HomeMy WebLinkAbout2023-11-27-minutes-it-study-sessionCreated on 1/29/2024 3:38:28 PM
KITTITAS COUNTY COMMISSIONERS
IT Study Session
Regular Meeting
Monday November 27, 2023 - 11:00 AM
BOCC Conference Room
205 West 5th Room 108 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Maintenance Department: Request to Approve a Resolution Acknowledging Contract
Changes
4. Updates: Check-In on Hardware Stats
5. Discussion about Data Backup Equipment Installation
6. Other Business - No Action to be taken
7. Concluded
11/27/23 MINUTES 1
COMMISSIONERS' MINUTES
KITTITAS COUNTY, WASHINGTON
BOCC CONF. ROOM
REGULAR MEETING
MONDAY 11:00 A.M. November 27th, 2023
Board members present: Chairman Cory Wright; Vice-Chairman Brett
Wachsmith; Commissioner Laura Osiadacz.
Others: IT Director Doug Fessler; Assistant IT Director Zane Kinney;
Maintenance Director Patti Stacey; IT Administrative Assistant Grant
Shimada
REGULAR MEETING IT STUDY SESSION COMMISSIONERS
At 11:00 a.m. Chairman Wright opened the Information Technology Study
Session.
CITIZEN COMMENTS
There were no citizen comments.
DISCUSSION Request to Approve a Resolution
Acknowledging Contract Changes
MAINTENANCE
Maintenance Director Patti Stacey began the study session by going
over the informational sheets she provided that covered the changes to
a contract originally approved a few months earlier for the repairs of
the Cle Elum parking lot. The original PSA needed adjustments due to
additional plans being added to improve longevity. All Commissioners
approved the resolution at 11:02 a.m.
DISCUSSION Check-In on Technology Hardware Stats IT
IT Director Doug Fessler gave the Commissioners an update on the
County’s technology hardware. Mr. Fessler explained that a large
portion of the Prosecutor’s network space is being consumed by the
Sheriff’s body cam video files.
DISCUSSION DATA BACKUP EQUIPMENT INSTALLATION IT
Mr. Fessler updated the Commissioners about the IT department procuring
the Rubrik hardware from Ivoxy instead of Ednetics due to the latter
proving to be unreliable. Ivoxy sent the IT department their Statement
of Work which is currently being reviewed by legal. The IT department
is working on a resolution that will approve the Statement of Work and
plans to present this resolution at the Commissioners Agenda Session
on December 5th.
11/27/23 MINUTES 2
OTHER BUSINESS New App Developer IT
Mr. Fessler went over the need for a new app developer and informed
the Commissioners that Brendan Killeen, a current IT support desk
employee, was a great fit for the position. Mr. Fessler discussed Mr.
Killeen’s educational background in computer science and how he was
the most qualified out of the applications received. Mr. Killeen has
already been offered and accepted the position of App Developer. Mr.
Fessler pointed out that with Mr. Killeen accepting the app dev
position, IT will be looking to backfill the support desk position.
All 3 Commissioner’s supported this decision.
MEETING CONCLUSION COMMISSIONERS
At 11:21 a.m. Chairman Wright concluded the Information Technology
Study Session.
KITTITAS COUNTY COMMISSIONERS
INFORMATION TECHNOLOGY DIRECTOR KITTITAS COUNTY, WASHINGTON
________________________________ ________________________________
Doug Fessler, IT Director Cory Wright, Chairman
KITTITAS COUNTY
Board of County Commissioners
AGENDA STAFF REPORT
AGENDA DATE: November 27, 2023
ACTION REQUESTED: Request Board approval on Resolution Acknowledging contract
changes.
BACKGROUND: Kittitas County entered into a Professional Service Agreement with
JM Pacific for the Upper County Court Parking Lot repairs. During
the project subgrade repairs were needed due to the unsuitable soil
which was encountered.
To repair the unsuitable soil the contractor needed to adjust some of
the quantities of materials needed for the project. In addition, the
engineer recommended seal coated and crack sealed the entire parking
lot to prolong the life of the asphalt.
With these changes the contract increase is $9879.29 bringing the
total to $105,159.29.
INTERACTION: JM Pacific and SCJ Alliance.
RECOMMENDATION: Recommend Boards signature on the Resolution Acknowledging the
contract changes.
HANDLING: Original – Clerk of the Board
Copy – Auditor
Copy – Maintenance
ATTACHMENTS: Project Ledger
LEAD STAFF: Patti Stacey, Facilities & Waste Operations Director
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2023- ____
RESOLUTION ACKNOWLEDGING CONTRACT CHANGE
WHEREAS: Kittitas County went out to bid on August 1, 2023 for the Upper
Courthouse parking lot project; and
WHEREAS: Kittitas County received bids on August 21, 2023, in the commissioner’s
office and we received three bids; and
WHEREAS: Kittitas County awarded the project to JM Pacific on September 5, 2023;
WHEREAS: SCJ Alliance has reviewed and quantities of material installed and the
Change order for sealcoating the full parking lot approval of the revised quantities and
total cost increase of $9879.29 and;
NOW, THEREFORE, BE IT RESOLVED: the Board of County Commissioners, in
authorized the contract change for Kittitas County Upper Courthouse Parking Lot to J.M.
Pacific Construction Inc.
DATED THIS _____ day of November 2023
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
________________________________________
Cory Wright - Chairman
________________________________________
Brett Wachsmith - Vice Chairman
________________________________________
Laura Osiadacz - Commissioner
ATTEST:
______________________________
Clerk of the Board
APPROVED AS TO FORM:
_____________________________
Douglas R. Mitchell, WSBA # 22877
(Deputy) Prosecuting Attorney
Difference
from bid
Quantity
Difference
in amount
due
230.0 S.Y.100.00 $23,000.00 266.00 $26,600.00 $26,600.00 36 $3,600.00
4 75.0 TON 100.00 $7,500.00 92.51 $9,251.00 $9,251.00 25 $1,751.00
40.0 200.00 $8,000.00 47.05 $9,410.00 47.050 $9,410.00 7.05 $1,410.00
10 00.0 L.F.1.50 750.00 $1,125.00 $1,125.00 -250 -$375.00
110.0 85.00 $9,350.00 105.00 $8,925.00 -5 -$425.00
$10,000.00 0.98 $9,799.09 0.980 $9,799.09 -0.02 -$200.91
$4,119.20
$9,879.29
$4,119.20
18 1.0 EACH FLAG POLE AND FOUNDATION 5,000.00 $5,000.00 1.00
$99,399.20
$0.00
$99,399.20
Subtotal
MOH
Sales Tax
Pmt #1:
$105,159.29
$0.00
$0.00
$105,159.29
MOH
Sales Tax
$105,159.29
$0.00
$105,159.29
Contract Amount Incl. Change Orders
Sales Tax
Totals
20 1.00 L.S.CHANGE ORDER 1 - CRACK SEALING 4,119.20 $4,119.20 1.00 $4,119.20 1.000
1,000.00 $2,000.00 2.00 $2,000.00 2.000
$5,000.00
19 1.0 EST.SUBGRADE REPAIR 10,000.00
$1,200.00
13 1.0 EACH CEMENT CONC. CURB RAMP TYPE PERPENDICULAR 3,500.00 $3,500.00
$5,000.00 1.000
$2,000.00
17 1.0 L.S.CLEANING EXISTING DRAINAGE STRUCUTRE 1,500.00 $1,500.00 1.00 $1,500.00 1.000 $1,500.00
16 2.0 EACH ADJUST MANHOLE
14 L.F.CHAIN LINK FENCE TYPE 4 $8,925.00 105.000
15 4.0 EACH END, GATE, CORNER, AND PULL POST FOR CHAIN LINK FENCE 300.00 $1,200.00 4.00 $1,200.00 4.000
1.00 $3,500.00 1.000
$300.00
12 3.0 EACH PAINTED NO PARKING SYMBOL 175.00 $525.00 3.00 $525.00 3.000 $525.00
$3,500.00
11 PAINT LINE $1,500.00 750.000
10 2.0 EACH PAINTED ACCESS PARKING SPACE SYMBOL 150.00 $300.00 2.00 $300.00 2.000
$400.00
9 42.0 L.F.EXTRUDED CURB 65.00 $2,730.00 42.00 $2,730.00 42.000 $2,730.00
8 2.0 C.Y.ROCK MULCH 2"-4"200.00 $400.00 2.00 $400.00 2.000
$6,000.00
6 TON COMMERCIAL HMA
7 1.0 EACH INLET PROTECTION 150.00 $150.00 1.00 $150.00 1.000 $150.00
5 0.5 TON ASPHALT FOR FOG SEAL 12,000.00 $6,000.00 0.50 $6,000.00 0.500
3 PAVEMENT REPAIR EXCAVATION INCL. HAUL 266.000
CRUSHED SURFACING BASE COURSE 92.510
$7,625.00
2 1.0 L.S.REMOVAL OF STRUCTURES AND OBSTRUCTIONS 5,000.00 $5,000.00 1.00 $5,000.00 1.000 $5,000.00
1 1.0 L.S.MOBILIZATION 7,625.00 $7,625.00 1.00 $7,625.00 1.000
OWNER: Kittitas County ENGINEER: SCJ
Alliance
Kittitas County Cle Elum Courthouse Parking Lot ProjectLedger.xls11/2/2023 Page 1
PROJECT LEDGER - Cle Elum Courthouse Parking Lot
Cle Elum Courthouse Parking Lot
ITEM
NO.
ESTIMATED
QUANTITY UNIT ITEM UNIT PRICE TOTAL BID PRICE
PAY EST. #1 10/17/2023 TOTAL TO DATE
QUANTITY
INSTALLED
AMOUNT DUE THIS PAY
PERIOD
TOTAL QUANTITY
INSTALLED TO DATE AMOUNT PAID TO
DATE
Page 1 of 1
Information Technology “Study Session Staff Report”, 11/27/2023
KITTITAS COUNTY
BOARD OF COUNTY COMMISSIONERS
STAFF REPORT FOR
STUDY SESSION
Information Technology
STUDY SESSION DATE: 11/27/2023
TOPIC: Discussion of Backup Data Equipment Installation
ACTION REQUESTED: No Action - Information Only
LEAD STAFF: Doug Fessler
BRIEFING SUMMARY: IT has purchased and received new backup storage units and is
currently working with our attorneys to draft a resolution for Commissioner approval for
professional installation.
BACKGROUND: The county’s backup servers are reaching their storage capacity limits
and in dire need of expansion. IT has been in meetings with Ivoxy for options on fixing
its storage issue and the conclusion was to purchase Rubrik storage devices and have the
equipment installed by an Ivoxy professional.
DISCUSSION: Ivoxy sent us a Statement of Work, which legal has reviewed and edited.
Those edits were accepted by Ivoxy.
According to our legal counsel, the IT Director does not have signature authority, so IT is
working with our legal team to draft a resolution for Commissioner approval on the
professional installation from Ivoxy with plans to present the resolution on the next
Commissioner agenda session on December 5th.
FISCAL IMPACTS: The current CRIS fund balance will be used for this purchase that
was originally budgeted for in the ET Fund in 2024. These funds will be freed up next
year.
ATTACHMENTS: None