My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_ForestRidgeRemand (2)
>
Meetings
>
2024
>
02. February
>
2024-02-06 10:00 AM - Commissioners' Agenda
>
Resolution_ForestRidgeRemand (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 12:09:29 PM
Creation date
2/1/2024 12:09:15 PM
Metadata
Fields
Template:
Meeting
Date
2/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Approve Condition 25 Remand From Superior Court Regarding the Final Plat of Forest Ridge Phase 4 and Phase 5
Order
33
Placement
Consent Agenda
Row ID
114122
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />2024 AGENDA STAFF REPORT <br />AGENDA DATE: February 6, 2024 <br />ACTION REQUESTED: Request to Approve a Resolution to Approve Condition 25 <br />Remand from Superior Court Regarding the Final Plat of <br />Forest Ridge Phase 4 and Phase 5 <br />BACKGROUND: In September 2023, the Superior Court issued a decision on <br />the land use petition challenging the final plat of Forest <br />Ridge, Phases 4 and 5. The Superior Court rejected all <br />arguments regarding the final plat and the BOCC's process <br />except for remanding the final plat for further review <br />regarding the the final plat's consistency with Condition 25 <br />as that relates to secondary access. <br />Representatives for Forest Ridge are working to relocate <br />this easement supporting secondary access. The easement's <br />terms state that roads shall be relocated "commensurate <br />with good land use transportation planning". In order to <br />resolve the Condition 25 remand, Forest Ridge is also <br />working with another property owner and expects <br />resolution utilizing the primary access as depicted on the <br />final plat. Further easement work with that resident is in <br />process, but again, is a matter of private property interests <br />that the County does not adjudicate. Resolving Condition <br />25 of the remand, staff have worked with the applicant's <br />engineer to develop an acceptable alternate secondary <br />access if the preferred alternative access somehow fails to <br />the applicant's satisfaction. An acceptable revised <br />engineer's estimate has been vetted by the County Engineer <br />along with preliminary engineering documents suitable for <br />the County Engineer to represent to the Board that the <br />Condition 25 remand has been met. It is the department's <br />opinion that the final plat is consistent with Condition 25 <br />based on the foregoing summary and that the final plat <br />meets all County Code and State law standards. <br />INTERACTION: Public Works. <br />RECOMMENDATION: Approve the Condition 25 remand to staff as accepted by <br />the County Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.