Loading...
HomeMy WebLinkAboutResolution_CRP Number_Horizontal Curve Safety ProjectKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: October 3, 2023 ACTION REQUESTED: Request to Approve a Resolution initiating County Road Project designated as CRP NO: 319-23, Horizontal Curve Safety Project. BACKGROUND: Kittitas County has been selected to receive $450,000 from the Highway Safety Improvement Program (HSIP) for the Horizontal Curve Safety Project. Roads that include horizontal curves have been identified as high risk by the 2023 Safety Plan as well as past safety plans. Kittitas County will benefit by collecting roadway horizontal curve data to identify roads in need of crash prevention measures. This grant funding will allow location selection and implementation of improved roadside signing including advisory speeds, LED chevrons/arrow signs, and addition carsonites safety posts to increase driver awareness, which can help reduce injuries on the road system. HSIP funding is through the Washington State Department of Transportation (WSDOT). The award does not require matching local funds if design and construction are authorized prior to April 30, 2026. To meet the requirements of the program the project needs to be initiated as a county road project and needs to be added to the WSDOT Statewide Transportation Improvement Program. INTERACTION: Public Works RECOMMENDATION: Approve a Resolution initiating County Road Project designated as CRP NO: 319-23, Horizontal Curve Safety Project. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Josh Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 319-23 JOB NO: RC2298-HP IT IS HEREBY RESOLVED that the Horizontal Curve Safety Project be as follows: The project will collect data and install/upgrade signing for horizontal curves (such as advisory speeds, chevrons, delineation). VARIOUS LOCATIONS COUNTYWIDE This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: 1 OR ❑■ W 101 PURPOSE AMOUNT TOTALS PRELMINARY ENGINEERING $ 150,000 TION ENGINEERING $ 50,000 WAY ACQUISITION $ Z U250,000 rces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 250,000 SUB -TOTAL TOTAL PROJECT COST $ 450,000 GRANTOR OTHER FUNDS 450,000 Grant Source: HSIP Is TOTAL COUNTY ROAD FUND ALLOCATION $ 0 oshua Fredrickson, P.E. County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2024 ANNUAL ROAD PROGRAM AS ITEM NO. 8 THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18, ADOPTED this 3rd day of October, 2023. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chair Brett Wachsmith, Vice -Chair Attest: Clerk of the Board Laura Osiadacz, Commissioner g:\baseXformskengkcrp-frm 9/26/2023