HomeMy WebLinkAbout2024-04-08-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday April 8, 2024 -1:30 PINT
BoCC Auditorium
206 West 5th Room 109 - Ellensburg
f. Call to Order
2. Citizen Comments ('I min. time limit)
3. Flood Control Zone District Match
4.5tate Auditor Office GMA Permit Timeliness Performance Audit
5. Road Fund Levy Update
6.Other Business - No Action to be taken
7. Concluded
Created on 4/412024 3:09:38 PM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM April 8, 2024
Board members present: Chairman Brett Wachsmith, Vice Chairman Laura
Osiadacz, and Comar..issioner Cory Wright.
Others: Mark Cook, Arden Thomas, Josh Fredrickson, Rebecca Cruse,
Public Works; Jamey Ayling, Jessica Miller, Chad Baia, Community
Development Services; Stephanie Hartung, Prosecuting Attorney s
Office; N-o members of the public.
At 1:30 PM Chairman Brett Wachsmith opened the Public Works Study.
Session.
No Citizen Co^:r.:ents _
FLOOD CONTROL ZONE DISTRICT MATCH
Arden Thomas briefed the Board of County Commissioners on an
Interlocal Agreement that is being requested by the City of
Ellensburg including the request for a $100,000 match. Arden Thomas
stated Flcod Control Zone District has contributed considerable
support to the City of Ellensburg in efforts to have continuous
modeling at jurisdictional boundaries and the funding may be found by
cost savings on other projects the Flood Control Zone District
currently provides assistance to. The Board of County Commissioners
expressed support and directed staff to prepare enabling documents
for consideration and will engage in further conversation with the
City of Ellensburg about the challenges in managing the flood zones.
STATE AUDITOR OFFICE GMA PERMIT TIMELINESS PERFORMANCE AUDIT
Mark Cook briefed the Board of County Commissioners on the results of
an audit conducted by the State on permit processing time of land
use, civil, and building permits. Mark Cook stated that Kittitas
County did very well, and recommendations were made that will a'_ow
for better review and accounting of the time it takes to process
permits for future audits.
ROAD FUND LEVY UPDATE
?ark Cook briefed the Board of County Commissioners on forecasted
Road Fund and the impact to the Road Fund and work program due to
inflation in the past years. Mark Cook stated it will be critical
that moving, forward into an election for a Road Fund Levy teat
expectations need to be clear to voters and they have a choice of
divesting from public roads and bridge infrastructure, or rate payers
2024-04-08 MINUTES
choose to vote in the levy. Mark Cook gave background on what CONSOR
has been implementing for the County outreach plan and that. CONSOR
has 2 focus groups set For this weekend, each with 1C-1.2 members.
D'scsss_on narsued about the pressures of increased taxation on
residents and other areas of funding. Mark Cook stated that Public
Works is limited in access to fur_dings or sales tax and Kittitas
County has maintained a high performing work program to date.
Meeting concluded at 2:13 PM
Aug (A&-,
Rebecca Cruse, Administrative
Assistant
2024-04-08 MINUTES
KITTITAS COUNTY COMMISSIONER
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY CON M- ISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 8, 2024
TOPIC: Flood Control Zone District Match
ACTION REQUESTED: Direction to Staff
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Direct staff to prepare enabling documentation for Interlocal Agreement with City of
Ellensburg and work on necessary budget changes to support.
BRIEFING SUMMARY:
• The City of Ellensburg was awarded Flood Control Account Assistance Program
(FCAAP) funding by the Department of Ecology.
• This grant will fund a city -led effort to improve flood risk information associated
with Whiskey and Mercer Creeks in the city and identify flood mitigation actions.
• The City has asked the Flood Control Zone District to provide matching
contributions valued at $100,000 in the form of District staff time and tasking our
on -call consultant with integration of the City's work with County -led flood risk
assessment.
e This contribution is not currently budgeted for 2024 and will require a budget
amendment.
• The Flood Control Zone District proposes to first look for cost savings in other
projects in 2024 to cover these expenses. If this cost savings cannot be found, the
Flood Control Zone District may need to reduce our 2024 contribution to the City
of Ellensburg Reecer Creek levy project to provide the required match.
BACKGROUND:
The City of Ellensburg was awarded Flood Control Account Assistance Program
(FCAAP) funding by the Department of Ecology. This grant will improve information
available about flood risk from Whiskey and Mercer Creeks in the city and identify
effective mitigation actions. The focus of the City's work is stormwater modeling, but
there are also floodplain integration and flood mitigation project identification elements
to the grant.
DISCUSSION:
Mis-communication between the City of Ellensburg and District staff resulted in this
project not being included in the Flood Control Zone District 2024 budget.
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
FISCAL PyIPACTS:
The $ 100,000 in matching contributions are not budgeted in the 2024 Flood Control Zone
District Budget. The actual budget impacts will be less, and District staff time is
budgeted and some of our consultant expenses will be incurred in 2025. District staff
proposes to first try to cover this additional expense through cost savings in other
projects, if available. If there are not project cost savings, the Flood Control Zone District
may need to reduce our 2024 contribution to the City of Ellensburg Reccer Creek levy
project.
ATTACHMENTS:
EXHIBIT 1: INTERLOCAL AGREEMENT PROVIDED BY CITY OF ELLEINTSBURG
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: INTERLOCAL AGREEMENT PROVIDED BY CITY OF ELLENSBURG
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
INTERLCCAL AGREEMENT BET EEN KITTITAS COUNTY FLOOD CONTROL
ZONE DISTRICT AND CITY OF ELLENSBURG
This Interlocal Agreement is made and entered into this I' day of April 2024, by and between
the City of Ellensburg (herein after the "City") and Kittitas County through the Kittitas County
Flood Control Zone District (hereinafter the "District").
RE" CITALI S
WHEREAS, the Interlocal Cooperation Act, as amended, and codified in Chapter 39.34 of
the Revised Code of Washington ("RCW"), provides for public agencies to enter into
agreements for joint or cooperative action authorized under that chapter; and
WHEREAS, Kittitas County established a County -Wide Flood Control Zone District
(District) pursuant to chapter 86.15 RCW for the purpose of addressing flood management
needs within county, and
WHEREAS, RCW 86.15.080(8) provides for flood control zone districts to enter into
cooperative agreements with any political subdivision; and
WHEREAS, the City of Ellensburg is undertaking the Shorelands Competitive Planning
Flood Assistance project, funded by the Department of Ecology Flood Control Account
Assistance Program (FCAAP), and
WHEREAS, the City of Ellensburg FCAAP project will improve information available
about flood risk from Whiskey and Mercer Creeks in the city and identify effective
mitigation actions, and
WHEREAS, the FCAAP grant requires $100,000 in matching funds during the contract
period (April 1, 2024-June 30, 2025) and the City has requested this match be provided by
the District; and
WHEREAS, the District will participate in the City's project for the purposes of
coordinating this effort with District -led floodplain mapping and flood -risk reduction
projects; and
WHEREAS, the District will document $100,000 in matching funds contributed by District
staff time and hydraulic and hydrologic professional services provided by on -call consultant
Watershed Sciences and Engineering.
1NTERLOCAL AGREEMENT FOR FLOOD CONTROL DISTRICT MATCH - 1
NOW, THEREFORE, it is hereby agreed as follows:
TERMS
1. Legal Hasis. This Agreement is entered into pursuant to Chapter 39.34 (the
Interlocal Cooperation Act) and Chapter 86.15 RCW (Flood Control Zone Districts).
2. Purpose. The purpose of this agreement is to document the value of District
services to meet the matching requirement for Funding Agreement (SEAFCAAC-2325-
EllePW-00033). The City will model the public storm system along with areas within the
Urban Growth Area. Combining both the City and County models will help more
accurately map both the rural and urban enviromnents.
3. Y erm of Agreement. The term of this Agreement shall be from its effective date
through June 30, 2025, or as otherwise agreed to by the parties as provided in Section 13 or
terminated as provided in Section 15.
4. Match Documentation Procedure. The County will provide the City with quarterly
reports documenting all match -eligible expenses. Quarterly reports will be submitted by
electronic mail to Mr. Jon Morrow
5. Coniract Mmaagement. The Agreement administrator for each of the parties shall be
responsible for and shall be the contact person for all communications and match
documentation regarding the performance of this Agreement.
The Agreement administrator for the City of Ellensburg is: Mr. Jon Morrow, 501 N
Anderson St, Ellensburg, WA 98926. Telephone: 509-952-8619.
The Agreement administrator for the District is: Ms. Arden Thomas, 411 North Ruby,
Suite 1, Ellensburg, WA 98926. Telephone: 509-962-7523.
6. M,a i erarce eJReeord. Each party hereto agrees to maintain books, records and
documents using accounting procedures which accurately reflect all direct and indirect costs
related to the performance of services described herein. Each party may examine the other
party's books and records to verify the accuracy of invoices. Each party's fiscal management
system shall include the capability to provide accurate and complete disclosure of all costs
invoiced under this Agreement. All books, records, documents and other materials relevant to
this agreement will be retained for six years after expiration of the Agreement, and the Office
of the State Auditor and any persons duly authorized by the parties shall have full access and
the right to examine any of these materials during this period. Each party will utilize
reasonable security procedures and protections to assure that records and documents provided
by the other party are not erroneously disclosed to third parties.
7. lndcr_rnif ma ior.. Each party agrees to be responsible and assume liability for its
own wrongful and/or negligent acts or omissions, or those of its officers, agents or employees
to the fullest extent provided by law, and further agrees to save, indemnify, defend and hold
INTERLOCAL AGREEMENT FOR FLOOD CONTROL DISTRICT MATCH - 2
harmless the other party from any and all such liability arising out of the performance of this
Agreement. In the case of negligence of more than one party, any damages allowed shall be
levied in proportion to the percentage of the negligence attributable to each party. This
indemnification paragraph shall survive the termination of this Agreement.
8. Asaignment. This Agreement cannot be assigned, transferred or any portion
subcontracted by either party hereto without the prior written consent of the other party, which
consent shall not be unreasonably withheld.
4. F�-,�urz Support. Neither party to this Agreement makes any commitment to future
support and assumes no obligation for future support of any activity contracted for herein,
except as may be expressly set forth in this Agreement.
10. "-o�:plianc- w�.h �.Fe��s. Each party hereto, in its performance of this Agreement,
agrees to comply with all applicable local, State, and Federal laws and ordinances.
11. Rekat onship G- the Y .rims. In the performance of the work herein contemplated,
the party performing the work is an independent contractor with the authority to control and
direct the performance of the details of the work; however, the work contemplated herein shall
be subject to the general rights of inspection and review of the party requesting the work be
done, to secure the satisfactory completion thereof.
12. Jurisdiction. Any legal dispute between the parties to this Agreement shall be
governed by the laws of the State of Washington, and any action to enforce this Agreement
shall be brought in Kittitas County, Washington.
13. Ivloaifcation. The provisions of this Agreement may be modified or amended only by
written mutual written agreement of the parties, executed by personnel authorized to bind each
of the parties.
14. 71civer. A failure by either party to exercise its rights under this Agreement shall not
preclude that party from subsequent exercise of such rights and shall not constitute a waiver of
any other rights under this Agreement unless stated to be such in a writing signed by an
authorized representative of the party and attached to the original Agreement.
15. Termination. This Agreement shall remain in full force and effect until terminated on
June 30, 2025, by mutual written agreement of the parties, or by written notice of termination
given by one party to the other at least thirty (30) days prior to the date of such termination.
16. Agreement Not zo; Benefit of";'h_rd ?aeles. This Agreement is entered into solely
for the benefit of the parties hereto and vests no rights in, or is it enforceable by, any third
parties.
17. Seve.-abill-Ny. If any provision of this Agreement or any provision of any document
incorporated by reference shall be held invalid, such invalidity shall not affect the other
provisions of this Agreement which can be given effect without the invalid provision, if such
I.NTERLOCAL AGREEMENT FOR FLOOD CONTROL DISTR[CT MATCH - 3
remainder conforms to the requirements of applicable law and the fundamental purpose of this
agreement, and to this end the provisions of this Agreement are declared to be severable.
18. Filing. This Agreement shall be filed with the Kittitas County Auditor, or,
alternatively, listed by subject on each or either party's web site or other electronically
retrievable public source pursuant to Revised Code of Washington 39.34.040.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as
of the date first written above.
CITY OF ELLENSBURG
Heidi Behrends Cemiwey, City Manager
Attest:
Approved as to form:
City Attorney
KITTITAS COUNTY
Brett Wachsmith,
Chairman
Attest:
Clerk of the Board
INTERLOCAL AGREEMENT FOR FLOOD CONTROL DISTRICT MATCH - 4
INTERLOCAL AGREEMENT FOR FLOOD CONTROL DISTRICT MATCH. - 5
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2024 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 8, 2024
TOPIC: State Auditor Office GMA Permit Timeliness Performance Audit
ACTION REQUESTED: None
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Support proposed actions as proposed in response to state audit results.
BRIEFING SUMMARY:
• The year long audit of the county's permit timeliness performance is concluded.
• Audit results recommend improvements to the county's permit issuance and
tracking system.
• Staff have responded to the State Auditor's Office with proposed mitigations.
BACKGROUND:
The State Auditor's Office began an audit of Kittitas County's Growth Management Act
permit timeliness performance, the first quarter of 2023. Kittitas County and Snohomish
County were the two counties selected in the audit. The cities of Bellingham, Richland,
Shoreline, and Vancouver were also selected to be audited. The audit evaluates
jurisdictions performance against state mandated permit issuance timeliness (120 days).
Three permit types were selected for comparison: land use, civil, and building. Kittitas
County met the 120-day standard for the three permit types: 79%, 97%, and 96%
respectively. Civil permit performance was the best of all jurisdictions in the audit.
Building was the second highest, with land use falling in the top half. A copy of the final
audit results is attached as EXHIBIT 1.
DISCUSSION:
Overall, the county did well in meeting the 120-day permit issuance requirement.
Statewide mandatory permit issuance performance is set to change in 2025. The
following timelines are set to implement in 2025:
e 65 days for permits that do not require public hearing,
• 100 days for permits that require public notice but NOT a public hearing,
• 170 days for permits that require public hearing.
The process reinforces for management the need to convey the value to permitting staff to
utilize SMARTGOV more effectively when stopping the time clock for poor applicant
Page 1 of 4
Public Works "Work Session StaffReporP', 2024
performance. It is common for staff to request additional information following cursory
review of submitted materials. It is not so common for staff to use SMARTGOV to
pause the clock while awaiting an applicant response. Management can do a better job
imparting value to using the software to stop the clock owing to poor applicant response
times.
Management has also verified the ability to query permit status for the three permit types
(land use, civil, and building). Providing this is done on a quarterly basis for a one-year
period, a permit frequently exceeding the statutory timeline will become known.
Management can then approach the Board of County Commissioners with a request to
amend the regulatory timeline based on the data derived from the permitting system. The
staff's response to the state audit is provided in EXHIBIT 2.
FISCAL IMPACTS:
ATTACHMENTS:
EXHIBIT 1: SAO PERFORMANCE AUDIT RESULTS
EXHIBIT 2: STAFF RESPONSE MITIGATING AUDIT RESULTS
Page 2 of 4
Public Works "Work Session Staff Report", 2024
EXHIBIT 1: SAO PERFORMANCE AUDIT RESULTS
Page 3 of 4
Public Works "Work Session Staff Report", 2024
PERFORMANCE
AUDIT
Growth Management Act:
County and city compliance with the
state's 120-day permitting requirement
April 2, 2024
Report Number: 1034439
Table of Contents
Executive Summary 3
Background 6
Audit Results 13
Audited governments met state -mandated permitting deadlines inconsistently in some areas,
sometimes by wide margins 13
Although already using many leading practices, audited governments could adopt
practices to further improve permit review times _ 27
Only one-third of local governments statewide published required annual performance
reports on permit processing times 32
State Auditor's Conclusions 35
' Recommendations 36
Agency Response 38
r,
Appendix A: Initiative 900 and Auditing Standards 48
Appendix B• Objectives, Scope and Methodology 50
Appendix C: Upcoming Changes to State Law 58
Appendix D: Local Building Codes and Processing Times 60
State Auditor's Office contacts
State Auditor Pat McCarthy
564-999-0801, Pat,McCarthy(asao.wa.gov
Scott Frank - Director of Performance and IT Audit
564-999-0809, Scott. Fran kcasa4,WA aov
Justin Stowe - Assistant Director for
Performance Audit
564-201-2970,Justin. Bowe@sao.wa.gov
Melissa Smith - Principal Performance Auditor
564-999-0832, Melissa.Smith@sao.wa.gov
Carolyn Cato - Senior Performance Auditor
564-999-0848, Carolyn.Cato@sao.wa.gov
Audit Team
Brenton Clark, Robert Evashenk, James Gel uso
Kathleen Cooper - Director of Communications
564-999-0800, Kathleen.Coopemsao.waxiov
To request public records
Public Records Officer
564-999-0918, Pu�Records@sao.wa.gov
Americans with Disabilities
In accordance with the Americans with Disabilities Act,
this document will be made available in alternative
formats. Please email Webmaster@sao.wa.gov
for more information.
Growth Management Act 1 2
Executive Summary
State Auditor"s Conclusions
G
As a former county executive, I found this performance audit spoke directly to
the complexities and challenges of processing development permits within the
timelines established by the Growth Management Act. Local governments work
hard to ensure each permit accounts for the important goals of the Act, including
protecting sensitive lands and ensuring new buildings are safe. At the same time,
timeliness and predictability in permitting are critical to ensuring Washington can
keep pace with its rapid economic and population growth.
As this report explains, audited local governments often met the statutory
requirement to process permits within 120 days. However, actual processing
times varied widely due to many factors. These can include the complexity of the
development, waiting for applicants to submit corrected or missing information,
and too few permitting staff.
Of the report's recommendations to improve permitting timeliness, I would
emphasize continuous improvement. By focusing on issues solidly within its
control, such as mapping existing processes, accurately recording work time and
analyzing performance, a government of any size can become more efficient.
I like to call this type of improvement "straightening the pipes" The State Auditor's
Office offers robust support to such efforts through our Center for Government
Innovation. To date, we have helped 30 cities and eight counties improve their
permitting through detailed process improvement programs. I encourage local
governments to consider the lessons contained in this report and take advantage of
the free continuous improvement webinar we will arrange in 2024.
Background
Land developers and builders must obtain permits from their local government
before carrying out development or building activity. These permits include land
use permits, which deal with dividing parcels of land or whether a proposed
project can be built on the specified parcel, as well as civil permits, which deal with
preparing land, and building permits, which deal with actual structures and focus
on ensuring they meet building codes and safety standards.
Local governments are required to issue a decision on permit applications within
120 days from when they determine the application is complete. If they cannot
Local governments
included in this audit
• City of Bellingham
• City of Richland
• City of Shoreline
• City of Vancouver
• Kittitas County
Snohomish County
Growth Management Act - Executive Summary 1 3
complete an application within 120 days, state law allows them to follow certain
processes. About 50 cities and counties are also required to publish annual reports
on the timeliness of their permit reviews.
To determine whether local governments are complying with the 120-day rule,
including the annual reporting requirement, we looked at six local governments
chosen to represent high -growth areas in the state.
Audited governments met state -mandated
permitting deadlines inconsistently in some areas,
sometimes by wide margins (page 13)
State law sets out a 120-day deadline for local governments to process land use,
civil and building permits. Performance of the six local governments against this
target varied widely and depended on the type of permit being processed. Audited
governments met the state -mandated deadline for more than 90 percent of building
permits, but some struggled to process land use and civil permits in time — often by
wide margins.
In the case of land use permits, four governments processed at least 75 percent
of applications within 120 days. Key factors for slow processing of these permits
included project complexity, staffing shortages and inefficient processes.
Washington law gives local governments two ways to make exceptions to the
120-day rule. However, none of the audited governments documented the process
for extending permit deadlines for specific projects. Two audited governments
inappropriately used waivers to eliminate permit deadlines entirely.
Almough already using many ieading practices,
audited governments could adopt practices to
further improve permit review times (page
Although audited governments used many leading practices around permit
processing, most did not fully apply practices related to continuous improvement.
All audited governments used leading practices related to education and outreach.
In addition, most had partially implemented staffing flexibility plans for high -
volume periods. However, audited governments could also improve their
implementation of continuous improvement practices.
Growth Management Act Executive Summary 14
Pr s
umairy
Only one-third of local ogovernments statewide
published required annual performance reports
on permit processing times 32)
Certain Iocal governments must post annual reports on permit review timeliness.
Beyond state law requirements, sharing permit review times with applicants helps
ensure predictability, and is therefore a leading practice for all governments.
However, only one-third of local governments publicly report on permit timeliness,
and even fewer included all information required by law. We examined 18
published government reports on permit processing time, and only four reports
contained most required elements.
Revisions to a chapter of state law (RCW 36.70B.080) will change reporting
requirements starting in 2025. In addition, the Department of Commerce will have
a new role in the process for annual permit reports.
Recommendations (page 36)
We made a series of recommendations to the six audited cities and counties to
address permit review performance that does not achieve 120-day compliance.
We recommended the local governments implement continuous improvement
methods, and analyze cost of service and staffing levels. We also made
recommendations to address a lack of transparency and predictability for permit
applicants in their jurisdictions.
Next steps
Our performance audits of state programs and services are reviewed by the Joint
Legislative Audit and Review Committee (JLARC) and/or by other legislative
committees whose members wish to consider findings and recommendations on
specific topics. Representatives of the Office of the State Auditor will review this
audit with JLARC's Initiative 900 Subcommittee in Olympia. The public will have
the opportunity to comment at this hearing. Please check the JLARC website for
the exact date, time, and location (www.leg.wa.gov/JLARC). The Office conducts
periodic follow-up evaluations to assess the status of recommendations and may
conduct follow-up audits at its discretion. See Appendix A, which addresses the
I-900 areas covered in the audit. Appendix B contains information about our
methodology.
Growth Management Act - Executive Summary
t+rt�:�r�tl
Background
The Growth Management Art governs
development and land use for local governments
Washingtons Growth Management Act (GMA) is a series of statutes dating back to
1990. This body of law balances the states environmental goals with development
and industrial needs in individual communities. For example, it directs local
governments to incorporate protections for wetlands and public water supplies into
their land use regulations, which could touch on issues such as drainage, flooding
and stormwater runoff. Governments must keep such goals in mind as they plan for
expected future growth, including adequate housing, capital facilities and utilities.
The GMAs key requirement is that fast-growing counties and the cities within them
must develop comprehensive plans and regulations to guide growth and limit urban
sprawl. These comprehensive plans must address timely and fair permit processing,
to ensure developers and builders can reliably predict how much time they should
allot for obtaining permits when embarking on a construction project.
Currently, 18 counties must follow the GMXs requirements. In addition, 10
counties have opted to meet GMA standards even though they are not required to
do so. These 28 counties comprised roughly 95 percent of the states population in
2020. The map in Exhibit I (on the following page) illustrates the 28 counties.
Growth Management Act Background 6
Exhibit 1 - Counties and their planning requirements under the Growth Management Act
Island Ferry
C Okanogan
t l
anChelan 11-
Jefferson
IRW
'auglas Lincoln
Grays Mown
{ —
Harbor
Legend: Counties Adams
and their GMA status Pierce Whitman
18 must meet '4
GMA planning LewisFranklIn CGorfleld
requirements 1- L
Lalumbla
10 opted in to Cowlitz iAsc
GMA planning 1Skamani B rttor� walla Wails
requirements Wahkiakum --
11 not subject KllCkitat
to GMA planning
Source: Washington State Department of Commerce.
Mate law requires most local governments
toissUeafinal ded ionorspermitapplications
within 120 days
Permits help ensure that development projects are safe and
comply with local regulations
Land developers, professional builders and property owners must obtain permission
from the appropriate local government before carrying out development or
building activity. Each local government establishes safety, environmental and
other standards in its comprehensive plan and development regulations. The permit
review process is meant to ensure that development and building projects comply
with the plan and regulations.
Growth Management Act - Background 1 7
Local governments use different categories of permits for this purpose. In
this report, we refer to three broad categories of permits that are involved in
development projects:
1. Land use or planning permits deal with dividing parcels of land or whether
a proposed project can be built on the specified parcel. They focus on
issues such as compliance with zoning laws, as well as the project's effect on
traffic and proximity to critical areas, such as habitat conservation areas or
hazardous areas.
2. Civil engineering or public works permits (also known as "land -disturbing
activities permits') deal with preparing land for building. They focus on
activities involving utilities, street access, grading and controlling stormwater
runoff.
3. Building permits deal with actual structures and focus on ensuring they
meet building codes and safety standards.
Government permit -review processes generally include examining detailed project
plans; they often involve multiple subject matter areas across departments and
divisions. Reviews often include managing public notices, hearings and comments.
Local governments must issue a decision on permits within
120 days, with limited exceptions
State law directs local governments that follow GMA to establish time periods for
permit reviews that take no more than 120 days from the start of review to the final
decision, although they are free to establish shorter timelines. The 120-day period
begins when a government determines the application is complete.
Local governments commonly understand that the 120-day period only includes
time when the government is actively reviewing an application, and excludes
time when staff are waiting for applicants to provide additional information or
corrections. However, state law does not explicitly say as much. It states:
The time periods for local government actions for each type of complete project
permit application or project type should not exceed one hundred twenty days,
unless the IocaIgovernment makes written findings that a specified amount of
additional time is needed to process specific complete project permit applications or
project types.
RCW 36.70B.080. (Emphasis added.)
As this excerpt shows, state law allows local governments to make exceptions to the
120-day requirement in limited circumstances and set longer timelines for specific
types of permits. They must document their justification for the extension. They may
also extend their established timeline for a particular permit with written agreement
from the applicant. Lastly, they may exempt some types of permits from the 120-day
requirement, such as those requiring approval by a legislative body such as a city
council or board of commissioners.
Growth Management Act - Background ' 8
Backgrowd
Although current law does not clearly define what actions count toward the 120-
day timeline, changes to state law that will go into effect in 2025 support local
governments' interpretation that it excludes time waiting for applicants to respond
with corrections or additional information. The 120-day requirement currently
applies to building permits and land use permits such as subdivisions, planned
unit developments, conditional uses and site plan reviews. For our analysis, we also
distinguished a third category of permits: "civil permits, such as those for grading
and utilities. These permits are typically processed by a separate set of people, often
with specialized skills and often in a separate department from building inspectors
and land use planners. Civil permits are included in the state building code with
other building permits, although the state code does not use that exact term.
State law requires certaii{ local governments
to publicly report on how long it takes to
process pprr-litc
Counties required
Aside from compliance with the 120-day permit -approval window, state law also
to report on permit
requires about 50 cities and counties to publish annual reports on the timeliness of
review timeliness
their permit reviews. This requirement applies to all counties west of the Cascades
Clark
with populations greater than 150,000 as of 1996, and all cities within those counties
King
with populations of at least 20,000. Counties covered by this requirement are listed
in the sidebar; Appendix B lists the affected cities.
Kitsap
State law specifies the content of these reports. Required data includes the average
Pierce
number of days for permit review, the number of permits that did and did not meet
0 Snohomish
the 120-day deadline, and the number of permits with deadline extensions.
• Thurston
• Whatcom
Revised state I a w will change review timelines
0 County included
and requirements for permit performance reports
in this audit
starting in 2025
Legislation passed during 2023 will change the key requirements we assessed in
the audit. Its provisions go into effect in 2025. First, it changes the deadlines for
how quickly local governments must process permits. Second, it changes the data
that certain governments must report about their permit review performance; the
Department of Commerce will have a new role in this process.
Growth Management Act - Background 19
ockg and
The revised chapter of state law sets three different deadlines depending on whether
a permit requires public notice or hearing, and specifies what actions are accounted
for in those deadlines. The new deadlines will be:
1. 65 days for permits that do not require public notice
2. 100 days for permits that require public notice but not a public hearing
3. 170 days for permits that require a public hearing
The revised law also clarifies that these deadlines do not apply to time when
applicants are making corrections or providing additional information, and that
the days counted are calendar days. in addition, governments that fail to meet a
specified deadline for a permit application will have to refund a portion of the
applicant's fees. Appendix C summarizes the changes made under the revised law.
This audit assessed whether selected local
governrne€tts met the 120-day permit review
timeline unbar state law
Across Washington, 246 local governments — 28 counties and 218 cities are
required to meet the 120-day deadline for permits. Rather than attempting a broad
look at all these jurisdictions, we selected six governments to review in detail.
Our goal when selecting governments was to include a good mix of cities and
counties on both sides of the Cascades. We chose high -growth areas with a variety
of population sizes and considered urban and rural designations for counties and
population density for cities.
Because the provisions of the revised law are not yet in effect, this audit compared
the performance of the local governments to the law in force during the 2019-2022
audit period. (Appendix B describes our review of current state law and building
codes.) Despite changes in the law, we decided that it was still important to see how
governments performed against the 120-day benchmark, and to determine why
some permits were not processed within the deadline. We also wanted to examine
whether audited governments waived the 120-day deadline entirely. The issues that
Local governments
cause governments to miss the current deadline, if not addressed, may also cause
included in this audit
governments to miss the new deadline.
• City of Bellingham
This audit was designed to answer the following questions:
• City of Richland
• To what extent are local governments complying with the 120-day rule,
• City of Shoreline
including the annual reporting requirement?
• City of Vancouver
• Are local governments using processes appropriately for project permit
• Kittitas County
reviews that exceed 120 days?
Snohomish County
Growth Management Act - Background 110
The map in Exhibit 2 shows the Iocal governments included in this audit and their
populations; they are also listed in the sidebar on the previous page.
Exhibit 2 - Local governments that participated in this audit
Population data as of 2020; all numbers rounded
Bellingham:
91,000 residents
1 c
�.SKoreline:
i.:59,000 residents
'Vancouver:
191,000 residents
FF
1 ckground
F nohomish County:
368,000 residents in
;unincorporated areas
1
Kittitas County:
021,000 residents in
,unincorporated areas
Richland:
61,000 residents
Legend: Audited
govenments and
their GMA status
Must meet
GMA planning
requirements
Opted in to
GMA planning
requirements
Not included
In the audit
Sources: Demographic data from Washington Office of Financial Management, map data from Washington State Department of Commerce.
A note about data presented in this report
To answer the audit questions, we analyzed permit data from each of the local
governments included in the audit. We also judgmentally selected land use permits
that exceeded the 120-day timeline to review. These permits provided examples of
causes for delay that governments may encounter while processing permits. This
selection of permits was not statistically significant and cannot be used to project
results to the total number of each government's permits.
The audited governments used a variety of permit tracking systems, and those
systems have varying capabilities. In most cases, governments were able to query
their systems and provide reliable data about when a permit was submitted and
approved. There were, however, some exceptions:
At four governments, the systems could not produce a report that showed
data for the dates when staff halted processing a permit while an applicant
was asked for revisions or more information and when they resumed after
the applicant responded.
Growth Management Act Background 11
F30dc mund
• Only two governments had previously published permit timeliness data,
which meant we could not verify the completeness of the data against a
published source.
Despite these shortcomings, we performed other tests that allowed us to conclude
that the permit data was sufficiently reliable to provide summary data in intervals of
60 days or more.
Growth Management Act Background 1 12
Pr
l�tidit �ul�s
r. a �S
Audited governments met state -mandated
permitting deadlines inconsistently in some
areas, sometimes by wide margins
Results in brief
State law sets out a 120-day deadline for local governments to process Iand use,
civil and building permits. Performance of the six local governments against this
target varied widely and depended on the type of permit being processed. Audited
governments met the state -mandated deadline for more than 90 percent of building
permits, but some struggled to process land use and civil permits in time — often by
wide margins.
In the case of land use permits, four governments processed at least 75 percent
of applications within 120 days. Key factors for slow processing of these permits
included project complexity, staffing shortages and inefficient processes.
Washington law gives local governments two ways to make exceptions to the 120-
day rule. However, none of the audited governments documented their process
for extending permit deadlines for specific projects. Two audited governments
inappropriately used waivers to eliminate permit deadlines entirely.
1:. LAW' eats GUl 11 Z -( 311,�' dC:E(EGG'lG l'C? G(' lcca{l
Washington's Growth Management Act (RCW 36.70A) mandates that cities and
counties process land use, civil and building permits within 120 days. Under the
act, 18 counties must write comprehensive plans and development regulations
to help ensure they meet the deadline, another 10 counties chose to participate.
All but the smallest cities and towns within those counties must also comply, and
95 percent of the state's population live in affected places. It applies to a variety
of building, civil and land use permits, including subdivisions, planned unit
developments, conditional uses, and site plan reviews.
The purpose of the requirement is to give permit applicants more predictability
about how long it will take for their permits to be approved.
Growth Management Act Audit Results 1 13
The clock starts when a government determines the application is complete and
ends when it issues a final decision. The law says the 120-day deadline is for "time
periods for local government actions;' but does not specify whether the 120 days
should include or exclude "applicant time, which are the days when the application
has been returned to the applicant for revisions or additional information. State
law thus allows local governments to establish for themselves whether applicant
time should be included or excluded from the 120-day period. The six audited
governments (listed in the sidebar) have clearly stated in their city or county codes
that applicant time is not counted toward their 120-day deadline.
This audit analyzed six local governments' performance
against the 120-day deadline for land use, civil and
building permits
Three broad categories of permits affect different phases of development projects.
First, confirming the proposed project can be built on a specific piece of land.
Second, preparing the land for building. Finally, ensuring that the proposed
structures will be safe £or occupants. While each local government might use
slightly different naming conventions, this report calls the three permit categories
land use, civil and building.
To understand how the six governments performed across the three permit
categories, we reviewed their permit data from 2019 through 2022. Although the
data each government collected varied, the data they supplied allowed us to assess
broadly how they performed. Appendix B. contains a more detailed explanation
of our analyses and data limitations. We found significant inaccuracies with the
approval dates in Bellingham's land use permit data, so we applied a different
method to judge whether it met the 120-day requirement. Instead of analyzing the
full data set provided, we used a random sample of 25 of the city's land use permits.
Specific details about the Bellingham data inaccuracies can be seen on page 53.
All sic governments specify in their city or county codes that only government
processing time is counted toward meeting the 120-day deadline. (See Appendix D
for relevant passages from city and county codes.) However, only two - Snohomish
County and Vancouver - could produce reports from their systems for dates
when work was paused while staff waited for information or revisions from the
applicant. The data reports from the other four governments showed only the dates
they received an application and issued the final decision; in a few cases, we also
received the date the government deemed the application complete. Therefore,
their performance is probably better than their own data indicates. Unless
otherwise specified, the analyses and exhibits in this chapter discuss the total time
a government took to complete the permit, including both government processing
time and applicant response time. To see how total time and hands-on government
time differed, we performed a separate analysis on data provided by Snohomish
County and Vancouver (see pages 19-21).
Local governments
included in this audit
City of Bellingham
City of Richland
City of Shoreline
City of Vancouver
• Kittitas County
• Snohomish County
Growth Management Act - Audit Results ; 14
Aod+t Results
' fG f`17 i I r_,. If`,L' ( i . a ii1' �ICJ�dl C,1(�7'G�['-Cf"I f 1`I e 1 1_& arc 1"f C C}
The performance against the 120-day deadline varied widely among the audited
governments, and across the types of permits. 'lhe two governments in Eastern
Washington, Richland and Kittitas County, completed a higher percentage of
permits within 120 days compared to those in Western Washington, but all
processed building permits on time more often than land use and civil permits.
Exhibit 3 uses each government's total processing time for all three permit types
to show the percentage each reviewed and completed within the 120-day deadline.
(See pages 19-21 for a discussion of total time versus hands-on government time.)
Exhibit 3 — Percent of applications processed within 120 days, 2019-2022
Total processing time
Land use
64%'
79%
91 %
77%
24%
96%
Civil
89%
97%
93%
83%
40%
43%
Building
96%
96%
97%
93%
91%
93%
Notes:1. Based on a sample of 25 permit records. 2. See exhibits 7 and 8 for hands-on government versus total time analyses.
Sources: Permit data from audited local governments.
Land use permits: Four governments processed at least
75 percent of permits within 120 days
Land use permits generally take longest to approve because they are the most
complicated. Such permits include:
Plats, which convert large parcels into subdivisions for several buildings
Use permits, allowing land to be used for certain purposes
Environmental permits, allowing construction near critical areas such as
rivers or slopes
Land use permits often require public meetings or hearings. While most decisions
are made by department staff, some are made by a hearing examiner, an arbiter
hired by the government to make a legal determination on whether an application
complies with local development regulations.
Growth Management Act Audit Results 15
Audit Results
6-.- P_F
Richland and Vancouver processed almost all their land use permits within the
statutory 120-day deadline. Kittitas County and Shoreline both achieved the 120-
day target for just over three-quarters of their permits. Bellingham achieved the
target for 64 percent of their permits. Snohomish County, however, completed
only 24 percent of its land use permits on time. While we discuss a variety of
factors for slow processing in the next section, staff vacancies were a significant
issue for Snohomish County. In addition, as the orange segments in the exhibit
show, all governments had at least some percentage of permits extend more than
120 days before completion. Exhibit 4 shows the total time taken by the audited
governments to process land use permits during 2019-2022.
Exhibit 4 - Percent of land use permits processed within or over 120 days, 2019-2022
Note. Numbers may not add to 100% due to rounding
Richland
Within
120 days F
More than
120 days 16%
tbo
Kittitas
County
9%
9%
4%/" —
Key
121-180 days
181-365 days
More than 365 days
• Based on a sample of 25 permit records.
source: Permitting data supplied by audited governments.
Vancouver
Shoreline
Snohomish
County
1 %
ate=
37%
Growth Management Act Audit Results 1 16
F7
]Audif rResolfs
Civil permits: Four governments processed more than 80
percent of permits within 120 days, while two processed
about 40 percent on time
Civil permits, for land preparation and underground utility work, are generally
faster to process than land use permits, although some can run into environmental
issues that complicate reviews. As Exhibit 5 shows, four of the six governments
processed civil permits within 120 days at least 80 percent of the time. Although
Snohomish and Vancouver did not perform as well when comparing total
processing time, their performance improved when we considered only
government processing time. See pages 20-21 for information about how their
performance changed when total time was compared to hands-on government
processing time.
Exhibit 5 — Percent of civil permits processed within or over 120 days, 2019-2022
Note: Numbers may not add to 100% due to rounding
Kittitas
County Rirhlanrl
Wi
1201
More
120
Key
Source: Permitting data supplied by audited governments.
26%
121-180 days 28% 21%
181-365 days
More than 365 days
Growth Management Act Audit Results 17
F-
Audli`Results
Building permits: All six local governments processed more
than 90 percent of building permits within 120 days, and
many took much less time
The final stage of a project typically requires building permits: the question is
precisely what will be built, not whether something can be built. These permits
cover the structure itself, including plumbing, electrical and mechanical fixtures,
and can usually be processed more quickly than land use or civil permits.
Applications are reviewed for safety and conformance with regulations, including
the building's size. As Exhibit 6 shows, all six governments processed at least
90 percent of their building permit applications within 120 days.
Exhibit 6 - Percent of building permits processed within or over 120 days, 2019-2022
Note: Numbers may not add to 100% due to rounding
Kittitas Richland
Bellingham County Shoreline Snohomish Vancouver
Count
Wi
I201
More
120
Key
Source: Permitting data supplied byaudited governments.
121-180 days
181-365 days
More than 365 days
Growth Management Act Audit Results 18
Audit Results
GovernmeL-6U c.ci r iic:t (, (,Yurtt ' Iu c. �UlrnLc "C"F
ap1_,_�:;� c .�f
As they review a permit application, governments often find they have questions,
require revisions or need the applicant to take some other action. State law allows
local governments to establish permit -processing procedures in their development
regulations. All six audited governments specified in their county or city codes that
time waiting for the applicant does not count against the 120-day deadline, but only
two of them could produce reports to show this time. Specifically, they could not
demonstrate:
Dates when staff halted processing a permit while an applicant was asked for
revisions or more information
• Dates when they resumed processing after the applicant responded
This gap in reporting means the performance of the other four is probably better
than their own data indicates. For example, Kittitas County could not report
on applicant time. In the longest case of permits we examined, the total time
from permit application to final decision was 479 days. However, we found that
during those 15 months, the county waited 413 days for the applicant to provide
corrections. The hands-on processing time at the county was just 66 days.
As noted earlier, both Snohomish County and Vancouver could produce reports
with the dates when they send applicants requests for information and when it
is returned. Graphing this data reveals the difference between total time, used in
exhibits 3 through 6, and hands-on government time, when staff had control of
the permit. By tracking this data, a government can review the actual time it spent
reviewing the application. With that more accurate picture, it can identify possible
problems in the way it processes certain types of permits that could cause delays.
Growth Management Act Audit Results 19
For Snohomish County, comparing total time to hands-on government time shows
modest improvements in meeting the 120-day deadline. Land use permits show
improvements of 5 percent (Exhibit 7a) and civil permits show improvements of
11 percent (Exhibit 7b). However, using the hands-on government time data -
the second bar in both exhibits - reveals that significantly fewer permits took the
county 181 or more days to process.
Exhibit 7a - Percent of Snohomish County
land use permits processed, total time vs.
hands-on government time
Permits processed within or over 120 days, 20I9-2022
Note: Numbers may not add to 100% due to rounding
Hands-on
Total time government time
Within
120 days
More than 9%
120 days M 20%
37%
47%
5% Mw
5ource: Permitting data supplied by audited governments.
Key
F_
udir Results
Exhibit 7b - Percent of Snohomish County
civil permits processed, total time vs.
hands-on government time
Permits processed within or over 120 days, 2019-2022
Note: Numbers may not add to 100% due to rounding
Hands-on
government time
Total time
Within
120 days.
More than
120 days 18%
26%
121-180 days 28% 19%
181-365 days 4%-
More than 365 days
Growth Management Act Audit Results 120
Vancouver's data for civil permits, in Exhibit 8,
showed even greater improvement in meeting the
120.. day deadline when hands on government
time was compared to total time. As the blue
bars show, when using total -time data, the city
completed just 43 percent of its civil permits on
time, but when using hands-on government time,
it completed 88 percent of permits on time.
Audit Results
Exhibit 8 - Percent of Vancouver civil
permits processed, total time vs. hands-on
government time
Permits processed within or over 120 days, 2019-2022
Note: Numbers may not add to 100% due to rounding
Hands-on
government time
Total time
Within
120 days
More than 2% 1 9%
120 days 261 %
9b
Key
21% 121-180 days
LL - 181-365 days
More than 365 days
Source: Permitting data supplied by audited governments.
Key factors for slow processing of land use permits
included project complexity, staffing shortages
and inefficient processes
As the comparison of total time versus hands-on government processing time
in two audited governments showed, one important factor in overdue permits
approved after the 120-day deadline is outside the government's control: the
response time of the applicant. When permit staff return an application with
questions or require additional documents, they must set the application aside
until the applicant replies. However, applicants sometimes turn in a response
that does not address all the concerns, requiring another round of questions and
answers. Because each response requires a new review, it can quickly add additional
processing time for the government.
Growth Management Act Audit Results 121
However, not all delays in processing permits are due to applicant errors or delays.
We found several other factors are just as — or more — important in explaining
delays in processing land use permits. These factors may be present at more than
one of the audited governments even though we only mention one as an example.
Additionally, because we based our observations on a judgmental selection of
permits that exceeded the 120-day timeline, our results should not be assumed to
affect all of each government's permits.
Some permits are complex and difficult to process
Some projects are more complex in themselves and require land use, civil and building
permits. Each must be completed to correct standards, usually by several departments
with different expertise. This means the most difficult permit can delay the review
process for other permits on the project, as local governments typically assemble all
project feedback from different departments into a combined letter.
In addition, available vacant land can be difficult to build on. Especially in more
populous areas, flat and simple land has already been developed, so what remains
may contain or be next to critical areas — shorelines, wetlands, slopes or other
factors that require protection or extra caution in building. These can require
governments to ask for additional surveys by the applicant, and can require
consultation with, or permits from, state or federal agencies. Additionally, these
factors can present regulatory complications. Some local government planning
managers noted that regulations have grown more complex over the last few
decades, while the 120-day deadline has remained unchanged. Regulations can
also offer a legal avenue of challenge for opponents of a project, which can also
contribute to delays.
A variety of other factors may slow down processing
Aside from such overarching reasons for a delay in issuing permits, audited
governments described several other factors that contributed to delays during
the audit's review period. The COVID-19 pandemic, unsurprisingly, resulted in
delays for permits in 2020 and into 2021 as staff retired early, took sick Ieave and
transitioned to working from home. In one case, in Kittitas County, a hearing on
a permit scheduled for March 2020 was delayed until the following October, while
the government's leaders figured out how to hold a virtual hearing that met legal
requirements. Three additional issues — one also associated with the pandemic —
caused delays at several audited governments, pertaining to staffing and inefficient
processes.
Insufficient staf, including engineers
Managers at several governments said they lost staff during the pandemic, and now
find themselves unable to fill all the vacancies needed to clear the backlog of permit
reviews. Managers said there are few qualified people and stiff competition to hire
Growth Management Act Audit Results 122
P7LAUdir ResUlrs
them, including from the private sector. This was especially acute at Snohomish
County, which carried out a successful retirement incentive program to save costs
during the pandemic, but now has too few engineers for the workload.
Shoreline faced a somewhat different problem after it rezoned two areas around
future light rail stations in 2015 and 2016 to encourage redevelopment. The city
saw a 50 percent increase in permit volume from 2017 to 2019. However, in 2019
the city still employed the same number of people to process permits as it had in
2017 (about 23 people). The city did not increase the number of people processing
permits until 2022, when it added three positions to the budget (about a 14 percent
increase over 2017).
Delays far permits subject to hearing examiner adjudication
Some permits require a decision made not by planning department staff but by
a hearing examiner. This professionally trained person, usually an attorney, is
engaged to make objective decisions, supported by recorded evidence and free
from political influences. All audited governments used hearing examiners; some
also set specific timeframes for examiner reviews. However, examiners did not
always complete their review within the set time. For example, of the eight Richland
permits we reviewed, four were delayed waiting for the hearing examiner's decision.
In early 2022, the city attempted to hire an additional hearing examiner, but did not
receive any qualified applicants.
Inefficient processes with poor communication
Local governments need a good system of communication for permit workflow to
ensure permits move smoothly through the process. Many permits are reviewed
by several departments, such as roads, wastewater and fire. Each reviewer must
notify the main planner when they have completed their review, otherwise the
permit will not move to the next step. This notification may be built into the permit
review software in the form of a check -box or `submit' button. During our review,
we noticed a problem with this process at one government, impairing its ability to
process permits on time. At Shoreline, we found that for six of the 16 permits we
examined, employees in one department did not click the button after completing
their review. These permits sat idle for more than 60 days and in one case more than
four months. Shoreline's planning manager said that when these delays occurred, the
city was in the process of transitioning the wastewater utility from an independent
district into a city department. This change affected the city's role in the utility
permitting process.
Growth Management Act Audit Results 123
Pr
Audit Re5alts
�1C'.'��F.,T Ie- ; �` G . `l,ef
r o r
il-Lti('J -ir l',
Washington law gives local governments two ways to make exceptions to the
120-day rule, but does not place many conditions around how they do so. Local
governments may:
Extend the time frame for specific projects with the agreement of the
applicant. In certain cases, the government may ask the applicant to agree
to an extension of the 120-day deadline by "a reasonable period of time"
However, the law does not define "reasonable" or advise governments how
to determine whether a period of time is reasonable.
Establish different time frames in their city or county codes for permit
types that are known to take more than 120 days. When it does so, the
local government must also document why additional time is needed.
However, state law does not define what is expected to be included in
the documentation, nor the level of local authorization required to
implement them.
While most governments allowed extensions to permit
deadlines for specific projects, none documented their
process for doing so
Most audited governments extended 120-day deadlines in certain circumstances.
For example, when an applicant requested more time from Vancouver, the reviewer
agreed to a two -week extension. A Shoreline manager said the city might accept
a request for an extension if initiated by the applicant, but said the city does not
attempt to initiate extensions because staff believe applicants would be unlikely
to agree.
Managers from three other audited governments said their reviewers sometimes
use extensions. In their view, extensions can help both the applicant and the
government, because if the government is held to a hard-and-fast 120-day deadline
for a decision, it may be forced to deny the permit simply because it cannot be
approved without additional work. That result benefits neither party. An applicant
can appeal the denied permit or submit a new application, but either solution costs
more time and money from both developer and city.
However, none of the governments had policies or procedures in place to ensure
extensions are used in a fair and consistent manner. Local governments typically
let permit reviewers make the decision on a case -by -case basis to manage their
workload. However, without standard procedures, permit reviewers may not apply
extensions consistently across all applicants. Furthermore, without clear policies
and documentation, the process might appear unfair to the applicants.
Growth Management Act Audit Results 124
Audit Results
Local governments could improve their permit review process by setting
standard policies for when it is appropriate to use deadline extensions, and clearly
communicating the policy with applicants.
Only one established a longer time frame for a specific
permit type
Our review of each government's development regulations found that they
generally did not specify different timeframes for permits that were known to
require more time to process. Bellingham specifically established a 180-day
timeframe for simple rezoning applications. Some managers at other governments
said they were not aware state law offered them this option to set longer time
frames. If local governments do not document the known additional time needed
for certain permit types, permit applicants have less predictability for how long the
process takes, a key Growth Management Act goal.
Two audited gover�ti��t�Lits inapprn rL- ��e `y used,
waivers to eliminate permit dear,'[[ ti. ;
Although state law allows for reasonable deadline extensions, two governments
chose to waive deadlines entirely. Richland and Snohomish County managers
said that during the audit period, with agreement from the specific applicant,
they waived the deadline rather than extending it for a specific amount of time.
However, by asking to waive a deadline entirely, the government may be placing
undue pressure upon the applicant to agree, out of concern that their application
will be denied if they do not do so. For example, a representative of the building
industry testified at a legislative committee hearing that builders feel pressure to
accept longer review times when the local government initiates the process.
Richland reviewers initiated waivers at the time of application for about six months,
according to a planning manager. The manager said the city ceased the practice in
May 2022. The manager said the current process is to ask applicants for deadline
extensions on a case -by -case basis.
Snohomish County reviewers asked applicants to agree to waivers for about
30 percent of the approximately 600 land use permits processed between 2019
and 2022. Snohomish was the only local government that provided data on the
frequency of waivers. County reviewers typically initiated deadline waivers after
their first review by sending a waiver form (illustrated in Exhibit 9 on the following
page) to the applicant with the request for corrections or additional information.
One manager said the county instituted this process to avoid having to issue a denial
when the review reaches the 120-day deadline. The form specifically mentions
allowing the county to review the application beyond the 120-day deadline.
Growth Management Act Audit Results 125
Audit Results
Exhibit 9 — Snohomish waiver template sent with first review letter
Snohomish County Planning & Development
Everett, OVA 98201-4N6
Re:
Dear Project Manager:
1 would like to waive the processing requirement that the final decision for n,y
Proposal fol
acres, must be issued within 120 days as specified in Snohomish
County Code section 30.70.110. Please continue to review the application beyond
the specified time limitations.
Sincerely,
Applicant
Source: Snohomish County.
Using waivers to entirely eliminate application deadlines does not align with state
law and creates two issues. First, it circumvents the 120-day rule, which reduces
government accountability and process predictability, a key Growth Management
Act goal. Second, it increases the risk for additional delays, because a project
without a deadline is less likely to be completed in a timely manner. An alternative
to waivers is an extension for a specified time period, which is allowed by state law.
Growth Management Act - Audit Results ' 26
Audit Results
L.. i�- l�.�'7U �t�.l� i�.(�;Iili T�ILC�C
r, r,
0
fj I j
Z,{. �I ,(' ( fr�($l L_'LtJ ,1 L4irs o
Results in brief
Although audited governments used many leading practices around permit
processing, most did not fully apply practices related to continuous improvement.
All audited governments used leading practices related to education and outreach.
In addition, most had partially implemented staffing flexibility plans for high -
volume periods. However, audited governments could also improve their
implementation of continuous improvement practices.
Although audited gL\1,Q-.',, nments used many
leading practices, did not fully apply those
related to continuous 1 �iiprovement
The Governor's Office for Regulatory Innovation and Assistance (ORIA) has
published leading practices for local government permitting. ORIA developed
six themes of leading practices in consultation with local governments and the
development industry in Washington with the purpose of improving permit
processes.
• Ensure complete applications. Define what constitutes a complete
application and communicate it to applicants. Establish a process to verify
these required items are present when an application is submitted.
• Build mutual understanding. Educate both employees and applicants on
the steps of the permit process and why those steps are in place.
• Engage stakeholders early. Bring together reviewers and applicants as early
as possible, to identify and discuss critical permit requirements to avoid
rework later in the process.
• Use information technology (IT) tools. Use online application portals
and electronic permit tracking systems to improve communication with
applicants and maintain accurate project records.
• Develop systems for staffing flexibility. Maintain performance during
busy periods with approaches such as cross -training, contracting and
interlocal agreements.
Growth Management Act Audit Results 127
FF
�4udil; Results
• Analyze processes, performance and costs. Document and analyze the
full permit process to reveal trends and prioritize improvements for
predictability and efficiency.
We found all six audited governments applied four of the six practices during the
audit period of 2019-2022, while most had not fully implemented the other two
practices. Governments that were already conducting most permit reviews within
the 120-day target might not improve performance dramatically by employing
additional leading practices. Nonetheless, periodically analyzing their permitting
processes for opportunities to refine them will likely prove helpful. Those
governments struggling to meet and improve permitting times can benefit most
from implementing all six practices.
Exhibit 10 summarizes our assessment of the six audited governments' adoption of
these leading practices; check marks show the practice was fully adopted.
Exhibit 10 - Mixed performance in implementing three of six leading practices
1. Ensure complete applications and verify V/ `/ ✓
required items are present at submittal
2. Build mutual understanding of the ✓ `/ ✓
process between employees and applicants
3. Engage stakeholders early to avoid ✓
rework later
4 Use Information technology to improve V/ Partial Partial
communication
5. Systems for staffing flexibility X Partial Partial `/ Partial X
to maintain performance during
high volume periods
6. Analyze process, performance, and costs
for improved predictability and efficiency
Sources; Auditor evaluation of local government information.
Partial X X X Partial Partial
Growth Management Act Audit Results ; 28
Pr
Rudit Resulfs
Audited governments all used leading practices 1 through 3,
related to education and outreach
The first three leading practices address education and outreach to applicants. All
six audited governments used a variety of techniques to achieve the goals of these
practices. Often, any given activity or technique encompassed more than one
practice, as the examples below illustrate.
Designated staff to assist applicants. Governments generally designated
staff such as permit technicians to be the primary contact with applicants by
phone, email and public counter. State law requires governments to designate
such staff.
Informed applicants about application requirements. Governments
provided information on their websites, such as application submittal
checklists, to define complete applications and help ensure applicants submit
all required documentation. State law requires governments to specify the
contents of a complete permit application.
Held pre -application meetings. Governments required a pre -application
meeting for at least one permit type, and made the meeting optional or
recommended for other types. Reviewers used these meetings to learn
more about proposed projects and advise applicants if they noticed unusual
complexities.
Managers from four audited governments said they bring technical staff, such as
planners, into the review process early to ensure application completeness. Their
expertise may help catch issues that would likely result in rework during full
application review. Snohomish County and Vancouver also published informational
videos on their websites to explain the permit process.
Governments used IT systems to manage aspects of
permitting, but two could improve communication tools
Local governments can apply IT solutions to many steps in permitting, including
permit tracking systems to manage workflow and online portals to facilitate
application submissions and correspondence. All six audited governments had
some form of information systems in place to aid applicant communication,
process permits and maintain accurate permit records. Some governments' systems
allowed staff to track electronic application submissions; these systems typically
also allowed applicants to view the status of their application. Some systems could
send messages to applicants requesting additional information or corrections.
Nonetheless, there are opportunities to use IT systems to further improve
communications — internally and with applicants -- and maintain accurate permit
records. For example, Kittitas had a public portal to communicate with applicants,
although it only worked for civil and building permits. Similarly, Richland used
an IT system to track civil and building permits, but did not use the system for
Growth Management Act Audit Results 129
FF
Atudit Results
land use permits. In late 2022, Richland worked with a consulting firm to audit
its development review, permitting and inspection functions. Richland is in the
process of implementing the recommendations from that report, which includes
a new permitting system for all permit types.
Most had partially implemented staffing flexibility plans for
high -volume periods
Four audited governments used on -call contractors as a staffing contingency to help
manage periods of high permit volume. However, three of them - Kittitas, Richland
and Snohomish - had those contracts in place for only part of the audit period,
while Shoreline had them in place for the entire audit period. In addition to an on -
call contractor, Shoreline also used part-time temporary staff to manage periods of
high permit volume.
Two governments - Bellingham and Vancouver - did not have staffing contingency
plans in place during the audit period. Bellingham established a new contract
for these services in February 2023. Vancouver engaged a consultant to help
process certain complex building permit applications but not specifically to deal
with periods of high permit volume. Instead, the city planned to meet 120-day
performance with permanent staff.
Managers from two governments said they do not regard on -call consultants as an
effective solution due to the steep learning curve to familiarize themselves with the
complexities of local codes. One manager said the additional time needed to review
consultant work for quality control would be better spent reviewing permits.
Audited governments could improve their implementation
of continuous improvement practices
The sixth theme in the leading practices listed in Exhibit 10 concerns continuous
improvement in local government permits. It advises governments to analyze their
permitting process, track and review their performance for various measures such
as timeliness, and track costs associated with permit activities. To fully implement
a continuous improvement effort around permitting, the Office advises mapping
the current permitting process, then analyzing the steps for problems that slow
processes or decision -making, or generate rework. By doing so, those involved in
the process might identify tasks that could be eliminated or combined, points of
poor communication, understaffing or inadequate cross -training, and any number
of other possible areas for improvement. Governments then decide what options
exist for change and develop recommendations that address the specific issues they
identified. Finally, they put changes in place, measure results and repeat the process
regularly. We considered that an audited government had fully implemented this
practice if it did at least one element in each of the audit years.
Growth Management Act Audit Results 130
, udrr Results
Three governments —Bellingham, Snohomish and Vancouver --had conducted
process improvement projects to streamline parts of their permitting processes.
However, none of the audited governments had processes in place to regularly
review permit processing times to put changes in place and measure results in each
year of the audit period. When asked why, one manager said that staff focus had
shifted to other priorities, such as pandemic response and implementing new IT
systems. Managers from ICittitas said the county had made process improvements.
However, we did not see documented evidence showing the efforts undertaken.
Two other governments addressed this leading practice after the period of our
review. In early 2023, Richland received the report from its 2022 consulting
engagement, so any resulting changes it decides to make fall outside our review
period. Shoreline held a two-day workshop in May 2023 to review its permitting
processes to identify areas for future improvements.
Given the value that analyzing permit review processes, performance and costs
could offer, the State Auditor's Office has arranged for its Center for Government
Innovation to offer all local governments - not only those involved in this audit
- a free, voluntary webinar in 2024. This webinar will focus on the principles and
practices involved in continuous improvement. By gaining a better understanding
of continuous improvement, attendees will be able to make better decisions about
how using its techniques can further improve their permit review process.
Growth Management Act Audit Results i 31
On ff -7 c 11' lii(a�
P� L:Si L rL wired annual
�� j;,rv,irmit processing times
Results in brief
pert(, rman., e
Certain local governments must post annual reports on permit review timeliness.
Beyond state law requirements, sharing permit review times with applicants helps
ensure predictabilit)4 and is therefore a leading practice for all governments.
However, only one-third of local governments publicly report on permit timeliness,
and even fewer included all information required by law. We examined 18
published government reports on permit processing time, and only four reports
contained most required elements.
Revisions to a chapter of state law (RCW 36.70B.080) will change reporting
requirements starting in 2025. In addition, the Department of Commerce will have
a new role in the process for annual permit reports.
Certain local governments must post annual
reports on permit review timeliness
State law requires all counties west of the Cascades with populations greater than
150,000 as of 1996 to publicly report how long it takes them to review permits.
Within those counties, cities with populations of at least 20,000 must also report
this information. These reports must be posted annually on the local governments
websites and include the following information:
• The total number of complete applications received during the year
The number of applications where a final decision was made within the 120-
day deadline (or other deadline established by the local government)
• The number of applications where a final decision was made after the
deadline
• The number of applications where a deadline extension was mutually agreed
to with the applicant
The average processing time and associated standard deviation
Growth Management Act Audit Results 132
PF—
Audif Results
Beyond the state law requirements, sharing permit review times with applicants
helps ensure predictability, a key Growth Management Act goal. Governments can
also use this information internally to identify areas where process improvements
may be needed. Therefore, although not a requirement for all governments, this is a
leading practice for all governments.
For this portion of our audit work, we surveyed other local governments that are
required to post these reports, so that we could measure statewide compliance
with this requirement. Our survey population included 45 required governments:
42 responded, for a 93 percent response rate. For more details on our survey
methodology, see Appendix B.
c ���► one-third of local governments publicly
included all information requireLJ by state law
Of the six audited governments, four are required to publish permit performance
reports. Two - Bellingham and Snohomish County - did not publicly post this
information. When asked why they did not do so, staff said other matters had
taken precedence. Officials at Bellingham said that they had published permit
performance metrics under a previous mayor but had stopped for unknown
reasons; the planning director said the city intended to resume publishing this
information but had not yet done so.
Another 29 governments also failed to publish annual permit timeliness reports,
which means only one-third of required local governments did post them.
The surveyed governments that said they did not post permit performance reports
offered three main reasons for not complying with state law:
Most governments mentioned limitations in their IT systems, including
having older systems that Iacked the functionality necessary to track the data
or produce the reports, as well as working to develop and implement new
systems.
Thirteen governments said they had concerns about the quality of the data
they would report.
Seven governments said they were not aware of the requirement or believed
the requirement did not apply to them.
Growth Management Act Audit Results 33
F—
Audit Resufts
Of those that did report, few included all required information
We examined 18 published government reports on permit processing time,
and found 10 - including two audited governments, Shoreline and Vancouver
- included at least some of the elements required by law. Three of these reports
included only one permit type (such as including only land use permits but
not building or civil permits), even though they included most or all required
statistics. Reports published by four more governments contained most required
elements; however, only one of them included the number of applications
where deadline extensions were used. Finally, Exhibit 11 - Most permit performance reports
four surveyed governments said they published lacked some or all required information
performance reports, but what they provided did
not meet any of the requirements in state law. Reported most -"� required data
Reported at
a
One of these governments provided a link to its required data
report, but we were unable to find the report from ��-
the government's main website. This indicated
it was not publicly accessible, and we therefore
classified it as not meeting the legal requirements.
See Exhibit 11 for a breakdown of performance 1 n
reporting results. V
Reported some
Overall, the three required elements least likely required data
to be included were the number of permits with
deadline extensions, the number of permits that
met review deadlines and the number that did not. source: auditorana�ysis of government report data.
Revisions to state law will change. Lre pp a. Ling
requirements starting in 2025
Governments that are required to post permit performance reports will soon be
required to adjust the content of their reports. These changes narrow the types of
permits that must be included in the reports. Some formerly reported data will
be eliminated, including the number of permits that did and did not meet review
deadlines and the number of permits where deadline extensions were used. New
required data will include the number of decisions issued for certain types of
permits and the average number of days from submittal to final decision.
The Department of Commerce will play a new role in coordinating the reports
from local governments and publishing the information statewide. Commerce will
be required to develop a report template for all reporting governments to use. This
change offers the agency an opportunity to educate local governments about their
reporting responsibilities. Doing so could help improve reporting by governments
that were unaware of reporting requirements or that believed it did not apply to
them. (See Appendix C for a summary of the changes made under the revised law.)
Growth Management Act Audit Results 34
oncluslans
F 7c; .
Mate Atirfitor's Conriti i I <
As a former county executive, I found this performance audit spoke directly to
the complexities and challenges of processing development permits within the
timelines established by the Growth Management Act. Local governments work
hard to ensure each permit accounts for the important goals of the Act, including
protecting sensitive lands and ensuring new buildings are safe. At the same time,
timeliness and predictability in permitting are critical to ensuring Washington can
keep pace with its rapid economic and population growth.
As this report explains, audited local governments often met the statutory
requirement to process permits within 120 days. However, actual processing
times varied widely due to many factors. These can include the complexity of the
development, waiting for applicants to submit corrected or missing information,
and too few permitting staff.
Of the report's recommendations to improve permitting timeliness, I would
emphasize continuous improvement. By focusing on issues solidly within its
control, such as mapping existing processes, accurately recording work time and
analyzing performance, a government of any size can become more efficient.
I like to call this type of improvement "straightening the pipes" The State Auditor's
Office offers robust support to such efforts through our Center for Government
Innovation. To date, we have helped 30 cities and eight counties improve their
permitting through detailed process improvement programs. I encourage local
governments to consider the lessons contained in this report and take advantage of
the free continuous improvement webinar we will arrange in 2024.
Growth Management Act State Auditor's Conclusions 135
Pr
Recommendations
Recommendations
For the six audited cities and counties
To address permit review performance that does not achieve 120-day
compliance, as described on pages 13-23, we recommend the agencies:
1. Implement continuous improvement methods, or continue work in
progress, which can include:
• Building detailed flowcharts of existing process
• Ensuring the accuracy of data by promptly recording when
applications are submitted, deemed complete, sent out for more
information and approved
Calculating work time, wait time, and overall performance
Analyzing the results
Developing change recommendations
• Implementing changes and measuring results
2. Analyze cost of service and staffing Ievels needed to achieve 120-day
performance, such as determining the direct labor and overhead for each
type of permit.
To address a lack of transparency and predictability for permit applicants
in their jurisdiction, as described on pages 24-26 and 32-34, we recommend
the agencies:
3. Develop clear policies or procedures governing deadline extensions,
which can include:
• At what point(s) in the review process it is appropriate to initiate an
extension
• What types of circumstances warrant an extension
• Standard lengths of time for extensions or how to determine the length
of time
4. Establish longer deadlines for permit types that are known to take longer,
with written justification
5. Prepare for the updated permit performance reporting requirements
that will go into effect in 2025 by assessing their ability to meet the
requirements and developing any necessary capabilities (such as
information systems) to produce those reports.
Growth Management Act Recommendations 136
F�I
Recommendatiom
6. Configure electronic permit tracking systems to ensure they have
information that is necessary for analyzing permit performance and
regularly report permit review performance. This would also include the
ability to report applicant time versus government time.
For Snohomish County
To address permit review performance that does not achieve 120-day
compliance, as described on pages 22-23, we recommend it:
7. Continue efforts to fill all vacancies in the permitting departments
at both the county and department levels
Guidance for all Washington cities and counties
We consider the audit results so broadly applicable that it is in the state's best
interest for every county and city that issues permits to undertake any relevant
and repeatable practices reported by the governments that participated directly
in the audit. We therefore suggest all Washington cities and counties consider
implementing the practices highlighted in this report.
We also suggest all such local governments attend a no -cost, informative
webinar - provided by the State Auditor's Office Center for Government
Innovation - to learn about process improvement methods and services
the Center offers. Using Lean methodologies, the Center has helped local
government permit teams make successful process improvements for more
than 10 years.
The webinar will take place in June 2024. Interested governments can learn
more and sign up on our website at sao.wa.govlthe-audit-connection-blog local-
cornpliance-gma-permit-timelines-varies-widely-audit-finds
Growth Management Act Recommendations ; 37
Agency Response
Response from City of Bellingham
Response from City of Richland
Response from City of Shoreline
Response from City of Vancouver
Response from Kittitas County
Response from Snohomish County
Pr
Rpar�se
39
41
42
44
45
47
Growth Management Act Agency Response 38
FF,
Planning and Community Devellopmeni Deparlmen'r,
City of Bad#ingttam
March 26, 2024
Honorable Pat McCarthy
Washington State Auditor's Office
Insurance Building, P.O. Box 40021
Olympia, WA98504-0021
Dear Auditor McCarthy:
On behalf of the city of Bellingham, thank you for the opportunity to review and respond to the State
Auditor's Office Performance Audit on the "Growth Management Act. County and city compliance with
the state's 120-day permitting requirement" (Report). We appreciated being involved in the audit and
look forward to implementing many of the recommendations outlined in the report, some we've already
done and/or begun. Additionally, we appreciated working with the audit team as they were helpful and
professional throughout the audit.
As noted in the Report, the audit period (2019-2022) covered an extremely rare time for our city, nation
and world asthe COVID,19 pandemic significantly impacted our daily lives, including the permitting realm.
Locally, we were forced to shift some of our permitting staff to other pandemic -related work. Retirements
and staff vacancies also significant.ly impacted review timeframes. For example, during the audit period,
of the 18 dedicated permitting services staff, 9bf those positions were at one -point vacant.
The report also acknowledges the complexity of land use permitting with evolving regulations such as
critical areas and stormwater, many of which the State mandates. Bellingham is boarded by Bellingham
Bay to the west, the Chuckanut mountains to the south, Lake Whatcom Reservoir to the east and
substantial wetlands and streams to the north and throughout the city. These factors complicate
permitting reviews and require additional reports and time for review, we commonly note that all the
easy land has been developed.
The city of Bellingham believes in continued process improvements in permitting performance and began
utilizing LEAN methods to help reduce redundancy and "waste" throughout the land use permitting
review process beginning in 2015. Those Initial changes helped refine our reviews and resulted In reducing
the number of required meetings, speeding up completeness review and shaving valuable time from the
overall permitting process. Though time saving strategies were gained in that initial LEAN review, it is
acknowledged we need to continuously improve our processes (Report Recommendation).
We would like to note that during the time period between 2015 and today, the City has made smaller
improvements such as using templates for minor critical area permits and internal checklists for building
Planning
210 Lottie Street
Bellingham, WA 98225
Phone: (3601 77&8300
Fax: (360)778-8302
T1Y:(360)778-8382
Email; planning@mb.org
www.cob.orgf planning
Community Development
210 LoWe Street
8etiingham, WA 98225
Phone: (350)778-8300
Fax: (3601 778-8302
rTY:(360)778-8382
Email: cd@cob,org
www.cob.org/planning
Building and Development Services
210 Lottie Street
Bellingham, WA 98225
Phone: (360) 778-8300
Fax: (360) 778-8301
TM (360) 778-8382
Email: permits@cob.org
www.cob.org/permits
Growth ix+tfanagement lac.# - Agency Re5p ar�5e-1 39
permit submittals that may not have been reflected in the report. Bellingham city departments continually
make small improvements in our processes that may not be officially documented but are none the less
being implemented.
Prior to being notified of the audit, the City identified the need to contract with outside companies to help
with permit volume and has since been utilizing this strategy to help with review timelines (Report
Recommendation). Additionally, we have hired a Permit System Business Analyst to help identify
opportunities to increase effectiveness in our permitting processes and added a new plans examiner
position to help speed the review process. The analyst has already made recommendations, such as
mapping processes, creating reports to track performance and creating standard operating processes to
ensure consistent, reliable and accurate use of permit tracking software (Report Recommendation). A
primary future role of the analyst will be to review our current permitting software to ensure we meet
the updated permit performance reporting requirements beginning In 2025 (Report Recommendation).
We appreciate the information provided in the Report, and If not already, plan on implementing the
recommendations outlined. We also intend to take advantage of the continuous Improvement workshop
offered by the Auditor's Office in 2024.
The city of Bellingham understands the importance of permitting in relation to needed housing production
and is dedicated to finding strategies and procedures to continually improve our land use review process.
Sincerely,
Blake Lyon
Planning and Community Development Director
Cc: Carolyn Cato, Senior Performance Auditor
James Geluso, Performance Auditor
Kurt Nabbefeld
Development Services Manager
Page 2of2
Growth Management Act — Agency Response 140
PF
Response
CITY OF RICHLAND
OFFICE OF THE CITY MANAGER
625 Swift Boulevard, MS-4
Richland, WA 99352
(509) 942-7390
March 07, 2024
The Honorable Pat McCarthy
Washington State Auditor
P.O. Box 40021
Olympia, WA 98504-0021
Dear Ms. McCarthy,
RE: SAO Performance Audit
Thank you for the opportunity to review and respond to the Growth Management Act: County and city
compliance with the state's 120-day permit requirement performance audit dated February 27, 2024.
We appreciate the professionalism of your staff throughout the process and the observations and
recommendations made as part of this audit.
The City of Richland makes a concerted effort to serve the development community in a professional,
courteous, and expeditious manner. We believe that this performance audit illustrates our commitment
to excellence and provides valuable guidance and recommendations that will improve the service we
provide to our community.
We agree with the recommendations provided in the performance audit, and the City of Richland
intends to incorporate them into our development and review process. In fact, we will implement a new
tracking software system within the next few months to address many of the recommendations
provided in the performance audit.
As part of the performance audit, it was pointed out that the City of Richland had initiated waivers to
extend deadline dates. This procedure was in place for less than six months and impacted only three or
four applications. This practice was discontinued before the commencement of the performance audit.
Once again, thank you for the opportunity to participate in the performance audit process and for the
recommendations that have been offered. The suggestions provided will be beneficial as we move
forward with our commitment to serve the public.
Sincerely,
Jan Amundson, ICMA-CM
City Manager
cc: Joe Schiessl, Deputy City Manager
Kerwin Jensen, Development Services Director
Mike Stevens, Planning Manager
CITY OF RICHLAND I WWM.CI.RICHLANRMUS
t.,rowth Management Act - AgEritiy Response 141
F es me
A A- -�
CITY OF
SHORELINE
March 20, 2024
The Honorable Pat McCarthy
Washington State Auditor
PO Box 40031
Olympia, WA 98504
Dear Ms. McCarthy:
SHORELINE CITY COUNCIL
Mayor Chris Roberts
Deputy Mayor Laura Mork
Councilmember Annette Ademasu
Councilmember Eben Pobee
Councilmember John Ramsdell
Councilmember Betsy Robertson
Councilmember Keith Scully
The City of Shoreline (City) appreciates the opportunity to respond to the Washington State
Auditor's Office (SAO) performance audit, "Growth Management Act: County and City
Compliance with the State's 120-day Permitting Requirement." We thank your team for their
thorough evaluation and recommendations.
The City's mission statement is "Fulfilling the community's vision through highly valued public
services." The permitting process is one of many public services we provide to our community,
and the timeliness and efficiency of the process are integral to the level of service we provide.
The performance audit highlighted several details and included six recommendations that apply
to the City. Below is the City's response to the audit and its recommendations.
Permit Complexity
The City appreciates the performance audit noting that available vacant land can be difficult to
build on and that regulations have grown more complex over the last few decades, while the 120-
day deadline has remained unchanged. The City would further note that in Shoreline's context
there is very little vacant land, and the majority of our development applications are
redevelopment of sites within areas the City has upzoned to encourage significant amounts of
new housing and development near regional transit such as the two light rail stations that will
open for service later this year. These planning efforts to get as many people and jobs as possible
near transit, we believe, advance citywide and regional goals toward housing and climate. Each
of these redevelopment sites contain unique challenges such as aging or undersized utility
infrastructure, stormwater management constraints, or vehicle access limitations that can add to
the overall review timeline.
Process Improvements
In January 2024 the City kicked -off a permit process improvement effort that will evaluate the
entire process using principles of continuous improvement. This effort will include hiring an
outside consultant to bring the necessary capacity and perspective to objectively identify process
bottlenecks and redundancies and to establish an implementation roadmap that will streamline
17500 Midvale Avenue N ♦ Shoreline, Washington 98133
(206) 801-2700 ♦ shorelinewa.gov
Growth Management Act Agency Response 142
Response
the process. The City will also work with local builders, developers, and stakeholders to get their
perspectives on the most challenging parts of the process and how to change them.
Through this review and implementation of process improvements the City will also incorporate
necessary changes to comply with SB 5290, which go into effect in 2025, by having a better
understanding of which permit types are likely to take longer so that written justification can be
provided, and to document and develop clear policies and procedures for all staff including those
necessary that will govern deadline extensions.
Through this permit process improvement work we anticipate implementing recommendation
nos. 1 and 3-6.
Cost of Service and Staffmg Levels
Recommendation number 2 of the performance audit is to analyze cost of service and staffing
levels needed to achieve 120-day performance. With better documentation and a road map of
how to streamline the process as noted above, the City anticipates being able to more effectively
measure the typical amount of staff time it takes to review and process each permit type. With
staff time identified, the costs and appropriate staffing levels could be estimated. This analysis
would likely not occur until after the permit process improvement work is completed.
Reporting on Permit Processing Times
The performance audit notes that only one-third of local governments report on permit timelines,
and even fewer included all information required by law. In recent years the City has reported on
its website the average permit turnaround times for a variety of permit types. Future City efforts
will include a more thorough reporting of timelines as well as including all required elements
noted within statute and the recently passed provisions under SB 5290.
Key Performance Indicators
A citywide effort is getting underway to develop Key Performance Indicators (KPIs) to track and
report on the performance of the City's services. While the KPI initiative is citywide, it will be
closely coordinated with the permit process improvement work noted above so that when
improvements are implemented there will be a system of tracking performance to address those
areas that are not meeting performance targets in a more ongoing and regular basis.
Again, thank you for your staffs collaboration and careful review of our permitting processes
and timelines.
Sincerely,
Bristol S_ 1=11iIIL,Ion
City Manager
cc: Mayor and Councilmembers
Andrew Bauer, Director of Planning and Community Development
GraWth Managt anent )Act - Agency Response 143
--somp-
CITY Of W
Vancouver
WASHINGTON
March 26, 2024
Pat McCarthy, State Auditor
Washington State Auditor's Office
PO Box 40031
Olympia, WA 98504
Dear Ms. McCarthy:
Fr -
Re
spOrrse A"
I am writing to express my appreciation to you and your staff for their work an the recent
audit of the City of Vancouver's performance In meeting the state's 120-day timeline
requirement for land use, engineering and building application reviews.
Throughout the audit, which took just over a year to complete, the SAO team (led by Carolyn
Cato, with Robert Evashenk as our assigned auditor) thoroughly explained the steps involved,
data needed, and the methodology to be used in analyzing the data. The SAO team was open
to our feedback and suggestions, responsive to questions, and helpful in expanding our
understanding of the analysis behind the numbers.
While we are pleased the final report indicates that the City of Vancouver is meeting the state
requirements in most categories, we acknowledge that there are some minor areas where
Improvement Is needed, such as annually publishing all of the required review performance
data and tightening up internal procedures related to requests for timeline extensions on
Individual projects.
On behalf of the City of Vancouver team, thank you again for the professionalism your team
exhibited In working with us to complete this audit. We look forward to future check -ins so
we can share our progress in implementing Identified Improvements to our procedures and
reporting.
Sincer y,
, /.6--
C ad Eiken, AICP, Director
Community Development Department
(360) 487-7882
chad.eike n_@cltyq.fvancouver.us
P.Q. Box 1995 1 Vancouver, WA 99668-1995 1 360-487-8000 1 TTY 711 1 cityofvancouver.us
Growth Mana.gomeat Act - Agency Respor se 144
Respoflse
DEPARTMENT OF PUBLIC WORKS
•, * Mark R. Cook PE Director
March 26, 2024
Ms. Carolyn Cato
Senior Performance Auditor
Office of the Washington State Auditor
Insurance Building
PO Box 40021
Olympia, WA 98504-0021
RE: Kittitas County Permitting Audit
Proposed Action Addressing Deficiencies
Dear Ms. Cato:
We have reviewed the State Auditor's Office recommendations resulting from our GMA Permit
Timeliness Performance Audit — Kittitas County, and we offer the following response to audit
recommendations.
1. Staff Improved Use of SMARTGOV Permitting Software 2024 Work Program.
Criteria No. 4 — Implementation of leading practice to help meet the 120-day
requirement.
Kittitas County utilizes SMARTGOV as our permitting software. This software issues
permits and allows staff the ability to track project performance timelines with the
software package. The audit affirms the need for management to instill accurate data
uploads into the software by permitting staff. To that end, management will convey our
value for timely use of the software, particularly when stopping the permit process owing
to applicant performance issues. Management recognizes the need to accurately track
applicant perfannance and the need to pause permitting timelines due to poor or non-
existent applicant response.
2. Continuous Improvement — 2024 Building and Land Use Flow Charts
Criteria No. 4 — Implementation of leading practice to help meet the 120-day
requirement.
We have produced draft process flow charts documenting the building permit and
common land use processes. Pending final acceptance by the Board of County
Commissioners, these flow charts will be finalized and be made available on the
Community Development Services website and be made available on the permit counter.
411 N. Rutn St, Su)te g!
EfleR9burg, WA 999�6
TEL ;509f jU,J`,23
FAX (509J M246A.1
Growth Management Act - Ayency Response 145
Dept. of $ubiic Works
rags 2
2024 Community Development Services (CDS) and Public Works (PW) Qua
Mining of Permit Data.
Criteria No. 4 and 5 — Implementation of leading practice to help meet the I2�..�,
requirement.
Criteria No. 8 — Specify in Writing time period review periods established beyond 120
days.
Criteria No. 9 — Written policy on when it is appropriate to use a deadline extension.
Staff has confirmed the ability to query SMARTGOV on a quarterly basis mining permit
data. Using "Permit Statistics Compared to Processing Target", we will write queries to
SMARTGOV mining quarterly data sets. The CDS and PW directors will analyze the
queries identifying specific permits that are tending "long" on the timeline. This allows
the interaction between management and permitting staff to determine if the issue is
applicant performance or a larger process issue. Over the course of one year's time,
management will have the data necessary to adjust the 120-day permit compliance period
legislatively. Adjustments are expected to result in augmented performance timelines
and associated permit costs.
An ancillary benefit to quarterly data mining is identifying necessary or appropriate time
extensions on a case -by -case basis. Our experience confirms that some applicants simply
cannot meet performance expectations. The quarterly data enables management to
interact with permitting staff and the applicant to mutually agree to appropriate time
extensions. The process can be replicated and repeated for numerous permit applications.
It also serves to set applicant expectations for staff performance. The process will be
monitored in the first year to determine if a written policy is necessary regarding time
extensions.
Sincerely,
Mark R. Cook
Public Works Director/Community Development Service
Kittitas County Board of County Commissioners
Josh Fredrickson, In -coming PW Director
Chad Bala, In -coming Community Development
411 N. Ruby St. Suite #1
Ellensburg, WA 9892E
Response
Gry th Management Act — Agency Response [ 46
March 27, 2024
State Auditor Pat McCarthy
Office of the Washington State Auditor
Olympia, WA 98504
Dear Auditor McCarthy,
n.
ie5ponse
Snohomish County
Planning and Development
Services
3000 Rockefeller Ave., MIS 604
Everett, WA 98201-4046
(425) 388-3311
www.snoco.org
Dave Somers
County Executive
On behalf of Snohomish County, thank you for the performance audit of the Growth Management Act. County
and city compliance with the state's 120-day permitting requirement. We appreciate how your audit team
worked with us and the other jurisdictions to provide a comprehensive report on the requirements, audit
findings, and challenges faced by local jurisdictions. Through the audit we received clarification and
interpretation of the requirements which we previously did not have.
Permitting is very important to Snohomish County. We have reviewed the report and recommendations, and we
want you to know we are workingvery hard to overcome the challenges we face in permitting development in
our county. The challenges of approving permits within established time frames are significant. Some of these
include the following:
• We are currently experiencing a severe staffing shortage of engineers who are a critical component of
our permit review process. As such, we have hired consultants to help us with the backlog of permits
under review.
* The increasing complexity of land use regulations and building codes has over the years negatively
impacted our time frames. Because reviews are taking longer than they used to, we may need to hire
more staff. We are conducting a thorough staffing analysis as part of our 2025-2026 biennial budget
development. .
We are identifying key issues that are critical to our success and that will help us meet the new time
frames established hi Senate Bill 5290. We are participating in the Department of Commerce's Permit
Review Work Group to better understand all the issues related to the new requirements, share our
experiences, and provide feedback to the legislature.
a One reason our time frames are longerthan other jurisdictions, and why we used waivers (which we
thought were allowed), is because of our customer service values. We have tried to work with applicants
as long as it takes to achieve full compliance with county and state regulations, rather than deny their
application. If several rounds of review are required on a project, it will take longer to reach a decision.
We are exploring ways to still live up to our core values and also meet time frames.
* We are reviewing our permit tracking system and making improvements to streamline the intake and
processing of electronic submittals.
Once again, thank you forteam's work on this audit. We recognize we have room for improvement, and we are
taking specific and appropriate steps to achieve the legislature's goals for improving permit review time frames.
Sincerely,
X1e 4d 11Ve 'r
Michael McCrary
Director, Planning and Development Services
Growth Management Act ^ Agency Aespnnse 147
PF
Appendix A
Appendix A: Initiative 900 and
Auditing Standards
Initiative 900 requirements
Initiative 900, approved by Washington voters in 2005 and enacted into state law in 2006, authorized
the State Auditor's Office to conduct independent, comprehensive performance audits of state and
local governments.
Specifically, the law directs the Auditor's Office to "review and analyze the economy, efficiency, and
effectiveness of the policies, management, fiscal affairs, and operations of state and local governments,
agencies, programs, and accounts" Performance audits are to be conducted according to U.S.
Government Accountability Office government auditing standards.
In addition, the law identifies nine elements that are to be considered within the scope of each
performance audit. The State Auditor's Office evaluates the relevance of all nine elements to each audit.
The table below indicates which elements are addressed in the audit. Specific issues are discussed in the
Results and Recommendations sections of this report.
F
1. Identify cost savings No.
2 Identify services that can be reduced No.
or eliminated
3. Identify programs or services that can be No.
transferred to the private sector
4. Analyze gaps or overlaps in programs or No.
services and provide recommendations
to correct them
Assess feasibility of pooling information No.
technology systems within the
department
Growth Management Act — Appendix A 148
Pr
Appendix A
6, Analyze departmental roles No.
and functions, and provide
recommendations to change or
eliminate them
7. Provide recommendations for statutory No.
or regulatory changes that may be
necessary for the department to properly
carry out its functions
8. Analyze departmental performance Yes. The audit analyzed permit data on review timeliness at the six
data, performance measures and self- audited governments.
assessment systems
9. Identify relevant best practices Yes.The audit used leading practices identified by the Governor's
Office of Regulatory Assistance for local government permitting
processes.
Compliance with generally accepted government
auditing standards
We conducted this performance audit under the authority of state law (RCW 43.09.470), approved as
Initiative 900 by Washington voters in 2005, and in accordance with generally accepted government
auditing standards as published in Government Auditing Standards (July 2018 revision) issued by the U.S.
Government Accountability Office. Those standards require that we plan and perform the audit to obtain
sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on
our audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and
conclusions based on our audit objectives.
The mission of the Office of the Washington State Auditor
To provide citizens with independent and transparent examinations of how state and local governments use
public funds, and develop strategies that make government more efficient and effective. The results of our
work are widely distributed through a variety of reports, which are available on our website and through
our free, electronic subscrWtion service. We take our role as partners in accountability seriously. We provide
training and technical assistance to governments and have an extensive quality assurance program. For
more information about the State Auditor's Office, visit www sao.wagc
Growth Management Act Appendix A 1 49
Pr
Appendix B
Appendix B: Objectives, Scope
and Methodology
Objectives
The purpose of this performance audit is to assess how local governments process permit applications.
The audit addresses the following objectives:
1. To what extent are local governments complying with the 120-day rule, including the
annual reporting requirement?
2. Are local governments using processes appropriately for project permit reviews that
exceed 120 days?
For reporting purposes, the audit results have been organized into key findings. The messages relate to
the original objectives as follows:
• Audited governments met state -mandated permitting deadlines inconsistently in some areas,
sometimes by wide margins (pages 13-26) — This finding addresses Objective 1 and 2.
• Although already using many leading practices, audited governments could adopt practices to
further improve permit review times (pages 27-31) — This finding addresses Objective 1.
• Only one-third of local governments statewide published required annual performance reports
on permit processing times (pages 32-34) —This finding addresses Objective 1.
Scope
This audit examined how long it took selected local governments to process
permits associated with building and development. It also reviewed these
governments' permitting processes to identify opportunities to better assist
applicants and reduce overall application time. Our audit period was calendar
years 2019 through 2022.
We selected six local governments for this audit. Our goal when selecting
governments was to include a good mix of cities and counties on both sides
of the Cascades. We chose high -growth areas with a variety of population sizes
and considered urban and rural designations for counties and population density
for cities. The six governments we selected include four cities and two counties:
four west of the Cascades and two east. The audited governments are listed
in the sidebar.
Local governments
included in this audit
City of Bellingham
• City of Richland
• City of Shoreline
• City of Vancouver
• Kittitas County
• Snohomish County
Growth Management Act Appendix B 150
]Appendix 8
Methodology
We obtained the evidence used to support the findings, conclusions, and recommendations in this audit
report during our fieldwork period (January to September 2023), with some additional follow-up work
afterward. To address the audit objectives, we used a variety of qualitative and quantitative approaches,
which are summarized below.
Reviewed laws and identified leading practices
We reviewed state law related to the "120-day rule" for permit approval time to identify requirements
for local government permit processes (RCW 36.70A and RCW 36.70B). We also reviewed the state
building code, as defined in Washington laws and regulations, which adopts the International Building
Code (RCW 19.27.031 and WAC 51-50-003). The International Building Code includes certain types
of permits, such as for grading and utilities, which we distinguished as civil" permits in our audit
report. We conducted online research to identify relevant leading practices. The Office for Regulatory
Innovation and Assistance (ORIA) published the guide "Local Government Permitting: Best Practices,"
which addressed permit processes. The full report, published in 2008, is available on the ORIA
website. In determining implementation status for governments, we assessed factors such as whether
governments used the practice for all three permit types and whether the governments used the practice
for the audit period.
Interviewed local government staff and reviewed supporting
documentation
We conducted interviews with staff at each audited governmenfs relevant department(s) to gain an
understanding of their permitting processes. We also requested and reviewed policies, procedures, local
ordinances and regulations when applicable, and other relevant documentation to assess permitting
processes and compare them to legal requirements and leading practices, and to verify information
from our interviews.
Evaluated permit data
We requested permit data from the six audited governments, covering all permit applications submitted
during calendar years 2019 through 2022, to determine timeliness of government review and final
decisions.
Data reliability testing
For each audited government, we met with relevant staff to gain an understanding of the government's
permitting systems. We also wanted to determine whether they could provide sufficient and
appropriate data for us to evaluate how long it took to fully process permit applications. We gained an
understanding of the quality controls each government had in place to ensure permit data was accurate
and complete. However, we did not evaluate governments' system controls for their permitting systems.
Growth Management Act Appendix B 51
Appendix B
After receiving data sets from each government, we conducted preliminary assessments on their
reliability. These tests included checking to ensure that the number of records matched what we were
told were sent and comparing the totals to other information sources. However, few governments had
previously published this data and so this resulted in inconclusive tests to verify the completeness of the
data. Although we could not verify the full completeness of the data, we believe we have sufficient data
to perform our analysis. We also checked for appropriate date ranges, missing data fields and illogical
results. We found in most data sets there were some records with dates in an illogical order, so we
excluded those records from the final analyses. We also followed up with government staff as necessary
to clarify any unusual data observations to determine if they were caused by errors in the data.
Next, we conducted detailed accuracy testing on a sample of permit records. We specifically tested key
dates in the data - such as the start of review, final decision and when applications were sent back for
revisions, when available - to determine if the data matched underlying records. We designed our tests
to give us a 95 percent confidence that the error rate for the tested dates was within 5 percent. The tests
went as follows:
1. Randomly selected 16 land use permit records and 16 building and civil permit records
2. Compared the key dates in each record to underlying documentation, such as stamped
applications, notices of final decision and communications between government staff
and permit applicants
3. If any of the records had dates that were more than four days different between the data and
supporting documents, we randomly sampled approximately 16 additional records
to review
We determined that the data was sufficiently reliable to determine whether permits were reviewed
within 120 days. However, we determined the data was not reliable for our original audit purpose of
reporting the average number of days that permit review takes. We made our assessment based on the
combined results of all analyses described above. Two key issues were:
1. Inconclusive completeness tests for most data sets because few governments had previously
published reports of the data
2. Inconclusive or failed accuracy tests for some data sets, meaning we found differences of more
than four days
When we determined the data was not reliable for our original purpose, we used an alternative
approach. We specifically analyzed permit review times in several ranges as further described below.
The difference in the determination for this alternative analysis was that in the previous analysis, we
considered records a match if they were within four days. In the new analysis, records are a match
if they are within the same range of time (that is, 0-60 days, 61-120 days, etc.). We designed our
alternative tests to give us a 95 percent confidence that the error rate for the tested dates was within
5 percent (with one exception, see Limitation: Richland). We determined the data was reliable for this
alternative purpose because it relies on a lower accuracy of data (ranges of time versus matches within
four days). Despite shortcomings of the data, we expect there is a high level of interest for the data in the
final report and we believe we have sufficient data to perform our analysis.
In addition, our overall data reliability assessment includes a limitation for one government, and an
exception for another government.
Growth Management Act Appendix B 1 52
Pr
Appendix 6
Limitation: Richland
We accepted a larger margin of error for Richland land use data. Specifically, we calculated Richland
land use data with 95 percent confidence and an error rate of 12.5 percent resulting in a range of 0.5 to
29 percent. This difference in methodology was due to time constraints related to on -site testing at
Richland — we were unable to select additional records to review when two of the 16 land use records
did not match to supporting documentation within our threshold. Because we could not take an
additional sample, we adjusted the margin of error.
Exception: Bellingham
For Bellingharris land use data, we used a random sample of 25 permits to test the accuracy of the dates,
we found that dates were not reliably entered into the data system and therefore not sufficiently reliable
for any of our audit'purposes. Of the 25 randomly selected land use permits tested, 11 (44 percent)
did not match supporting documentation. Ten of the 11 errors were due to the data set showing an
approval date that was later than the actual approval date. Four of the errors were extreme — ranging
from 318 days (10 months) to 393 days (13 months). According to Bellingharns planning director, the
approval date recorded in the system is updated when documents are uploaded, or when the case is
closed. In the body of the report, the results of Bellingham land use data reflect what we observed when
we inspected the sample of 25 permits, that is, the true application and approval time for each, and
whether the permits met or exceeded the 120-day timeline. We then calculated that extrapolating the
random sample to the population would have an estimated error rate of plus or minus 19 percent with
95 percent confidence for the portion processed either within or more than 120 days. Because of the
large error rate, we limited our conclusions to the random sample.
Data analysis
We analyzed the local governments' permitting data to calculate how many days elapsed between the
date an application was determined to be complete (the start of the 120-day timeline) and the date a
final decision was made. When the data was available, we excluded time when the government returned
the application to the applicant for additional information or corrections; only two governments,
Snohomish County and Vancouver, provided data that allowed us to do so consistently.
Rather than simply calculate the overall number and percentage of permit applications that met or
exceeded the 120-day requirement, we assigned each application to a category based on how long the
review took. These categories were: 0-60 days, 61-120 days, 121-180 days, 180-365 days, and more
than 365 days. Analyzing the data in these categories allowed us to provide some additional detail
about whether permits took significantly longer than 120 days to process within the reliability of the
governments' data.
Judgmental selection of land use permits to identify factors of delay
We judgmentally selected land use permits from all six audited governments that exceeded the 120-
day timeline to review. Our selection included a variety of land use permit types from each audited
government. These permits provided examples of causes for delay that governments may encounter
while processing permits. This selection of permits was not statistically significant and cannot be used
to project results to the total number of each government's permits.
Growth Management Act Appendix B 1 53
Appendix B
Conducted a survey of selected cities and counties
Survey design and population
We designed a short online survey to determine whether governments required to post public reports
on their permit review time performance as specified in state law did so, and to learn the reasons why
for those that did not. We sent our surveys to the planning or building department director at each
selected government. We asked governments that said they did report for the online location of their
report. We asked governments that said they did not report to identify key reasons why they did not;
the survey included an option for free response. The online survey was open from May 1 through 19,
2023. We conducted email follow-up with governments that did not respond within the first two weeks
to encourage them to participate.
To determine the correct survey population, we first identified all governments required by state law
to post these reports. Required governments are all counties west of the Cascades with populations
of more than 150,000 in 1996, and all cities within those counties with populations of 20,000 or
more. We used population information from the Office of Financial Management to identify counties
with populations of more than 150,000 as of 1996, and cities within those counties with populations
of 20,000 or more as of 2020. We relied on information from the Washington State Department of
Commerce to classify counties as west or east of the Cascades. A total of 49 local governments met
the criteria to be included in the survey population. We then excluded the four governments already
selected as part of this audit, and sent our survey to a total of 45 governments.
Growth Management Act Appendix B ' 54
Figure 1 sets out a complete list of the 49 counties and cities required to publish reports. The four
excluded from the survey are marked with an asterisk.
Figure 1 -The 49 counties and cities required to report performance on permit review timeliness
* These communities were included in the audit, and excluded from the audit survey.
■ Clark County
Mercer Island
Snohomish County*
Battle Ground
Redmond
Edmonds
Camas
Renton
Everett
Vancouver*
Sammamish
Lake Stevens
■ King County
SeaTac
Lynnwood
• Auburn
Seattle
Marysville
• Bellevue
Shoreline*
Mill Creek
• Bothell
Tukwila
- Mountlake Terrace
• Burien
u Kitsap County
Mukilteo
• Covington
Bainbridge island
■ Thurston County
• Des Moines
Bremerton
Lacey
Federal Way
■ Pierce County
Olympia
• Issaquah
Bonney Lake
Tumwater
• Kenmore
Lakewood
;: Whatcom County
• Kent
Puyallup
• Bellingham*
Kirkland
Tacoma
Maple Valley
University Place
We included five additional governments in our survey. They met the population requirements for
reporting but were located east of the Cascades, and therefore not required to report their performance.
We included them to determine if any governments not required to report nonetheless published
information on their permit review times. However, even though all five responded, we ultimately
decided not to include their results in the report.
Survey response
Of the 45 surveyed governments, 42 responded, for a 93 percent response rate.
Response validation
For those governments that responded that they posted reports on their permit review time
performance, we obtained the posted reports and reviewed them against the required elements in state
law. However, we did not test one of the required elements - variance of actual performance - because
we found the meaning of this element to be ambiguous. We also searched the public websites of the
three governments that did not respond to our survey to see if they posted reports. All did so, and we
reviewed those we found.
Growth Management Act Appendix B I
Data limitations and extrapolating results
Our survey included all governments required to report on permit review time performance, so
the results demonstrate the overall level of compliance with state law. The responses from required
governments about why they did not post reports are similarly representative of the entire state because
it included all required governments.
In addition, for those governments that said they did not post permit performance reports, we did not
search their websites to corroborate their responses. It is therefore possible that some governments that
said they do not post these reports do include some or all the information listed in state law on their
websites.
Work on internal controls
Internal controls were significant within the context of the audit objectives. We assessed each local
government's design for specific controls to determine if they would be capable of achieving their
objectives. We also assessed whether these controls were in place during the audit period. However, we
did not assess the operational effectiveness of these controls. We specifically evaluated the following
controls:
Timeliness of permit review. We evaluated whether the local governments had established review
time periods for each type of project permit as required by state law. We also evaluated whether
local governments published annual reports on permit performance statistics. We interviewed
government officials and reviewed documents such as local ordinances and reports to determine
if these controls were in place. Several governments did not publish annual permit reports, which
represents a deficiency in internal control. We did not assess the operational effectiveness for these
controls where they did exist.
Sufficient staffing to assist applicants and meet permit review timelines. We evaluated whether
the local governments had designated staff positions to assist applicants during the permit process.
We also evaluated whether local governments had any staffing contingencies such as on -call
contractors to respond to periods of high permit activity. We interviewed government staff and
reviewed documents such as position descriptions and contracts to determine if these controls
were in place. We did not assess the operational effectiveness for these controls.
Education and outreach to permit applicants. We evaluated whether the local governments
had developed educational and outreach materials to explain the permit process to applicants
and help them understand how to submit complete applications. We interviewed government
staff and reviewed documents such as permit checklists and other application materials to
determine if these controls were in place. We did not assess the operational effectiveness for these
controls.
Monitoring and continuous improvement of permitting processes. We evaluated whether the
local governments monitored their permitting processes and conducted continuous improvement
efforts related to ensuring they met the 120-day review timeline. We interviewed government staff
and reviewed documents such as project charters and reports to determine if these controls were
in place. We did not assess the operational effectiveness for these controls.
Growth Management Act Appendix B 1 56
Appendix B
Policies and procedures to define deadline extension processes. We evaluated whether the local
governments had adopted policies or procedures that defined when it would be appropriate to
extend established permit review deadlines and the process for doing so. None of the governments
had adopted documented policies or procedures for this topic: this represents a deficiency in
internal control.
In addition, we gained an understanding of the system controls in place for the local governments'
permitting systems as part of our data analysis. However, we determined that information system
controls were not significant to answering our audit objectives, and we therefore did not evaluate the
effectiveness of these controls.
Growth Management Act Appendix 8 157
r Appendix C I
Appendix C: Upcoming Changes
to State Law
As noted throughout the report, legislation passed during the 2023 session will make several changes
to the state laws relevant to this audit. This bill, Second Substitute Senate Bill 5290, makes the following
changes starting January 1, 2025, to requirements regarding the time periods local governments must
establish for reviewing permit applications. Figure 2 compares current and new state law requirements.
Figure 2 - Comparison of key requirements in current and new state law
Current State Law Requirements
1. Local governments must establish time periods
to review permits that do not exceed 120 days,
except in certain circumstances
2. This requirement specifically included building
permits
3. The law was not clear whether the time periods
should be based on calendar or business
days
4. The law was not clear whether the time periods
included only time spent by governments
reviewing applications or all time from start to
finish
5. The law did not indicate what would happen
if applicants made significant changes to their
application
6. The law did not indicate what would happen if
governments did not meet the time periods
New State Law Requirements
1 Local governments must establish time periods
to review permits that do not exceed.
65 days for permits that do not require public
notice
100 days for permits that require public
notice
170 days for permits that require public
notice and a public hearing
2. The reference to building permits has been
removed from the law
3. The law now clearly states the time periods are
based on calendar days
4. The law now clearly states that the time periods
only include time for government review and
exclude time for applicants to provide updates
or corrections
5. The law now states that the time periods start
over it applicants make significant changes
that would make the project no longer meet
completeness requirements
6. The law now states that if governments do not
meet the time periods, they must refund a
portion of the applicant fee.
Growth Management Act Appendix C 158
P!
]Appendix C
The bill also makes the changes regarding the annual permit performance reports certain local
governments are required to post publicly. These changes are compared in Figure 3.
Figure 3 - Comparison of key requirements for performance reporting in current and new
state law
Current State Law Requirements
1. Counties with populations greater than 150,000
as of 1996, and cities within those counties
with populations of at least 20,000, must post
annual reports publicly on their websites
with information on their permit timeliness
performance
2. Required governments must report the
following information:
a. The total number of complete applications
received
b. Number of applications where the final
decision was issued before the established
deadline
c. Number of applications where the final
decision was issued after the established
deadline
d. Number of applications where a deadline
extension was used
e. Variance of actual performance to the
established deadline
f. Average processing time and standard
deviation
3. State law did not indicate that governments
should send the information to any other
entity
New State Law Requirements
1. No change in state law
2. Required governments must report the
following information.
a. The permit time periods established for
specific permit types
b. The total number of decisions issued for
specific permit types
c. The number of decisions for each permit type
that included consolidated review
d. The average number of days for each permit
type from submittal to decision
e. The total number of days for each application
for specific permit types counting only
government review time
f. The total number of days excluded from the
above calculation (that is, total applicant
time)
3. State law now requires governments to send
their reports to the Department of Commerce
by March 1 each year
4. State law requires the Department of Commerce
to report on the data it receives from local
governments
5. State law requires the Department of Commerce
to develop a report template for local
governments.
Growth Management Act Appendix C 59
Fr
Appendix D
Appendix D: Local Building Codes and
Processing Times
Current state law (RCW 36.70B.080) requires that permits be completed within a "time period for
local government actions" of no more than 120 days. Each of the six county and city governments
have detailed in their codes how they interpret that phrase, elaborating on what time periods are not
included when they count days. We found no court rulings or Attorney General opinions that would
clarify the statute. A law effective in 2025 will change the definition to explicitly not include times that
the local government is waiting for an answer from the applicant.
Below are sections of code from the six county and city governments that address the issue. All six use
identical or similar language. Emphasis is added throughout.
Local government page
City of Bellingham ...................................................
61
City of Richland.........................................................
63
City of Shoreline.......................................................64
City of Vancouver.....................................................
65
Kittitas County..........................................................
66
Snohomish County.................................................67
Growth Management Act Appendix D 160
P7 ]Appendix D I
City of Bellingham
Bellingham Municipal Code 21.10.080 Time frames for review.
A. RCW 36.70B.070 and 36.70B.080 require that permit processing time frames be established. Decisions
on Type I, II, III and VII applications shall be made within 120 days from the date of a determination
that the application is complete unless a shorter time is required by city ordinance or state statute. A
decision on a Type V-A application shall be made within 180 days. No time frames are established for
Type V-B or VI applications. Exceptions to these time frames are:
1. Substantial project revisions made by an applicant, in which case the time frame will be calculated
from the time the city determines the revised application to be complete.
2. A mutual agreement by the applicant and director to an extension of time.
3. Applications that require an amendment to the comprehensive plan or a development
regulation.
4. Applications for a project requiring an approval for siting of an essential public facility as provided
in RCW 36.70A.200.
5. Applications for which the city makes written findings that a specified amount of additional time
is needed for processing of specific complete project permit applications or project types (RCW
36.70B.080 (1)).
6. Type V-A applications that are remanded to the planning commission from the city council.
B. The time limit does not include:
Any period of time during which the applicant has been requested by the city to correct plans,
perform required studies, or provide additional required information. The period shall be
calculated from the date the city notifies the applicant of the need for additional information until
the earlier of the date the city determines whether the additional information satisfies the request
for information or 14 days after the date the information has been provided to the city. If the
city determines that the information submitted by the applicant is insufficient, it shall notify the
applicant of the deficiencies and the procedures under BMC 21.10.190(B) shall apply as if a new
request for studies had been made.
The time required to prepare and issue a draft and final environmental impact statement (EIS) in
accordance with the State Environmental Policy Act.
Any period for administrative appeals of project permits, if an open record appeal hearing or
a closed record appeal, or both, are allowed. The time period for consideration and decision on
appeals shall not exceed:
o Ninety days for an open record appeal hearing; and
o Sixty days for a closed record appeal.
C. Preliminary Plats. Pursuant to RCW 58.17.140, preliminary plats of any proposed subdivision and
dedication shall be approved, disapproved, or returned to the applicant for modification or correction
within 90 days from the date of filing thereof unless the applicant consents to an extension of such time
Growth Management Act Appendix D 1 61
rL
Appendix
period or the 90-day limitation is extended to include up to 21 days as specified under RCW 58.17.095(3).
The 90-day period shall not include the time spent preparing and circulating an environmental impact
statement by the local governmental agency.
D. Final Plats (Type I) and Short Plats. Pursuant to RCW 58.17.140, final subdivision approvals and short
plats shall be approved, disapproved, or returned to the applicant within 30 days from the date of filing a
complete application, unless the applicant consents to an extension of such time period. [Ord. 2018-12-036
§ 44; Ord. 2004-12-088; Ord. 2004-09-065],
Growth Management Act Appendix D 1 62
Appendlx D
City of Richland
Richland Municipal Code 19.60.090 Calculation of time periods for issuance of
notice of final decision.
A. In determining the number of days that have elapsed after the local government has notified the
applicant that the application is complete for purposes of calculating the time for issuance of the notice of
final decision, the following periods shall be excluded:
1. Any period during which the applicant has been requested by the city to correct plans, perform
required studies, or provide additional required information, including any additional
information requested by a city hearing or decision -making body. The period shall be calculated
from the date the city notifies the applicant of the need for additional information until the earlier
of the date the local government determines whether the additional information satisfies the request
for information or 14 days after the date the information has been provided to the city;
2. If the city determines that the information submitted by the applicant under subsection (A)(1) of
this section is insufficient, it shall notify the applicant of the deficiencies and the procedures under
subsection (A)(1) of this section shall apply as if a new request for studies had been made;
3. Any period during which an environmental impact statement is being prepared following a
determination of significance pursuant to Chapter 43.21 C RCW, if the city ordinance has established
time periods for completion of environmental impact statements, or if the local government
and the applicant in writing agree to a time period for completion of an environmental impact
statement;
4. Any period for administrative appeals of project permits, if an open record appeal hearing or
a closed record appeal, or both, are allowed. The time period for consideration and decision on
appeals shall not exceed:
a. Ninety days for an open record appeal hearing;
b. Sixty days for a closed record appeal.
The parties may agree to extend these time periods;
5. Any extension of time mutually agreed upon by the applicant and the local government; and
a. The time limits established in this title do not apply if a project permit application:
i. Requires an amendment to the comprehensive plan or a development regulation;
ii. Requires approval of the siting of an essential public facility as provided in RCW
36.70A.200;
iii. Is an application for a permit or approval described in RMC 19.20.070; or
iv. Is substantially revised by the applicant, in which case the time period shall start from
the date at which the revised project application is determined to be complete.
Growth Management Act Appendix D 163
ppendi D
City of Shoreline
Shoreline Municipal Code 20.30.140 Permit processing time limits.
A. Decisions under Type A, B or C actions shall be made within 120 days from the date of a
determination that the application is complete. Exceptions to this 120-day time limit are:
4. Substantial project revisions made or requested by an applicant, in which case the 120 days will
be calculated from the time that the City determines the revised application to be complete.
5. The time required to prepare and issue a draft and final Environmental Impact Statement (EIS)
in accordance with the State Environmental Policy Act.
6. Any period for administrative appeals of project permits.
7. An extension of time mutually agreed upon in writing by the Department and the
applicant.
8. Amendments to the Comprehensive Plan or Code.
B. The time limits set for Type A, B, and C actions do not include:
Any period of time during which the applicant has been requested by the Department to correct
plans, perform studies or provide additional information. This period of time shall be calculated
from the date the Department notifies the applicant of the need for additional information, until
the date the Department determines that the additional information satisfies the request for such
information or 14 days after the date the information has been provided to the Department,
whichever is earlier.
2. If the Department determines that the additional information submitted to the Department by the
applicant under subsection (13)(1) of this section is insufficient, the Department shall notify the
applicant of the deficiencies, and the procedures provided in subsection (B)(1) of this section shall
apply as if a new request for studies has been made.
C. If the Department is unable to issue its final decision on a project permit application within the time
limits provided for in this section, it shall provide written notice of this fact to the project applicant. The
notice shall include a statement of reasons why the time limit has not been met and an estimated date for
issuance of the notice of decision. (Ord. 406 § 1, 2006; Ord. 238 Ch. III § 4(g), 2000).
Growth Management Act Appendix D 164
F_
Appendix 0
City of Vancouver
Vancouver Municipal Code 20.210.040 Type I Applications
E. Review by Planning Official. Unless accompanied with a SEPA checklist review the planning official
shall approve, approve with conditions, or deny a Type I application within 28 calendar days after the
date the application was accepted as fully complete; provided, that an applicant may agree in writing to
extend the time in which the planning official shall issue a decision. Qualifying Planned Actions and other
projects which involve a SEPA Review shall be reviewed within 60 days of a fully complete determination.
Time spent by the applicant to revise plans or provide additional studies or materials requested by
the city shall not be included in the maximum permitted review period. The planning official may
consider new evidence the applicant introduces with or after such a written request for extension. The
planning official's decision shall address all of the relevant approval criteria applicable to the development
application.
20.210.050.1-1 Type II Applications
H. Timeline to make Final Decision. The Final Decision on a Type II application shall be made and
mailed pursuant to Section 20.210.050(I) VMC not more than 120 calendar days (90 days for short
subdivisions) after the date a fully complete determination is made. This period shall not include:
1. Time spent by the applicant to revise plans or provide additional studies or materials requested
by the city.
2. Time spent preparing an environmental impact statement.
3. Time between submittal and resolution of an appeal.
4. Any extension of time mutually agreed upon by the applicant and the city in writing.
20.210.060.G Type III Applications
G. Timeline to Make Final Decision.
The Final Decision on a Type III application shall be made and mailed pursuant to Section 20.210.050(H)
(1) VMC not more than 120 calendar days (90 days for subdivisions) after the date a fully -complete
determination is made. This period shall not include:
1. Time spent by the applicant to revise plans or provide additional studies or materials requested
by the city.
2. Time spent preparing an environmental impact statement.
3. Time between submittal and resolution of an appeal.
4. Any extension of time mutually agreed upon by the applicant and the city in writing.
Growth Management Act Appendix D 165
,4pp en dix
Kittitas County
Kittitas County Code 15A.03.040 Determination of complete application.
1. Within 14 days after an applicant has submitted to the permitting agency additional information
identified by the permitting agency as being necessary for a complete application, the permitting agency
shall notify the applicant whether the application is complete or what additional information is necessary.
In determining the number of days that have elapsed after Kittitas County has notified the applicant that
the application is complete, the following periods shall be excluded;
a. Any period during which the applicant has been requested by Kittitas County to correct
plans, perform required studies, or provide additional required information. The period shall
be calculated from the date Kittitas County notifies the applicant of the need for the additional
information until the earlier of the date Kittitas County determined whether the additional
information satisfies the request for information or 14 days after the date the information has been
provided to Kittitas County.
b. Any period during which an environmental impact statement is being prepared following a
determination of significance pursuant to Chapter 43.21C RCW, if Kittitas County and the applicant
in writing agree to a time period for completion of an environmental impact statement.
c. Any period of administrative appeals of project permits, if an open record hearing or a closed
record appeal, or both, are allowed. The time period to consider and decide such appeals shall not
exceed;
i. Ninety days for an open record appeal hearing,
ii. Sixty days for a closed record appeal; and
iii. The parties to an appeal may agree to extend these time periods.
d. Any extension of time mutually agreed upon by the applicant and Kittitas County.
e. These time limits do not apply to a project permit application, if the project.
i. Requires an amendment to the comprehensive plan or a development regulation;
ii. Requires approval of a new fully contained community as provided in RCW 36.70A.350, a
master planned resort as provided in RCW 36.70A.360, or the siting of an essential public
facility as provided in RCW 36.70A.200;
iii. Is substantially revised by the applicant, in which case the time period shall start from
the date at which the revised project application is determined to be complete.
f. If Kittitas County is unable to issue its final decision within the time limits provided, it shall provide
written notice of this fact to the applicant. The notice shall include a statement of reasons why the
time limits have not been met and an estimated date of issuance of the notice of final decision.
g. Applications shall be void if they remain incomplete for more than 180 days.
h. This section shall apply to project permit applications filed on or after the date of adoption of this
title.
Growth Management Act Appendix D 1 66
F-
Appendix
Snohomish County
Snohomish County Code 30.70.110 Processing timelines.
(1) Notice of final decision on a project permit application shall issue within 120 days from when the
permit application is determined to be complete, unless otherwise provided by this section or state law.
(2) In determining the number of days that have elapsed after an application is complete, the following
periods shall be excluded:
(a) Any period during which the county asks the applicant to correct plans, perform required
studies, or provide additional required information. The period shall be calculated from the date
the county mails notification to the applicant of the need for additional information until the date
the county determines whether the additional information satisfies the request for information,
or 14 days after the applicant supplies the information to the county, whichever is earlier. If the
information submitted by the applicant under this subsection is insufficient, the county shall mail
notice to the applicant of the deficiencies and the provisions of this subsection shall apply as if a new
request for information had been made;
(b) Any period during which an environmental impact statement is being prepared;
(c) A period, not to exceed 30 calendar days, during which a code interpretation is processing in
conjunction with an underlying permit application pursuant to chapter 30.83 SCC;
(d) The period specified for administrative appeals of project permits;
(e) Any period during which processing of an application is suspended pursuant to SCC 30.70.045(1)
(b);
(f) Any period during which an agreement is negotiated or design review is conducted for an urban
center pursuant to SCC 30.34A.180(1) or 30.34A.180(2); and
(g) Any period of time mutually agreed upon by the applicant and the county.
(3) The time periods established by this section shall not apply to a project permit application:
(a) That requires an amendment to the comprehensive plan or a development regulation in order to
obtain approval;
(b) That is substantially revised by the applicant, in which case a new 120-day time period shall start
from the date at which the revised project application is determined to be complete;
(c) That requires approval of development agreement by the county council;
(d) When the applicant consents to an extension; or
(e) During any period necessary for reconsideration of a hearing examiner's decision.
(4) Subject to all other requirements of this section, notice of final decision on an application for a
boundary line adjustment shall be issued within 45 days after the application is determined complete.
Growth Management Act Appendix D 167
Appendix D
(5) The county shall notify the applicant in writing if a notice of final decision on the project has not been
made within the time limits specified in this section. The notice shall include a statement of reasons why
the time limits have not been met and an estimated date of issuance of a notice of final decision.
(6) Failure of the county to make a final decision within the timelines specified by this chapter shall not
create liability for damages.
(7) Timelines for processing shoreline substantial development, shoreline conditional use and shoreline
variance permits shall be in accordance with the provisions of this chapter unless otherwise specified in
chapter 30.44 SCC.
(8) Timelines for processing personal wireless service facility permits shall be in accordance with the
provisions of SCC 30.28A.030.
Growth Management Act Appendix D 68
Office of the Washington State Auditor
EXHIBIT 2: STAFF RESPONSE MITIGATING AUDIT RESULTS
Page 4 of 4
Public Works "Work Session Staff Report", 2024
hup..4...hip��, , KI'rTYTAS G'O
DEPARTMENT OF PUBLIC WORKS
KIMTA6 COUNTY Mark R. Cook, PE Director
March 26, 2024
Ms. Carolyn Cato
Senior Performance Auditor
Office of the Washington State Auditor
Insurance Building
PO Box 40021
Olympia, WA 98504-0021
RE: Kittitas County Permitting Audit
Proposed Action Addressing Deficiencies
Dear Ms. Cato:
We have reviewed the State Auditor's Office recommendations resulting from our GMA Permit
Timeliness Performance Audit — Kittitas County, and we offer the following response to audit
recommendations.
1. Staff Improved Use of SMARTGOV Permitting Software 2024 Work Program.
Criteria No. 4 — Implementation of leading practice to help meet the 120-day
requirement.
Kittitas County utilizes SMARTGOV as our permitting software. This software issues
permits and allows staff the ability to track project performance timelines with the
software package. The audit affirms the need for management to instill accurate data
uploads into the software by permitting staff. To that end, management will convey our
value for timely use of the software, particularly when stopping the permit process owing
to applicant performance issues. Management recognizes the need to accurately track
applicant performance and the need to pause permitting timelines due to poor or non-
existent applicant response.
2. Continuous Improvement — 2024 Building and Land Use Flow Charts
Criteria No. 4 — Implementation of leading practice to help meet the 120-day
requirement.
We have produced draft process flow charts documenting the building permit and
common land use processes. Pending final acceptance by the Board of County
Commissioners, these flow charts will be finalized and be made available on the
Community Development Services website and be made available on the permit counter.
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
3. 2024 Community Development Services (CDS) and Public Works (PW) Quarterly
Mining of Permit Data.
Criteria No. 4 and 5 — Implementation of leading practice to help meet the 120-day
requirement.
Criteria No. 8 — Specify in Writing time period review periods established beyond 120
days.
Criteria No. 9 — Written policy on when it is appropriate to use a deadline extension.
Staff has confirmed the ability to query SNIARTGOV on a quarterly basis mining permit
data. Using "Permit Statistics Compared to Processing Target", we will write queries to
SMARTGOV mining quarterly data sets. The CDS and PW directors will analyze the
queries identifying specific permits that are tending "long" on the timeline. This allows
the interaction between management and permitting staff to determine if the issue is
applicant performance or a larger process issue. Over the course of one year's time,
management will have the data necessary to adjust the 120-day permit compliance period
legislatively. Adjustments are expected to result in augmented performance timelines
and associated permit costs.
An ancillary benefit to quarterly data mining is identifying necessary or appropriate time
extensions on a case -by -case basis. Our experience confirms that some applicants simply
cannot meet performance expectations. The quarterly data enables management to
interact with permitting staff and the applicant to mutually agree to appropriate time
extensions. The process can be replicated and repeated for numerous permit applications.
It also serves to set applicant expectations for staff performance. The process will be
monitored in the first year to determine if a written policy is necessary regarding time
extensions.
Sincerely,
A4a,��
Mark R. Cook
Public Works Director/Community Development Services Director
C: Kittitas County Board of County Commissioners
Josh Fredrickson, In -coming PW Director
Chad Bala, In -coming Community Development Services Director
411 N. Ruby St, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2024 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 8, 2024
TOPIC: Road Fund Levy Update
ACTION REQUESTED: None
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Continue supporting CONSOR's outreach effort.
BRIEFING SUMMARY:
• Levy rate impacts from three years of inflation are currently being evaluated.
• A strategy for managing inflation and historic road fund diversion impacts is
being formulated.
BACKGROUND:
For the past several months, Public Works' (PW) outreach consultant CONSOR has been
implementing their 2024 contract outreach plan. Initial outreach efforts are complete
(results are attached as EXHIBIT 1). Efforts now shift to two (2) in -person focus group
meetings (one in upper county and one in lower county) scheduled for April 13th, 2024.
DISCUSSION:
Inflationary impacts resulting from 2021 — 2023 total 16.8 percent (Western States CPI).
The Ten -Year Transportation Plan (TAMP) utilizes an annual inflation rate of two (2)
percent. Using 2024 assessed values and the certified Road Levy, capturing the
inflationary impact results in an estimated 2025 levy rate of $1.82 per $1,000 of assessed
value. This represents an increase of ($1.82 — $0.77 = $1.05) beyond 2024 levels. It
seems unlikely that county rate payers will approve this increase. This rate scenario will
be vetted at focus group meetings scheduled for later this month. The net result on a
$400,000 home in 2025 is $420 more (2025) in road tax than 2024.
An alternative approach is to try and capture one-half (1/2) of what is needed now and
reassess the Road Fund in five years. The impact to the levy rate in 2025 is estimated at
being $1.29 per $1,000 of assessed value. This represents an increase of $0.52 per
$1,000 of assessed value beyond 2024 levels. This rate scenario will also be tested at
focus group meetings later this month. A financial forecast is attached as EXHIBIT 2.
The net result on a $400,000 home is $208 more (2025) in road tax than 2024.
Page 1 of 4
Public Works "Work Session Staff Report", 2023
The impact of losing $4.8 million for Road Fund levy shifts (2015 — 2019) resulted in a
serious depletion of the road fund. While the overall outcome resulting from the levy
shifts was favorable (the creation of the county's water bank) for county residents, it has
come at the expense of Public Works infrastructure maintenance.
We may want to convey the strategy we used when addressing the Upper County Rule
(Department of Ecology closing upper county to single family exempt wells) with the
message that it is now time to pay back the road fund. Regardless of the message, three
years of high inflation (coupled with the crippling impact of levy diversions) have
adversely impacted PW's ability to deliver projects detailed in the TAMP. Considering
the large increase in road fund levy rate needed to address inflationary impact, it would
be prudent to begin the process of identifying elements of the road and bridge network
that we will want to prioritize for abandonment, presuming no additional offsetting
revenue flow into the road fund.
FISCAL IMPACTS:
Without supplementing road fund revenue, PW must start divesting from infrastructure
assets as detailed in the TAMP,
ATTACHMENTS:
EXHIBIT 1: CONSOR ROAD LEVY RESEARCH (DRAFT)
EXHIBIT 2: ROAD FUND LEVY FINANCIAL FORECAST
Page 2 of 4
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: CONSOR ROAD LEVY RESEARCH (DRAFT)
Page 3 of 4
Public Works "Work Session Staff Report", 2023
SCADE3. T$
Kittitas County Road Levy
a
Research
Stakeholder Interviews DRAFT Summary
Introduction
Kittitas County operates and maintains 562 miles of roads and 268 bridges within the County, not
including roads and bridges within city limits. The County performs routine maintenance on these
facilities, such as filling potholes and plowing, and more substantial preservation, such as paving
and chip sealing. The 2018 County Transportation Plan analyzed current road and bridge conditions
and identified needed maintenance in order to maintain these facilities in a good state of repair.
Public Works staff are considering putting a road levy measure on the November 2024 ballot to pay
for continued regular maintenance of County roads and bridges.
As an early step to considering a road levy, the County partnered with Consor Strategic Planning
and Communications (the consultant) to interview key stakeholders (see Ap=dix A for the list of
participants) to gather their thoughts and feedback. The interview questions asked interviewees
about their connection to Kittitas County, how they use the county's roads and bridges, their
perception of the current conditions of county roads and bridges, reaction to a potential road levy
to fund regular road and bridge maintenance, insights on effective communications and
messaging, and any advice for the project team as they consider the road levy. See AV-p3ndJx B for
the interview questions. Between January and March 2024, the consultant team completed nine
interviews. The interviewees represented a broad range of Kittitas County groups and interests and
included representatives from the:
Ellensburg School District
• Hay Growers Association
Home Builders Association
• Kittitas County Commissioners
Kittitas County Chamber of Commerce
• Kittitas County Planning Commission
• Kittitas Reclamation District
• Kittitas valley Fire and Rescue
• Realtors Association
• Suncadia Resort
Highlights
Interviewers provided a brief project overview and context about why they were interviewing the
participants about a proposed road levy in Kittitas County. Participants shared a wide range of
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary
March 2024
perspectives and experiences with Kittitas County roads and bridges and identified both support
and opposition to a proposed road levy to pay for continued road and bridge maintenance.
Throughout the interviews, many of the participants echoed similar themes that included:
• An acknowledgement that County roads and bridges were in pretty good condition overall,
but require continued maintenance and that some specific areas were in poorer condition
• A need to consider different methods of raising funds that did not disproportionally burden
residents and allowed visitors to help pay the costs
• A need to understand the specifics of a levy, what led to needing a levy, and how the funds
would be used, and
• The need to lead any levy outreach with transparency and to start that outreach as soon as
possible, with opportunities for in person engagement.
Key Themes and Takeaways
The following section highlights the key themes and takeaways from the stakeholder interviews
Stakeholders
The time interviewees have lived in the county ranged from just a few years to multi -generation
lifelong residents. They live and recreate in the area in addition to working in a variety of fields,
including emergency services, transportation, real estate, tourism, business, agriculture, and
public service. Overall, interviewees said that transportation was a priority and felt that their peers,
professional groups, and communities also shared their priorities and concerns around
maintaining County roads for safety and daily personal and business -related use. They generally
had a positive outlook regarding Kittitas County and quality of life issues, though almost all shared
concerns about area growth and funding growth -related road and bridge needs.
Current Situation
Interviewees use County roads and bridges to get to and from home and work, for recreation, for
business, transporting harvest, and for daily tasks. They shared that visitors also rely on the roads
and bridges to visit the area, especially during the summer months for recreation and for people
who have homes in the area. Overall, participants describe the conditions of the county roads and
bridges as pretty good, with an average rating of about six or seven on A
a scale of one to ten, with one being the worst and 10 the best. While fm 6 Newhomes in
the roads and bridges are generally in good condition, some did rural areas and
acknowledge that some areas have roads and bridges in poor condition, an increase in
such as decommissioned bridges in Elk Meadow. Some people also noted visitors put
concerns over road and bridge conditions and their ability to support larger pressure on
vehicles like emergency services vehicles, freight for hauling goods, or roads. 55
school buses (i.e., school buses can no longer use Cook Canyon Bridge
due to safety concerns). It was also noted that upper county roads dealt with increased wear and
usage due to greater traffic and spillover from Interstate-90 (1-90) congestion. A number of
Kittitas County Road Levy Research j Stakeholder Interview Draft Summary 2
March 2024
interviewees mentioned concern about wildfire, particularly in the upper county, and the ability of
firefighters to access fires via county facilities and residents to evacuate.
Several expressed appreciation for the Public Works Department and for clearing roads as quickly
as possible during and after snow events.
Proposed Levy
Participants largely felt one of two ways about the proposed levy:
1) while they did not necessarily want to pay more taxes, they It's wise to take
understood the critical need to maintain the county's roads and care of what we
bridges and were generally supportive, or 2) were very concerned about have and keep
the disproportionate burden of a levy on residents (particularly on larger projects
farmers with large properties, people on fixed incomes, and people with separate.
low incomes) and wanted to explore other ways to payfor road and
bridge maintenance, such as an impact fee or sales tax so visitors would
also help pay for their usage. Most felt that a "maintain what the County has" approach over a
substantially larger and more costly "new roads and bridges or improvements" approach was the
right balance.
Several themes surfaced around challenges the county may face with a road levy.
Fairness around who will pay. Several interviewees expressed concerns about the
disproportionate burden on residents, particularly on large
Landowners (since the amount people have to pay for the levy
Consider having
maybe based on property value) and people on fixed
people who are using
incomes or who have low incomes. The County is experiencing
the roads help pay
urban growth, with new people moving in from the western side of
for the maintenance.
the state, and hosts many visitors, especially during the summer
People on fixed
months. Some stakeholders feel that visitors, who contribute to the
incomes and rural
wear and tear on the infrastructure, should also help pay for road
and bridge maintenance. They said the County should consider
other methods to raise funds, such as an impact fee or sales tax so it
is not just an additional cost to residents. Another idea to cover the
communities are
going to be extremely
burdened by this
(levy].
cost was to ask for grant support from the state since the area is a
popular summer destination in Washington, and congestion from 1-90 spillover adds
to more traffic on county roads.
r
Sharing howthe County got to this point. All participants emphasized that it will be critical for the
County to share how they got to this point of needing more funding for road and bridge
maintenance. Questions that will likely be important to voters will be around why the funding is
needed now, how the previous funds were used, and why the current budget is not adequate to
cover maintenance now (i.e., increased labor or material costs, greater growth, etc.). Many
stakeholders acknowledged that while they do not want more taxes, they understand that under -
maintaining the roads and bridges will lead to worsening conditions and more expensive fixes in the
future.
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary 3
March 2024
Transparency of how the funds will be used and the proposed levy timing. A continuation of the
questions around how the County got to the point of needing a road levy are questions about who
wit( pay and contribute, how long the levy will be in place and the amount taxpayers will pay per
year, what the specific projects are, and what roads and bridges wilt get attention (stakeholders
commented that it will be important that both upper and lower county see benefits).
Regarding timing of the levy, some participants noted there may be some challenges in introducing
a road levy on the November ballot given the controversy around national politics and the county
Leaning more conservative and anti -tax. Other stakeholders did not see an issue with the potential
timing of the levy in November, but noted that how well the economy is doing (specifically for
farmers) may affect the outcome. Generally, interviewees felt that people who are strongly against
taxes or area growth will oppose the levy, while others who depend on well -maintained roads, for
business, daily life, safety, or recreation, will generally support the levy as a necessity. Whether or
not people oppose or support the levy, it will still be important for the County to address the above
challenges and concerns.
Need to build support and trust (including earning back trust). Interviewees also agreed that the
County will need to focus on building early support and trust to pass a levy. Part of building support
will be to engage with voters and community members and educate them on why the County needs
more funds for road and bridge maintenance, how it will benefit residents, and how the County will
hold itself accountable with the funds raised by the levy. It was noted that the County would also
have to earn back trust due to challenges from a previous real estate excise tax (REET) that
impacted some groups represented by interviewees. Those who raised the trust issue also talked
about the power of social media and instances where a few loud voices can dominate the
conversation, and are usually against something, regardless of the topic. They said that these
voices will need to be countered with those who can speak to the benefits of the levy in an
educated manner.
Communications and Messaging
When asked about what information is important to share with Frame [the levy]in
voters and their organizations and communities, and how they
would communicate about the Levy, interviewees offered key insights. the bigger picture if
As noted above, it will be important to share the story and the history get communities don't
Leading up to the County considering this road levy. Just as important is ahead true of
infrastructure
a clear and transparent plan about who will contribute to paying for nfture repair
and maintenance, it's
road and bridge maintenance, the specifics of the proposed levy adding to a bigger
amounts and over what timeline, how the funds will be used and where, problem down the
and how the County will hold itself accountable for how the funds are road. 1111
used. Interviewees recommended framingthe need forthe road levy OF OF
around safety, especially wildfire safety and keeping evacuation routes maintained.
Economic health, moving goods, the ability to do business, and ability to complete daily tasks were
also noted as key points to convey. It will be important to consider messaging, understand the
audiences, and what will resonate with different groups and their needs. Stakeholders strongly
recommended transparency throughout any levy campaign and starting the conversation early.
Several interviwees shared that it took multiple times to pass the school levy and that may be the
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary 4
March 2024
case with a road levy, especially if voters perceive that the County is "proposing a Cadillac rather
than a Chevy." Lastly, participants felt that the message of taking care of what we have is a message
that will resonate with voters.
The best ways to get information out to organizations and communities, and more broadly to voters
are to use diverse methods. These include digital methods, like social media, email listservs, and
online publications, print materials, and community and in -person communications and
engagement opportunities (i.e., workshops). It will be important to keep engaging with stakeholders
and connecting with their networks, local leaders and elected officials, and local organizations like
the chambers of commerce and Rotary Clubs.
Final Advice
The key final advice interviewees had to share was to understand different audiences, lead with
transparency, seek out and collaborate with supporters to help spread a unified message, and start
outreach early.
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary 5
March 2024
Appendices
Appendix A: Participants
Carol Chrisman, Transportation Director, Ellensburg School District
Bruce Coe, Kittitas County Planning Commission Chair
Kevin Edinger, Kittitas Reclamation District
Andi Hochleutner, Central Washington Home Builders Association
Halley Holbrook, Colette Rarden, and Sam Pace, Realtors Association
Carl Jensvold, Hay Growers Association
Amy McGuffin, Kittitas County Chamber of Commerce
John Sinclair, Kittitas Valley Fire and Rescue
Mark Thorne, Managing Director, Suncadia Resort
Cory Wright, Kittitas County Commissioner
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary g
March 2024
Appendix B: Interview Guide
Kittitas County Road Levy
Stakeholder Interviews Rev.11/9/23
Name: Phone:
Organization: Email:
DISCUSSION GUIDE
Introduction
Kittitas County operates and maintains 562 miles of roads and 268 bridges within the County
(the County is not responsible for roads and bridges within city limits). The County performs
routine maintenance on these facilities (fills potholes, plows, etc.) and more substantial
preservation, such as paving and chip sealing. The 2018 County Transportation Plan analyzed
current road and bridge conditions and identified needed maintenance in order to maintain
these facilities in a good state of repair. Public Works staff are considering putting a measure of
the November 2024 ballot to pay for continued regular maintenance of County roads and
bridges.
About You
1. How long have you been in Kittitas County with ? What are your primary
interests? Where does transportation fit within the priorities that are important to you?
2. Do you feel County voters share your concerns about these issues/programs?
3. What's your general outlook on Kittitas County and quality of life issues?
Current Situation
4. How do you use the County's roads and bridges?
5. How would you describe the condition of these facilities (rate road/bridge conditions on a
scale of 1-10 as a general way to gauge their perceptions)? Are you aware of any
specific needs?
6. What is your perception of how roads and bridges are maintained and are you satisfied
with their condition? If not, are there any specific deficiencies?
7. What important benefits do the County's transportation facilities provide? (i.e., safety,
commerce, recreation, etc.)
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary 7
March 2024
Proposed Levy
8. The County has identified a $31 million funding gap and is proposing a levy lift to
address needed maintenance of roads and bridges, not funding for improvement or
restoration projects. What is your reaction to that?
9. A levy lift for improvement and restoration would be substantially bigger. The County
feels that a "maintain what we have" approach strikes a balance and is more likely to be
supported. (Your initial reaction? Any thoughts?)
10. What do you see as the biggest challenges/barriers to this levy? Any challenges
associated with its timing (November 2024)?
11. Who do you see as likely supporters and opponents?
Communication/Messaging
12. What information will be of the greatest interest to you/your organization about the road
levy?
13. If you were responsible for communicating the benefits of this levy, what do you think
would resonate the most with voters? (i e , specific maintenance "projects", economy,
safety, access to recreation, issues related to 1-90 etc.)
14. What Is the best way to get information to you and your organization and more broadly
to voters?
Final Advice
15. Are there any other people or organizations you would recommend we contact to get
their views on the proposed road levy?
16. Can you offer a single most important piece of advice for Kittitas County as it considers
putting the road levy on the November 2024 ballot?
17. Any further comments or suggestions?
Kittitas County Road Levy Research I Stakeholder Interview Draft Summary 8
March 2024
EXHIBIT 2: ROAD FUND LEVY FINANCIAL FORECAST
Page 4 of 4
Public Works "Work Session Staff Report", 2023
:.7
N
7
'a
SO
C
a
C6
C_
co
d
N
O
N
L
}
4,7
LO
T
N
J
E
N �
N
LL N
N �
m
N
m
V
LD
O
LL
Lo
0
N
N
J
o y
i6
(D
CD
U �
N O
LL O
Lo 69
O 0 m
N O_ 7
M
O
a)
y
m
Q
N
LL
N
O
N
c
U
0
a.
Q7
C
O
W
D
O
Q
0
d
v
0
O
LL
N
O
N
ti
6%
ti
C6
M
co
LO
co
6%
m
CD
co
06
6%
M
O
O
Q �R
CL
•� o
N Oi
Lo
N
N
O7
�o
y �
N
y LO
N
Q r
N r
a
N
6%
d4
_ d °0 w Go
T 0 CO LO N
�LO
d
� fD
N
LO
C
O
N
r
69 69 e9
N Lo
N N
0 N N
C r 3
O N
W r 0
E
O
L
ry. O
N G
7
to
��y O
T O
o �
N E
z _
� b
P
C CL E
a+
0
6. 0
0 ��'' 9
0 C -00
O C p>
C
0 C O
z ,
m
J
W
L6 N
0
O
°J'a
It fn
N N
N
O LOLO
LO
CO
CL
°Y r
LO ~
N �
O
N
co 4
O W
coo LD
r Lf)
TCV
r
O
N
6'!
co 0
0 m
Co ch
CD N
69 v}
ti
CD
co
co
°D N
N 0)
O
N LW
00
�3
O
Lf) It
C14 CD
N
C nl
.- C r
c ,0
O W:
� C
O C
M
Ny T
N y
N �
Co >
11 8
NO NO
dl N N
7
E
O
Z
O
b
0
C
O
t5
a
E
L
LU c
0 o 0
C W
CD EN
N
w U N
C N
d L
� W
}
C 0 W
C N c
cr
co
CL p (W:3q
O 7
o 0
Q7 r
E
CL
9) °7 Ly°
w � O
N
C d G
G
C r
CD
0 G.
9 w a:
W
C
D cm C N
9 L C
a
y N
cc
n C
9 C
� o -
] N :3
] Lh W
r 12
C. N
vLri •-
t
`o
i o
'u N us m
� T
S C
-S
o d 0 o
E �v
ig aGF�
3 47 W
O
° of V O
e Q1N 2a
iN w
U W
LD E 7 W
O 0.0
L O A N
W
L C N
O p w
_ C EC
W m O
O C L
S"_. �%ppyy °O ID
7 N w ID
c b w 60
p LLDS 2 V
C 3 49
1 LO '- t7 W
C rG
N 7 L
1
C y " W
m N
7 L41° C
7 V m
5 C Ln d C
w le
N N U 5
N
�a E LD
J N CD
'yWO, H
� t N
O'D � co
I r:: Er
c a w E6%
o w E o
tM V N
I p w 3