Loading...
HomeMy WebLinkAboutResolution_ProspectusPEPhase_HorizontalCurveSafetyProjectKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: December 5, 2023 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. BACKGROUND: The Horizontal Curve Safety Project was selected to receive Federal Funding through the Highway Safety Improvement Program (HSIP). The grant funding provides the County a cost-effective approach to study horizontal curves countywide and will allow location selection and implementation of improved roadside signing including advisory speeds, chevron arrow signs, and the addition of carsonite safety posts to increase driver awareness, which can help reduce injuries on the road system. This project is eligible for 100% Federal Funding for all phases authorized prior to April 30, 2026. This Project Prospectus covers the Federal Funding for the Preliminary Engineering phase of the project. Public Works is preparing to perform the preliminary engineering with County staff, including survey, environmental permitting, and design. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Josh Fredrickson, County Engineer BOARD OF COUNTY COMMISSII COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2023 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS ENGINEERING PHASE FOR THE HORIZONTAL CURVE SAFETY PROJECT CRP 319-23 WHEREAS: The Horizontal Curve Safety Project was awarded Federal Funding through the 2023 Highway Safety Improvement Program; and WHEREAS: The Federal Funding will be used for the preliminary engineering phase to design, develop and prepare construction plans and specifications for these improvements; and WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the Washington State Department of Transportation release the Federal Funds for preliminary engineering; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project CRP 319-23. DATED on this 5th day of December 2023, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz, Commissioner Washington State �� Department of Transportation Local Agency Federal Aid Project Prospectus Prefix Route ( ) Date 11/17/2023 Federal Aid Project Number HSIP DUNSNumber 01-020-2547 Lo 1 I Agency Project Number RC 2298 i WSDO y 1 ` Use Only J Federal Employer Tax ID Number 91-601349 Agency CAAgency Federal Program Title Kittitas County Public Works WJ Yes ❑ No FVI 20.205 ❑ Other HSIP Project Title Start Latitude N 47.181726 Start Longitude W-120.954167 Horizontal Curve Safety Project End Latitude N 47.165419 End Lon itude W-120.012574 Project Termini From -To Nearest City Name Project Zip Code (+4) countywide countywide Ellensburg 98926-7989 Begin Mile Post End Mile Post Length of Project Award Type countywide countywide countywide Z Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name countywide countywide 19 Kittitas WSDOTRegion Legislative District(s) Congressional District(s) Urban Area Number South Central Region 13 8 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. 225,000.00 225,000.00 November 2023 R/W Const. 225,000.00 225,000.00 Total 450,000.00 450,000.00 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes varies varies Many roads have hazardous curves and non standard or non-existent delineation. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Collect data and install/upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation). Local Agency Contact Person Title Phone Darren Case Construction Manager 509-962-7019 Mailing Address City State Zip Code 411 N. Ruby, Suite 1 Ellensburg WA 98926 By Project Prospectus Approving Authority Title County Engineer Date vorlZCF'3 DOT Form 140-101 Page l Revised 01/2022 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Horizontal Curve Safety Project 11/17/2023 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑✓ 3-R varies varies ❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ❑✓ Urban ❑✓ Minor Arterial ❑✓ Urban 0✓ Minor Arterial Functional ❑✓ Rural ❑✓ Collector ❑✓ Rural 0✓ Collector Classification ❑ NHS ❑✓ Major Collector ❑ NHS ❑✓ Major Collector ❑✓ Minor Collector Minor Collector ✓❑ Local Access ❑✓ Local Access Terrain ❑ Flat ❑ Roll [:]Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed varies Design Speed varies Existing ADT varies Design Year ADT Design Year Design Hourly Volume (DHV) Performance of Work Preliminary Engineering Will Be Performed By Others Agency County % 100 % Construction Will Be Performed By Contract Agency Contract 100 % % Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations DOT Form 140-101 Page 2 Revised 0112022 Previous Editions Obsolete Agency Project Title Date Kittitas County Public Works Horizontal Curve Safety Project 11/17/2023 Right of Way ❑✓ No Right of Way Needed ❑ Right of Way Needed All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ❑✓ No utility work required ❑✓ No railroad work required ❑AII utility work will be completed prior to the start El All railroad work will be completed prior to the start of of the construction contract the construction contract ❑AII utility work will be completed in coordination ❑AII the railroad work will be completed in coordination with the construction contract I with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Utilities will be located and if conflicts are identified, Kittitas County will require relocation prior to the construction project. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ✓Z No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson DOT Form 140-101 Page 3 Revised 01/2022 Previous Editions Obsolete