Loading...
HomeMy WebLinkAboutECONorthwest - Ellensburg Sleep Center Feasbility Analysis ReportEllensburg Sleep Center Feasibility Analysis Report March 2024 Insert image/graphic on top of this box. Leave green border. Background & Context Existing Cold Weather Shelter Operated by the KVMA Boise v. Martin Shelter beds required to enforce camping ordinances in both city and county Regulatory Context for Emergency Shelters in Ellensburg City Land Development Code updated February 5, 2024 to comply with HB 1220 Analysis Components OPERATION Desired framework for Sleep Center operation Shelter operations in WA Year -round overnight shelter components COST ANALYSIS Detailed assumptions and considerations for cost analysis Site prep costs Building costs Ongoing operating costs Expansion costs SITE ANALYSIS Identifying and evaluating sites Site Criteria Site Search Site Selection Site Analysis Pathways property –area behind the former Nites Inn Motel Recommended Site CoStar & Vacant Lands Analysis Methods for Site Search Zoning, Site Size, Adjacent Uses, Accessibility, Lease vs Own Site Search Criteria Image here Add pic of new site Source: Ellensburg Daily Record Insert image/graphic on top of this box. Leave green border. Operating Framework •Year -round operation open 6PM to 8AM •Up to 25 individual use shelters with heating and cooling •Staff office, bathroom and shower units, community areas •Ideally would provide meals, storage, onsite social services, and other amenities •Laundry, pet area, WiFi , landscaping Photo Credit: Pallet Shelter Shelter Type Choices Sheds, Moses Lake Sleep Center Pallet Shelters, Seattle Pallet Shelter Locations Locations Arkansas California Colorado Delaware Hawaii Massachusetts Montana North Carolina Oregon South Carolina Texas Washington Wisconsin Pallet Shelters Pallet Shelter, Burlington, VT Source: Pallet Shelter Interior of Pallet Shelter Unit Source: Pallet Shelter Insert image/graphic on top of this box. Leave green border. Pallet Shelters in Washington •Everett •Tacoma •Burlington •Walla Walla •Tulalip •+ more! Skagit First Step, Burlington, WA Cost Analysis Overview •Excavations •Sewer, electric, and water connections •Landscaping, lighting, and fencing Site Preparation •Shelters •Bathroom and shower units •Staff offices, community room and other amenities Building Infrastructure •Staffing and security •Program expenses, including utilities and leases •Maintenance costs Operating Costs •Adding two new shelters per year for a total of 43 shelters after 10 years Expansion Costs Site Preparation Costs Considerations: •Infrastructure and utility improvement costs estimated by City Public Works staff •Improvements include adding water, sewer, electrical, and hardscaping to the sight •Soft costs (sales tax, cost contingency, and escalations) come to ~$72,000 Total: •~ $394,000 $31,000 $161,900 $99,100 $30,100 $24,500 $47,500 $0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 $400,000 $450,000 Contingency Tax Fencing and lighting Water, sewer and electric Roads and paving Site prep for work $324,800 $145,000 $145,000 $20,000 $135,000 $99,500 $45,000 $43,000 $16,000 $43,000 $119,300 $142,300 $142,300 $13,500 $13,500 $13,500 $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 Pallet Cost Non-Pallet Cost (Own)Non-Pallet Cost (Lease) Shelters Bedding Bathrooms and Showers Community Room Staff Offices Storage Shed Prep for Units Wishlist Items (excluding heat/ AC) Building Costs Considerations: •Shelter costs make up the majority of the cost difference between scenarios •City could potentially “mix and match” building components •Pallet shelters advantages : set -up, warranty, safety, replacement options and mobility. Totals: •Pallet: $675,900 •Non-Pallet (own): $492,400 •Non-Pallet (lease): $306,900 Operating Costs per Year Considerations: •Tuff sheds likely to have much greater maintenance and upkeep costs •While leasing infrastructure requires no upfront cost, doing so results in high annual costs •Because the City is providing site infrastructure improvements, there are no leasing costs Totals: •Site A: $326,000 •Site B: $409,000 Totals: •Pallet: $377,800 •Non-Pallet (own): $401,000 •Non-Pallet (lease): $452,300 $51,300 $260,000 $260,000 $260,000 $36,300 $36,300 $36,300$33,600 $33,600 $33,600 $23,200 $23,200 $47,900 $47,900 $47,900 $0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 $400,000 $450,000 $500,000 Pallet Non-Pallet (own)Non-Pallet (lease) Trailer leases Staffing and security Program expenses Utilities Maintenance Meals $659,000 $285,000 $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 Pallet Shelters Tuff Sheds Ten Year Expansion Costs Total costs for expanding from 25 to 43 shelters over ten years (two new shelters per year). •Does not consider maintenance or upkeep costs •Tuff sheds present major maintenance and longevity concerns Q&A Thank you!