Laserfiche WebLink
NASPO Customer:CCA Use Only: <br />Site Name:NASPO Region Code# <br />Street Address:AR# <br />City, State, Zip Ship to Customer # <br />Location ACE Customer#Renewal Contract#Bill to Customer # <br />Sales Representative Annual Contract Value: <br />Contract Period Begin and End Date 2/28/2025 $2,637.00 <br />Fire Panel Make & Model <br />Silent Knight <br />Fire Alarm Annual Semi-Annual Quarterly Inspection Month(s) <br />Fire Alarm Control Panel 2 0 0 April <br />NAC Power Supply 0 0 0 <br />Remote Annunciator 0 0 0 <br />DACT 0 0 0 <br />Smoke Detector Inspection (Only)12 <br />Smoke Detector Sensitivity Testing - Enhanced or Expert Only Not Included <br />Smoke Detector Cleaning - Enhanced or Expert Only Not Included <br />Duct Detector Inspection (Only)0 <br />Duct Detector Sensitivity Testing - Enhanced or Expert Only Not Included <br />Duct Detector Cleaning - Enhanced or Expert Only Not Included <br />Heat Detector 0 <br />Flame Detector 0 <br />Beam Detector 0 <br />Pull Station 8 <br />A/V 20 <br />Other (IAM, Relay, etc.)0 <br />Door Holder 0 <br />Elevator Recall 0 Inspection Month <br />Tamper Switch 0 <br />Flow Switch 0 <br />Hours 3 <br />Essential Yes <br />Enhanced Labor Only No <br />Enhanced Labor & Panel Parts Option No <br />Expert Standard Labor & Full Service Parts Coverage Option No <br />Expert 24/7 Labor Coverage & Full Service Parts Coverage Option No <br />After-Hours Fire Alarm Inspection (Based on Essential Coverage - if No <br />other Tier Coverage is required, contact Melanie LeClair to update) <br />$0.00 <br />Annual Cost $813.00 <br />Monitoring <br /> <br />Sprinkler System Quantity Inspection Month <br />Wet Annual (Includes Annual Flow Test)1 $ 508.00 April <br />Wet Semi-Annual (Includes Annual Flow Test)0 $ - <br />Wet Quarterly (Includes Annual Flow Test)0 $ - <br />Dry Annual (Includes Annual Trip Test)0 $ - <br />Dry Semi-Annual (Includes Annual Trip Test)0 $ - <br />Dry Quarterly (Includes Annual Trip Test)0 $ - <br />Deluge Annual (Includes Annual Flow Test)0 $ - <br />Deluge Semi-Annual (Includes Annual Flow Test)0 $ - <br />Deluge Quarterly (Includes Annual Flow Test)0 $ - <br />Pre-Action Annual (Includes Annual Trip Test)0 $ - <br />Pre-Action Quarterly (Includes Annual Trip Test)0 $ - <br />Backflow Preventer Annual 2 $ 300.00 April <br />Hydrant Annual 0 $ - <br />PIV Annual 0 $ - <br />Fire Hose Annual 0 $ - <br />Standpipe Annual 0 $ - <br />Antifreeze Annual 0 $ - <br />Fire Pump (200-500)0 $ - <br />Fire Pump (501-800)0 $ - <br />Fire Pump (801-1199)0 $ - <br />Fire Pump (1200+)0 $ - <br />Hours 4 <br />Essential Sprinkler Yes <br />After-Hours Sprinkler Inspection (Based on Essential Coverage - if No <br />Optional Labor Coverage is required, contact Melanie LeClair to update) <br />Annual Sprinkler Cost $808.00 <br />Special Hazards (Test & Inspect Annual Semi-Annual Inspection Month <br /> Johnson Controls Fire Protection <br />Washington State Contract #24223; NASPO <br />ValuePoint Master Contract #99SWC-NV23- <br />16270 <br />3/1/2024 <br />Kittitas County Courthouse <br />Kittitas County Courthouse <br />205 W 5th Ave <br />Ellensburg WA 98926 <br />Randel Nelson <br />Pricing Breakout by Product Line & Inspection Information <br />Monitoring must be quoted separately on Monitoring Quote forms