HomeMy WebLinkAboutSOQ_Fire Station_ArchitecturalEngServicesKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
2023 AGENDA STAFF REPORT
AGENDA DATE: October 3`d, 2023
ACTION REQUESTED: Authorize the Publication of a Request for Qualifications
for Professional Architectural and Engineering Services for
Fire Station 73.
BACKGROUND: Kittitas County has developed a compliance plan to bring
Fire Station 73 into compliance with the National Flood
Insurance Program building standards. Compliance is
required for Kittitas County to remain in good standing
with the National Flood Insurance Program and remain
eligible for the Community Rating System and emergency
funding through FEMA. The first step in the compliance
plan is to acquire professional architectural and engineering
services to identify alternatives, evaluate feasibility, and
provide cost estimates for compliance options. Professional
Servies will be funded by the Flood Control Zone District
and is included in the 2023 work plan and budget.
INTERACTION: Public Works
RECOMMENDATION: Direct staff issue Request for Qualifications and advertise
accordingly.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Notice of Request for Qualficiations; Request for
Qualifications
LEAD STAFF: Arden Thomas
Water Resources Manager
9/27/23, 11:34 AM newspaper -text (15).html
Public Notice
Kittitas County, Ellensburg WA
STATEMENT OF QUALIFICATIONS (SOQ)
TO PROVIDE PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR FIRE STATION
FLOODPLAIN COMPLIANCE
IN KITTITAS COUNTY, WASHINGTON
All submittals received after 5:00 PM, local time, October 27, 2023, will be discarded.
PURPOSE:
The Kittitas County Flood Control Zone District is requesting Statements of Qualifications from qualified firms interested in
providing professional architectural and engineering services to bring an existing fire station into compliance with National
Flood Insurance Program building standards.
SCOPE OF WORK:
Professional architectural and engineering services are needed to identify alternatives, evaluate feasibility, and provide cost
estimates for options to bring an existing fire station into compliance with National Flood Insurance Program building
standards. The selected firm will work with Fire District and Flood Control Zone District staff to understand facility needs
and permitting requirements for the structure. The alternative analysis should consider both building retrofit and building
relocation options.
PROCEDURES FOR SUBMITTAL:
If you wish to be considered for work under this Statement of Qualifications (SOQ), you must be a registered consultant on
the Municipal Research and Service Center of Washington — Shared Small Works and Consultant Roster
(www.mrscroster.org).
To respond to this solicitation to provide Professional Architectural and Engineering Services for Fire Station Floodplain
Compliance, submit a sealed envelope with three (3) printed copies of the SOQ to Ms. Candle Leader, Administrative
Supervisor, at 411 N. Ruby St. Suite 1, Ellensburg WA 98926, no later than 5:00 PM on October 27, 2023. Failure to adhere
to submittal requirements allows for disqualification.
For your records, the County will provide a confirmation email to the contacts provided in the submittal confirming receipt
of your interest in the proposal. Submittals received after 5:00 PM local time October 27, 2023, will be disregarded. The
County reserves the right to reject one or more submittals.
To facilitate review, SOQ submittals shall conform to the following format.
1. Experience and Qualifications: Provide a description of your frrm's experience and qualifications in designing
facilities to meet National Flood Insurance Program building standards for structures located within a Special Flood
Hazard Area. This description should include experience providing engineered flood proofing and fire station
architectural services.
2. Project Team: Identify proposed team members and responsibilities. Provide individual resumes, outlining
credentials and experience, and a statement about the availability and commitment of the proposed team members to
complete the contract.
3. References: Provide the name and phone number for at least three (3) references of past clients in relation to projects
similar to those in the above Scope of Work definition.
4. Project Understanding: Identify the approach that will be taken to meet the scope of work. Identify any special
considerations for fire station facilities, facilities within a Special Flood Hazard Area, and retrofits of existing
structures to meet National Flood Insurance Program building standards.
Responders are directed as follows:
• The maximum number of pages (double -sided) is ten and shall be 12-point font — including all graphics.
• A cover letter may be provided in addition to the ten -page (double sided) limit.
file:///C:/Users/candie.leader/Downloads/newspaper-text (15).html 1/3
9/27/23, 11:34 AM newspaper -text (15).html
SELECTION PROCESS AND PROPOSED SCHEDULE:
Kittitas County selection will be based on:
1. Firm/Team Qualifications (30%): Preference shall be given to qualifications in providing engineered flood proofing
approaches, particularly for fire stations or other critical facilities located within a Special Flood Hazard Area.
2. Project Experience (30%): Preference shall be given to experience in relation to projects similar to those in the
above Scope of Work.
3. References (15%): Preference shall be given to experience references for projects located within a Special Flood
Hazard Area, buildings retrofitted to meet National Flood Insurance Program building standards, and fire station
projects.
4. Project Understanding (25%): Preference shall be given to a comprehensive understanding of the Scope of Work
requirements.
A Kittitas County and Fire District review committee will review and rank the SOQs. The committee may choose to
interview a shortlist of consultants before making the selection.
The County reserves the right to reject any and all submissions to this SOQ, request clarification, and waive
informalities/technicalities, if deemed in the best interest of the County. The County assumes no responsibility for costs
incurred in responding to this SOQ.
Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and
Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21,
nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby
notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement,
disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response
to this invitation and will not be discriminated against on the grounds of race, color, national origin or sex in consideration
for an award.
Anticipated Dates and Tasks
5 PM local time October 27, 2023 - Deadline for SOQ submittals
November 3, 2023 - Selection of Firms to Interview
November 17, 2023 - Interviews and Reference Checks
November 27, 2023 - Provider Selection
December 5, 2023 - BOCC Contract Award
The above schedule is tentative and may be changed based on the number of proposals submitted.
CONTRACT:
The selected consultant will be expected to enter into a Standard Local Agency Professional Services Negotiated Hourly
Rate Consultant Agreement. Insurance requirements are included in that agreement. A detailed scope of services and
associated fees will be developed and agreed to by the selected consultants and the County and incorporated as part of the
contract.
INQUIRIES:
Direct all inquiries regarding this request for services to Candie Leader, Administrative Supervisor at (509) 962-7523, or via
e-mail to candie.leader@co.kittitas.wa.us
The complete Request for Qualifications may be viewed online at http://www.co.kittitas.wa.us/ or contact Public Works at
509-962-7523.
Published in the Daily Record and Daily Journal of Commerce:
file:///C:/Users/candle.leader/Downloads/newspaper-text (15).html 213
9/27/23, 11:34 AM newspaper -text (15).html
First Publication: October 5, 2023
Second Publication: October 12, 2023
Third Publication: October 19, 2023
Clerk of the Board
Publish:
Daily Record: 10/05/2023; 10/12/2023; 10/19/2023
Daily Journal of Commerce: 10/05/2023; 10/12/2023; 10/19/2023
(le:///C:/Users/candie.leader/Downloads/newspaper-text (15).html 3/3
9/27/23, 11:34 AM
www-text (15).html
Kittitas County shall evaluate statements of qualifications and performance data submitted by firms regarding
the proposed project. Following the evaluation, the county may invite one or more firms to meet with county
officials to discuss the project and the relative benefits of various methods of providing the desired services. The
county then selects from among those firms the one "most highly qualified" to provide the required services.
County procedures and guidelines are to include a plan to ensure that women, minority, and veteran -owned firms
have the maximum opportunity to compete for the contract. The level of firm participation should be consistent
with their availability within the relevant professional community.
After choosing the most qualified firm, the county then negotiates with that firm for a contract at a price the
county determines is fair and reasonable, considering the estimated value of the services to be rendered, as well
as the scope and complexity of the project. If a satisfactory contract cannot be negotiated, the county formally
terminates the negotiations with that firm and attempts to negotiate a contract with the next most qualified firm.
The process continues until an agreement is reached or the search is terminated.
In emergency situations, the process outlined above for procuring services maybe dispensed with upon a finding
by the county that an emergency requires the immediate execution of the work involved.
All submittals shall become the property of Kittitas County.
Kittitas County reserves the right to reject all submittals and re -advertise if necessary.
file:///C:/Users/candie.leader/Downloads/www-text (15).html 1/1
�nscno�+_. ro nre
KXr=XTj!LB COUNTY
4p 9
DEPARTMENT OF PUBLIC WORKS
Mark Cook, PE, Director
KITTITASCOONTI'
STATEMENT OF QUALIFICATIONS
Fire Station Floodplain Compliance
Kittitas County, Washington
The Kittitas County Flood Control Zone District is requesting Statements of Qualifications from
interested and qualified firms interested in providing professional architectural and engineering
services to bring an existing fire station into compliance with National Flood Insurance Program
building standards.
All submissions must be received by 5:00 PM October 27, 2023.
The complete Request for Qualifications may be viewed online at http://www.co.kittitas.wa.us/
or contact Public Works at 509-962-7523.
Published in the Daily Record and Daily Journal of Commerce
First Publication: October 5, 2023
Second Publication: October 12, 2023
Third Publication: October 19, 2023
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 2
STATEMENT OF QUALIFICATIONS (SOQ)
TO PROVIDE PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES
FOR FIRE STATION FLOODPLAIN COMPLIANCE
IN KITTITAS COUNTY, WASHINGTON
All submittals received after 5:00 PM, local time, October 27, 2023, will be discarded.
PURPOSE:
The Kittitas County Flood Control Zone District is requesting Statements of Qualifications from
qualified fines interested in providing professional architectural and engineering services to
bring an existing fire station into compliance with National Flood Insurance Program building
standards.
SCOPE OF WORK:
Professional architectural and engineering services are needed to identify alternatives, evaluate
feasibility, and provide cost estimates for options to bring an existing fire station into compliance
with National Flood Insurance Program building standards. The selected firm will work with Fire
District and Flood Control Zone District staff to understand facility needs and permitting
requirements for the structure. The alternative analysis should consider both building retrofit and
building relocation options.
PROCEDURES FOR SUBMITTAL:
If you wish to be considered for work under this Statement of Qualifications (SOQ), you must be
a registered consultant on the Municipal Research and Service Center of Washington — Shared
Small Works and Consultant Roster (www.mrscroster.org).
To respond to this solicitation to provide Professional Architectural and Engineering Services for
Fire Station Floodplain Compliance, submit a sealed envelope with three (3) printed copies of
the SOQ to Ms. Candie Leader, Administrative Supervisor, at 411 N. Ruby St. Suite 1,
Ellensburg WA 98926, no later than 5:00 PM on October 27, 2023. Failure to adhere to submittal
requirements allows for disqualification.
For your records, the County will provide a confirmation email to the contacts provided in the
submittal confirming receipt of your interest in the proposal. Submittals received after 5:00
PM local time October 27, 2023, will be disregarded. The County reserves the right to reject
one or more submittals.
To facilitate review, SOQ submittals shall conform to the following format.
Experience and Qualifications: Provide a description of your firm's experience and
qualifications in designing facilities to meet National Flood Insurance Program
building standards for structures located within a Special Flood Hazard Area. This
description should include experience providing engineered flood proofing and fire
station architectural services.
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 3
2. Project Team: Identify proposed team members and responsibilities. Provide
individual resumes, outlining credentials and experience, and a statement about the
availability and commitment of the proposed team members to complete the contract.
References: Provide the name and phone number for at least three (3) references of
past clients in relation to projects similar to those in the above Scope of Work
definition.
4. Project Understanding: Identify the approach that will be taken to meet the scope of
work. Identify any special considerations for fire station facilities, facilities within a
Special Flood Hazard Area, and retrofits of existing structures to meet National Flood
Insurance Program building standards.
Responders are directed as follows:
The maximum number of pages (double -sided) is ten and shall be 12-point font —
including all graphics.
A cover letter may be provided in addition to the ten -page (double sided) limit.
SELECTION PROCESS AND PROPOSED SCHEDULE:
Kittitas County selection will be based on:
Firm/Team Qualifications (30%): Preference shall be given to qualifications in
providing engineered flood proofing approaches, particularly for fire stations or other
critical facilities located within a Special Flood Hazard Area.
2. Project Experience (30%): Preference shall be given to experience in relation to
projects similar to those in the above Scope of Work.
3. References (15%): Preference shall be given to experience references for projects
located within a Special Flood Hazard Area, buildings retrofitted to meet National
Flood Insurance Program building standards, and fire station projects.
4. Project Understanding (25%): Preference shall be given to a comprehensive
understanding of the Scope of Work requirements.
A Kittitas County and Fire District review committee will review and rank the SOQs. The
committee may choose to interview a shortlist of consultants before making the selection.
The County reserves the right to reject any and all submissions to this SOQ, request clarification,
and waive informalities/technicalities, if deemed in the best interest of the County. The County
assumes no responsibility for costs incurred in responding to this SOQ.
Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42
U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663
Dept. of Public Works
Page 4
Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally
assisted programs of the Department of Transportation issued pursuant to such Act, hereby
notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to
this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be
afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, national origin or sex in consideration for an
award.
Anticipated Dates
Tasks
5 PM local time October 27, 2023
Deadline for SOQ submittals
November 3, 2023
Selection of Firms to Interview
November 17, 2023
Interviews and Reference Checks
November 27, 2023
Provider Selection
December 5, 2023
BOCC Contract Award
The above schedule is tentative and may be changed based on the number of proposals
submitted.
CONTRACT:
The selected consultant will be expected to enter into a Standard Local Agency Professional
Services Negotiated Hourly Rate Consultant Agreement. Insurance requirements are included in
that agreement. A detailed scope of services and associated fees will be developed and agreed to
by the selected consultants and the County and incorporated as part of the contract.
INQUIRIES:
Direct all inquiries regarding this request for services to Candie Leader, Administrative
Supervisor at (509) 962-7523, or via e-mail to candie.leader@co.kittitas.wa.us
411 N. Ruby, Suite #1 TEL (509) 962-7523
Ellensburg, WA 98926 FAX (509) 962-7663