of the recipient that are pertinent to this grant. The department may require that an appropriate audit be conducted by a recipient. In any case in which an independent audit is made of the accounts of a sponsor relating to the disposition of the proceeds of a grant or relating to the project in connection with which this grant was given or used, it shall file a certified copy of such audit with the department not later than six months following the close of the fiscal year for which the audit was made. (14) Wage rates. It shall include in all contracts in excess of two thousand five hundred dollars, or as outlined in WAC 296-127-050, for work on any projects funded under this grant agreement which involve labor, provisions establishing minimum rates of wages under the Washington State Prevailing Wages on Public Works Act, chapter 393912 RCW, which contractors shall pay to skilled and unskilled labor, and such minimum rates shall be stated in the invitation for bids and shall be included in proposals or bids for the work. This shall be documented by a statement of intent to pay prevailing wages and an affidavit of wages paid. (15) Nondiscrimination requirements. It shall prohibit discrimination in all phases of contracted employment, contracting activities and training pursuant to Title VI of the Civil Rights Act of 1964, Section 504 of the Rehabilitation Act of 1973, the Age Discrimination Act of 1975, the Justice System Improvement Act of 1979, the Americans with Disabilities Act of 1990, the Civil Rights Restoration Act of 1987, 49 C.F.R. Part 21, chapter 49_60 RCW and other related laws and statutes. (16) Equal employment opportunity (EEO) responsibilities. It shall comply with regulations relative to nondiscrimination in state -assisted programs of the department, which are herein incorporated by reference and made a part of this project. With regard to the work performed during the project, it shall not discriminate on the grounds of race, color, gender, creed, national origin, age, sexual orientation, gender identity, marital status, disability or veteran status in the selection and retention of contractors, consultants and service providers, including procurement of materials and leases of equipment. (17) Veteran's preference. It shall include in all contracts for work on any project funded under this grant agreement which involve labor, such provisions as are necessary to ensure that, in the employment of labor (except in executive, administrative, and supervisory positions), preference shall be given to honorably discharged military personnel who are veterans of any war of the United States, or of any military campaign for which a campaign ribbon shall have been awarded, and their widows or widowers, shall be preferred for appointment and employment. Age, loss of limb, or other physical impairment, which does not in fact incapacitate, shall not be deemed to disqualify them, provided they possess the capacity necessary to discharge the duties of the position involved as defined in RCW 73.16.010. However, this preference shall apply only where the individuals are available and qualified to perform the work to which the employment relates. (18) Conformity to plans and specifications. It will execute the project subject to plans, specifications, and schedules approved by the department. Such plans, specifications, and schedules shall be submitted to the department prior to commencement of site preparation, construction, or other performance under this grant agreement, and, upon approval of the department, shall be incorporated into this grant agreement. Any modification to the approved plans, specifications, and schedules shall also be subject to approval of the department, and incorporated into this grant agreement. (19) Construction inspection and approval. it will provide and maintain competent technical supervision at the construction site throughout the project to assure that the work conforms to the plans, specifications, and schedules approved by the department for the project. It shall subject the construction work on any project contained in an approved project application to inspection and approval by the department and such work shall be in accordance with regulations and procedures prescribed by the department. Such regulations and procedures shall require such cost and progress reporting by the sponsor or sponsors of such project as the department shall deem necessary. (20) Planning projects. In carrying out planning projects: (a) It will execute the project in accordance with the approved program narrative contained in the project application or with the modifications similarly approved by the department. (b) It will furnish the department with reports pertaining to the planning project and planning work activities, as designated by the department. (c) It will include in all published material prepared in connection with the planning project a notice that the material was prepared under a grant provided by the state of Washington. (d) It will make all material prepared in connection with this grant available for examination by the public, and agrees that no material prepared with funds under this project shall be subject to copyright in the United States or any other country. (a) It will give the department unrestricted authority to publish, disclose, distribute, and otherwise use any of the material prepared in connection with this grant. (f) It will grant the department the right to disapprove the sponsor's selection of specific consultants and their subcontractors to do all or any part of projects funded by this grant as well as the right to disapprove the proposed scope and cost of professional services. (g) It will grant the department the right to disapprove the use of the sponsor's employees to do all or any part of the project. (h) It understands and agrees that the department's approval of this project grant or the department's approval of any planning material developed as part of this grant does not constitute or imply any assurance or commitment on. the part of the department to approve any pending or future application for an airport aid grant. (21) Operation and maintenance. The airport and all facilities which are necessary to serve the aeronautical users of the airport, other than facilities owned or controlled by the United States or the state of Washington, shall be operated at all times in a safe and serviceable condition and in accordance with the minimum standards as may be required or prescribed by applicable federal, state, and local agencies for maintenance and operation. It will not cause or permit any activity or action thereon which would interfere with its use for airport purposes. It will suitably operate and maintain the airport and all facilities thereon or connected therewith, with due regard to climatic and flood conditions. Any proposal to temporarily close the airport for nonaeronautical purposes must first be approved by the department. In furtherance of this assurance, the sponsor will have in effect arrangements for: (a) Operating the airport's aeronautical facilities whenever required; (b) Promptly marking and lighting hazards resulting from airport conditions, including temporary conditions; and (c) Promptly notifying airmen of any condition affecting aeronautical use of the airport. Nothing contained herein shall be construed to require that the airport be operated for aeronautical use during temporary periods when snow, flood, or other climatic conditions interfere with such operation and maintenance. Further, nothing herein shall be construed as requiring the maintenance, repair, restoration, or replacement of any structure or facility which is substantially damaged or destroyed due to an act of God or other condition or circumstance beyond the control of the sponsor. (22) Hazard removal and mitigation. It assures that such terminal airspace under the appropriate category of Federal Air Regulation Part 77, 14 C.F.R. 77, as is required to protect instrument and visual operations to the airport (including established minimum flight altitudes) will be adequately cleared and protected by removing, lowering, relocating, marking, or lighting or otherwise mitigating existing airport hazards and by preventing the establishment or creation of future airport hazards. Where hazards are on land owned by others, the sponsor will make every effort to coordinate with owners to mitigate airport hazards. (23) Compatible land use. It shall, either by the acquisition and retention of property interest, in fee or easement, or by seeking enforcement of local zoning action, prevent the construction of any object which may constitute an incompatible land use such as residential encroachment, wildlife attractants, uses that emit smoke, steam, glare, or electromagnetic interference, and height hazards. Sponsor will take proactive measures to discourage incompatible land uses adjacent to the airport, to include a formal consultation with local jurisdictions on land use issues, and support and/or recommend land use regulations consistent with WSDOT best management practices found in WSDOT's Airports and Compatible Land Use Guidebook. (24) Economic nondiscrimination. (a) It will make the airport available as an airport for public use and without discrimination to all types, kinds and classes of aeronautical activities, including commercial aeronautical activities offering services to the public at the airport. (b) In any agreement, contract, lease, or other arrangement under which a right or privilege at the airport is granted to any person, firm, or corporation to conduct or to engage in any aeronautical activity for furnishing services to the public at the airport, the sponsor will insert and enforce provisions requiring the contractor to: (i) Furnish said services on a reasonable, nondiscriminatory, basis to all users thereof; and (ii) Charge reasonable, and nondiscriminatory, prices for each unit or service, provided that the contractor may be allowed to make reasonable and nondiscriminatory discounts, rebates, or other similar types of price reductions to volume purchasers. (c) Each fixed -based operator at the airport shall be subject to the same rates, fees, rentals, and other charges as are uniformly applicable to all other fixed -based operators making the same or similar uses of such airport and utilizing the same or similar facilities. (d) Each air carrier using such airport shall have the right to service itself or to use any fixed -based operator that is authorized or permitted by the airport to serve any air carrier at such airport. (e) Each air carrier using such airport (whether as a tenant, nontenant, or subtenant of another air carrier tenant) shall be subject to such nondiscriminatory and substantially comparable rules, regulations, conditions, rates, fees, rentals, and other charges with respect to facilities directly and substantially related to providing air transportation as are applicable to all such air carriers which make similar use of such airport and utilize similar facilities, subject to reasonable classifications such as tenants or nontenants and signatory carriers and nonsignatory carriers. Classification or status as tenant or signatory shall not be unreasonably withheld provided an air carrier assumes obligations substantially similar to those already imposed on air carriers in such classification or status. (f) It will not exercise or grant any right or privilege which operates to prevent any person, firm, or corporation operating aircraft on the airport from performing any services on its own aircraft with its own employees (including, but not limited to, maintenance, repair, and fueling) that it may choose to perform. In the event the sponsor itself exercises any of the rights and privileges referred to in this assurance, the services involved will be provided on the same conditions as would apply to the furnishing of such services by commercial aeronautical service providers authorized by the sponsor under these provisions. (g) The sponsor may establish such reasonable, and nondiscriminatory, conditions to be met by all users of the airport as may be necessary for the safe and efficient operation of the airport. The sponsor may prohibit or limit any given type, kind or class of aeronautical use of the airport if such action is necessary for the safe operation of the airport or necessary to serve the civil aviation needs of the public. (25) Exclusive rights. It will not grant exclusive right for the use of the airport to any person(s) providing, or intending to provide, aeronautical services to the public. For purposes of this subsection, the providing of the services at an airport by a single fixed -based operator shall not be construed as an exclusive right if the following apply: (a) It would be unreasonably costly, burdensome, or impractical for more than one fixed -based operator to provide such services; (b) If allowing more than one fixed -based operator to provide such services would require the reduction of space leased pursuant to an existing agreement between such single fixed -based operator and such airport. It further agrees that it will not, either directly or indirectly, grant or permit any person, firm, or corporation, the exclusive right at the airport to conduct any aeronautical activities including, but not limited to, charter flights, pilot training, aircraft rental and sightseeing, aerial photography, crop dusting, aerial advertising and surveying, air carrier operations, aircraft sales and services, sale of aviation petroleum products whether or not conducted in conjunction with other aeronautical activity, repair and maintenance of aircraft, sale of aircraft parts, and any other activities which because of their direct relationship to the operation of aircraft can be regarded as an aeronautical activity, and that it will terminate any exclusive right to conduct an aeronautical activity existing at such an airport before the grant of any assistance under RCW 47.68.090; and (c) It has received approval from the department. (26) Fee and rental structure. It will maintain a competitive fee and rental structure for the facilities and services at the airport which will make the airport as self-sustaining as possible under the circumstances existing at the particular airport, taking into account factors such as the volume of traffic and economy of collection. No part of the state share of an airport development or airport planning project for which a grant is made under RCW 47.68.090 shall be included in the rate basis in establishing fees, rates, and charges for users of that airport. (27) Airport revenues. All revenues generated by the airport and any local taxes established after December 30, 1987, on aviation fuel, will be expended by it for the capital or operating costs of the airport; the local airport system; or other local facilities which are owned or operated by the owner or operator of the airport and which are directly and substantially related to the actual air transportation of passengers or property; or for noise mitigation purposes on or off the airport. The following exceptions apply to this subsection: (a) If covenants or assurances in debt obligations issued before September 3, 1982, by the owner or operator of the airport, or provisions enacted before September 3, 1982, in governing statutes controlling the owner or operator's financing, provide for the use of the revenues from any of the airport owner or operator's facilities, including the airport, to support not only the airport but also the airport owner or operator's general debt obligations or other facilities, then this limitation on the use of all revenues generated by the airport (and, in the case of a public airport, local taxes on aviation fuel) shall not apply. (b) If the department approves the sale of a privately owned airport to a public sponsor and provides funding for any portion of the public sponsor's acquisition of land, this limitation on the use of all revenues generated by the sale shall not apply to certain proceeds from the sale. This is conditioned on repayment to the secretary by the private owner of an amount equal to the remaining unamortized portion (amortized over a twenty-year period) of any airport improvement grant made to the private owner for any purpose other than land acquisition on or after October 1, 1996, plus an amount equal to the federal share of the current fair market value of any land acquired with an airport improvement grant made to that airport on or after October 1, 1996. (c) When requested by the department, the sponsor will obtain an audit that will review, and the resulting audit report will provide an opinion concerning, the use of airport revenue and taxes, and indicate whether funds paid or transferred to the owner or operator were paid or transferred in a manner consistent with state law and any other applicable provision of law, including any regulation promulgated by the secretary. Any civil penalties or other sanctions will be imposed for violation of this assurance in accordance with state law. (28) Reports and inspections. It will: (a) Submit to the department such annual or special financial and operations reports as the department may request and make such reports available to the public; make available to the public at reasonable times and places a report of the airport budget in a format prescribed by the department; for airport development projects, make the airport and all airport records and documents affecting the airport, including deeds, leases, operation and use agreements, regulations and other instruments, available for inspection by any duly authorized agent of the department upon request; (b) In a format and time prescribed by the department, provide to the department and make available to the public following each of its fiscal years, an annual report listing in detail: (i) All amounts paid by the airport to any other unit of government and the purposes for which each such payment was made; and (d) All services and property provided by the airport to other units of government and the amount of compensation received for provision of each such service and property. (29) Use by government aircraft. It will not charge the state or its agencies (except for those under contract), for limited but reasonable, nonroutine, search and rescue, law enforcement or public safety use of public landing and aircraft parking facilities. The sponsor may require written verification of an entity's official government business status, and notification prior to use of facilities. (30) Land for state facilities. It will furnish without cost to the state of Washington for use in connection with any air traffic control or air navigation activities, or weather reporting and communication activities related to air traffic control, any areas of land or water, or estate therein, or for these same purposes, rights in buildings of the sponsor as the department considers necessary for construction, operation, and maintenance at state expense of space or facilities. Such areas or any portion thereof will be made available as provided herein within four months after receipt of a written request from the department. (31) Airport layout plan. (a) It will provide airport layout plans (ALPs) as prescribed in WSDOT's Aviation Grant Procedures Manual. It will keep up-to-date at all times an airport layout plan of the airport showing: (i) Boundaries of the airport and all proposed additions thereto, together with the boundaries of all off -site areas owned or controlled by the sponsor for airport purposes and proposed additions thereto; (H) The location and nature of all existing and proposed airport facilities and structures (such as runways, taxiways, aprons, terminal buildings, hangars, and roads), including all proposed extensions and reductions of existing airport facilities; (iii) The location of all existing and proposed nonaviation areas and of all existing improvements thereon; and (iv) All proposed and existing access points used to taxi aircraft across the airport's property boundary. Such airport layout plans and each amendment, revision, or modification thereof, shall be subject to the approval of the department which approval shall be evidenced by the signature of a duly authorized representative of the department on the face of the airport layout plan. The sponsor will not make or pen -nit any changes or alterations to the airport or any of its facilities which are not in conformity with the airport layout plan as approved by the department and which might, in the opinion of the department, adversely affect the safety, utility, or efficiency of the airport. (b) If a change or alteration in the airport or the facilities is made which the department determines adversely affects the safety, utility, or efficiency of any state-owned, leased, or funded property on or off the airport and which is not in conformity with the airport layout plan as approved by the department, the owner or operator will, if requested, by the department. (i) Eliminate such adverse effect in a manner approved by the department; or (ii) Bear all costs of relocating such property (or replacement thereof) to a site acceptable to the department and all costs of restoring such property (or replacement thereof) to the level of safety, utility, efficiency, and cost of operation existing before the unapproved change in the airport or its facilities except in the case of a relocation or replacement of an existing airport facility due to a change in the department's design standards beyond the control of the airport sponsor. (32) Disposal of land. (a) For land purchased under a grant for airport development purposes, it will, when the land is no longer needed for airport purposes, dispose of such land at fair market value or make available to the department an amount equal to the states' proportionate share of the fair market value of the land. The portion of the proceeds proportionate to the states' share of the cost of acquisition of such land will, upon application to the department, be reinvested or transferred to another eligible airport as prescribed by the department. The department shall give preference to the following, in descending order: (1) Payment to the state of Washington for deposit in the aeronautics account; or (ii) Reinvestment in an approved project that is eligible for grant funding under RCW 47.68.090. (b) Land shall be considered to be needed for airport purposes under this assurance if: (i) It may be needed for aeronautical purposes (including runway protection zones) or serve as noise buffer land; and (ii) The revenue from interim uses of such land contributes to the financial self-sufficiency of the airport. (c) Disposition of such land will be subject to the retention or reservation of any interest or right therein necessary to ensure that such land will only be used for purposes which are compatible with noise levels associated with operation of the airport. (33) Engineering and design services. It will award each contract, or subcontract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping or related services with respect to the project in the same manner as a contract for architectural and engineering services is negotiated under WSDOT Consultant Services Manual M-27- 50.02 or an equivalent qualifications -based requirement prescribed for or by the sponsor of the airport. (34) Foreign market restrictions. It will not allow funds provided under this grant to be used to fund any project which uses any product or service of a foreign country during the period in which such foreign country is listed by the United States trade representative as denying fair and equitable market opportunities for products and suppliers of the United States in procurement and construction. Sponsors are encouraged to "Buy American" whenever feasible and appropriate. (35) Policies, standards, and specifications. It will carry out the project in accordance with policies, standards, and specifications approved by the department and included in this grant, and in accordance with applicable state policies, standards, and specifications. (36) Relocation and real property acquisition. It will be guided in acquiring real property, to the greatest extent practicable under state law, by the land acquisition policies in RCW 8.26.180. (37) Disadvantaged business enterprises. The recipient shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any department -assisted contract or in the administration of its DBE program or the requirements of Governor's Executive Order 12-02. (38) Hangar construction. If the airport owner or operator and a person who owns an aircraft agree that a hangar is to be constructed at the airport for the aircraft at the aircraft owner's expense, the airport owner or operator will grant to the aircraft owner for the hangar a long-term lease that is subject to such terms and conditions on the hangar as the airport owner or operator may impose. For the purpose of this section, a long-term lease is defined as not to exceed fifty years. [Statutory Authority: RCW 47.68.090. 13-07-037, § 468-260-030, filed 3/14/13, effective 4/14/13.1 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. ;Zt-!/-(, {'£..< KITTITAS COUNTY GREENHOUSE GAS EMISSION REDUCTION POLICY WHEREAS: State, regional, and local governments throughout the United States are adopting energy conservation programs and policies; and WHEREAS: It is hoped that local governments throughout the nation, both smal and large, can reduce the need for imported oil through the implementation of programs and policies that promote reduced energy bills, green space preservation, air quality improvements, reduced traffic congestion, improved transportation choices, and green house gas emission reduction policies, among other policies; and WHEREAS: As a part of overall policy considerations, policies addressing green house emissions are deemed necessary and the State of Washington Department of Commerce requires that the County adopt Greenhouse Gas Emission Reduction Policy prior to approval of Community Development Block Grant (CDBG) program contracts and Transportation Improvement Board (TIB) grant applications; and WHEREAS: The policies attached hereto as Exhibit "A" satisfy the Washington State Department of Commerce's requirements for Greenhouse Gas Emission Reduction policies that benefit Kittitas County's natural resources and reduce air pollutants, energy consumption, and traffic congestion. NOW, THEREFORE BE IT RESOLVED: The Board of County Commissioners, after due consideration, declares it be in the best interest of the public to adopt Exhibit "A" as Kittitas County's policies for the reduction of greenhouse gas emissions. DATED this 3�Ceil day of tt- 2011, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS CQ.UNTY, WASHINGTON �N"', wSsIOA`Fq "'I", .` GO 2 o Paul Jewell, Chair ATT;7 •...}} yy�:(°j Alan/ ran i h, Mce- hair Clerk of the EYbard Obie O'Brien, Commissioner APP O T FORM OPP. Se'terphan-i-e U. HAppold, W38112 Civil Deputy Prosecuting Attorney Exhibit A. Kittitas County, Washington Greenhouse Gas Ernission Deductions Policies All new publicly funded buildings should be models of cost-effective, energy efficient design. 2. Encourage energy conservation practices in buildings by raising the awareness of employees own energy use. 1. Consider energy -sensitive fleet vehicle replacements, to include alternate energy sources such as electricity, diesel, or bottled gas, fuel efficient vehicles. 2. Consider methods to reduce pollutants from transportation activities, including the use of cleaner fuels and vehicles, increasing alternatives to driving alone, and reduced vehicle idling time. 1. Consider efforts to reduce pollutants from transportation activities, including the use of cleaner fuels and vehicles and increasing alternatives to driving alone as well as design and land use. I. Where and when allowed by the building code, encourage the use of building construction materials made from recycled and recyclable materials. 2 Reduce GFIG emissions waste through management of waste handling and reductions in waste generation. 3. Coordinate with other agencies in region to develop and implement effective waste management strategies and waste -to -energy technologies. 1. Encourage a development pattern that utilizes existing infrastructure; reduces the need for new roads, utilities and other public works in new growth areas; and enhances non - motorized transportation. 2. Encourage new growth into existing city/urban reserve areas. 3. Encourage alternative modes of transportation. 4. Whenever possible, urban development should occur only where urban public facilities and services exist or can be reasonably made available. I , Protect and enhance the environment and public health and safety when providing services and facilities, 2. Conserve natural resources such as water and open space to minimize energy used and GHG emissions and to preserve and promote the ability of such resources to remove carbon from the atmosphere. Continue providing a recycling program to reduce the amount of waste produced. 2. Coordinate with other agencies and outreach efforts to align messages on topics such as energy efficiency and conservation, trip reduction, alternative modes of transportation, green building, energy efficient design, waste reduction, recycling, composting, water conservation, water efficient design and products, benefits of buying locally grown, prepared, and manufactures goods and services. Consider transportation projects that will contribute to a reduction in vehicle miles traveled per capita, while maintaining economic vitality and sustainability. 2. Provide safe and convenient access for pedestrians and bicyclists to, across, and along major transportation corridors.