HomeMy WebLinkAbout2023-11-01-minutes-2024-budget-meeting-Created on 10/23/2023 4:54:56 PM
KITTITAS COUNTY COMMISSIONERS
2024 Budget Meeting
Special Meeting
Thursday October 26, 2023 - 10:00 AM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Treasurer's Office - 2024 Personnel Request
4. Public Defender's Department - 2024 Personnel Request
5. 2024 Projects Budget - Preview of October 31 Meeting
6. 2024 General Fund - Revisions to Draft Budget
7. "Overflow" Staffing - Follow-up Analysis
8. 2024 Salary Survey - Preliminary Budget Analysis
9. Other Business - No Action to be taken
10. Concluded
Page 1 of 12
Staff Report by:
Brian Carlson
Budget and Finance Director
Topic:
2024 Personnel Request –
Treasurer
Meeting
BOCC Budget Hearing
October 26, 2024
Summary:
• Treasurer is requesting a reclass of four existing “fiscal” positions to “accountant I”, per the revised 2023
courthouse contract classification of finance positions.
• Treasurer proposes an offsetting reduction of one FTE to the current approved “roster”.
Background & Analysis:
• Treasurer’s review of Office staffing structure was in-progress at the time of Courthouse union revision
• Proposal is now ready for BOCC and union consideration
• Four positions move from “fiscal tech” to “accountant I”, at their respective “steps”. Salary increase for
the impacted positions range from 11% to 24%, excluding 3% COLA.
Cost = $52K/year, including benefits.
• Treasurer has an approved fiscal tech position that has been vacant for over a year, and can be safely
eliminated. Treasurer proposes a reassessment late in 2024 to determine whether any additional part-
time staff would be needed in 2025 and beyond to fully back-fill this eliminated position.
Savings = $85K/year, including benefits.
Conclusion / Next Steps:
• BOCC provide consensus direction and/or next steps to Treasurer and Finance Director
Page 2 of 12
Staff Report by:
Brian Carlson
Budget and Finance Director
Topic:
2024 Personnel Request
Public Defender’s Office
Meeting
BOCC Budget Hearing
October 26, 2023
Summary:
• Public Defense Director requests an additional FTE Legal Assistant I
Background & Analysis:
• Cost: $40K salary, $26K benefits, $66K total; apprx 7.5% additional increase in 2024
• FTE roster goes from five to six
Conclusion / Next Steps:
• Provide consensus direction to Public Defense Director and Finance Director for 2024 budget
Page 3 of 12
Staff Report by:
Brian Carlson
Budget and Finance Director
Topic:
2024 Preliminary Projects Budget
Meeting
BOCC Budget Hearing
October 26 2023
Summary:
• Update to October 19th presentation
Background & Anlaysis:
• Staff continues to compile and rank project requests, and to explore appropriation / optimal funding
sources
• See attached slides for additional details
Conclusion / Next Steps:
• Continuation of discussion on Tuesday, October 31st budget hearing
Page 4 of 12
County Projects: $ 28.85 MM (Excludes Public Works, Airport, CDS)
Approved,
$ 3.20 MM
Inprogress,
$ 22.48 MM
New request,
$ 2.92 MM
Repeat
request,
$ 0.26 MM
Facility Request Sum of 2024 Budget
Transfer Station LC 17,000,000
Inprogress 17,000,000
Upper County EOC 4,600,000
Inprogress 4,600,000
Jail 2,061,212
Approved 1,311,212
New request 750,000
Transfer Station UC 1,500,000
Approved 1,500,000
Courthouse 1,275,000
Inprogress 880,000
New request 395,000
Equipment 1,195,000
Approved 55,000
New request 890,000
Repeat request 250,000
Events Center 502,000
Approved 50,000
New request 440,000
Repeat request 12,000
Landfill 300,000
New request 300,000
County wide 250,000
Approved 250,000
Sheriff 70,000
Approved
New request 70,000
Morris Sorenson 55,000
New request 55,000
Upper County Courthouse 30,000
Approved 30,000
Permit Center 15,000
New request 15,000
Grand Total 28,853,212
Page 5 of 12
2024 Project Requests $ 3.18 MM
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
By Facility
Facility Project 2024
Courthouse Sidewalk Replacement 175,000
Window glazing 100,000
Extend Jury Box 70,000
Replace Interior Vestibule door 25,000
Replace ADA Motor 10,000
New Door 10,000
Blinds for Jury Room & Courtroom 215 5,000
Courthouse Design services
Equipment Compost Screen 285,000
Underwater rescue drone 250,000
Compost Turner 175,000
Vehicle 145,000
Water Truck 125,000
Two new trucks 100,000
Search and Rescue Snowmobile Trailer 40,000
Marine Rescue Jetski 20,000
Events Center RV Park Utility Installation 200,000
South Grandstands Exterior Painting 75,000
Barn/Vendor Electrical Upgrades 65,000
RV Park Design Planning 50,000
Replace Expo Hall Exterior Doors 50,000
Barn Sound System Upgrade/Repair 12,000
Jail Jail fire line repairs 750,000
Landfill Closure of LPL Landfill 300,000
Morris Sorenson Sidewalk Replacement 55,000
Permit Center Crack Seal Permit Center 15,000
Sheriff Evidence bay build-out 70,000
Grand Total 3,177,000
Page 6 of 12
2,
$ 1.43 MM
1,
$ 1.07 MM
2.5,
$ 0.25 MM
1.5,
$ 0.23 MM
3,
$ 0.20 MM
Priority Score Project 2024
1 Jail fire line repairs 750,000
Two new trucks 100,000
Extend Jury Box 70,000
Evidence bay build-out 70,000
Replace Expo Hall Exterior Doors 50,000
Replace ADA Motor 10,000
New Door 10,000
Blinds for Jury Room & Courtroom 215 5,000
1.5 Sidewalk Replacement 230,000
2 Closure of LPL Landfill 300,000
Compost Screen 285,000
Underwater rescue drone 250,000
Compost Turner 175,000
Vehicle 145,000
Water Truck 125,000
Barn/Vendor Electrical Upgrades 65,000
Search and Rescue Snowmobile Trailer 40,000
Marine Rescue Jetski 20,000
Crack Seal Permit Center 15,000
Barn Sound System Upgrade/Repair 12,000
Courthouse Design services
2.5 RV Park Utility Installation 200,000
RV Park Design Planning 50,000
3 Window glazing 100,000
South Grandstands Exterior Painting 75,000
Replace Interior Vestibule door 25,000
Grand Total 3,177,000
2024 Requests by Priority Score: $ 3.18 MM
Page 7 of 12
Maybe,
$ 5.15 MM
No,
$ 22.85 MM
Yes,
$ 0.86 MM
All Projects (Includes Requests) $ 28.85 MM – Are They Funded by General Fund ?
Gen Fund Project Sum of 2024 Budget
Yes 855,000
Blinds for Jury Room & Courtroom 215 5,000
Courthouse Design services
Crack Seal Permit Center 15,000
Evidence bay build-out 70,000
Extend Jury Box 70,000
Marine Rescue Jetski 20,000
New Door 10,000
Parking Lot 30,000
Replace ADA Motor 10,000
Replace Interior Vestibule door 25,000
Search and Rescue Snowmobile Trailer 40,000
Sidewalk Replacement 230,000
South Grandstands Exterior Painting 75,000
Truck 55,000
Two new trucks 100,000
Window glazing 100,000
Maybe 5,150,000
Armory AV 40,000
County-wide security cameras 250,000
EOC Building 4,600,000
Granstand Rooms fire system 10,000
Underwater rescue drone 250,000
Grand Total 6,005,000
Page 8 of 12
Maybe,
$250,000
No, $2,157,000
Yes, $770,000
Requests $ 3.18 MM – Are They Funded by General Fund ?
Gen Fund Priority Score Project Sum of 2024 Budget
Yes 1 Blinds for Jury Room & Courtroom 215 5,000
Evidence bay build-out 70,000
Extend Jury Box 70,000
New Door IT 10,000
Replace ADA Motor 10,000
Two new trucks 100,000
1 Total 265,000
1.5 Sidewalk Replacement 230,000
1.5 Total 230,000
2 Courthouse Design services
Crack Seal Permit Center 15,000
Marine Rescue Jetski 20,000
Search and Rescue Snowmobile Trailer 40,000
2 Total 75,000
3 Replace Interior Vestibule door 25,000
South Grandstands Exterior Painting 75,000
Window glazing 100,000
3 Total 200,000
Yes Total 770,000
No 2,157,000
Maybe 2 Underwater rescue drone 250,000
2 Total 250,000
Maybe Total 250,000
Grand Total 3,177,000
Page 9 of 12
Staff Report by:
Brian Carlson
Budget and Finance Director
Topic:
2024 Budget
Revisions to Draft General Fund
Meeting
BOCC Budget Hearing
October 26, 2023
Summary:
• Update to preliminary $7.7 General Fund deficit, based on “bake sale” budgeting-to-mean analysis
Background & Analysis:
Conclusion / Next Steps:
• BOCC receive and file
• Finance will continue to work this topic with Directors and Elected Officials, and will provide updates
ongoing
Page 10 of 12
Staff Report by:
Brian Carlson
Budget and Finance Director
Topic:
Overflow Staffing –
Follow-up Analysis
Meeting
BOCC Budget Hearing
October 26, 2023
Summary:
• Additional analysis and calculations in response to BOCC questions during Oct 19th meeting
Background & Analysis:
• BOCC informally supported an allowance for Corrections and Law Enforcement to staff beyond the full
authorized roster, three and two positions, respectively
• Finance Director represented a budget-neutral estimate, based on a turnover profile that will have the
two divisions hovering around full staffing throughout the year.
• Discussion with the respective Chiefs yields these additional data points and forecasts:
o Law enforcement estimates a range of between two vacancies and 0.25 over-staffing
Cost/savings range, including benefits = ($225K) to $30K
o LE Division has been under-staffed for four years
o Currently 20% of LE Division began with Corrections Division
o Corrections estimates a range of between two vacancies and fully-staffed
Cost/savings range, including benefits = ($190K) to $0
o Corrections Chief observes that staff explores career change at about the two-year point, and
move not only to County Law Enforcement, but also to Ellensburg, University, and other regional
agencies.
Conclusion / Next Steps:
• BOCC receive and file; provide additional feedback or questions to staff
Page 11 of 12
Staff Report by:
Brian Carlson
Budget and Finance Director
Topic:
Salary Survey
Preliminary Analysis
Meeting
BOCC Budget Hearing
October 26, 2023
Summary:
• Preliminary calculations reflecting different implementation models to adjust wage ranges and step
structure
Background:
• This is a first, brief effort to orient BOCC and management to implementation methods and related costs
• The salary survey contemplates exempt and non-bargained positions; 130 total
Analysis:
• Staff extrapolated survey results to determine County variance from selected “comps” pay ranges
• Calculations reflect adjustments based on three metrics: variance from existing range low, mean, and
high
• Calculations to not make downward revisions to any position
• Aggregate salary for the group is apprx $10MM
• Modeling impacts between one-third and one-half of the group
• Cost impact range, including benefits: $200K - $450K (2% - 4.5%)
• Annual step-increase model reflects 2.5% increases annually; $250K
• Total cost range for “wholesale” implementation = $500K - $750K annually
• Staff will present other implementation models and refinements to calculations in future budget
meetings
Conclusion / Next Steps:
• Finance and HR will continue to analyze implementation methods, applicability, and impact
• BOCC receive and file; provide feedback and/or direction
Page 12 of 12