HomeMy WebLinkAboutRES 2024-028BOARD OF' COUNTY COMMISSIONERS
COT]NTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2024 -O 28
AUTIIORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS F'OR THE LIBERTY ROAI) SWAUK CREEK BRIDGE
REPLACEMENT, CRP 306-21
WHEREAS: Public Works has received funding through the FFY z}22W{Federal Lands
Access Program (FLAP); and
WHEREAS: The federal funding will be used for the construction of a new bridge on Liberty
Road crossing Swauk Creek; and
WHEREAS:In preparation for construction advertisement Kittitas County Public Works is
requesting the Washington State Department of Transportation release the federal
funds for the construction phase; and
WHEREAS: A Local Agency FederalAid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Liberty Road Swauk Creek
Bridge Replacement, CRP 306-21.
DATED on this 6th day of February 2024, at Ellensburg, Washington.
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COTINTY GTON
the Board- Julie Kjorsvik
ice-Chair
n Deputy Clerk of the Board- Mandy Buchholz
Cory Wright, Commissroner
^-'w Washington State
Department of Transportation Local Agency Federal Aid
Project Prospectus
Date utr/2024
DUNS Number 0l-020-2541
FederalEmployer
Tax lD Number 9t-601349WSDOT
Use Only
Prefix Route (
FederalAid
Proiect Number FLAP - STBGR 20t9 031
Local Agency
Project Number RC 2193, CRP 306-21
Agency
Kittitas County Public Works
CAAgency
Zyes nruo
Federal Program Title
Zzo.zos Z otrer
20.224
Federal Lands Access Program
Project Title
Liberty Road Swauk Creek Bridge Replacement
Start Latitude N 47 14'35.2I
End Latitude N47 14'36.32
StartLongitude W 120 4l'57.20
End Lonoitude W 120 4l'47.84
Project Termi n i From-To
MP 0.02 MP 0.07
Nearest City Name
Cle Elum
Project Zip Code (+4)
98922-9t18
Begin Mile Post
0.02
End Mile Post
0.01
Length of Project
0.05
Award Type
f tocat ! tocat rorces I State ! Railroad
Route lD
38350
Begin Mile Point
0.o2
End Mile Point
0.07
City Number
N/A
County Number
t9
County Name
Kittitas
WSDOT Region
North Central Region
Legislative District(s)
t3
Congressional District(s)
8
Urban Area Number
N/A
Phase
Total
Estimated Cost
{Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date
Month Year
P.E 799,000.00 317,100.00 481,300.00 0s12022
R/W
Const.3,812,800.00 1,790,600.00 2,022,200.00 0412024
Total 4,611,800.00 2,108,300.00 2,503,500.00
Description of Existing Facilit1t (Existing Design and Present Gondition)
Roadway Width
26',
Number of Lanes
2
Swauk Creek bridge # 01rcI on Liberty Road is currently load restricted and needs to be replaced. The current
structure is 40' long x 30' wide and was originally built in 1955 and rebuilt in L971.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Replacement of bridge 07101 with new structure, realign stream and roadway
Local Agency Contact Person
Danen Case Construction Manager
Title Phone
509-962-7019
Mailing Address
411N. Ruby, Suite 1
City
Ellensburg
State
WA
Zip Code
98926
Approving Authority
By
Project Prospectus
I1;s County Engineer ssla U3012024
Revised 0112022 Previous Editions Obsolete
Agency
Kittitas County Public Works
Project Title
Liberty Road Swauk Creek Bridge Replacqg
Date
rltu2024
Type of Proposed Work
Project Type (Check all that Apply)
n ruew Construction n Path / Trail n s-n
Reconstruction
Railroad
fl Pedestrian / Facilities n Z-n
! Parking n otrer
Z erioge
Roadway Width
32',36' at bridge
Number of Lanes
2
Geometric Design Data
Description Through Route Grossroad
Federal
Functional
Glassification
! uroan
E Rural
[ ruHs
! erincipalArterial
! Vinor Arterial
I Collector
! ti,ta.lor Collector
Z winor Collector
Local Access
I uroan
I nurat
! runs
I PrincipalArterial
! Vtinornrterial
! Collector
n Vajor Collector
! tvtinor Collector
n tocat Access
Terrain Flat 17 Roll [l Mountain Flat Roll Mountain
Posted Speed 35
Design Speed 35
Existing ADT 153 - existing <400
Design YearADT 400
Design Year 2022
Design Hourly Volume (DHV)N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Agency and Consultant
Others
75 o//o
Agency
25 o/to
Construction Will Be Performed By
Contractor
Contract
100 o/to
Agency
o/to
Environmental Class ification
Class I - Environmental lmpact Statement (ElS)
I Project lnvolves NEPA/SEPA Section 404
lnteragency Agreement
Class lll - EnvironmentalAssessment (EA)
! Project lnvolves NEPA/SEPA Section 404
I nteragency Agreements
M Ctass ll - Categorically Excluded (CE)
M Projects Requiring Documentation
(Documented CE)
Environmental Considerations
Revised 0112022 Previous Editions 0bsolete
Page
Agency
Kittitas County Public Works
Project Title
Liberty Road Swauk Creek Bridge Replacq
Date
U11 12024
Right of Way
Z tto Right of Way Needed
* All construction required by the
contract can be accomplished
within the existing right of way.
! night of Way Needed
No Relocation ! Relocation Required
Utilities Railroad
! ruo utility work required
Z ntt utility work will be completed prior to the start
of the construction contract
All utility work will be completed in coordination
with the construction contract
{No railroad work required
!ru1 railroad work will be completed prior to the start of
the construction contract
Erut the railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Shuctures lnvolved in the Project
All utility relocations will be performed by the utility owners
FAA lnvolvement
ls any airport located within 3.2 kilometers (2 miles) of the proposed project? n yes No{
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date Mayor/Chairperson
Ag
By
DOT Form 140-101
Revised 0112022 Previous Editions 0bsolete
,J 14
Page 3