HomeMy WebLinkAboutAmendment 2 Detailed Breakdown of CostsKittitas County TS Project Amendment 2 Costs Title Unit Rate Unit (Hrs) Total Project Director 295.00$ 1.5 442.50$ Project Manager 282.00$ 8 2,256.00$ Lead Engineer 207.00$ 28 5,796.00$ Civil/Stormwater Engineer 196.00$ 164.5 32,242.00$ Designer/Drafter 107.00$ 91 9,737.00$ Composting 260.00$ 1 260.00$ Project Engineer 115.00$ 23 2,645.00$ Sr Project Engineer 150.00$ 19.5 2,925.00$ Sub-Total, SCS Labor Costs = 56,303.50$ Name of Sub-Consultant Unit Rate Unit Total FSI 13,200.00$ 1 13,200.00$ Lund-Opsahl 14,071.50$ 1 14,071.50$ Rolluda 2,475.00$ 1 2,475.00$ Sub-Total, Sub-Consultant Costs = 29,746.50$ Overall Total for Amendment 2= 86,050.00$ Table 1. Overall Total for Amendment 2 SCS Labor Costs SCS Sub-Consultant Costs Page 1 of 2 January 2024 Kittitas County TS Project Amendment 2 Costs Title Unit Rate Unit (Hrs) Total Project Director 295.00$ 1.5 442.50$ Project Manager 282.00$ 6 1,692.00$ Lead Engineer 207.00$ 22 4,554.00$ Civil/Stormwater Engineer 196.00$ 131.5 25,774.00$ Designer/Drafter 107.00$ 71 7,597.00$ Composting 260.00$ 1 260.00$ Project Engineer 115.00$ 19 2,185.00$ Sr Project Engineer 150.00$ 14.5 2,175.00$ Sub-Total, SCS Labor Costs = 44,679.50$ Name of Sub-Consultant Unit Rate Unit Total FSI 13,200.00$ 1 13,200.00$ Lund-Opsahl 6,041.50$ 1 6,041.50$ Rolluda 2,475.00$ 1 2,475.00$ Sub-Total, Sub-Consultant Costs = 21,716.50$ Total for Fire System Redesign= 66,396.00$ Title Unit Rate Unit (Hrs) Total Project Director 295.00$ 0 -$ Project Manager 282.00$ 2 564.00$ Lead Engineer 207.00$ 6 1,242.00$ Civil/Stormwater Engineer 196.00$ 33 6,468.00$ Designer/Drafter 107.00$ 20 2,140.00$ Composting 260.00$ 0 -$ Project Engineer 115.00$ 4 460.00$ Sr Project Engineer 150.00$ 5 750.00$ Sub-Total, SCS Labor Costs = 11,624.00$ Name of Sub-Consultant Unit Rate Unit Total FSI -$ 1 -$ Lund-Opsahl 8,030.00$ 1 8,030.00$ Rolluda -$ 1 -$ Sub-Total, Sub-Consultant Costs = 8,030.00$ Total for MRW Bldg. Scope Change = 19,654.00$ Table 2. Amendment 2 Cost Breakup by Task Task 1. Fire System Re-Design Task 2. MRW Bldg. Scope Change 1B. Fire System Re-Design, SCS Sub-Consultant Costs 2A. MRW Bldg. Scope Change, SCS Labor Costs 2B. MRW Bldg. Scope Change, SCS Sub-Consultant Costs 1A. Fire System Re-Design, SCS Labor Costs Page 2 of 2 January 2024