HomeMy WebLinkAboutResolution_ProspectusPEPhase_HuntzingerRoadSafetyImprovementsKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: December 5, 2023
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Huntzinger Road Safety Improvements
Phase 1 CRP 318-23.
BACKGROUND: The Huntzinger Road Safety Improvements Project Phase 1
was selected to receive Federal Funding through the
Highway Safety Improvement Program (HSIP). The grant
funding provides the County a cost-effective approach to
implement safety improvements such as guardrail, signing
and delineation improvements to this corridor.
This project is eligible for 100% Federal Funding for all
phases authorized prior to April 30, 2026.
This Project Prospectus covers the Federal Funding for the
Preliminary Engineering phase of the project.
Public Works is preparing to perform the preliminary
engineering with County staff, including survey,
environmental permitting, and design.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Huntzinger Road Safety Improvements Phase 1 CRP 318-
23.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2023 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS ENGINEERING PHASE FOR THE HUNTZINGER
ROAD SAFETY IMPROVEMENTS PHASE 1 PROJECT CRP 318-23
WHEREAS: The Huntzinger Road Safety Improvements Phase 1 Project was awarded Federal
Funding through the 2023 Highway Safety Improvement Program; and
WHEREAS: The Federal Funding will be used for the preliminary engineering phase to
design, develop and prepare construction plans and specifications for these
improvements; and
WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the
Washington State Department of Transportation release the Federal Funds for
preliminary engineering; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
of the Board of County Commissioners acknowledging the project has been
reviewed and is consistent with the County's comprehensive plan for community
development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Huntzinger Road Safety
Improvements Phase 1 Project CRP 318-23.
DATED on this 5th day of December 2023, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Brett Wachsmith, Vice -Chairman
Laura Osiadacz, Commissioner
Aft
. Washington State
Department of Transportation
enc Local A F I
project Prospectus
Prefix Route ( ) Date 11/17/2023
Federal Aid Project Number HSIP
DUNS Number 01-020-2547
Local Agency Project Number RC 2297
WSDOT Federal Employer
Use OnlyTax ID Number 91-601349
( )
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
W1 Yes ❑ No
❑✓ 20.205 [:]Other HSIP
Project Title
Start Latitude N 46.868506
Start Longitude W-119.978605
Huntzinger Road Safety Improvements - Phase 1
End Latitude N 46.795541
End Lon itude W-119.945450
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
5.14 10.74
Vantage
98950-0001
Begin Mile Post
End Mile Post
Length of Project
Award Type
5.14
10.74
5.60
❑✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
5.14
10.74
19
Kittitas
WSDOT Region
Legislative Distdct(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollarl Mnnth vo..
P.E.
190,000.00
RIW
Const.
1,391,000.00
Total
1,581,000.00
190,000.00
1,391,000.00
1,581,000.00
November 2023
2024
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
vanes
Number of Lanes
2
Some roadsides are steep and unprotected, some areas do not have proper signage or markings.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Install/upgrade guardrail, signing, and delineation.
-
Local Agency Contact Person
Darren Case
Title
Construction Manager
Phone
509-962-7019
Mailing Address
411 N. Ruby, Suite 1
City
Ellensburg
State
WA
Zip Code
98926
Project Prospectus
By
Approving Authority
Title County Engineer
Date /�Z-3
Revised 01/2022 Previous Editions Obsolete rage 1
Agency
Project Title
Date
Kittitas County Public Works
Huntzinger Road Safety Improvements - P�
11/17/2023
osed Work
all that Apply)
Roadway Width
Number of Lanes
ruction ❑ Path / Trail
rReconstruction
E/13-R
24' - 28'
2
tion ❑ Pedestrian / Facilities
❑ 2-R
❑ Parking
❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban
ElMinor Arterial
ElUrban
❑ Minor Arterial
Functional
✓❑ Rural
Collector
❑ Rural Rural
El
Classification
❑NHS
❑ Major Collector
NHS
ElMajor Collector
❑✓ Minor Collector
❑ Minor Collector
❑ Local Access
❑✓ Local Access
Terrain
❑✓ Flat ❑ Roll ❑ Mountain
❑✓ Flat ❑ Roll ❑ Mountain
Posted Speed
50mph
Design Speed
50mph
Existing ADT
473 - 818
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
County
%
100
Construction Will Be Performed By
Contract
Agency
Contract
100
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
✓❑ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
V v Revised 01r2022 Previous Editions Obsolete Page 2
Agency Project Title Date
Kittitas County Public Works Huntzinger Road Safety Improvements - PI® 11/17/2023
Right of Way
W1 No Right of Way Needed ❑ Right of Way Needed
*All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
❑ No utility work required ❑✓ No railroad work required
❑✓ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of
of the construction contract the construction contract
All utility work will be completed in coordination ❑AII the railroad work will be completed in coordination
with the construction contract I with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utilities will be located during project survey and if conflicts are identified, Kittitas County will require
relocation prior to the construction project.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3