Loading...
HomeMy WebLinkAboutResolution_CRS FormKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: February 6, 2024 ACTION REQUESTED: Request to Approve the Resolution to Ratify the Chair's Signature on Community Rating System Verification Form CC-230. BACKGROUND: The Community Rating System is a program offered by the National Flood Insurance Program which rewards communities that implement certain activities to reduce the impacts of flooding with lower flood insurance rates. INTERACTION: Kittitas County was accepted into the program in 2014 as a Class 6 community and this rating was maintained during the 2019 program audit. Due to the County's participation in the program, residents receive a 20% discount on standard flood insurance policy rates. Every 5-years, FEMA conducts a full verification visit to evaluate Kittitas County's CRS activities, credit, and rating. The verification form requires the signature of the Chief Executive Officer of the jurisdiction. Public Works - Flood Control Zone District RECOMMENDATION: Motion to approve the Resolution to Ratify the Chair's Signature on Federal Emergency Management Agency Community Rating System Verification Form HANDLING: Return a copy of the Resolution to Public Works, Flood Control Zone District ATTACHMENTS: Resolution Recertification form CC-230 LEAD STAFF: Arden Thomas, Water Resource Manager BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2024- AUTHORIZING THE CHAIR'S SIGNATURE ON FEDERAL EMERGENCY MANAGEMENT AGENCY COMMUNITY RATING SYSTEM VERIFICATION FORM WHEREAS: Kittitas County is enrolled in the Federal Emergency Management Agency (FEMA) Community Rating System (CRS); and WHEREAS: This federal program lowers flood insurance premiums for all county residents receiving federal flood insurance; and WHEREAS: Every five years, FEMA conducts a full verification visit to evaluate Kittitas County's CRS activities, credit, and rating; and WHEREAS: Chair signature is required on form CC-230 Verification (FEMA FORM 086-0-35A); NOW THEREFORE, BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chair's signature on the 2024 FEMA Community Rating System Verification form. DATED this 6" day of February, 2024, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman Laura Osiadacz, Vice -Chairman Cory Wright, Commissioner DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency CRS COMMUNITY CERTIFICATIONS OMB Control Number: 1660-0022 Fznirafinrt 1n/31/7n73 Community Kittitas County State WA CID 530095 (6-digit NFIP Community Identification Number) CC-230 Verification Date of Visit March 12, 2024 Initial FIRM Date October 15, 1981 Population Current FIRM Date September24, 2021 County Kittitas County ISO/CRS Specialist Marlene Jacobs Coordinators Manual Year Chief Executive Officer CRS Coordinator Name Brett Wachsmith Arden Thomas Title Chair, Board of County Commissioners Water Resources Manager Address 205 W 5th AVE STE 108 411 N Ruby St., Ste 1 Ellensburg WA 98926-2887 Ellensburg, WA 98926 Phone number 509-962-7508 509-962-7690 E-mail address brett.wachsmith.co@co.kittitas.wa.us arden.thomas@co.kittitas.wa.us The County of Kittitas [community name] is requesting credit for implementing the following activities [check the ones that apply]. I hereby certify that we will continue to implement those activities for which we receive verified credit and will advise FEMA if any of them are not being conducted in accordance with this certification. We will cooperate with the ISO/CRS Specialists verification visit and will submit the documentation and annual recertification needed to validate our program. ❑X 310 (Elevation Certificates) 440 (Flood Data Maintenance) ❑%� 320 (Map Information Service) 450 (Stormwater Management) ❑%� 330 (Outreach Projects) (Repetitive Loss Requirements) ❑ 340 (Hazard Disclosure) ❑X 510 (Floodplain Management Planning) ❑ 350 (Flood Protection Information) 520 (Acquisition and Relocation) ❑ 360 (Flood Protection Assistance) ❑ 530 (Flood Protection) ❑ 370 (Flood Insurance Promotion) ❑ 540 (Drainage System Maintenance) ❑X 410 (Floodplain Mapping) ❑ 610 (Flood Warning and Response) N 420 (Open Space Preservation) ❑ 620 (Levees) 19 430 (Higher Regulatory Standards) 630 (Dams) I hereby certify that, to the best of my knowledge and belief, we are in full compliance with the minimum requirements of the NFIP and we understand that we must remain in full compliance with the minimum requirements of the NFIP. We understand that at any time we are not to be in full compliance, we will retrograde to a CRS Class 10. CC-230-1 [continued on next page] FEMA FORM 086-0-35A (10/23) Page 5 of 11 Community Kiftitas County State WA CID 530095 (6-digit NFIP Community Identification Number) I hereby certify that we will maintain FEMA Elevation Certificates on all new buildings and substantial improvements constructed in the Special Flood Hazard Area following the date at which we joined the CRS. I hereby certify that if there are one or more repetitive loss properties in our community that we must take certain actions that include reviewing and updating the list of repetitive loss properties, mapping repetitive loss areas, describing the cause of the losses, and sending an outreach project to those areas each year, and if we have fifty (50) or more repetitive loss properties must also prepare a plan of how it will address its repetitive flood problem. I hereby certify that, to the best of my knowledge and belief, we are maintaining in force flood insurance policies for insurable buildings owned by us and located in the Special Flood Hazard Area shown on our Flood Insurance Rate Map. I further understand that disaster assistance for any community -owned building located in the Special Flood Hazard Area is reduced by the amount of National Flood Insurance Program flood insurance coverage (structural and contents) that a community should be carrying on the building, regardless of whether the community is carrying a policy. Signature (Chief Executive Officer) Date CC-230-2 [continued on next page] FEMA FORM 086-0-35A (10/23) Page 6 of 11 Community Kittitas County State WA CID 530095 (6-digit NFIP Community Identification Number) CRS Program Data Fable A. In the SFHA B. In a regulated floodplain outside the SFHA C. In the rest of the community 1. Last report's number of buildings in the SFHA (bSF) (line 6, last report) 1,307 2. Number of new buildings constructed since last report + 13 3. Number of buildings removed/demolished since last report - 0 4. Number of buildings affected by map revisions since last report (+ or -) -3 5. Number of buildings affected by corporate limits changes (+ or -) 0 6. Current total number of buildings in the SFHA (bSF) (total lines 1 -5) 1,317 7. Number of substantial improvement/damage projects since last report 1 8. Number of repetitive loss properties mitigated since last report 0 9. Number of LOMRs and map revisions (not LOMAs) since last report 1 10. Acreage of the SFHA (aSFHA) as of the last report (line 13, last report) 25,307.4 11. Acreage of area(s) affected by map revisions since last report (+ or -) -80.9 12. Acreage of area(s) affected by corporate limits changes (+ or -) 0 13. Current acreage of the SFHA (aSFHA) (total lines 10-12) 25,226.5 14. Primary source for building data: Risk map building information and County building and floodplain permit data 15. Primary source for area data: DFIRM database 16. Period covered: 10/15/2023 - 01/30/2024 ICurrent FIRM date 9/24/2021 If available, the following data would be useful. 17. Number of new manufactured homes installed since last report 3 18. Number of other new 1 -4 family buildings constructed since last report 10 19. Number of all other buildings constructed/installed since last report 0 Comments: (Please note the number of the line to which the comment refers. CC-230-3 [continued on next page] FEMA FORM 086-0-35A (10/23) Page 7 of 11 Community wttitas County State WA Instructions CID 530095 (6-digit NFIP Community Identification Number) At the first verification visit after the effective date of the 2013 CRS Coordinator's Manual, ONLY LINES 6 AND 13 NEED TO BE COMPLETED. These lines form the baseline data about the number of buildings and area of the SFHA for when the table is completed as part of the next annual recertification. The "period covered" entered in line 16 is the date that lines 6 and 13 are first completed. At all subsequent annual recertifications and cycle verification visits, the entire table is completed. The information in lines 6 and 13 from the last report is transferred to lines 1 and 10 in the next report. Instructions for the Columns Column A numbers are for the SFHA (the A and V Zones shown on the Flood Insurance Rate Map) (FIRM)). Use the FIRM currently in effect, not a draft or pending revision. Column B is completed only if the community receives CRS credit for regulating floodplain development outside the SFHA under Activity 410 (Floodplain Mapping) or Activity 430 (Higher Regulatory Standards). Column C numbers help relate what happens in the floodplain to what is happening in the rest of the community. Enter "0" if there are no numbers to report for this period. Do not leave a cell blank. Do not fill in the shaded boxes. Instructions for the Lines Lines 1-7 deal with buildings. o Section 301.a of the CRS Coordinator's Manual defines what constitutes a "building" and lists examples of structures that are not counted as "buildings" by the CRS. o Section 302.a of the CRS Coordinator's Manual describes how the CRS counts buildings. For example, accessory structures are not counted. o As noted in Section 302.a, to determine building counts, communities may use any method that yields reasonably good estimates of the number of buildings. Examples of acceptable methods are listed in Section 302.a. Precision is less important for large numbers. For example, the impact of the numbers will not change much if there are 10,000 buildings or 10,100 buildings. o If a building is out of the SFHA, but in a parcel that is partly in the SFHA, it is not counted in column A —In the SFHA. o In line 14, note how the building counts were obtained or estimated. Use the comments area, if needed. Line 4 refers to map revisions. These include physical map revisions, Letters of Map Revision (LOMR), and Letters of Map Amendment (LOMA). If a building is removed from the SFHA by FEMA through a LOMA, but the community still administers its floodplain management regulations on the property, the building should not be included in the line 4 count in column A --In the SFHA. However, communities that still regulate areas removed by LOMAs can receive credit under Activities 410 or 430. If the community is receiving such credit, the building should be counted under column B --In a regulated floodplain outside the SFHA. Line 7 is for the total number of buildings that were substantially improved plus the number of buildings that were substantially damaged during the period covered. Lines 10 -13 deal with areas. o These areas are based on the areas shown on the community's FIRM including LOMRs or LOMAs. Section 403.b discusses those portions of the SFHA that are subtracted from the area of the SFHA to calculate the community's aSFHA used in credit calculations. o Section 403.e of the CRS Coordinator's Manual discusses calculating areas for CRS purposes. o Section 403.e notes that communities "should not spend an inordinate amount of time measuring areas." As with buildings, communities may use any method that yields reasonably good estimates. Examples of acceptable approaches are listed in Section 403.e. o Line 13 asks for the current acreage of the SFHA. The best source for this number is a GIS layer that shows the SFHA. If the community does not have GIS, the county, regional agency, or state NFIP mapping office may have SFHA layers and may be able to provide the data. If the community has a relatively recent FIRM, the study contractor or consulting engineer may have the data. o In line 15, note how the area calculations were obtained or estimated. Use the comments area, if needed. Lines 17 -19 are voluntary, if the numbers are readily available. o Line 17 includes replacing an existing manufactured home with a new one. The newly placed manufactured home is counted as a new, post -FIRM, building. o The total of lines 17 -19 should equal the value entered in line 2. CC-230-4 FEMA FORM 086-0-35A (10/23) Page 8 of 11