HomeMy WebLinkAboutResolution_ProspectusPEPhase_HorizontalCurveSafetyProjectKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: December 5, 2023
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Horizontal Curve Safety Project CRP
319-23.
BACKGROUND: The Horizontal Curve Safety Project was selected to
receive Federal Funding through the Highway Safety
Improvement Program (HSIP). The grant funding provides
the County a cost-effective approach to study horizontal
curves countywide and will allow location selection and
implementation of improved roadside signing including
advisory speeds, chevron arrow signs, and the addition of
carsonite safety posts to increase driver awareness, which
can help reduce injuries on the road system.
This project is eligible for 100% Federal Funding for all
phases authorized prior to April 30, 2026.
This Project Prospectus covers the Federal Funding for the
Preliminary Engineering phase of the project.
Public Works is preparing to perform the preliminary
engineering with County staff, including survey,
environmental permitting, and design.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Horizontal Curve Safety Project CRP 319-23.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSII
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2023 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS ENGINEERING PHASE FOR THE HORIZONTAL
CURVE SAFETY PROJECT CRP 319-23
WHEREAS: The Horizontal Curve Safety Project was awarded Federal Funding through the
2023 Highway Safety Improvement Program; and
WHEREAS: The Federal Funding will be used for the preliminary engineering phase to
design, develop and prepare construction plans and specifications for these
improvements; and
WHEREAS: In preparation to begin work, Kittitas County Public Works is requesting the
Washington State Department of Transportation release the Federal Funds for
preliminary engineering; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
of the Board of County Commissioners acknowledging the project has been
reviewed and is consistent with the County's comprehensive plan for community
development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Horizontal Curve Safety Project
CRP 319-23.
DATED on this 5th day of December 2023, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Brett Wachsmith, Vice -Chairman
Laura Osiadacz, Commissioner
Washington State
�� Department of Transportation
Local Agency Federal Aid
Project Prospectus
Prefix
Route
( )
Date
11/17/2023
Federal Aid
Project Number
HSIP
DUNSNumber
01-020-2547
Lo 1 I Agency
Project Number
RC 2298
i WSDO y 1
` Use Only J
Federal Employer
Tax ID Number
91-601349
Agency
CAAgency
Federal Program Title
Kittitas County Public Works
WJ Yes ❑ No
FVI 20.205 ❑ Other HSIP
Project Title
Start Latitude N 47.181726
Start Longitude W-120.954167
Horizontal Curve Safety Project
End Latitude N 47.165419
End Lon itude W-120.012574
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
countywide countywide
Ellensburg
98926-7989
Begin Mile Post
End Mile Post
Length of Project
Award Type
countywide
countywide
countywide
Z Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
countywide
countywide
19
Kittitas
WSDOTRegion
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
225,000.00
225,000.00
November 2023
R/W
Const.
225,000.00
225,000.00
Total
450,000.00
450,000.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
varies
varies
Many roads have hazardous curves and non standard or non-existent delineation.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Collect data and install/upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation).
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
City
State
Zip Code
411 N. Ruby, Suite 1
Ellensburg
WA
98926
By
Project Prospectus
Approving Authority
Title County Engineer
Date vorlZCF'3
DOT Form 140-101 Page l
Revised 01/2022 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Horizontal Curve Safety Project
11/17/2023
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑✓ 3-R
varies
varies
❑ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑✓ Urban
❑✓ Minor Arterial
❑✓ Urban
0✓ Minor Arterial
Functional
❑✓ Rural
❑✓ Collector
❑✓ Rural
0✓ Collector
Classification
❑ NHS
❑✓ Major Collector
❑ NHS
❑✓ Major Collector
❑✓ Minor Collector
Minor Collector
✓❑ Local Access
❑✓ Local Access
Terrain
❑ Flat ❑ Roll [:]Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
varies
Design Speed
varies
Existing ADT
varies
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
County
%
100 %
Construction Will Be Performed By
Contract
Agency
Contract
100 %
%
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑✓ Class II - Categorically Excluded
(CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
DOT Form 140-101 Page 2
Revised 0112022 Previous Editions Obsolete
Agency Project Title Date
Kittitas County Public Works Horizontal Curve Safety Project 11/17/2023
Right of Way
❑✓ No Right of Way Needed ❑ Right of Way Needed
All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
❑✓ No utility work required ❑✓ No railroad work required
❑AII utility work will be completed prior to the start El All railroad work will be completed prior to the start of
of the construction contract the construction contract
❑AII utility work will be completed in coordination ❑AII the railroad work will be completed in coordination
with the construction contract I with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utilities will be located and if conflicts are identified, Kittitas County will require relocation prior to the
construction project.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ✓Z No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete