Loading...
HomeMy WebLinkAboutResolution_LibertySwaukCreekBridge_ProspectusKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: February 6, 2024 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Liberty Road Swauk Creek Bridge Replacement CRP 306-21. BACKGROUND: On March 29, 2022, Kittitas County was informed that the Liberty Road Swank Creek Bridge Replacement Project was selected to receive funding through the Federal Lands Access Program (FLAP). The Federal Funds are administered through Washington State Department of Transportation (WSDOT) Local Programs per the Local Agency Guidelines (LAG). Public Works has also been granted additional funding from the FLAP program to cover the higher than anticipated construction costs. Public Works was notified in November 2023 that an additional $1,200,000.00 was approved for the project. Due to the continuing resolution at the federal level, the Federal Highway Administration has noticed Public Works that additional award will be formalized at a later date. This prospectus is showing this additional funding as local funds on the Prospectus but will supplement our Local Agency Agreement with WSDOT when the additional Federal Funding is formalized and released. The LAG requires Federal Funds for each phase of a project to be obligated separately. The Preliminary Engineering phase was obligated in May 2022. We are now preparing to advertise for construction and are ready to obligate the Construction Phase funds. A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Liberty Road Swauk Creek Bridge Replacement CRP 306- 21. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Josh Fredrickson, County Engineer BOARD OF COUNTY COMMISSIt COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2024 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE LIBERTY ROAD SWAUK CREEK BRIDGE REPLACEMENT, CRP 306-21 WHEREAS: Public Works has received funding through the FFY 2022 WA Federal Lands Access Program (FLAP); and WHEREAS: The federal funding will be used for the construction of a new bridge on Liberty Road crossing Swank Creek; and WHEREAS: In preparation for construction advertisement Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for the construction phase; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Liberty Road Swank Creek Bridge Replacement, CRP 306-21. DATED on this 6th day of February 2024, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chair Laura Osiadacz, Vice -Chair Cory Wright, Commissioner ilk State � m Department of Transportation Local Agency Federal Aid Wm Project Prospectus Prefix Route Date 1/11/2024 Federal Aid FLAP - STBGR 2019 DUNS Number 01-020-2547 Project Number F031 Local Agency RC 2193, CRP 306-21 WSDOT Federal Employer Project Number ( Use Only Tax ID Number 91-601349 Agency CAAgency Federal Program Title Kittitas County Public Works 0 Yes ❑ No ❑ 20.205 ❑✓ Other Federal Lands Access Program Project Title Start Latitude N 47 14'35.21 Start Longitude W 120 41'51.20 Liberty Road Swauk Creek Bridge Replacement End Latitude N 47 14'36.32 End Lon itude W 120 41'47.84 Project Termini From -To Nearest City Name Project Zip Code (+4) MP 0.02 MP 0.07 Cle Elum 98922-9118 Begin Mile Post End Mile Post Length of Project Award Type 0.02 0.07 0.05 ❑✓ Local ElLocal Forces ❑ State ❑Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 38350 0.02 0.07 N/A 19 Kittitas WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number North Central Region 13 8 N/A Phase Total Estimated Cost Local Agency Funding Federal Funds Phase Start Date P.E. 799,000.00 317,700.00 R/W Const. 3,812,800.00 1,790,500.00 Total 4,611,800.00 2,108,200.00 481,300.00 2,503,600.00 of Existing Facility (Existing Design and Present Condition) way Width Number of Lanes rDescription 2 uk Creek bridge # 07101 on Liberty Road is currently load restricted and needs to be replaced. The current ture is 40' long x 30' wide and was originally built in 1955 and rebuilt in 1977. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Replacement of bridge 07101 with new structure, realign stream and roadway Local Agency Contact Person Title Phone Darren Case Construction Manager 509-962-7019 Mailing Address City State Zip Code 411 N. Ruby, Suite 1 Ellensburg WA 98926 By Project Prospectus Approving Authority Title County Engineer Date �2�y nnT Fn.... � nn_� In' Revised 0112022 Previous Editions Obsolete Page 1 Agency Project Title Date Kittitas County Public Works Liberty Road Swauk Creek Bridge Replaces 1/11/2024 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 32', 36' at bridge 2 ❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other Z Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ❑Urban ❑Minor Arterial ❑ Urban ❑ Minor Arterial Functional 0 Rural ❑ Collector ❑ Rural ❑ Collector Classification ❑ NHS ❑Major Collector NHS ❑Major Collector ❑✓ Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑ Flat ✓❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 35 Design Speed 35 Existing ADT 153 - existing <400 Design Year ADT 400 Design Year 2022 Design Hourly Volume (DHV) N/A Performance of Work Preliminary Engineering Will Be Performed By Others Agency Agency and Consultant 75 % 25 % Construction Will Be Performed By Contract Agency Contractor 100 % % Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ✓� Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 W1 Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations U, l rvnn »U- w 1 Page 2 Revised 0112022 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Liberty Road Swank Creek Bridge Replaces 1/11/2024 ay Needed ❑ Right of Way Needed ction required by the m ❑ No Relocation ❑ Relocation Required be accomplished xisting right of way. lities Railroad No utility work required ❑✓ No railroad work requiredAll utility work will be completed prior to the start [of ❑AII railroad work will be completed prior to the start of the construction contract the construction contract AII utility work will be completed in coordination ❑ All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project All utility relocations will be performed by the utility owners FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes W] No Remarks Phis project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 0112022 Previous Editions Obsolete