HomeMy WebLinkAbout2024-03-25-minutes-ec-study-sessionKITTITAS COUNTY COMMISSIONERS
EC Study Session
Regular Meeting
Monday March 25, 2024 -10:00 AM
BOCC Conference Room
205 West 5th Room 108 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Approve Request for Chair's Signature on the 2023-2025 WSDA Grant Agreement
4. Update on Account Assistant III Position
5. Discussion on 2026 Proposed Bedding Fees
6. Update on Livestock Sale Management Progress
7. Other Business - No Action to be taken
8. Concluded
Created on 3/21/2024 9:56:49 AM
KITTITAS COUNTY
EC STUDY SESSION MINUTES
BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG
Regular Meeting
MONDAY 1 10:00 AM I March 25, 2024
Board members present: Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz,
Commissioner Cory Wright
Others: Kady Porterfield (Event Center Director), Robert Eddings (Fair Board President)
1. Call to Order: 10:00am
2. Citizen Comments (1 min. time limit): None
3. Approve Request for Chair's Signature on the 2023-2025 WSDA Grant Agreement:
Kady reported that the project under this grant had no issues for the Department of Historic
Preservation and it received no tribal comments, so it's time to finalize the agreement.
Commissioner Osiadacz moved to approve the request for chair's signature on the 2023-2025
WSDA Agreement. Commissioner Wright seconded the motion. Motion passed.
4. Update on Account Assistant III Position: KVEC management completed interviews
and selected a candidate for hire who accepted the position. She will start on April 2, 2024.
5. Discussion on 2025 Proposed Bedding Fees: Fair Board President, Bob, is looking for
feedback on the Bedding Fees structure as it's a continued item of discussion amongst the
Fair Board. The Livestock Directors have conducted some calculations and have some ideas
of decreasing the bedding fees for small livestock and raising them for large livestock, like
Beef. It was discussed that the fees are only a small portion of the actual cost and don't really
serve as a true fee as it is very subsidized. The current bedding fee is also structured more as
a per animal entry fee. The feedback received said it might be wise to consider changing the
wording of the fee to an animal entry fee, rather than a bedding fee, as it's truer to its nature
that way. The Commissioners all expressed that they do not want to see fees decreased when
everything else is so heavily subsidized as is. If fee changes are brought forward in the
future, a full cost analysis is to be presented that includes hauling off bedding waste, staff
time to clean up and haul it, equipment use and fuel, and any other connected costs to that
piece of the Fair operation.
6. Update on Livestock Sale Management Progress: Kady is waiting to hear back from
Friends of the Fair President, Becky McDowell, on a time to meet to answer questions
2024-03-25 MINUTES
Friends of the Fair have on the proposed amended agreement. It seems there is a struggle
from a few involved in Friends of the Fair that believe the County (the County Fair) should
own the Livestock Sale, but it has been reiterated that the County (Commissioners) only
agreed for the Livestock Sale to move from one non-profit to another non-profit, not
obligating the County Fair to any further financial commitments. The County was supportive
of the Friends of the Fair taking on the Sale because the Fair would be able to support the
Sale with currently owned and operated resources to help make it more cost effective and
essentially keeping the cost of commission down for the livestock kids. There is hope that an
understanding can be met over the new contract language to make expectations and terms
more clear, but if an agreement is not reached, then the Fair Board will have to consider other
options for outside management of the Sale and request the Event Center Director contract
the Sale out to another entity.
7. Other Business: Kady reported she just received a proposal from ALSC to move forward
with a 50% design to help reconceptualize the Grandstands Project so we can evaluate new
budget needs and try to get the entire project launched.
Commissioner Wachsmith gave a recap on the Craig's Hill walk through with City and
County officials and thought it was a great informational and educational meeting. No results
or actionable items came from that meeting, but there is a meeting tomorrow to discuss in
further detail with all parties involved.
Meeting concluded at 10:28am.
43SVV oxt�cklv
Kady Po erfield
2024-03-25 MINUTES 2
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Chairman
GRANT AGREEMENT FACE SHEET
Agreement Number: K5060
Washington State Department of Agriculture
FAIRS PROGRAM
CAPITAL PROJECT GRANTS
1. Grantee
2. Fair Facility
Kittitas County
Kittitas County Fair
205 W 5th Avenue, Rm 102
901 East 7th Avenue
Ellensburg, WA 98926
Ellensburg, WA 98926
3. Grantee Representative
4. WSDA Representative
Kady Porterfield, Event Center Director
Anne Norman, Fairs Program Administrator
Phone: 509-962-7675
Phone: (360) 902-2043
Kadv.00rterfieldfa-co.kittitas.wa.us
%irsfiaar.wa.gov
6. Grant Start Date 7. Grant End Date
5. Grant Amount
$250,000.00
Upon Final Signature May 31, 2025
8. Biennium: 9. Project Must Be Completed By
2023-2025 Ma 31, 2025
10. Tax ID # 11. Statewide Vendor # 12. UBI #
91-6001349 10475-15 192002673
13. Grant Purpose
WSDA and Grantee have entered into this Agreement to provide funding for a capital improvement project to
make health or safety improvements to agricultural fairgrounds or fair facilities in order to benefit participants
and the fair -going ublic pursuant to RCW 15.76.165.
WSDA and Grantee agree to the terms of this Agreement as set forth in this GRANT AGREEMENT FACE
SHEET, the TERMS AND CONDITIONS, and the following documents incorporated by reference:
ATTACHMENT I: GRANTEE'S APPLICATION FOR CAPITAL GRANT FUNDS; ATTACHMENT II:
CERTIFICATION OF AVAILABILITY OF FUNDS TO COMPLETE PROJECT. This Agreement governs the
rights and obligations of both parties to this Agreement, which is executed on the date below to start as of the
date and year last written below.
FOR THE GRANTEE
FOR THE WASHINGTON STATE DEPARTMENT OF
AGRICULTURE
By signing this agreement, I bind the Grantee to this
Agreement and certify that I am authorized to do so.
Gloriann Robinson
Brett chs
Board of County Commissioners Chair
Acting Administrative Regulations Manager
4ArJ',.
Date
Date
❑ Additional signatures on next page
APPROVED AS TO FORM ONLY
Check box if true
Steve Scheele December 15, 2023
Assistant Attorney General
TERMS AND CONDITIONS
Washington State Department of Agriculture
Fairs Program
CAPITAL PROJECT GRANT
TERMS AND CONDITIONS
1. DEFINITIONS
The following definitions apply throughout this Agreement.
"Agreement" means this Capital Project Grant Agreement, specifically the Grant Agreement Face Sheet, the
Terms and Conditions, and all documents incorporated by reference including Attachment I: Grantee's Application
for Capital Grant Funds, Attachment II: Certification of Availability of Funds to Complete Project.
"Capital Project" means the capital improvement project described in Section 4.
"Fair Facility" means the agricultural fairgrounds or fair facility owned by the Grantee and located at the address
shown for the Fair Facility on the Grant Agreement Face Sheet.
"Grant Amount" means the total amount of funding under this Agreement, as set forth on the Grant Agreement
Face Sheet.
"Grantee" means the entity identified as the Grantee on the Grant Agreement Face Sheet, who is a Party to the
Agreement, and includes all employees and agents of the Grantee.
"WSDA" means the Washington State Department of Agriculture, who is a Party to the Agreement.
2. AUTHORITY AND PURPOSE
Acting under the authority of RCW 15.76.165, WSDA has awarded the Grantee funding under this Agreement to
undertake a capital improvement project to make health or safety improvements to agricultural fairgrounds or fair
facilities in order to benefit participants and the fair -going public. Grantee will undertake, by whatever legal
means, to construct, install, build, or otherwise cause the completion of the Capital Project at the Fair Facility.
Grantee must perform in accordance with this Agreement's terms and conditions and all applicable federal, state,
and local laws and ordinances, which by this reference are incorporated into this Agreement as though set forth
fully herein.
3. FUNDING
WSDA shall pay an amount not to exceed the awarded Grant Amount for the eligible costs necessary for or
incidental to the performance of work as set forth for the Capital Project.
4. CAPITAL PROJECT
Grantee must use the funding awarded by WSDA under this Agreement solely for the capital improvement project
set forth in ATTACHMENT I: GRANTEE'S APPLICATION FOR CAPITAL GRANT FUNDS, which includes
designing and laying out utilities for a new RV park.
5. COMMUNITY BENEFITS
In consideration for the funding under this Agreement, Grantee agrees to provide the following community
benefits.
Klmtas (Aunty
K5060
a. Use of the Capital Project in the course of holding an agricultural fair as defined by RCW 15.76.110.
b. If charging admission fees for the agricultural fair(s), a charge to the general public that is reasonable and
consistent with the standard fees charged at other public agricultural fairs and, to the extent possible,
discount or free admission to special populations such as military families, foster families, student groups,
seniors, babies, and toddlers.
c. Access to the Fair Facility and its exhibits and programs to persons of differing abilities.
d. Where possible, availability of the Fair Facility for rental at reasonable or discounted cost for educational
or public programs benefitting the public.
Page 2
Fair Capital Project Grant
e. Space for charity and other nonprofit community organizations to conduct fundraising or educational
activities.
f. Support other local groups and programs in promoting the welfare of farm people and rural living
including the exhibition of livestock and agricultural produce of all kinds, and exhibition of related arts and
manufactures including products of the farm home, and exhibition of educational contests, displays, and
demonstrations designed to train youth.
6. CHANGE OF OWNERSHIP OR USE
a. Grantee understands and agrees that Grantee must hold and use all real property and facilities acquired,
constructed, improved, or rehabilitated with Grant funds for a period of at least three (3) years following
termination or expiration of this Agreement for the express purpose(s) of the Capital Project and the
Community Benefits under Section 5.
b. If the Grantee is found to be out of compliance with this section, the Grantee must repay to the state
general fund the amount of the grant and interest as provided in the Recapture provision, Section 17.
7. CERTIFICATION OF NON -STATE MATCHING FUNDS OR IN -KIND SERVICES
a. The release of state funds under this Agreement is contingent upon the Grantee certifying that it has
expended or has access to non -state matching funds or in -kind services from other sources as set forth in
ATTACHMENT II: CERTIFICATION OF THE AVAILABILITY OF FUNDS TO COMPLETE THE PROJECT
to complete all construction and activities identified for the Capital Project.
b. Grantee shall maintain records sufficient to evidence that it has access to or has expended funds from
such sources, and shall make such records available for WSDA's review upon request.
8. PROJECT EXPENDITURES ELIGIBLE FOR REIMBURSEMENT
WSDA will make payments to the Grantee on a reimbursement basis only. For the purposes of this Agreement,
eligible costs are construed to mean costs incurred and paid, or costs incurred and payable within thirty (30) days.
Only costs incurred between (1) the grant start date and (2) grant end date, as shown in the Grant Agreement
Face Sheet, and timely invoiced are eligible for reimbursement under this Agreement. No final invoice voucher is
eligible for reimbursement unless it is submitted at the same time as or after submittal of the Certified Project
Completion Report in Section 10.
Grantee must not request reimbursement for services and expenses that Grantee has charged or will charge to
the State of Washington or any other party under any other contract or agreement. WSDA is not liable for
payment of such charges.
Disallowed Costs: The Grantee is responsible for any audit exceptions or disallowed costs incurred by its own
organization or that of its subcontractors.
9. BILLING PROCEDURES AND PAYMENT
a. WSDA will reimburse Grantee for eligible project expenditures up to the maximum payable under this
Agreement. Grantee must submit a signed and completed Invoice Voucher (Form A-19), referencing in
the project activity performed, and any appropriate documentation. The Invoice Voucher must be certified
by an official of the Grantee with authority to bind the Grantee.
b. Grantee may submit a single Invoice Voucher for the full grant amount or no -more -than -monthly periodic
Invoice Vouchers. WSDA will reimburse no more than seventy-five percent (75%) of the grant amount
until all project activities are complete and the Grantee submits a complete Certified Project Completion
Report as required by Section 10.
c. Each Invoice Voucher must be accompanied by a Project Status Report, which describes, in narrative
form, the progress made on the project since the last invoice was submitted, as well as a report of project
status to date, and all receipts associated with work described in the Project Status Report. WSDA will not
release payment for any reimbursement request without receiving a Project Status Report.
d. The Grantee shall submit all Invoice Vouchers and any required documentation to WSDA's Agreement
Manager shown in Section 35. Proof of cashed checks must include both the front and back of the check.
e. WSDA will process reimbursement after approving the Invoice Voucher and Project Status Report.
f. Payment shall be considered timely if made by WSDA within thirty (30) calendar days after receipt of
properly completed invoices.
Kittitas County Page 3 Fair Capital Project Grant
K5060
g. Grantee must submit the final invoice voucher no later than July 15, 2025. Unless the Legislature
has re -appropriated the funding, WSDA will not make payment on vouchers submitted after July 15,
2025.
10. CERTIFIED PROJECT COMPLETION REPORT
The Grantee shall complete a Certified Project Completion Report when the Capital Project is complete. The
report must include:
a. A certified statement that the Capital Project is complete and, if applicable, meets required standards.
b. Before and after photographs, either hard copy or electronic, of the Fair Facility showing the Capital
Project.
c. A certified statement of the actual dollar amounts spent, from all funding sources, in completing the
Capital Project. This includes the value of in -kind services performed.
d. Certification that all costs associated with the project have been incurred and accounted for. Costs are
incurred when goods and services are received and/or Agreement work is performed.
e. Consultation with Department of Archaeology and Historic Preservation (DAHP). Certification that
Grantee consulted with DAHP.
f. Certification that Grantee is and will continue to provide Community Benefits set forth in Section 5.
g. A final invoice voucher for the remaining eligible funds, unless Grantee intends to submit the final invoice
voucher after submitting the project completion report.
11. QUARTERLY REPORTS
a. Grantee shall submit quarterly reports to WSDA by the due date on each report form.
b. By December 31, 2024, Grantee must affirm in writing that the project will be completed by May 31, 2025,
unless Grantee has prior submitted a Certified Project Completion Report.
c. The Grantee shall furnish WSDA with other reports as WSDA may require.
d. Failure to file reports as requested may result in termination of this Agreement.
12. LACK OF ADEQUATE PROGRESS
Grantee's inability to affirm by December 31, 2024, that the project will be complete by May 31, 2025, is a basis
for WSDA to terminate the Agreement in whole or in part for cause as provided in Section 27. At WSDA's
discretion, the parties may modify this Agreement in lieu of termination.
13. EVALUATION AND MONITORING
a. The Grantee shall cooperate with and freely participate in any monitoring or evaluation activities
conducted by WSDA, including site inspections, if requested.
b. If requested by WSDA, Grantee must provide photographs, either hard copy or electronically, which
visually depict the progress made on the project.
c. WSDA or the State Auditor and any of their representatives shall have full access to and the right to
examine all of the Grantee's records with respect to all matters covered in this Agreement. Such
representatives shall be permitted to audit, examine, and make excerpts or transcripts from such records
and to make audits of all contracts, invoices, materials, payrolls, and records of matters covered by this
Agreement. Such rights last for six (6) years from the date final payment is made.
14. SIGNAGE, MARKERS, AND PUBLICATIONS
If, during the period covered by this Agreement, the Grantee displays or circulates any communication,
publication, or donor recognition identifying the financial participants in the project, any such communication or
publication must identify "The State of Washington" and "The Washington State Department of Agriculture — Fairs
Program" as participants.
15. CODE REQUIREMENTS
All construction and rehabilitation projects must satisfy the requirements of applicable local, state, and federal
building, mechanical, plumbing, fire, energy, and barrier -free codes. Compliance with the Americans with
Disabilities Act of 1990, 28 C.F.R. Part 35 will be required, as specified by the local building Department.
16. PREVAILING WAGE LAW
Kittitas County Page 4 Fair Capital Project Grant
K5060
The project funded under this Agreement is subject to state prevailing wage law (chapter 39.12 RCW). The
Grantee is advised to consult the Industrial Statistician at the Washington Department of Labor and Industries to
determine the prevailing wages that must be paid. WSDA is not responsible for determining the prevailing wages
applying to this project or for any prevailing wage payments that may be required by law.
17. RECAPTURE PROVISION
a. If Grantee fails to expend state funds in accordance with state law or the provisions of this Agreement,
WSDA reserves the right to recapture state funds in an amount equivalent to the principal amount of the
grant plus interest. Interest is calculated at the rate of interest on State of Washington general obligation
bonds issued most closely to the date of authorization of the grant.
b. Repayment by the Grantee of state funds under this recapture provision shall occur within thirty (30) days
of demand. If WSDA is required to institute proceedings to enforce this recapture provision, WSDA is
entitled to its cost thereof, including reasonable attorney's fees.
c. If Grantee fails to perform this Agreement in accordance with state laws, federal laws, and/or the
provisions of this Agreement, WSDA reserves the right to recapture all funds disbursed under the
Agreement, in addition to any other remedies available at law or in equity.
18. AMENDMENTS
The parties may amend this Agreement by mutual agreement. Such amendments shall not be binding unless they
are in writing and signed by personnel authorized to bind each of the parties.
19. SAVINGS
If funding from state or other sources is withdrawn, reduced, or limited in any way after the effective date of this
Agreement and prior to normal completion, WSDA may terminate the Agreement for convenience under Section
27, without the ten (10) business days' notice requirement. In lieu of termination and at WSDA's discretion, the
parties may amend the Agreement to reflect the new funding limitations and conditions.
20. NONDISCRIMINATION
a. Nondiscrimination Requirement. During the term of this Agreement, Grantee, including any subcontractor,
shall not discriminate on the bases enumerated at RCW 49.60.530(3). In addition, Grantee, including any
subcontractor, shall give written notice of this nondiscrimination requirement to any labor organizations
with which Grantee, or subcontractor, has a collective bargaining or other agreement.
The funds provided under this Agreement shall not be used to fund religious worship, exercise, or
instruction. No person shall be required to participate in any religious worship, exercise, or instruction in
order to have access to the facilities funded by this Agreement.
b. Obligation to Cooperate. Grantee, including any subcontractor, shall cooperate and comply with any
Washington state agency investigation regarding any allegation that Grantee, including any
subcontractor, has engaged in discrimination prohibited by this Agreement pursuant to RCW
49.60.530(3).
c. Default. Notwithstanding any provision to the contrary, WSDA may suspend Grantee, including any
subcontractor, upon notice of a failure to participate and cooperate with any state agency investigation
into alleged discrimination prohibited by this Agreement, pursuant to RCW 49.60.530(3). Any such
suspension will remain in place until WSDA receives notification that Grantee, including any
subcontractor, is cooperating with the investigating state agency. In the event Grantee, or subcontractor,
is determined to have engaged in discrimination identified at RCW 49.60.530(3), WSDA may terminate
this Agreement in whole or in part, and Grantee, subcontractor, or both, may be referred for debarment as
provided in RCW 39.26.200. Grantee or subcontractor may be given a reasonable time in which to cure
this noncompliance, including implementing conditions consistent with any court -ordered injunctive relief
or settlement agreement.
d. Remedies for Breach. Notwithstanding any provision to the contrary, in the event of Agreement
termination or suspension for engaging in discrimination, Grantee, subcontractor, or both, shall be liable
for contract damages as authorized by law including, but not limited to, any cost difference between the
original Grant and the replacement or cover Grant and all administrative costs directly related to the
replacement Grant, e.g., cost of the competitive bidding, mailing, advertising and staff time , which
damages are distinct from any penalties imposed under Chapter 49.60, RCW. Grantee may also be
required to repay grant funds pursuant to Section 17 (Recapture) of the Terms and Conditions if the
Kittitas County Page 5 Fair Capital Project Grant
K5060
Agreement is terminated based on a violation of the nondiscrimination requirement. WSDA shall have the
right to deduct from any monies due to Grantee or subcontractor, or that thereafter become due, an
amount for damages Grantee or subcontractor will owe WSDA for default under this provision.
21. HISTORICAL AND CULTURAL ARTIFACTS
Prior to approval and disbursement of any funds awarded under this Agreement, Grantee shall cooperate with
WSDA to complete the requirements of Governor's Executive Order 21-02 or Grantee shall complete a review
under Section 106 of the National Historic Preservation Act, if applicable. WSDA will not disburse any funds
under this Agreement unless and until WSDA determines that adequate consultation has been completed
as required by Executive Order 21-02. Project activities commenced prior to the completion of adequate
consultation may not be reimbursed and are undertaken at Grantee's own risk.
Grantee agrees that the Grantee is legally and financially responsible for compliance with all laws, regulations,
and agreements related to the preservation of historical or cultural resources and agrees to hold harmless WSDA
and the state of Washington in relation to any claim related to such historical or cultural resources discovered,
disturbed, or damaged as a result of the project funded by this Agreement.
In addition to the requirements set forth in this Agreement, Grantee shall, in accordance with Governor's
Executive Order 21-02 as applicable, coordinate with WSDA and the Washington State Department of
Archaeology and Historic Preservation ("DAHP"), including any recommended consultation with any affected
tribe(s), during Capital Project design and prior to construction to determine the existence of any tribal cultural
resources affected by the Capital Project. GRANTEE agrees to avoid, minimize, or mitigate impacts to the
cultural resource as a continuing prerequisite to receipt of funds under this Agreement.
The Grantee agrees that, unless the Grantee is proceeding under an approved historical and cultural monitoring
plan or other memorandum of agreement, if historical or cultural artifacts are discovered during construction, the
Grantee shall immediately stop construction and notify the local historical preservation officer and the state's
historical preservation officer at DAHP, and the WSDA Representative identified on the Grant Agreement Face
Sheet. If human remains are uncovered, the Grantee shall report the presence and location of the remains to the
coroner and local enforcement immediately, then contact DAHP and the concerned tribe's cultural staff or
committee.
The Grantee shall require this provision to be contained in all subcontracts for work or services for any activities
associated with the Capital Project to be funded under this Agreement.
In addition to the requirements set forth in this Agreement, Grantee agrees to comply with RCW 27.44 regarding
Indian Graves and Records; RCW 27.53 regarding Archaeological Sites and Resources; RCW 68.60 regarding
Abandoned and Historic Cemeteries and Historic Graves; and WAC 25-48 regarding Archaeological Excavation
and Removal Permits.
Completion of the requirements of Section 106 of the National Historic Preservation Act shall substitute for
completion of Governor's Executive Order 21-02.
In the event that the parties find it necessary to amend the scope of the Capital Project, the Grantee may be
required to re -comply with Governor's Executive Order 21-02, or Section 106 of the National Historic Preservation
Act.
22. CONFLICT OF INTEREST
Grantees must maintain and comply with written standards of conduct covering conflicts of interest and governing
the actions of its employees engaged in the selection, award and administration of contracts. Grantee must
comply with the following minimum requirements:
No employee, officer, or agent may participate in the selection, award, or administration of a contract supported
by a grant award if he or she has a real or apparent conflict of interest. Such a conflict of interest would arise
when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or an
organization which employs or is about to employ any of the parties indicated herein, has a financial or other
interest in or a tangible personal benefit from a firm considered for a contract. The officers, employees, and
agents of the Grantee may neither solicit nor accept gratuities, favors, or anything of monetary value from
contractors or parties to subcontracts and must comply with RCW 39.26.020. However, Grantee may set
standards for situations in which the financial interest is not substantial or the gift is an unsolicited item of nominal
value. The standards of conduct must provide for disciplinary actions to be applied for violations of such
standards by officers, employees, or agents of the Grantee.
If the Grantee has a parent, affiliate, or subsidiary organization that is not a state, local government, or federally
recognized tribe, the Grantee must also maintain written standards of conduct covering organizational conflicts of
Kittitas County
K5060
Page 6
Fair Capital Project Grant
interest. Organizational conflicts of interest means that because of relationships with a parent company, affiliate,
or subsidiary organization, the grantee is unable or appears to be unable to be impartial in conducting a
procurement action involving a related organization.
23. DISPUTES
Except as otherwise provided in this Agreement, when a dispute arises between the parties that cannot be
resolved through discussion and negotiation, either party may request a dispute hearing. The parties shall select
a dispute resolution team to resolve the dispute. The dispute resolution team shall consist of a representative
appointed by the WSDA, a representative appointed by the Grantee, and a third party mutually agreed upon by
both parties. The dispute resolution team shall attempt, by majority vote, to resolve the dispute. The parties agree
that this dispute process shall precede any action in a judicial or quasi-judicial setting.
24. HOLD HARMLESS
a. This Agreement is solely for the benefit of the parties and gives no right to any other entity that is not a
party to this Agreement. Each party is responsible and assumes liability for its own negligent acts or
omissions, or those of its officers, agents, or employees to the fullest extent required by law. In the case
of negligence of more than one party, any damages allowed shall be levied in proportion to the
percentage of negligence attributable to each party, and each party shall have the right to seek
contribution from the other party in proportion to the percentage of negligence attributable to the other
party.
b. This indemnification clause also applies to all causes of action arising out of the performance of work
activities under this Agreement. Each contract for services or activities utilizing funds provided in whole or
in part by this Agreement must include a provision that WSDA and the State of Washington are not liable
for damages or claims from damages arising from any subcontractor's performance or activities under the
terms of the contracts.
25. INDEPENDENT CAPACITY OF GRANTEE
The Grantee and its employees or agents performing under this Agreement are not employees or agents of the
state of Washington or WSDA. The Grantee will not hold itself out as or claim to be an officer or employee of
WSDA or of the state of Washington by reason hereof, nor will the Grantee make any claim of right, privilege or
benefit which would accrue to such officer or employee under law. Conduct and control of the work will be solely
with the Grantee.
26. RECORDS MAINTENANCE
The Grantee shall maintain books, records, receipts, documents, data and other evidence relating to this
Agreement and Capital Project for a period of six (6) years following the date of final payment. At no additional
cost, these records, including materials generated under the contract, shall be subject at all reasonable times to
inspection, review, or audit by WSDA, personnel duly authorized by WSDA, the Office of the State Auditor, and
federal and state officials so authorized by law, regulation, or agreement. If any litigation, claim, or audit is started
before the expiration of the six (6) year period, the records shall be retained until all litigation, claims, or audit
findings involving the records have been resolved.
27. TERMINATION OR SUSPENSION
a. For Cause: If WSDA determines the Grantee has failed to comply with the conditions of this Agreement in
a timely manner, WSDA has the right to terminate this Agreement. Before terminating the Agreement,
WSDA shall notify the Grantee in writing of the need to take corrective action. If corrective action is not
taken within twenty (20) calendar days, WSDA may terminate the Agreement and seek recapture of funds
as provided in Section 17.
b. For Failure to Complete: If the Grantee fails to complete the Capital Project by the Project Completion
Date shown on the Grant Agreement Face Page, WSDA may terminate this Agreement and seek
recapture of funds as provided in Section 17.
c. For Convenience: Except as otherwise provided in this Agreement, WSDA may terminate this Agreement,
in whole or in part, after ten (10) days written notice, beginning on the second day after the mailing. If this
Agreement is so terminated, WSDA shall be liable only for payment required under the terms of this
Agreement for services rendered or goods delivered prior to the effective date of termination.
d. Suspension: WSDA reserves the right to suspend all or part of the Agreement, withhold further payments,
or prohibit the Grantee from incurring additional obligations of funds during investigation of an alleged
Kittitas County Page 7 Fair Capital Project Grant
K5060
compliance breach and pending corrective action by the Grantee or a decision by WSDA to terminate the
Agreement.
e. The rights and remedies of WSDA provided in this contract are not exclusive and are, in addition to any
other rights and remedies, provided by law.
28. ORDER OF PRECEDENCE
In the event of an inconsistency in this Agreement, the inconsistency shall be resolved by giving precedence in
the following order:
a. Applicable federal and state of Washington statutes and regulations
b. Grant Agreement Face Sheet
c. Terms and Conditions
d. Attachments
29. OWNERSHIP OF PROPERTY
WSDA makes no claim to any real property improved or constructed with funds awarded under this Agreement,
does not assert, and will not acquire any ownership interest in or title to the capital facilities and/or equipment
constructed or purchased with state funds under this Agreement. This provision does not extend to claims that
WSDA may bring against the Grantee in recapturing funds expended in violation of this Agreement.
30. ENTIRE AGREEMENT
This Agreement contains all the terms and conditions agreed upon by the parties. No other understandings, oral
or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind any of the parties
hereto.
31. GOVERNING LAW AND VENUE
This Agreement shall be construed and interpreted in accordance with the laws of the state of Washington, and
the venue of any action brought hereunder shall be in the Superior Court for Thurston County.
32. SEVERABILITY
The provisions of this Agreement are intended to be severable. If any term or provision is illegal or invalid for any
reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of the Agreement.
33. SURVIVAL
The terms, conditions, and warranties contained in this Agreement that by their sense and context are intended to
survive the completion of the performance, cancellation, or termination of this Grant shall so survive, including but
not limited to the following sections: Capital Project, Community Benefits, Change of Ownership or Use,
Evaluation and Monitoring, Recapture Provision, Hold Harmless, and Records Maintenance.
34. WAIVER
WSDA's failure to insist on strict performance of any provision in this Agreement or to exercise any right based
upon a breach of any provision or the acceptance of any performance during such breach, shall not constitute a
waiver of any right under this Agreement.
35. GRANT MANAGEMENT
The Agreement manager for each of the parties shall be responsible for and shall be the contact person for all
communications and billings regarding the performance of this Agreement.
The Agreement Manager for the Grantee is: The Agreement Manager for WSDA is:
Kady Porterfield, CFE- Event Center Director Anne Norman, Fairs Program Administrator
Kittitas Valley Event Center Washington State Dept. of Agriculture
901 East 7th Avenue 1111 Washington Street SE
Ellensburg, WA 98926 PO Box 42560
Telephone: 509-962-7635 Olympia, WA 98504-2560
E-mail: kady.r)orterfield(a)co.kittitas.wa.us Telephone: 360-902-2043
Email: fairs(&aar.wa.aov
Kittitas County Page B Fair Capital Project Grant
K5060
ATTACHMENT
GRANTEE'S APPLICATION FOR CAPITAL GRANT FUNDS
Ki0itas County
K5060
Washington
S D State Department of
Agriculture
Fairs Program
PO Box 42560
Olympia WA 98504-2560
(360) 902-2043
Application for Capital Improvement Grant Funds
Application deadline: October 2, 2023
(See reverse for eligibility requirements & application process)
Applicant
Name of Fair
Application Date
Kittitas County Fair
09/15/2023
Street Address
Mailing Address
901 E 7th Ave
901 E 7th Ave, Suite 1
City
State
Zip Code
Mailing City
State
Zip Code
Ellensburg
WA
98926
Ellensburg
WA 198926
Name of Requesting Officer (please print)
Phone Number
Email Address
Kady Porterfield
509-306-5720
kady.porterfield@co.kittitas.wa.us
If you submit more than one Application for Capital Improvement Grant Funds, what priority is this application (1 being the highest priority)?
This application is priority number 1 of the 2 grant applications we intend to submit for this fair.
Capital Improvement Detail
Description of Capital Improvement (use additional pages if necessary)
(See attached project summary.)
Amount Requested from WSDA
Total Project Amount
Type of Match
$ 250,000.00
$ 400,000.00
[j] Monetary ❑ In -Kind ❑ Both Monetary & In -Kind ❑ No Match
Has the owner of the facility approved this grant application? 0 Yes ❑ No
Description of Match
Kittitas County's project manager is budgeting additional funds for supporting the fourth phase of laying new
utilities as we expect the design contract, planning, and permitting costs to use a large portion of this grant.
How does the project meet the health or safety legal requirement of the capital funding?
(See attached project summary.)
What is the impact if you were to receive a grant award less than requested?
Can the project be completed by May 31, 2025?
(See attached project summary.)
Q Yes ❑ No
Applicant Certification
I hereby certify under penalty of perjury that the foregoing information is true and correct to the best of my knowledge.
Kady Porteeld
Signature of Officer Completing Application Date Signed
AGR-5543 (R/7/23) Information collected by WSDA becomes a public record and may be disclosed unless exempted by federal or state law. Page 1 of 2
SUPPLEMENT TO WSDA APPLICATION FOR CAPITAL IMPROVEMENT GRANT FUNDS
Project Summary: New RV Park
Submitted by the Kittitas County Fair — 2023 Application Year
Kittitas County acquired an old mobile home park next to the fairgrounds several years ago as
part of the first phase of establishing a new RV Park per the Kittitas County Fairgrounds Master Plan.
Since then, the County has been working hard on the second phase that included cleaning up and
clearing the area of old mobile homes, abandoned vehicles, and lots of garbage. This was completed just
before our 2023 Fair.
We are set to begin the third and fourth phases of the master plan project, which include
completing a design and beginning to lay new utilities. Our old RV Park is outdated and has major water
and power issues. With the new RV Park design, the goal is to have a layout and utilities that can service
the size and capacity of modern-day RV, house trailers, and living quarter trailers for our events that we
hold all year long, but especially during Fair.
Not only will we be able to provide fair exhibitors and vendors with a safer, easier accessible, and
more sustainable camping experience, but we will be able to generate more revenue for the Fair and
year-round interim rentals. We currently must reject many camping applications for the Fair because our
spaces are very limited. Many year-round events also inquire about upgraded facilities and often opt for
other accommodations because we can't meet their expectations.
We are very excited to have the new property prepared to move on with the next phases, but
without grant support there will be a delay in proceeding with the project. After the investment made by
Kittitas County over the last few years on the first couple phases, the Board of County Commissioners
have directed to Fair Management that other projects across the County will be a priority for funding
unless we can secure the funding support. The Kittitas County Project Manager is requesting some
additional funding from the County in their project budget to cover what we estimate won't be covered
by this grant, but if the grant is not received, the Commissioners will not support their budget request
and the whole project will be on hold.
The goal is to have the third phase and part of the fourth phase complete in 2024 with finishing
the fourth phase in early 2025. With the groundwork in place, the final phases will aim to be completed
to open the new RV Park for the 2026 Fair. Additional needs in the future for the park will include
building a new restroom and shower facility to service all camping and event visitors.
3
a�
ATTACHMENT II:
CERTIFICATION OF THE AVAILABILITY OF NON -STATE MATCHING OR IN -KIND
SERVICES TO COMPLETE THE PROJECT
Washington State Department of Agriculture: FAIR CAPITAL GRANTS
Grantee: Kittitas County
Agreement Number: K5060
lVpe of Funding
Soa1oeverlption
Grant
Washington State Department of - - -
$260,000.00
Agriculture
Other Grants
Grant #1
$0
Grant #2
$0
Total Other Grants
$0
Other Monetary Sources
Source #1
Kittitas County funds
$150,000.00
Total Other Sources
$160,000.00
Estimated Value of In -Kind Services
Source #1
_
$0
Source #2
$0
Total Value of In -Kind
$0
Total Project Funding
$400,000.00
ERTIFICATION PERFORMANCE MEASURE
The Grantee, by its signature, certifies that non -state matching and in -kind services from sources other than those
provided by this Agreement and identified above are fully expended or committed, or both, in an amount sufficient to
complete the project, or a distinct phase of the project that is useable to the public, and that the funding will be used for
the purpose as described elsewhere in this contract, as of the date and year written below.
The Grantee shall maintain records sufficient to evidence that it has expended or has access to the funds needed to
complete the Project, and shall make such records available for WSDA'S review upon request.
Brett W chsmith
Board of County Commissioners Chair
25
DATE
Kittitas County
K5060