Loading...
HomeMy WebLinkAboutResolution_ProspectusPEPhase_HuntzingerRoadSafetyImprovementsKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: December 5, 2023 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Huntzinger Road Safety Improvements Phase 1 CRP 318-23. BACKGROUND: The Huntzinger Road Safety Improvements Project Phase 1 was selected to receive Federal Funding through the Highway Safety Improvement Program (HSIP). The grant funding provides the County a cost-effective approach to implement safety improvements such as guardrail, signing and delineation improvements to this corridor. This project is eligible for 100% Federal Funding for all phases authorized prior to April 30, 2026. This Project Prospectus covers the Federal Funding for the Preliminary Engineering phase of the project. Public Works is preparing to perform the preliminary engineering with County staff, including survey, environmental permitting, and design. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Huntzinger Road Safety Improvements Phase 1 CRP 318- 23. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Josh Fredrickson, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2023 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS ENGINEERING PHASE FOR THE HUNTZINGER ROAD SAFETY IMPROVEMENTS PHASE 1 PROJECT CRP 318-23 WHEREAS: The Huntzinger Road Safety Improvements Phase 1 Project was awarded Federal Funding through the 2023 Highway Safety Improvement Program; and WHEREAS: The Federal Funding will be used for the preliminary engineering phase to design, develop and prepare construction plans and specifications for these improvements; and WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the Washington State Department of Transportation release the Federal Funds for preliminary engineering; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Huntzinger Road Safety Improvements Phase 1 Project CRP 318-23. DATED on this 5th day of December 2023, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz, Commissioner Aft . Washington State Department of Transportation enc Local A F I project Prospectus Prefix Route ( ) Date 11/17/2023 Federal Aid Project Number HSIP DUNS Number 01-020-2547 Local Agency Project Number RC 2297 WSDOT Federal Employer Use OnlyTax ID Number 91-601349 ( ) Agency CAAgency Federal Program Title Kittitas County Public Works W1 Yes ❑ No ❑✓ 20.205 [:]Other HSIP Project Title Start Latitude N 46.868506 Start Longitude W-119.978605 Huntzinger Road Safety Improvements - Phase 1 End Latitude N 46.795541 End Lon itude W-119.945450 Project Termini From -To Nearest City Name Project Zip Code (+4) 5.14 10.74 Vantage 98950-0001 Begin Mile Post End Mile Post Length of Project Award Type 5.14 10.74 5.60 ❑✓ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 5.14 10.74 19 Kittitas WSDOT Region Legislative Distdct(s) Congressional District(s) Urban Area Number South Central Region 13 8 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date (Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollarl Mnnth vo.. P.E. 190,000.00 RIW Const. 1,391,000.00 Total 1,581,000.00 190,000.00 1,391,000.00 1,581,000.00 November 2023 2024 Description of Existing Facility (Existing Design and Present Condition) Roadway Width vanes Number of Lanes 2 Some roadsides are steep and unprotected, some areas do not have proper signage or markings. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Install/upgrade guardrail, signing, and delineation. - Local Agency Contact Person Darren Case Title Construction Manager Phone 509-962-7019 Mailing Address 411 N. Ruby, Suite 1 City Ellensburg State WA Zip Code 98926 Project Prospectus By Approving Authority Title County Engineer Date /�Z-3 Revised 01/2022 Previous Editions Obsolete rage 1 Agency Project Title Date Kittitas County Public Works Huntzinger Road Safety Improvements - P� 11/17/2023 osed Work all that Apply) Roadway Width Number of Lanes ruction ❑ Path / Trail rReconstruction E/13-R 24' - 28' 2 tion ❑ Pedestrian / Facilities ❑ 2-R ❑ Parking ❑ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ❑ Urban ElMinor Arterial ElUrban ❑ Minor Arterial Functional ✓❑ Rural Collector ❑ Rural Rural El Classification ❑NHS ❑ Major Collector NHS ElMajor Collector ❑✓ Minor Collector ❑ Minor Collector ❑ Local Access ❑✓ Local Access Terrain ❑✓ Flat ❑ Roll ❑ Mountain ❑✓ Flat ❑ Roll ❑ Mountain Posted Speed 50mph Design Speed 50mph Existing ADT 473 - 818 Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency County % 100 Construction Will Be Performed By Contract Agency Contract 100 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ✓❑ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations V v Revised 01r2022 Previous Editions Obsolete Page 2 Agency Project Title Date Kittitas County Public Works Huntzinger Road Safety Improvements - PI® 11/17/2023 Right of Way W1 No Right of Way Needed ❑ Right of Way Needed *All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ❑ No utility work required ❑✓ No railroad work required ❑✓ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of of the construction contract the construction contract All utility work will be completed in coordination ❑AII the railroad work will be completed in coordination with the construction contract I with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Utilities will be located during project survey and if conflicts are identified, Kittitas County will require relocation prior to the construction project. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 01/2022 Previous Editions Obsolete