HomeMy WebLinkAbout2023-11-29-minutes-sheriffs-office-budget-follow-upKITTITAS COUNTY COMMISSIONERS
2024 Budget Meeting
Special Meeting
Tuesday October 31, 2023 - 1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Request to Approve a Resolution - Declaration of Emergency Grandstands Meeting Room
Water Damage.
4. 2024 Preliminary Budget Meetings with: Kittitas County Solid Waste & Maintenance.
5. Other Business - No Action to be taken
6. Concluded
Created on 10/30/2023 9:54:21 AM
2023-10-31 MINUTES 1
KITTITAS COUNTY
BUDGET MEETING MINUTES
BOCC AUDITORIUM ROOM, 205 WEST 5TH ROOM 215 - ELLENSBURG
Tuesday 1:30 PM October 31, 2023
Board members present: Cory Wright, Brett Wachsmith, Laura Osiadacz
Others: Brian Carlson, Bryan Elliot, Zack DeHaven, Andrew Yoder, Chris Whitsett, Mark
Cook, Cody Cupp, Patti Stacy, Kady Porterfield, Sarah Keith, Barb Demory,
Call to order: 1:30pm
1. Citizen Comments (1 min. time limit): None
2. Declaration of Emergency Event Center
Ms. Poterfield explained the extent of the current fire system failure necessitating a
declaration of emergency. A sprinkler head in the fire suppression system failed causing
etensive water damage to multiple areas of the event center. To compound the issue dirt
and debri were disloged by the flow adding further difficulty to the repair efforts. Until
the system is repaired it must remain dry and unable serve in a fire supression function.
The emergency has been submitted to the county insurance provider for review.
3. Mr. Carlson oriented the board with the current methodology for project evaluation.
The roster presented includeds all projects and capital equpments requests omitting
public works. Several large scale projects were removed from the analysis as they
warrant stand alone consideration. The projects included in the mulitple listings were
presented in tiers of criticallity. Projects scoring a one are health and safety issues given
the highest criticallity score and projects scored as a three are less of an immediate
concern.
The first grouping presented were jail maintenance and repair projects to be funded by
the 1/10th Jails reserve tax. The commissioners unanimously approved this list.
2023-10-31 MINUTES 2
The second grouping presented by Mr. Carslon were all projects for solid waste
locations. These projects will all be funded by solid waste fee structure, outside loans,
and existing fund balance. The commissioners unanimously approved this list.
The third grouping included projects to be carried out on the county’s event center. This
included a proposed 75,000 dollars of general fund and 65,000 dollars left to be
determined. The commissioners approved the list with the modification that the general
fund impact be adjusted to 140,000 dollars to abosrb the undetermined amount with the
caveat that staff continue to look for external funding sources.
The Fourth grouping offered for consideration included all the remaining projects. Ms.
Demory explained the need for a jury box extension in the lower district court room,
highlighting the increased functionality and ability to serve as a back up location for the
superior court room. She expressed her desire that the trial courts fund not be used as a
funding source. Further analysis will be conducted to quantify impacts and benefits.
Water diversion away from the IT exterior door and the ADA motor replacement were
both agreed upon as general fund expenses totaling 20,000 combined. Conversation
shifted to the topic of exterior sidewalks and stairs and the county’s responsibility to
maintain them. Comssioner Osiadacz raised the possibility of removing the south set of
courthouse stairs leading from the courthouse parking lot to the sidewalk adjacent to the
street. The proposed repair expense and minimal usage were highlighted as rationale for
removing the stairs from services. Chairman Wright expressed his desire for clear
direction regarding the county’s desire to maintain the current courthouse and
corresponding infrastructure versus a serious effort toward relocation and/or rebuilding.
Mr. Carlson offered a condensed list of Courthouse centric projects for consideration at
a future meeting.
The Fifth and final grouping was composed of equipment. Vehicle requests were
highlighted as being subject to change as we await the outcome of the fleet analysis
currently underway. Mr. Whitsett spoke to the need and funding behind the equipment
requests for the Sherrif’s office. The jet ski request will be primarily funded by the
2023-10-31 MINUTES 3
vessel replacement fees collected and with the remainder being sourced from 3/10ths
funds. The snowmobile trailer is primarily used for search and rescue and has no other
appropriate source but the general fund. Mr. Whitsett emphasized the need for an
underwater rescue drone while acknowledging its cost of 250,000 and lack of outside
funding sources. ARPA funds were mentioned as a possibility to consider. The listed
vehicle uplifts are a carryforward of work begun and budgeted for in 2023 that will not
be completed until 2024. The equipment listing will be revisited at a future meeting for
consideration.
Next steps for Mr. Carlson and team finance include:
• Award status of outside funding applications.
• Concise listing of county funds identified in this presentation including their
sources, levels and uses.
• Inventory of Trial Court’s designated project list with estimates.
• Isolated analysis of Courthouse and Jail projects.
• Defined scope and deliverables of the countywide security camera project
• Results of the 2023 North Jail Parking lot discussion
4. Concluded: 2:58 PM
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brian Carlson Cory Wright, Chairman
Budget Hearing, October 31, 2023
Projects and Equipment: Agenda
1. Review 2024 Budget Requests
and Funding Sources
•Exclude Public Works
2. Discuss Next Steps
a. Stand-alone project topics ($30MM)
•Transfer station
•Upper County EOC
•New courthouse
•Fire Station 7
•Ellensburg fieldhouse
b. Updates
•Quarterly review with BOCC,
stakeholders
c. Assessments
•deferred and ongoing maintenance
•staff project capacity with/without
contracted PMs
•Financial capacity
•Planning documents
•“2024 Gen Fund Status” does not include projects / equipment requests
•Current projects increase GenFund deficit to $5.8MM
•Most ($10.4MM) of “TBD” funding (below) is Transfer Station & Upper County EOC
•Staff is exploring how to source remaining $1.2MM of “TBD”
Beg Deficit 7,700,000
Bake Sale (2,900,000)
COLA (150,000)
Health Bene (345,000)
Airport Subs 545,000
CDS Subs 705,000
Curr Deficit 5,555,000
2024 Gen Fund Status
PROJECT & EQUIPMENT REQUESTS AND FUNDING SOURCES
Fund Balance
Estimates
2024
REQUESTS
TBD GenFund Jail CIP REET1
TrialCt
Improv
New
CtHouse Lodging Tax ARPA Solid Waste TOTAL
YE 2023 18,000,000 9,000,000 5,000,000 335,000 1,950,000 6,000,000 2,600,000 1,800,000 44,685,000
2024 BUDGET NET (5,600,000) 1,000,000 (200,000) - - 1,000,000 - (1,100,000) (4,900,000)
YE 2024 12,400,000 10,000,000 4,800,000 335,000 1,950,000 7,000,000 2,600,000 700,000 39,785,000
-
PROJECT REQUESTS 11,065,000 235,000 1,600,000 230,000 70,000 250,000 50,000 1,450,000 3,885,000
EQUP REQUESTS 582,000 - - - - - - 1,000,000 730,000 1,730,000
ADJ YE 2024 12,165,000 8,400,000 4,570,000 265,000 1,700,000 6,950,000 1,600,000 (1,480,000) 34,170,000
COUNTYWIDE PROJECTS REQUESTS
Priority Facility
Grants
Pending Loan TBD GenFund Jail CIP REET1
TrialCt
Improv
New
CtHouse Lodging Tax ARPA Solid Waste
1 Courthouse 280,000 20,000 175,000 70,000 600,000
Events Center 10,000 50,000
Jail 1,611,212
Morris Sorenson 55,000
Sheriff 70,000
Transfer Station LC 10,000,000 7,000,000
Transfer Station UC 350,000 1,150,000
1 Total 10,000,000 7,360,000 20,000 1,611,212 230,000 70,000 50,000 950,000 1,150,000
2 County wide 250,000
Courthouse - 250,000
Events Center 300,000 55,000
Landfill 300,000
Permit Center 15,000
Upper County EOC 1,200,000 3,400,000
2 Total 1,500,000 3,705,000 15,000 250,000 300,000
3 Courthouse 125,000
Events Center 75,000
3 Total 200,000
Grand Total 1,500,000 10,000,000 11,065,000 235,000 1,611,212 230,000 70,000 250,000 50,000 950,000 1,450,000
Facility Jail
Priority Project
Grants
Pending Loan TBD GenFund Jail
CIP
REET1
TrialCt
Improv
New
CtHouse
Lodging
Tax ARPA
Solid
Waste
1 Elevator 120,000
enclosure 50,000
entry doors 81,212
Exterior 400,000
fire line repairs 750,000
outdoor rec re-seal 150,000
vinyl flooring 60,000
Grand Total 1,611,212
SOLID WASTE PROJECTS AND EQUIPMENT
Priority Facility Project Notes
Grants
Pending Loan TBD GenFund Jail
CIP
REET1
TrialCt
Improv
New
CtHouse
Lodging
Tax ARPA
Solid
Waste
1
Transfer
Station LC
New Transfer
Station
Project $17, loan $10; remaining
funding pending/unknown;
how does $5MM to-date relate
to $17 estimate?
Stand-alone discussion 10,000,000 7,000,000
Transfer
Station UC
Entrance and
updates
$1.1MM in SW budget; CleElum
Scale House; 350K ARPA
$377K short of $1.5MM 350,000 1,150,000
1 Total 10,000,000 7,000,000 350,000 1,150,000
2 Landfill
Closure of LPL
Landfill
Start design and closure of the
LPL landfill.300,000
Equipment
Compost
Screen New Screen 285,000
Compost
Turner Compost turner 175,000
Vehicle Replace 18 year old expedition 80,000
Replace F150 Truck 65,000
Water Truck
Replace existing truck that has
failed.125,000
2 Total 1,030,000
Grand
Total 10,000,000 7,000,000 350,000 2,180,000
Facility Events Center
Priority Project Notes
Grants
Pending Loan TBD GenFund Jail
CIP
REET1
TrialCt
Improv
New
CtHouse Lodging Tax ARPA
Solid
Waste
1
Granstand Rooms
fire system
10k = min maintenance, not upgrade or
replacement;
replacement costs unknown; $500K
BC/ZD placeholder
Big LTAC grant? ("stadium", 140)
Consider contract scopw w/similar Jails
project 10,000
Replace Expo Hall
Exterior Doors
Contract Job - will apply for LTAC small
capital in 2024 50,000
1 Total 10,000 50,000
2 Armory AV
Contract Job - Applied for grant for
$30K did not receive 40,000
Barn Sound System
Upgrade/Repair Applied for Law and Justice Grant 100%
Barn/Vendor
Electrical Upgrades Applied for $50K through WSDA Grant 50,000 15,000
RV Park Design
Planning
Applied for WSDA Grant 100%
get award date from Kady 50,000
RV Park Utility
Installation
Applied for WSDA Grant 100%
get award date from Kady 200,000
2 Total 300,000 55,000
3
South Grandstands
Exterior Painting Contract Job 75,000
3 Total 75,000
Grand
Total 300,000 65,000 75,000 50,000
ALL OTHER PROPERTIES (EXCLUDING JAIL, EVENTS CENTER, SOLID WASTE)
Priority Facility Project
Grants
Pending Loan TBD GenFund Jail CIP REET1
TrialCt
Improv
New
CtHouse
Lodging
Tax ARPA
Solid
Waste
1 Courthouse Extend Jury Box 70,000
New Door 10,000
North Jail Parking lot 280,000 600,000
Replace ADA Motor 10,000
Sidewalk
Replacement 175,000
Morris
Sorenson
Sidewalk
Replacement 55,000
Sheriff
Evidence bay build-
out 70,000
1 Total 350,000 20,000 230,000 70,000 600,000
2 County wide
County-wide
security cameras 250,000
Courthouse
Courthouse Design
services - 250,000
Permit Center
Crack Seal Permit
Center 15,000
Upper County
EOC EOC Building 1,200,000 3,400,000
2 Total 1,200,000 3,650,000 15,000 250,000
3 Courthouse
Replace Interior
Vestibule door 25,000
Window glazing 100,000
3 Total 125,000
Grand Total 1,200,000 4,000,000 160,000 230,000 70,000 250,000 600,000
Facility Equipment
Dept Project Notes
Grants
Pending Loan TBD GenFund Jail
CIP
REET1
TrialCt
Improv
New
CtHouse
Lodging
Tax ARPA
Solid
Waste
Building
Maintenance Two new trucks Two new trucks for Maintenance 100,000
Coroner Truck
Approved for 2023 - did not purchase
attempted surplus 55,000
Sheriff
Marine Rescue
Jetski
Majority (16k?) funded by state vessel
registrations fees.20,000
Search and Rescue
Snowmobile Trailer
Replacement of aging emergency response
equipment.40,000
Underwater rescue
drone
Enhance underwater search and recovery
capabilities; replace high-risk and high-
liabiliity divers. Exploring grant funding
and regional asset sharing.250,000
Vehicle Upfits
5 vehicle upfits in progress not anticipated
to be completed until 2024 117,000
Grand Total 582,000