HomeMy WebLinkAbout2023-09-12-minutes-solid-waste-and-maintenanceKITTITAS COUNTY SOLID WASTE AND MAINTENANCE MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Regular Meeting TUESDAY 1 2:00 PM I September 12, 2023 Board members present: Chairman Cory Wright and Vice Chairman Brett Wachsmith, (Absent) Commissioner Laura Osiadacz Others: Patti Stacey, Erica Luce. Bryan Elliott out at 2:19 p.m. Call to Order at 2:01 p.m. Citizen Comments (1 min. time limit) — None New Transfer Station Updates: Patti informed the Board she applied for a 2nd Public Works Board Loan for $7.6 million, this amount will complete the project. We did not receive two grants she had previously applied for. All documents are turned into the City of Ellensburg for review. Discussion was held on changes in wetlands and current delineations. Request Boards Approval on a Resolution Authorizing Use of "REET 1" Revenues for Debt - Service Costs Relating to the Construction of a New Transfer Station Facility: Patti informed the Board she spoke with Brian Carlson to draft the resolution and updated Commissioner Osiadacz on the resolution in a prior meeting. Discussion was held on the percentage of annual debt services, the Board agreed to 50 percent covered by REET 1 funds. Further discussion was held on the Solid Waste enterprise fund's ability to repay portion of loan with tipping fees. Commissioner Wachsmith made a motion to approve, Commissioner Wright seconded, motion passed 2-0. Other Business (Moved) — No Action to be Taken: Bryan Elliott informed the Board he is working with the Developmental Disabilities Advisory Committee regarding accessibility to elections and assessing the public's access to the Court House via the City's bus routes & stops. Discussion was held on potential locations at the Court House. Bryan will propose the ideas discussed to the Committee. Ryegrass Landfill Update: Patti updated the Board on the most recent correspondence between the Department of Ecology, Public Health and Solid Waste on an air quality permit. Discussion was held on possible options for future land application areas and green energy. Further discussion included considering partnering with the City on a Public Works Board grant for potential sewer plant. Request Boards Approval on Task Order with Parametrix for Additional Engineering Services: Patti informed the Board the Ryegrass Facility operations require ongoing environmental monitoring and permitting. Patti explained nine tasks required to obtain permits and maintain compliance. Discussion was held on the new well requirements and potential dirt for landfill cover. Patti informed the Board this is a two-year agreement. Commissioner Wachsmith made a motion to approve the Chair's signature on the Amendment, Commissioner Wright seconded, motion passed 2-0. Cie Elum Transfer Station Updates: Patti informed the Board the contractors will be breaking ground on the new scales project next week. 2023-09-12 MINUTES 1 New Roof Top Unit Updates: Patti informed the Board the new units will be installed the first week of November and are scheduled to take three days with a full mobile crane. On -Call Architect Project Updates: Patti informed the Board the consultants will be on site touring the jail this Thursday. Patti updated the Board on a new leak found in the jail. Maintenance Work Order Items: 1) Sheriff's Office Remodel — Patti informed the Board of the Sheriffs Office request for new placements for doors. 2) Clerk's Office Remodel — Discussion was held on the Clerk's Office requests. The Board directed staff to develop a threshold for minor maintenance requests vs. remodels and write a policy. Upper District Court Parking Lot Updates: Patti informed the Board the sinkhole is larger than expected, the engineers are coming in to look for possible water leaks. Work has begun on improving the ADA entrance. North Parking Lot Updates: Patti informed the Board permit applications were turned in to the City for review. Discussion was held on the possibility of needing to apply for additional permits, further discussion was held on potentially grading the site. Other Business Continued — No Action to be Taken: Discussion was held on establishing a timeline to begin a public outreach campaign for a new Court House and possible alternative locations. The Board requested the topic be left as a standing item on the agenda. Meeting adjourned at 2:55 p.m. -- �J 4 2_cL.5 Erica Luce 2023-09-12 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Sofld Waste and IMaa ntenanCe RegWalr Meeting Tuesday September 12, 2023 0 2:00 PH BOCC Conference Room 205 West 5th Room 108 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. New Transfer Station Updates 4. Request Boards Approval on a Resolution Authorizing Use of "REET V Revenues for Debt - Service Costs Relating to the Construction of a New Transfer Station Facility. 5. Ryegrass Landfill Updates 6. Request Boards Approval on Task Order with Parametrix for Additional Engineering Services 7. Cie Elum Transfer Station Updates 8. New Roof Top Unit Updates 9. On Call Architect Project Updates 10. Maintenance Work Order Items: 1) Sheriffs Office Remodel 2) Clerk's Office Remodel 11. Upper District Court Parking Lot Updates 12. North Parking Lot Updates 13. Other Business - No Action to be taken 14. Concluded Created on 9/11/2023 12:27:44 PM KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS RESOLUTION NO. 2023 - r A Resolution Authorizing Use of "REET 1" Revenues for Debt -Service Costs Relating to the Construction of a New Transfer Station Facility. WHEREAS, Kittitas County will construct a new lower -county transfer station in 2024; and WHEREAS, the County has secured a $10 million loan to cover a portion of construction costs; and WHEREAS, management has modeled scenarios for loan repayment including transfer station fee increases and use of Real Estate Excise Tax ("REET") revenues; and WHEREAS, the County recognizes that its solid waste fee structure is an important variable in the success and sustainability of its overall economic growth, ecological, and quality -of -life initiatives; NOW, THEREFORE BE IT RESOLVED by the Board of County Commissioners that "REET 1" revenues are authorized for repayment of loan(s) secured for the construction of the lower -county transfer station beginning in 2025, or upon completion of the aforementioned project, in amounts to be determined by the BOCC, and subject to annual appropriations not to be less than 50% of the total cost of the annual loan payments. Dated this 121h day of September, 2023. ' CQiIUTiI�s\ �/r ._y.��: \ SEAL .� 2,f2 lerk of th oard BOARD OF COUNTY COMMISSIONERS KITTITAS 0 NTY WASHINGTON Chairman Vice Ch irman ABSENT Commissioner lD Ln -0 O N (D (D 9� � W a lD S -� ° 3 o C' �- 0 N• v� 3' D �' n' w ,-i w 3 L- "O n0 fD Ncz 3 ONJ 0 n ,-a D n K CD EA < O O" 0 O O CD N � C N D `< cnLn W rr N - • 0- Ln co W Q �r Ul n 3_ Cfl (D w M CD w O Ox (D CD :3 O' :3`C � COLO O (Dcu — v1 C CD ((D (p � rni CD to O" % � T `< CD (Q N O -+, m � N _0 � a) CD -s, N W s n CD Q p O n' n � p z `nr N :3 _ On 0- - = N Lah O v , rt CD -0 O -0 �' a] p 0- 0 CD O O �, 3 CD :3jumt rD D — < o m CD � '7I r+ `•n fD CAD � �. � W E' � (D � N h --.IQ. CD CD ::3 O. Junk CQ N N r° CD "O O -i' N T -h O =3 n CD =3 rA -< r+ O- 0- W 00 N 0 Q CD ,N-r O Q. -O "D � Oh 00 O rj D :3O Ln (Q rn+ ,� T O r+ 0 O � O n Lo C =3 C' n N O (D N W [D r+ a) D S Q0 0 n N 0 O EA Z- N N O rr oN 0 cD � La CDO CD 0 n0 (D d1 CN n Q -h OI-Ra O -+, D N O O 0-o' Q `n 3 Co C: r r CD N h l< �• to M C tr O H W O OJ Ol to .p W N -' V to .P r n n n n o w n n n < Y 0 o c 0 o 0 O 0 O O 7 rt n 0 O n o V1 C O—h O a�^ o n O n a) (D 0) I n O < O � �C , 6 jD w (n v O CC = O (D 0� 0 _0 0 0 :3,ter CD n (D 7 v La aj c 3 (D rt (D < o < yr �y En n h O n' r v in v W p -n n (D iD iD (D 7 tQ m 7 7' O tQ 7 tQ 7 7 O O (D (D (D O 77 Ln 77 =O O 0 0 to 7 O Lo CO La . Q Z0 Q: Z0 0 Q Z0 -CL Z0 Q Z� N0 -Q- "hs O O v O v < (D O in h O v < (D in < -hR lD O O rt O< -i (D h< (D (/1 (D (A (D (D (A (D fD (D (A CJ (D (A lD (D Ln fD '+ (D (p VI (D (D fA (D In (D VI (D '� (n lD (D {A (D 1]. pip CAV1 (D N (D N (D Ln Ln (D (n VI (D Ln (D in V1 CD Ln (D In N (D (A (D LA N (D N (D - (D CA (D Ln (D V1 (D `< (A 0 c, Ln T o_ o_ Q- O_ o_ Q- o- o-o_ Q- a o_ o_ o_ Q a 0. 'LS — LA) N J — V N 0:) N --AIv co V CO N to N to J N v N N W L tQ Lo CG S (n (D (D (D (D En Ln (D En (CD (D cn h (D (CD (D Ln rr rr In h h (A Ln h h h LA h ram+ Ln h Ln En PO c ;u c c (Z PO c ;u c ;;o po c c c PU a C � 6c ' � O" a' � � o ' -, a" � � 6 o L3" S c v v c w w v a) a) a) 2 m m v d al m Co y N N 70 VI 0 m W 0 n 0 o a) ' O 3 0 O 3 -'� O 3 O 3 0 3 O 3 O 3 r(np O aWi0 w a `< s Ln a) (D cA (D �at) m W (D Ln (D Ln m Ln (D 3 -pw w. Ln c0 _ M ram+, N h `G Et ct ct ct rt•�• to h nCC nCC n nCC nCC n nCC (D (D tho (D (D (D (D C m [D G G G C < G [D N (n(D(hD CD lD (hn l0 CD N N (hD N v r n' ; v h r o 0 ; n n h Z c) c) � Ln w oo v- n Z 0. = n c 0. 7v -a v v n (D -, a' (D o 3 Q+ (D v LA o n a� Q z .c v, [D O 6 O o• rat ry 0 O , Oh N (ND (D 0 T n rt O En D D p 3 � 3 3 w h fD D 3 c tQ D < _0 CD v,rD 3r m Q� m (<D - CD a, 2 Q m ai (D a h N O rt (`(DD %r Q(D (DD D Q c} W cz c (D c S 3 �'+ p' O n _0 y S �. O �. m 3 ,� D n al a- r 3 (D ,gyp Q h D (D — y (D S 0 Q C n vhi � to M m 3 n a-0 c T! h (D _0 = c rt 3 3 n (�D ,� z d o ' - tQ to 2 n (D D rr �< tQ CD Q 3 (D ID Q cu 'c � n N La ro .Z7 (3D vfDi 0 n = Q (D (D 3 v c w Et (D CD Or Ln O Ln + �- O M 0 0 m tQ n c�ii ro w cn rD O aD 0. (D ra (D — :3' r+ Lnr-p 3 O_ rt Ln V) 00 00 00 00 00 00 00 co 00 00 00 00 w t0 is l0 lD to V V V V V V -4 00 00 00 to to O -a IN N W 0 O 0 O 00 00 00 O iv A O O O IV N Ol N y t4 ter 64 t . � 1.4 413 by -64 tfs i v t C 7 CL N to N O Ln to w — O O N in O O J N to J O w O O O W V O O CY) to O O N -! O O O O Oo O O O O O O O O O O O O O O In O V M O O A O O O 00 O Cb N fX CD O O O O CD O CD CD CD CD Cl CD O CD to C O O O O O O O O O O O -I O O O al O ro O O O O O O O O O O O O O O O O O 0 O O O O O O O O O O O O O O O U1 W W W W W N N N N N N N N N N to P W N O t0 co v M to A W N O t0 00 p n o n n n —+ < r) z 7S (•) n r n n (1 n n �+ �' O O ^ O 0 O n) wO -+1 0 --Ill-+, O O �, O -+, O O ' <_ -+, 0, n * , O, c to ti', _0O D r 7� (D (D - °) 3 3 rh} Q O Off O C0- to to 2 7 — N p (D l2 < 0 (D O C En rN-' in < z r�r (D -1 Q CD 7 .2. n rt Ln (o p #k ((D ~ n' 0 h t" 7\- -v v :. n (D 7 7 �� (D S CD :3 d iy N o n 3 rt (D `Q `Q v (D 3 (D `° Q 377 `" d 3 nw c 0 v �,• 3 zo Lf)Q zo Q- zp -2- z2- zn- zq O- z0 p LA(Q Z0 Lo q Z O (D L O (n O i' < O AO O � O n (n in n' (D O n(D vO fD (D D -- (D ' fD (D ' CD (D ' (D (D ' CD ' (D ' (D (D ' (D M (D (D -z CD ' (D - CD ' Ln (D (n N V) Ln CD LA EA (A � N En (A Ln Ln CD LA N(D LA (A (D (D `< (D (D (D (ND (D (D CD CCDD (D ((DD (ND (D (DD (D `F (D Q Q Q Q O- 0- Q Q Q Q Q- Q Q Q o (D -r� — J N to .A — W t.0 N UW — N tD N 03 In In W lb to O A O N N Lo C CC C a CCD v CC CC CC G a CC G a) G C < a CC G N CC G G (D rN-r G (D r�-r < CD En to G (D .N-r (n r-r G (D w G (D rtN-r (D v+ (D N cn rr CD in CD (n Ln •-+ CD Ln In rt fD In C 70 C x C .v C C C PO C ;u C C �u A C 0 0 o C c C c C C C C N N (n Ln to p POp O N o 3 0 3 O 3 o 3 m o 3 (D n Q 0 0 0 3 0 a 0 3 0 3 0 3 0 CD (D a) (D a) v (D Q to CD n CC 3 3 (ND \ D Ln CD Ln (D 3 n n cn n N N n n (°1„nC (� nC n nC wlD (D CD (D C ( (DD(DG (( CD G < CD CD (D (D CD LArt O ,�+ ,�+ rt h CAD (�D (�D rD ( tQ (D CD CAD r�D �D � n' r v In N p r p D N D m p v oo = D ((D O `. v in n ' �' Q p N 'a n CD n O 1+ CD N n (D _ Q to 3 to O N (D , + -V 7 Ln3 ED O N to — -+ 0 N. 0 o 27 (��,,,tD <�C ID "O (D � ::F vCi N O '� (D Ln oJ(D °' o a, o �! w 3 n Q '� °CC' 3 3 3 a vn CD O n O_ [ND CL O Cp O La n. (D O Nf N G !D p CD CD to 7 O 3 `< H N (D (D (D (� LA (n -n G (n CND m �' N v, 7 n. (fD hD N+ O O n to t� °� m O — f+ 3 (D < (D W 3 CD N R D �' rt rrD 0 0 3 �3 rQ v � N Ln n 0 ° x 3 sv E CD `< rt M 3 o (<D m O m o h N ((DCD N X ct O CD �« n� o 3 CD o 7 < (D G fD 7 N r+. N < `0_ (D 3 l<D O. 0 3 �, N CD T. O N 3 3 lDCD 3 (D (� CD : -0 r-r CD ' v rt (D �+ vim, (D m �. r+ 1+ v CD Ln r+ m co 00 co 00 co 00 00 00 00 0o 00 07 co 00 00 00 w O W !Al W W W W $ p. Fa la a p. In !-n W N 01 0% C% 00 co 00 O d' 01 a% 00 00 co O O d�- Do O O O O O O O O O O O O O O O O O O O -64 to -64 � in wbq �64 �64 lb r tfr ba ifr Ora 1.4 t-� -64 -64 00 to 6l O -� V to O) W a) w N N Ln N W O O to v In O Ql 00 O O to (n O In w -! O O lD M O O O) O Ol O O O O W J :lI V 6l O 6) O O O iQ Z;S. O O W O W A O O O cn O 00 O O O O W O O Co O O O O O O Cl O O O O O O .A O O O O O O O O O O O O O O O O A —+ O O O O O O O O O O O O O O O O O O O O O O O O O 0 O O O O O O O O O O O O O O 0 O Ln to (n (n A A A A A A A A A A W W W W W N — p l0 00 � m Vl A W N O (.0 Oo J 0) *�< 0 n o r n o n o N o N o :. r n L o n ° (.—� m e a)ZT V (D S�Lrt N n Ln a) !n to � to 3 _n ;; ^ F N N (D C. rN+ n O 3. O n 0 _, 3. n n zT O M n a) C. n a) — n n 0 0 D z 0 _ (D 3 O _ ' m (D 7 L/I�, ID 0 to Q a) QCD - m p `C O �, n f, G Cj0 v 3C v 3 a) O_ N rDD CD -t a)j 3 n O r* 3 -� 0 n c `� 0- (D (n CD n� a� r+ rC+ C0 O O M. v N N (D a) to O- 3 v1 v 3 Z) n C (D (D ,+ (D O a) 3 0 3 (D =3 Q — (D (D a) (D 3 O n v 2c p Es oa v) Ll Es 7. Ln n �. m (0 rt 3 3 (fl (fl (Q a) (D LO N- l0 3 n (D _0 00 O Q rt n N n fD 3 3 0 Ln 0-Zo- Zp Inc- Q- ZQ-0 O- ZQ ZQ Z0 0; Z0 (n? Z0 Z0 _ O N aZ_ N O OO toO [D O vi< N_0 oo (D CD (D (D (D CD 3 (D CD 3 (D (D 3 CD (D (D 3 (D f 3 (D (D 3 (D fD (D CD 3 O m (D CD (D 3 V (D CD ( 3 (D H t 0 N Ln En tnn M V) Ln `< In (D H (D (D (n (D to 0 to (D tn In (D to CD to O tLn m (n (D to (D to (D to (D to m VI (D Q Q Q Q Q Q Q Q Q Q Q Q o- Q Q- Q a Q N N —1 W co — W W W W A N W — W 1.0 t.0 tT W O A —I J W O A W A �l W W A C C CC W CC N CC O CC C < CA G d CC G C < C N G N (D to (D to G (D to to rt G (D to to r+ G (D to (n r+ G (D to (D to (D to to r1' (D to (D to (D to u, (D ul h cz c ;U cz C ;)o ;v cz C C: cz C: ;u C C & 0- C -i - 6 — 0 C C — -s Q' - cr -ti 6 - 0-0- C -+ 0- C - cr C - n) m m m a) d v n) v m a) a) a) v m m w v 3 3 3 3 3 3 3 3 3 3 (.n 0 N 0 0 0 N V) 0 O o n) O O O O O o o O O v O 0 0 3 3 h 3 3 3 3 3 3 3 3 3 3 3 3 d (D rD v O CD (D rD (o (D (D (D (D d a) (D m (D In rt N rt (n =t N r+ N r4 to ct rt to rt to ct N ct to != to rF, � `Z to Ln to (n n n (n n n n n n n n n n (n N n !1 n a) (+ v (+ v r+ 1 r+ v r+ m r+ a) r+ r d (+ n) r+ (D d r+ tv rr m � rD (D � (D (D m (D m (D rD rD (D m rD � m m m rD (n n 3 O -o m v —1 (n (n l< 3 (n n cn -o Ln -n 3 'o p � r -0 —1 3- 7a Vl o j' co v O O C O "p v + W Ln v O, -0 n �. m -6 to 3 w O F' a) `� `O _a -O m" O. <. rD -O @ 3 m (D O 3 N rp .tn-r (D n O O= `�' n O n N• to (D N r3-r '•77 — < o rt o rt a) 3 3' (D < 0 O D C v ai 3 �< (Q ONo rt rt< CC rt O 3 n (D Ln ram+ °rt) — 3. ID (n .�+ n = v G m 00 (Q m _ =, < o 3 (D G °+ v 3 n D `Ln 3 o 0 3 o7 Co 3 3 N 3 M 3 Q' NO W CD 7 d vC�i N 7 A 7 0+ `< �' O (hD N Q O O O Q y Q G n �r t' N tn (D (ND lD Ln 0 a) -0D CD CD 3 v n 3 (D m - v 3 0 3 (D 3 _ CD (D T Q 0, N a) 3 5 3 p 70 v •D o h -0 C < 3 n CD , r Z T. (n 70 4 ((DD v (D m Ln N rD C c N 3 2 0 G 3' ;lD rt (D (D W 3 co -a d Q GC 3 [D r�-, 0 h '�-' n p 'a N m � rt n N (nD w N (3D 3 `< 00 Et rtC N o v 3 N D N N ,3a -u 3 < (r+p 3 Cvl (D (D ti; 3 3 O N Q t CD 3 h �• r+ r+ �' rD (D n rt z 3 r+ Q co co co co co co co co O co co co co co O co co co O O O O N $ O C1 O O O A C1 O in co O O N N a% m O O O O O O O O O O O O O O O O O O {a4 f,4 iy4 {A b+ 64 Va AA, fi4 {A t64 -64 {fr 14 {A {A {A fA O — N -• W Cn w — 0) N N 07 O — w w O in tT ifl -- m m v w -4 W O to co O �I (n • O O p to N �l CY) p O O A A al O O O O O O O O O O cn l0 O O O A (n O p CD C) CD N O O O O O C) in O O O N O O O O O O 0) O O p O O C) Ln p O C) A O O O O O O O O p p O p O 00 p O p (n O O O C:) O p (D C) C) Cl O C) O O O O p O p O O O O C) (D C) p C) O p Cl p p O C) 0 O 0 0 to coo a) Ul P W N n_ 0 o o p Ln n --a r-< CD 0S r^-FLn rt w! rnr - < O f1 O 3 (D 0 O :3 h m C °) � m O r-+ LA n) D m r+ CD (D m # 0 Gl 7C T Ln L —1 m LA :3 to : to 0co D m 1:3 h ru cn Z o m � Ln � O ZO Z � Q Z � - O n_� < O NO in MO nC' o - m - - - m - m to z m m rn m Ln , m IA , m m' m z m m N N CL y CD N (Do. 0 Q 0 Q Q N W W A W J N W Ql V W �I Q1 CD t.00 00 v rn Ln � n ::E n< p cn w p p )n Ln D r— m (D = — p Q o m o m �. r+ m ZY :3 (D rD� O p < r' n m n m I v m h C `C #+` CD °La N rD N, O n0 N w .� a n v _ i m v 7 3 y r+ m a rC+ CD 0 a) ` cu m n) CD cm0 0 O 3 CD m r+ a n T -a h o m ° p Fi s ° N O i �. m 3 s �o ZQ Zfl Zn Z0 Zfl; Z Ln m )n o(n O )n O Ln O cn' m < N O Ln O r+ + m m m m m m m m m Ln (D r Ln m w U, (D < cD Ln m Ln m EA m Ln m m `� H (D to m Q O o_ 0- a a a a N N l0 LnONi t0 A r Ln 1:� m G m G m N [n G m (n Ln r+ m (n < m !n < m En N to G LAm G Ln G un (DN N ;U -z �_ C a• fl1 C C• f1) C cr fll C cr fl7 C 2) N ;Z C n) N C C C v C v!U, C C cr _ O 3 m Ln r+ n 'r+ m O 3 m Ln r+ n r+ m m CD m O 3 m cn n r+ O 3 m tA + n r+ m O 3 m cn r+ n r+ m O 3 m cn +, n r+ m O 3 m tn r+ n r+ m -,� G Q O 3 m in n r+ m O 3 m Ln n r+ m O 3 m w n r+ m O 3 m En n r+ m o 3 m LA n 1+ m O 3 + 0 3 m in n rt O v N m 3 Ln 0 — 0 0 r+ o Q Ln N ' 0 (D CD o LnCD 7;7' m ul LO ( 2' 3 0 0 30 Ln L. 3 Q .-+ fll O (D � O (p W �� N m O+ w r0r Z O m m + c�D Ln m 3 m a N m v LQ m m -a n N m CD CD 3 rt r+ p co O V G O V O O V O O v Cn O p N O O m O lO O O tf+ �a iF+ ba t 4-A,w t v+ CD CD O kD CD A O O O -I! v O O O O O O O 0C) O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Cl O O v r W O CCD :3 (D 3 �' -+ coo 3 o m o -- 4 m O m o D < 0 r* m rt m < (D ° 3 fD C 3 r+ v 3 ccu co m � C (D N ^CC' C 3 o N� N a m s Lo Q) CD O w fD zT d O 7 N _0 Q _0 Q 6 - fll Ln LA. 0 O �. O' m O O m p n 3 m Z, CD T : r+ 3• V V co co co co CO lO lO lO O O O O O N O 00 O O O C O O O O O O O O N N cf+ tra +n• tfa tfs -,a u3 to , (flyt' .p O 61 W Ln Ln O O A P O O O W O O O O O O O to O O O -A O O O O N O O O C O O O O O O O O a O O O O O O O O O O O O O O O O co co O Oo O 00 v J --1 J �l -II J V -I v to P W N -s (D lfl W v Q) to W N O a O a 0 h o (AD ,� °' Di o < o n ? ((DD O + O C 0 n' O O n 0 OC N < rt 0 (D C _� w C rr �CC n C< c (D C ,N.r (D CD(D C `-''• O G rt CCD S 3 rt 3- `� C `< Q. 3 - � 3 `G p 77 0) j n. 7C' �. o ❑ �p n* < 3 h m m o n -� W N C C CD (D 3 3 Q. 7.' -z m. rt h CD n O 7� (l (n 7 n w ;;_1 ❑ W �. w N w O N (D ti 3 O ill S w 3 O C O (n 3 r-h O iT 77- p O w O � O O r F 3 w 717 �• N rw-F C 3 N' D- C 3 ❑ (n 0- z0 Ln 0-z z0 a z0 Q- z0 -0 (n0 zQ Z❑ fl z❑ < rN-r O N G N-r O �• O N rN-,• O N O ID N� < N G , .N-r O 0 Ln0 �. (D (D (D "+ (D (D (D (D (D (D (D -z fD - CD (D (D (D (D N (D (D `< N N (D N (D V) (D N N (D LA N (D V, Ln rD N N (D N CA (D N N (D N (D N (D N (D N (D N N (D N N rD N N (D N N (D N N (D Q 0_ Q 0- 0_ Q n. 0 a Q Q- 0- 0- Lk) N N N OD W -.j W co Vn CO Ul m N 01 A l0 Cn J •A• O) W Ol W Cu m m (D N r-r Q, z O (D N r+ (D N r,• (D N r-r rD N rr d N CD ,-r a) N (D N r-r (D N r-r w N m N (D N r-r N (D V) r. N 5 C 7D C C ;;o C C C pu �u �a C C C 70 C D r+ 6 w -'i w w Q' w w a' m - w -t 6 m C w C v — C -'z w — - D- w -z Q' w I U m C 'z m — — ffl r 3 — 3 3 — 3 3 3 — 3 3 7 0 ❑ (n ❑ 0 (n ❑ ❑ Ln ❑ 0 O (n ❑ O 0 3 �' 0 3 w O 3 0 3 0 0 3 0 3 °) �.• 0 3 0 3 0 3 6 0 3 0 3 0 3 (D (D w (D (D 3 (D rD w (D N (D N (D N w (D N 0 N (D N N .--r N r-r Ln Et Ln .-+ N !:t Ln .-r, Eat .-+ ct h r+ rr nC C' n N C) nCC nnCC Ln nnC n n VI nnC nnC m v mt m+ (D rmh rmt (D (D rfl'r (D r+ (D (D (D (D (D (D (D (D (D (D S M N1 S N(1) -0 v m ;;u (n (n (n < o ZI < N 07 07 V) Ln D D << m W C O 0 O ,l<i, (D` w OC tQ -0 - n n O_ ID 3 Z7 CD C `< 0 CD m O n (ND 0-- 3 C n .-r < ,Ny. C -s 3 -� co n 3'< 3 C° m 3 Qrt CD c �CC Ll w Nm d l<-a C W (D )_ nOi Q CD [D 3 N m m° (D w 0. 3 3 G (� C- N a). 7: rD Ln O r+ K C ' ((Dn w O to (�D f+ h N (D Q. (D 3 C (D _r• O (D (D �' ,-,. (CD v N (<D N rD frD <D ` h C 3 3 (D m 3 ,3-�• O (�p ,mi. (�DV7 m _ U (3D w• O [D w l4 N Q -0 (D (D O- N n O O C) m (D 3 n m LO N rt N + 3 p (> ti v (p N D 3 Ln C r r Qj w fl n (D ,-i- ' O (rD 3 w G! 3 •-,• `t (D 3 C 3- O 0 ��* O — (D 3 (D n (D i Q (D = < (D LO rD w 3 w o w 3 D n ro 4A Cm 0CD N (n O V -! -1 rl -1 -.! V -4 V V V V V 3 lfl t0 O W W P. A �n In !-n Q1 61 61 01 01 y O 00 O N Im A O N co N N A A Ol O O O O O O O O O O O O O O O to tD t -V* ffr -64 -64 lb -I to -U4 tR t o -b , fa t� O Zn (o N -• N O O O Ln OD •P co Ln O N m Ln O co vi CD C) �! CD CD (IlP C)-! a)OD (n uu 'p N N o O 0 W o Vu C)m 1 O o O 0 � - co O o O 0 O 0 --• 0 O C) In o iv Ol o O O O O N O O O O O O O O O O Oo Q O O O O A CD CD In CD CD C) C) C)O O C) N o 0 C) 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O N O Cl O 0 O O 0 O 0 Cl Gal T TITAS COUNTY Board of County Commissioners Five]"4121;7;F3-I_12aI L1411167G til AGENDA DATE: September 12, 2023 ACTION REQUESTED: Request Boards approval Resolution BACKGROUND: Kittitas County Solid Waste operates the Ryegrass Facility which includes multiple permits and activities. The operations on site are governed under WAC 173.200, WAC 173.350 and WAC 173.308 all of which require ongoing environmental monitoring and permitting. This Amendment will cover nine different areas onsite. Due to the complexity of the site it is necessary to have the same consultant work with all of the permits and regulations since some of the monitoring is needed for multiple permits. Task 1 will include siting and drilling a new ground water monitoring well between the septage lagoons and the landfills. The Department of Ecology Hydrogeologist has requested that an up gradient well be installed per WAC 173.350-330, in order to confirm background water quality. Over the years we have talked with the DOE about this well and siting of it has been an issue since we are on the top of the mountain and finding the correct location. Prior Hydrogeologist had not required the installation. Task 2 Limited Purpose Landfill closure design services. Task 3 Limited Purpose Landfill engineering services Task 4 Evaluation of borrow soils to be used on site for cover material. Testing of soil to be brought on to the site to be used for cover material and to amend existing soils. Task 5 Expansion of the Biolsolids land application area. Task 6 SEPA Check list and Critical Areas Report update. Task 7 Air permitting for the facility. Task 8 Unanticipated, Critical Work Allowance. Task 9 Annual Environmental Monitoring Reporting This work is to be completed by September 2025. UTErRACTION: Solid Waste, Parametrix, and Department of Ecology RECOMMENDATION: Recommend the approval of the proposed Amendment to Parametrix Professional Service agreement. HANDLING: Return to Solid Waste ATTACHMENTS: Amendment #1 with Parametrix LEAD STAFF: Patti Stacey Kittitas County SoNd Waste Programs 925 Industrial Way, Ellensburg, WA 98926 Telephone: (509) 962-7542 September 12, 2023 Parametrix Attention: Tiffany Neier 60 Washington Avenue, Suite 390 Bremerton, WA 98337 RE: Amendment No. 1 to Professional Service Agreement This Amendment will add Task 1-9 to the Professional Service Agreement for the Ryegrass Landfill Facility. Original Professional Service Agreement $237,242.40 Task 1 New Ground water Monitoring Well $ 59,497.64 Task 2 LPL Closure Design $ 49,509.79 Task 3 LPL Closure Engineering Services $ 25,477.39 Task 4 Evaluation of Borrow Soils $ 24,980.78 Task 5 Expansion of Biolsolids Land application $ 30,545.93 Task 6 SEPA and Critical Areas Report Updates $ 15,504.77 Task 7 Air permitting $ 57,315.92 Task 8 Unanticipated, Critical Work Allowance $ 10,000.00 Task 9 Annual Environmental Monitoring Reports $ 20,277.42 Total Adjust Service Contract Amount not to exceed. $530,352.04 I have enclosed four copies of this change please sign and return. Approval Kittitas Co l tty/ hair Board of Commissioners BY: --- Name: TITLE: DATE: 11. 2 I Zl-) Parametrix BY: Name: Jenifer Young TITLE: EP&C Division Manager DATE: September 14, 2023 Parametrix ENGINEERING. PLANNING. ENVIRONMENTAL SCIENCES SCOPE OF WORK Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion Area, and Air Permit INTRODUCTION Kittitas County Solid Waste Programs (County) owns and operates the Ryegrass Limited Purpose Landfill (LPL) located in Kittitas County, Washington. The site is currently permitted under Washington Administrative Code (WAC) 173-350-400, Limited Purpose Landfills. The current facility was reclassified as an LPL in 2004 with a planned capacity of approximately 550,000 cubic yards. Based on the results from the groundwater monitoring over the past several years, the Washington State Department of Ecology (Ecology) has requested that a monitoring well work plan be developed and executed to try to determine if the nitrates are entering the groundwater from the septage lagoons, a product of the closed Municipal Solid Waste (MWS) landfill on site, the biosolids land application, or a different unanticipated factor not related to activities on site. Once the source of the constituent is determined a plan can be developed on how to address them in a way that will meet Ecology's directive. The LPL is now nearing capacity and the County is planning a Final Closure of the LPL and beginning of Post - Closure Care. Parametrix, Inc. (Parametrix) will assist the County in updating the Ryegrass LPL Closure Plan and financial assurance documentation. Additionally, Parametrix will develop a plan for the conditioning of the soil from another County project site to be used for Final Cover of the LPL. County also owns and operates the Ryegrass Biosolids Management Facility that includes two 500,000-gallon lined septage ponds installed in 2006, west of two leachate and process wastewater ponds and a biosolids land application practice. The County is looking to add the area south of the existing LPL as a new biosolids application area. Parametrix will support the County in obtaining a modification to the existing General Permit for Biosolids Management to increase the land application area for Class I and II septage. As part of this effort, Parametrix will update the Site -Specific Land Application Plan (SSLAP) to include the new application areas, update the Plan of Operation for the septage evaporation lagoons, and evaluate alternative crop types for more effective nutrient uptake. This scope is assumed to be executed over a two-year period with the timing of each item depending on outside influences like regulations and facility capacity. Parametrix's services will be provided in accordance with the following tasks. PROJECT MANAGEMENT Throughout the course of this contract, Parametrix will provide effective project management and coordination, ensuring the scope of work is executed effectively within budget and schedule. The effort involved for Project Management is included under each task. Parametrix will: Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 1 September 2023 Area, and Air Permit SCOPE OF WORK (continued) • Manage project activities • Prepare monthly invoices accompanied by a project status report • Administer subcontractor agreements • Coordinate, schedule, and participate in project meetings, including preparation of meeting notes • Coordinate with other consultants • Provide quality control over all aspects of Parametrix's work Project management is assumed to occur throughout the project duration of approximately 12 months. Deliverables: • Monthly invoice and status reports (PDF) • Meeting Notes (PDF) • Periodic schedule updates (MS Project or PDF) Schedule We are prepared to begin this project upon written authorization to proceed with the assumption of a September 2023 start. The project duration is proposed through September 2025. If the projects extend past September 2025, an amendment will be requested. TASK 01 — NEW GROUNDWATER MONITORING WELL Objective The objective of this task is to determine the source of constituents in the groundwater like nitrates as directed by Ecology. This task includes the development of a work plan for hydrogeologic characterization, siting the location of one new well, and coordinating with regulators. Once a work plan is developed and accepted by Ecology, Parametrix will assist the County with procurement and well construction and develop a report documenting the work. This task includes the following actions: • Review existing hydrogeologic information and develop a work plan for the drilling of a well including the well depth, type of drilling, hydrogeologic analysis • Perform a site visit/reconnaissance to select a location for one new groundwater monitoring well. Attend virtual meetings with HWA, Parametrix, County, and Department of Ecology staff regarding the new well • Develop plans and specifications for procurement of a licensed well driller to drill a monitoring well up to 200 feet below ground surface • Provide oversight of the selected drilling contractor, review submittals, assist County with contract • Oversee drilling, well construction, well development, and geologic observations • Prepare boring/well log Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 2 September 2023 Area, and Air Permit SCOPE OF WORK (continued) • Survey the well location and wellhead elevation • Develop a formal report documenting the well installation and initial results • Project Management, meetings, and communications Additional work beyond the scope and budget of this task asked for by regulators will be covered under an amendment to this contract. Deliverables The following list of deliverables will be prepared related to the new monitoring well: • Draft Hydrogeologic Work Plan for the new monitoring well • Final Hydrogeologic Work Plan for the new monitoring well • Draft plans and specifications for the new monitoring well (90%) • Final plans and specifications for the new monitoring well • Engineer's / Hydrogeologists Estimate for the cost of the project • Draft Monitoring Well Construction Summary Report • Final Monitoring Well Construction Summary Report Assumptions Based on the scope we have developed the following assumptions: • Kittitas County will provide one set of comments of the Draft deliverables prior to finalization. • Parametrix will attend up to four one hour virtual meetings with regulators to discuss the project. • Ecology and Kittitas County Health Department will provide one set of comments on the Work Plan. • Kittitas County with contract directly with the licensed well driller for drilling, construction, well development, and pump placement. • Well drilling, construction, and development will take place over the course of 5 business days. • Sampling and analysis of the new well will be completed by others and the results provided to Parametrix. TASK 02 — LPL CLOSURE DESIGN SERVICES Objective This task will encompass the items needed to complete design of the closure for the existing LPL so that the post - closure period may begin. This includes planning, permitting, design, bid assistance, and limited construction services as discussed below. Assumed items include the following: Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 3 September 2023 Area, and Air Permit SCOPE OF WORK (continued) Meetings with Regulators Consultant and County will meet with regulators from the Kittitas County Department of Public Health (DOH) and the Department of Ecology (Ecology) to discuss what items the regulators would like to see for the final closure of the landfill. Anticipated items the regulators will require: • Updated 2004 LPL Permit figure to show liner limits and existing conditions • Final Cover Design • Update the Plan of Operations • Updated Closure/Post-Closure Plan • SEPA (to be completed under Task 09: SEPA Checklist) Update LPL Permit The figure site figure for the LPL permit will be updated to reflect the existing conditions and surveyed limits of waste. The County will provide the surveyed limits of waste for this task. Final Cover Design The assumption for this scope is that the County will take this project out to bid. A full bid set will there for be compiled for this project. Design items to be provided by Consultant: • Drawing Sheet Set including: o Cover Sheet o Final grade plan sheet o Drainage Plan sheet o Landfill Sections o Cover system and stormwater details • Specifications • Engineer's opinion of probable construction cost. Though the cover system is planed to be installed in stages, this task assumes one plan set. Update Operations and Maintenance Plan This task involves modifying the exiting Operations and Maintenance Plan from the approved 2004 LPL Permit and incorporating aspects of the draft Operations and Maintenance Plan from the Draft Expansion Permit. Update Closure/Post-Closure Plan Update the existing LPL Post -Closure Care plan to reflect existing conditions and identify if there are any items that do not meet current regulations. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 4 September 2023 Area, and Air Permit SCOPE OF WORK (continued) TASK 03 — LPL CLOSURE ENGINEERING SERVICES Objective This task will encompass the items needed to complete construction of the closure for the existing LPL so that the post -closure period may begin. This includes bid assistance and limited construction services as discussed below. The construction is assumed to be in phases, the first of which is assumed to be in 2025. Included items include the following: The County will have a full-time inspector on site during the construction. The Consultant shall assist in answering construction questions and reviewing submittals and requests for information (RFIs). The Consultant engineer will also attend the pre -construction meeting in person and do one site visit at the end of the project. The County will perform a drone survey before and after construction so that we can demonstrate to DOH and Ecology that the full cover depth has been applied. The County will analyze the survey and submit the information to the regulators. Services During Construction • Responses to RFIs and Submittals • Pre -construction meeting attended by engineer (on site) • Final walk through by engineer TASK 04 — EVALUATION OF BORROW SOILS FOR OTHER USES Objective We understand that Kittitas County Solid Waste is planning to close the Phase 1 area at its Ryegrass LPL and set up a biosolids recycling facility on site. Closure of the Phase 1 area would consist of placement and compaction of a soil cap comprised of two layers: 1) a low permeability barrier soil layer, and 2) an upper vegetative soil layer. Concurrently, the County will be constructing a new transfer station, which will require extensive removal of settlement prone soil. The intent of this geotechnical evaluation is to determine whether the soil removed from the transfer station site will be suitable for use as final cover soil components at the Ryegrass LPL. In addition, representative soil samples will be evaluated by a local agricultural laboratory (SoilTest of Moses Lake, WA) to provide baseline parameters for soil fertility (for the vegetative cover soil layer) and for use in the biosolids recycling process. Activities Herein, we present an abbreviated scope of the evaluation for HWA to perform: • Conduct geotechnical testing on three bulk samples that HWA obtained at the Transfer station site during foundation explorations conducted for the design of the new transfer station. The samples represent soil composited from 3 areas where deep excavations will occur at the new transfer station s ite. • Geotechnical testing will include compaction (proctors), shear strength (direct shears) and remolded permeability. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 5 September 2023 Area, and Air Permit SCOPE OF WORK (continued) • Agricultural testing will be conducted to determine soil fertility and compatibility with proposed final cover vegetation, in addition to assessing the potential for soil use in the biosolids recycling process. • The results of our geotechnical testing will inform our recommendations regarding, handling, drying, placement, compaction, and stability of the soil used for final cover. • Our findings and recommendations will be provided in a technical memorandum. Parametrix shall assist in coordination and review of information for this task and assist where needed. Deliverables • Technical memorandum outlining the findings and recommendations for the soil. TASK 05 — EXPANSION OF BIOSOLIDS LAND APPLICATION AREA Objective The objective of this task is to obtain a modification to the Kittitas County Ryegrass Septage Facility's (the Facility) existing General Permit for Biosolids Management (Permit Number BT9208) to increase the land application area for Class I and II septage. Activities The following activities will be performed to increase the land application area to include previously closed MSW landfill areas and the footprint previously designated for expansion of the LPL. • Coordinate with Ecology to apply for a permit modification to increase the land application area. • Complete a SEPA checklist and threshold determination (to be completed under Task 09: SEPA Checklist). • Prepare responses to public comments. • Prepare a Site -Specific Land Application Plan (SSLAP) to include the new application areas. • Update the Plan of Operation for the septage evaporation lagoons, which will include the additional two leachate ponds as discussed in the next task. • Evaluate alternative crop types for more effective nutrient uptake using region -specific sources (e.g., Washington State University Extension) and publications. TASK 06 — SEPA CHECKLIST AND CRITICAL AREAS REPORT UPDATE Prepare a SEPA checklist using the most recent version of the checklist form. The SEPA checklist that was prepared for the Phase 2 LPL Expansion will be modified to reflect the LPL closure, new leachate lagoon and biosolids land application. Additionally, this task includes updating the Ryegrass Critical Areas Report and Habitat Management Plan prepared for the previously proposed Phase 2 Expansion. The report will be modified to be non-specific to any particular project on the site. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 6 September 2023 Area, and Air Permit SCOPE OF WORK (continued) TASK 07 —AIR PERMITTING Kittitas County Solid Waste Programs (County) owns and operates the Ryegrass Limited Purpose Landfill (LPL) located in Kittitas County, Washington. Solid waste handling activities at the site are currently permitted under Washington Administrative Code (WAC) 173-350-400, Limited Purpose Landfills. Washington State air pollution control standards and requirements are covered under Chapters 173-400, -401, and -460 WAC. Establishment of new equipment or modification of existing equipment that may cause an increase in air pollution emissions is subject to minor new source review (NSR) under Chapters 173-400 and -460 WAC. Any facility that meets or exceeds the applicability requirements in WAC 173-401-300 is required to obtain an air operating permit. Federal air pollution control standards for landfills are covered under the New Source Performance Standards contained in Title 40 Code of Federal Regulations (CFR) 60 and the National Emission Standards for Hazardous Air Pollutants contained in 40 CFR 63. All these air quality requirements are administered by the Department of Ecology Air Program. Parametrix will evaluate applicability of the state and federal air quality requirements to the Ryegrass LPL, determine actions necessary to achieve compliance with applicable air quality requirements, and prepare required applications for submittal to Department of Ecology (Ecology). This scope will be executed over a six-month period with the timing of each item depending on outside influences such as regulatory review and availability of information from the County. Parametrix's services will be provided in accordance with the following tasks. Schedule We are prepared to begin this project upon written authorization to proceed. Project management effort for the scope included herein was based upon a six-month period to complete. Evaluation of Applicable Regulations Objective This task will review air quality regulations pertaining to landfill operations in the Washington Administrative Code (WAC) and Federal Code of Regulations (CFR). The findings in this section will provide direction on the air permitting regulations governing the Ryegrass LPL and be used to complete Task 3 "Permitting." Approach This task includes the following actions performed by Parametrix: • Review the WAC and CFR for applicable regulatory sections based upon historical operations and refuse acceptance. • Determine requirements of applicable regulations upon Kittitas County for operation of the Ryegrass Limited Purpose Landfill including surrounding facilities such as the historic MSW and septage lagoons as required by the Department of Ecology Air Program Deliverables: • One draft and one final technical memorandum summarizing findings. Assumptions: • Regulatory review will not require field testing. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 7 September 2023 Area, and Air Permit SCOPE OF WORK (continued) Permitting Requirements Objective This task will include determination of the required actions for the obtaining of any necessary permits for the Ryegrass LPL. The findings of this task will inform the required services to prepare and submit required applications and provide follow-up with Ecology as required to obtain the corresponding approval(s). Approach This task includes the following actions performed by Parametrix: • Determination of steps required for a New Source Review (NSR) application and air operating permit based upon the findings of the evaluation of applicable regulations. Deliverables: • Summary of steps required to pursue NSR application and air operating permit. Permitting Assistance Objective This task will utilize findings from the evaluation of applicable regulations to prepare and submit required applications and provide follow-up with Ecology as required to obtain the corresponding approval(s). Approach The following activities will be performed as part of this task: • Preparation of inventory of all regulated air pollutants from the operations at the site during calendar year 2023. This will be done by using known emission factors and annual production throughput values to be provided by the County, along with any proposed new equipment. • Prepare the permit application submittal to Department of Ecology (Ecology) on behalf of the County. The application will be based on the Ecology Instructions for Permit Application. Subtasks are expected to include o Review of equipment and process data o Prepare best available control technologies (BACT) analysis o Determine controlled potential to emit (PTE) o Compare PTE of toxic air pollutants (TAPS) to WAC 173-460-150 o Prepare permit application • Equipment usage and operations will be based on the 2023 LPL emissions inventory. Deliverables The following deliverables will be prepared: • Draft NSR Permit application for County review and a final application for County signature by responsible official(s) using Ecology application forms. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 8 September 2023 Area, and Air Permit SCOPE OF WORK (continued) Assumptions: • The County will provide all data concerning equipment and materials throughput required for emission inventory calculations. This data is necessary for the emission inventory calculations to be done. • This scope does not include preparation of detailed ambient impact modeling utilizing AERMOD. • Drawing and SEPA preparation will not be required. TASK 08 — UNANTICIPATED, CRITICAL WORK ALLOWANCE If unanticipated, critical work activity becomes necessary that is not within the authorized scope of services, the County may authorize additional services utilizing the budget established in this task. An allowance of $10,000 has been allocated to this task. A"TASK 09 —ANNUAL ENVIRONMENTAL MONITORING REPORT Objective: Prepare annual report documenting the results of the four quarterly groundwater monitoring events in accordance with the requirements of Solid Waste Handling Standards (Chapter 173-350 WAC), the current solid waste handling permit issued by Kittitas County Health Department, the Sampling and Analysis Plan (SAP), and Guidance for Groundwater Monitoring at Landfills and Other Facilities Regulated Under Chapters 173-304, 173-306, 173-350, and 173-351 WAC (December 2012, Ecology Publication 12-07-072). Additionally, summarize the environmental monitoring for gas and leachate monitoring of the LPL and the closed landfill. Approach: Prepare annual report summarizing the data collected during quarterly monitoring for the LPL and bi-annual sampling for the closed landfill. The annual report will include evaluating the groundwater data in accordance with the statistical approach presented in the SAP, which consists of establishing a subset of parameters for formal detection monitoring and conducting quarterly comparisons of data to intrawell trends and those that are statistically significant (95%) for both long term and short-term trends. For new wells without historical data, the baseline data will be established with the initial eight data points. Deliverables: Draft (PDF via Parametrix SharePoint site) and Final Environmental Monitoring Annual Report (three copies and PDF via Parametrix ftp site). The data for each quarter in 2024 will be submitted to the Ecology's EIM database following submittal of the final annual report. Assumptions: • Copies of original laboratory reports, including laboratory QA/QC results, will be provided to Parametrix by HWA or the analytical laboratory. • Groundwater data will be provided to Parametrix in electronic format. The laboratory will provide groundwater quality data in an EIM-ready format. • Groundwater, leachate, and gas sampling will be completed by others (HWA) • Gas and Leachate data will be provided to Parametrix by HWA with digital copies of the gas results and electronic format of leachate testing. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 9 September 2023 Area, and Air Permit SCOPE OF WORK (continued) The annual report will summarize and interpret the following information (for all four quarters): o All groundwater monitoring data, including laboratory and field data for the sampling periods o Statistical results and/or any statistical trends, including findings of any statistical increases for the year including time series plots of concentrations o A summary of concentrations above the maximum contaminant levels of Chapter 173-200 WAC, Water Quality Standards for Groundwaters of the State of Washington o A summary of the leachate results compared to groundwater samples o A summary of the landfill gas conditions o Static water level readings for each monitoring well for each sampling event o Potentiometric surface elevation maps depicting flow direction for each sampling event o Groundwater flow velocity calculations for each sampling event and a discussion of any trends or changes during the year o Geochemical evaluation, including cation -anion balancing and trilinear and/or stiff diagraming for each sampling event noting any changes or trends in water chemistry for each well during the year One hard copy of the final report will be submitted to Kittitas County, Ecology, and the Health Department. BUDGET We estimate that the scope of services described herein will require a budget of $293,109.64. A breakdown of these costs is presented on the attached spreadsheet. Parametrix agrees not to exceed the above budget without the County's authorization. However, if during the work, a level of effort beyond the scope of our work appears necessary, Parametrix will contact the County immediately to discuss any necessary modifications to the scope of services and/or budget estimate. The budget presented in this proposal reflects an estimate based on our current understanding of the project requirements for a scope of work developed from information provided. Parametrix reserves the right to transfer hours and budget dollars between tasks to satisfy project requirements. The budget also reflects estimated direct costs to the project. Parametrix may also transfer funds allocated for direct costs to professional/technical hours, or vice versa, to satisfy project requirements. Kittitas County Solid Waste Groundwater Monitoring Well, LPL Closure, Biosolids Expansion 10 September 2023 Area, and Air Permit Additional Groundwater Monitoring, LPL Closure, Biosolids Expansion Area, and Air Permit 1 New Groundwater Monitoring Well Parametrix $49,497.64 H WA $10,000.00 Total $59,497.64 2 LPL Closure Design Services Parametrix $49,509.79 Total $49,509.79 3 LPL Closure Engineering Services Parametrix $25,477.39 Total $25,477.39 4 Evaluation of Borrow Soils for Other Uses Parametrix $4,152.78 HWA $20,828.00 Total $24,980.78 5 Expansion of Biosolids Land Application Area Parametrix $28,345.93 Land Profile, Inc $2,200.00 Total $30,545.93 6 SEPA Checklist and Critical Areas Report Update Parametrix $15,504.77 Total $15,504.77 7 Air Permitting Parametrix $57,315.92 Total $57,315.92 8 Unanticipated, Critical Work Allowance Parametrix $10,000.00 Total $10,000.00 900;I Annual Environmental Monitoring Report Parametrix $20,277.42 Total $20,277.42 Overall Total $293,109.64 Placeholder 6m uaAON ApS 115p8o1oa8olpAH uasu4af'N uea 101wls!U!Wp l�elluo7l m .si—dn seon� epuew su011ea114nd ,.jenl4M iud 1sllelaad m s!ol3U0. afold 'P^ L lnlM a!—N lueluno]] 1J3101d n lasolN aa!AeN III lsiluap N appaS uAla41eN 1sA!euy 519lolua issulan9 uAlnel II laau!eu3 14 wTi. 0 0 o� o sewo4l nu!l Ill laau18u3 8ue4d U1103 II laau!8u3 h UO1JON MDJ(I III —18U3 n o h lan!y3 ao AI 1aau18u3 N o o e APel0 lae4a!W Al u!BOIoaBolpAH'�^ lAl!len a o laHng ue! lIV) laau!8u31 lall!W 34a!Mp luelinsuo !edlP ,d N m w� o la!aN A-j4 la2—W Oa(Old to N Q z �• m '�T C O 3 c — mmm mi:ns� CL g d n4 4 --iig{ •6 O a C t0 N � a 3 S= of ba a c Z N 9 3 Q .��. a °5 m 15 3 � z9 IJ U n Q a Nj r d,�a�ii 0 c� m c 0 main v 9 Q