PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 NEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM September 25, 2023
Board members present: Chairman Cory Wright, Vice Chairman Brett
Wachsmith, and Commissioner Laura Osiadacz.
Others: Josh Fredrickson, Rebecca Cruse, Public Works; Brian Carlson,
Auditors Office; Jessica :Miller, Jamey Ayling, Community Development
Services; Stephanie Hartung, Jacob Schroeder Prosecuting Attorrey's
Office; No members of the public.
At 1:35 PM Chairman Cory Wright opened the Public works Study Session.
No Citizen Comments -
PHEASANT LANE
Josh Fredrickson briefed the Board of County Commissioners on requests
received to use Pheasant Lane, an unopened right-of-way for access to
development of residential homes. Josh Fredrickson presented a Road
Improvement District as an option for the residents to improve the road
and stated in 2020 a Public Hearing was held, and the road remained
unopened. Discussion pursued. Chairman Cory Wright requested this item
be tabled for further review.
SEARCH AND RESCUE WETLAND IMPACTS
Josh Fredrickson stated that the consultant is working on design and
environmental permitting for the new Search and Rescue Facility site and
wetlands have been identified adjacent to Airport Road. Josh Fredrickson
added that exemptions exist for the setback requirements for Public
Facilities. The Board of County Commissioners supported staff efforts
moving forward on the project.
CERB GRANT REQUEST FOR ELN
Josh Fredrickson briefed the Board of County Commissioners on a pending
Economic Development Grant for development of a master plan for Bowers
Field. Chairman Cory Wright requested Briar. Carlson_, Budget and Finance
Director's input on funding. Brian Carlson stated that there are
possibly some ARPA funds that could be allocated to fund the master plan
development.
Meeting concluded at 1:58 PM
2023-9-25 MINUTES
Rebecca Cruse, Administrative
Assistant
2023-9-25 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 25, 2023
TOPIC: Pheasant Lane
ACTION REQUESTED: Direct staff
LEAD STAFF:
Joshua Fredrickson
RECOMMENDATION:
Direct staff to provide access permits for residential uses on unopened right-of-way.
BRIEFING SUMMARY:
• Unopened county right-of-way continues being used for residential access.
• Pheasant Lane extends from a bend in Reecer Creek Road north for
approximately 2.62 miles.
• Pheasant Lane provides access to numerous residences and undeveloped lots
• Public Hearing on August 18, 2020, and continued September 1, 2020, considered
establishment of unopened Pheasant Lane county right-of-way. The decision to
not establish Pheasant Lane onto the public road network resulted from the public
hearing.
Pheasant Lane continues to be unopened county right-of-way for approximately
2.62 miles.
• Interest from property owners seeking to develop residential housing in the area
increases demand to the unopened county right-of-way.
• Public Works currently has a request to use Pheasant Lane for another residential
home builder.
BACKGROUND:
Unopened rights -of -way exists throughout Kittitas County. Public Works has seen an
increase in demand for access permits to parcels utilizing unopened right-of-way for
development. Pheasant Lane, located off of Reecer Creek Road, is a current example of
such right-of-way. Public access to public lands as well as access for development brings
an inherent confusion related to utilization of the unopened right-of-way. Increased use of
unopened rights -of -way results in higher demand for maintenance and ongoing confusion
of maintenance responsibility.
DISCUSSION:
Development interests to construct residences utilizing access through unopened right-of-
way continues to increase. The inherent confusion over public access occurs when
individuals look to utilize unopened right-of-way for home access. Road improvements
Page 1 of 3
Public Works "Work Session Staff Report" 2023
may be considered through a Road Improvement District (RID). An example of an RID
used for improvement was Wiehl Road. Access permits for existing and future uses may
be issued, conditioned on future improvements, and require waiving the right to protest
future formation of an improvement district.
FISCAL IMPACTS:
Undetermined at the time of this briefing presentation.
ATTACHMENTS:
Exhibit 1: Pheasant Lane Map
Page 2 of 3
Public Works "Work Session Staff Report" 2023
EXHIBIT 1: Pheasant Lane Map
Page 3 of 3
Public Works "Work Session Staff Report" 2023
`4e:SYf
yFY
7
a
bl
o
C C
U)
m
�
0 all
M :m
�x
o �
mk✓�
X i
' N
Sr
1-
0
I c
IN
t
it
i H
p
y
-z
' z
I
I Z7
F
o
o �
�
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 25, 2023
TOPIC: Search and Rescue Wetland Impacts
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook.
RECOMMENDATION:
Support staffs decision completing design and environmental permitting for the Search
and Rescue facility in Cle Elum, WA.
BRIEFING SUMMARY:
• Public Works (PW) has been leading the design and environmental permitting
effort supporting the development of a new search and rescue facility in Cle
Elum, WA.
• A couple of months back, during final environmental permit preparation, a small
wetland was discovered on site.
• Our current Critical Areas Ordinance (CAO) imposes a wetland buffer of
sufficient size that renders the site useless for search and rescue facility purposes.
• County code contemplates such an occurrence at KCC 17A.01.060 Exceptions.
• A critical areas report is currently being produced consistent with KCC
17A.01.080 and will provide the basis for an exception request.
• The Director then reviews the request and shall: approve, approve with
conditions, or deny the request.
BACKGROUND:
PW is nearing completion of the environmental permitting phase of the project. Site
impacts from a small wetland onsite negate the use of the property owing to CAO
required wetland buffer size. KCC 17A.01.060 allows exceptions for a public agency_
DISCUSSION:
Once the required critical areas report is completed and reviewed by the Director
(PWICDS), a decision regarding a requested exception shall be consistent with the
requirements of KCC 15A.03. The criteria for review and approval appear below for
Board of County Commission consideration:
i. There is no other practical alternative to the proposed development with less
impact on the critical area and its buffer;
ii. The application of this Title would unreasonably restrict the ability to provide
utility and/or agency services to the public;
Page I of 3
Public Works "Work Session Staff Report", 2023
iii. The proposal does not pose an unreasonable threat to the public health, safety, or
welfare on or off the development proposal site;
iv. The proposal attempts to protect and mitigate impacts to the critical area functions
and values consistent with the best available science; and
v. The proposal is consistent with other applicable regulations and standards.
Pursuant to county code, a Director administrative decision may be appealed to the
Hearings Examiner and then to Superior Court (KCC 15A.03).
FISCAL IMPACTS:
Site engineering and building design are nearing completion. The county has invested
approximately $500,000 to date in land acquisition and building design costs.
ATTACHMENTS:
EXHIBIT 1: KCC 17A.01.060
Page 2 of 3
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: KCC 17A.01.060
Page 3 of 3
Public Works "Work Session Staff Report", 2023
17A.01.060 Exceptions.
1. Public Agency and Utility. It the application of this Title would prohibit a proposed
development by a public agency or public utility, the agency or utility may apply for an
exception pursuant to the following:
a. Exception Request and Review Process. An application for a public
agency and utility exception shall be made to the County and shall include
a critical areas report, as described in KCC 17A.01.080. including mitigation
plan, if necessary; and any other related project documents, such as permit
applications to other agencies, special studies, and environmental
documents prepared pursuant to the State Environmental Policy Act
(Chapter 43.21 C RCW). The application shall follow the administrative
project permit review process outlined in KCC 15A.03
b. Director Review. The Director shall approve, approve with conditions, or
deny the request based on the proposal's ability to comply with all the
reasonable use exception criteria in Subsection 2(c).
c. Public Agency and Utility Review Criteria. The criteria for review and
approval of public agency and utility exceptions are as follows:
i. There is no other practical alternative to the proposed
development with less impact on the critical area and its
buffer;
ii. The application of this Title would unreasonably restrict the
ability to provide utility and/or agency services to the public;
iii. The proposal does not pose an unreasonable threat to the
public health, safety, or welfare on or off the development
proposal site;
iv. The proposal attempts to protect and mitigate impacts to the
critical area functions and values consistent with the best
available science; and
V. The proposal is consistent with other applicable regulations
and standards.
d. Burden of Proof. The burden of proof shall be on the applicant to bring
forth evidence in support of the application and to provide sufficient
information on which any decision must be made on the application.
2. Reasonable Use. if the application of this Title would deny all reasonable economic use
of the subject property, the County shall determine if the property owner may apply for
an exception pursuant to the following:
a. Exception Request and Review Process. An application for a reasonable
use exception shall be made to the County and shall include a critical areas
report, as described in KCC 17A.01.080, including mitigation plan, if
necessary; and any other related project documents, such as permit
applications to other agencies, special studies, and environmental
documents prepared pursuant to the State Environmental Policy Act
(Chapter 43.21C RCW and rules thereunder in Chapter 197-11 WAC). The
application shall follow the administrative project permit review process
outlined in KCC 15A.03. In determining what is considered reasonable use
of an undeveloped parcel, the Director may consider additional information
such as zoning, and comparable structure sizes and land uses of the
surrounding area.
b. Director Review. The Director shall approve, approve with conditions, or
deny the request based on the proposal's ability to comply with all the
reasonable use exception criteria in Subsection 2(c).
c. Reasonable Use Review Criteria. Criteria for review and approval of
reasonable use exceptions include:
i. The application of this Title would deny all reasonable
economic use of the property;
ii. No other reasonable economic use of the property has less
impact on the critical area and its buffer;
iii. The proposed impact to the critical area is the minimum
necessary to allow for reasonable economic use of the
property;
iv. The inability of the applicant to derive reasonable economic
use of the property is not the result of actions by the applicant
after the effective date of this Title;
V. The proposal does not pose an unreasonable threat to the
public health, safety, or welfare on or off the development
proposal site;
vi. The proposal will result in no net loss of critical area functions
and values consistent with the best available science;
vii. The proposal is consistent with other application regulations
and standards.
d. Burden of Proof. The burden of proof shall be on the applicant to bring
forth evidence in support of the application and to provide sufficient
information on which any decision must be made on the application.
Ord. 2021-016, 2021
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 25, 2023
TOPIC: CERB Grant Request for ELN
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATIONS:
Support accepting the Community Economic Revitalization Board (CERB) grant
developing a Master Plan for economic development at Bowers Field (ELN) in the
amount of $75,000.
Provide direction to staff to appropriate and/or repurpose $111 K for this Master Plan
element.
BRIEFING SUMMARY:
• The county has been noticed of a pending $75,000 planning grant from CERB.
• County match for this grant is $47K; County has previously appropriated $50K in
anticipation of this grant award (first 2023 Budget Amendment resolution).
• JUB has an executed task order (3) in the amount of $236,000.
• Additional funding of $1 I OK is needed to complete this task.
Staff can identify optimal combination of new appropriations and repurposed
prior appropriations to Airport and formalize in Resolution to Amend 2023
Budget.
The action is consistent with the recently adopted Economic Development
Strategic Plan for Kittitas County.
BACKGROUND:
On the heels of adopting the Economic Development Strategic Plan for Kittitas County,
the county is seeking grant funding (EXHIBIT 1) to master plan economic development
at ELN. The plan author will be JUB using their existing service contract for ELN
support.
DISCUSSION:
Re -assignment of agricultural leases at ELN begins the process of identifying the
feasibility of master planning approximately 850 acres of industrial development. The
plan produces: topographic survey, documents public involvement, inventories existing
conditions, produces an economic/market feasibility study, analyses utilities and
infrastructure need and identifies possible funding assistance implementing elements of
the master plan.
Page 1 of 4
Public Works "Work Session Staff Report", 2023
The project is expected to start in July 2023 and be completed in December 2024.
FISCAL IMPACTS:
$111,000 is required to complete project funding.
ATTACHMENTS:
EXHIBIT 1: CERB GRANT APPLICATION
EXHIBIT 2: GRANT PRESENTATION
Page 2 of 4
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: CERB GRANT APPLICATION
Page 3 of 4
Public Works "Work Session Staff Report", 2023
CERB Planning Project Analysis
2023-2025
I. PROJECT SUMMARY
Staff Contact: Janea Stark 360.252.0812
CERB Meeting: September 21, 2023
Applicant:
Kittitas County
County:
Kittitas
Rural County:
yes ® no ❑ (as defined by OFM)
Rural Community:
yes ❑ no ®(as defined by CERB)
Distressed County:
yes ❑ no ® (as defined by ESD)
Project Title: Bowers Field Business Park Feasibility Study
Project Description: ; A study to evaluate the feasibility of development of approximately 850 acres
of land surrounding the Kittitas County Airport (Bowers Field).
11. FINANCING REQUEST
A. Applicant Request
CERB 5-Year
Average
Leveraged Funds
Funding Request: Grant:
$75,000
$29,448
Amount
Match
$47,200
Source
Status
Kittitas County
Secured
TOTAL Match $47,200
Total Match as
of Project Cost
Project Total $122 200
(112u16 to b1zU21 - nl Planning Projects: Estimated Match;
B. Staff Funding Recommendation
Recommended Offer: I Grant: 1 $75,000
III. OTHER CONSIDERATIONS
I A. Local Dynamics i
Current Unemployment Rate Three Year Avg. Unemployment Distressed County?
Rate 3 year avg. county i
unemployment 2096 greater
County i State County State than state avg. 3 year rate
3.7% 3.8% 6.7% 5.7% No
B. Previous CERB Planning applications for this applicant*
Mo/Year 1 Total Award
Current Status
Updates
07/2021 $40,000.00 Study Completed 11/2022:The next step for this project will i
07/12/2022 be applications for funding to support the
i I necessary mid -mile and FTTN networks.
C. Previous CERB planning applications for other applicants in this county*
Mo/Year
Jurisdiction
Total Award
Current Status
Updates
07/2021
PUD #1 of
$47,020.56
1 Study Completed
i 12/27/2022: Study deemed feasible,
Kittitas County
07/12/2022
i however support for public investment in
!
Itelecommunications infrastructure is
expected to be a significant challenge for rate
'
payers.
09/2022
Ellensburg BDA,
$50,000.00
j Conducting
dba CenterFuse
i Study
I
09/2022
Ellensburg BDA,
$50,000.00
Conducting
dba CenterFuse
i;
I
Study
! '
01/2023
Ellensburg BDA,
$25,000.00
Conducting
i
dba CenterFuse
i Study
r nese planning projects were awarded in the last 10 years. The client reports on projects for 5 years after project completion.
D. Population Data As of (Date)
Total Labor Force 22,786 June 2023
Per Capita Income ; $45,267 2020
E. Project Readiness
Consultant Services Chosen
06/2023
Consultant Begin Work
07/2023
E Consultant Draft Report
06/2024
Consultant Final Report
11/2024
E Consultant End Work
11/2024
Project Complete
12/2024
1V. PROJECT DYNAMICS
A. Industry Clusters
Does this project build on locally -identified industry clusters? ® Yes ❑ No
If yes, please explain:
Staff Contact: Janea Stark 360.252.0812
CERB Meeting: September 21, 2023
{ Agriculture • Warehouse/Distribution
• Healthcare O Alternative (renewable) Energy
• Manufacturing + Aviation
• Tourism
B. Supports Infiil
Evaluate the feasibility of development of up to approximately 850 acres of land surrounding the Kittitas County
Airport (Bowers Field). in addition, land previously used for the closed crosswind Runway 7-29 will be evaluated for
development opportunities. This effort will produce a Master Plan document to report existing conditions of the
properties and recommendations of actionable items to promote opportunities. The Master Plan will encompass the
entire 850 acres of Bowers Field, with an emphasis on the "Ready to Lease" properties primarily south of W Bowers
Rd that are more "infrastructure ready" for Conceptual Site Plans. The "Future Development" properties are
primarily north of the closed crosswind Runway 7-29 and will be evaluated at a later date, as funding is available and
development occurs. If this project is not funded, the timeline will ultimately be stalled until the County can secure
funding to move forward. There is a high demand for developable land adjacent to airports for aeronautical and
related uses. Industries are looking to move now and if this project is not funded, the crucial window of opportunity
to utilize such desirable land may be missed. This will not only negatively impact the airport, but Kittitas County and
the surrounding communities in the region.
C. Evaluation Standards
Short-term benefits:
• Identify key industries who may be interested in the site.
• Identify lot size and configuration, infrastructure needs, and wastewater treatment options.
10 Provide a supply chain analysis to identify potential growth opportunities.
• Focus recruitment on industries that are not only compatible with the site, but with the community and its
values.
Long-term benefits:
• Position Bowers Field and Business Park as an aviation training and light manufacturing hub.
• Develop tools to strengthen the County's talent pipeline by aligning development, attraction, and retention
efforts with the needs of current and future employers.
• Provide a steppingstone to continue coordination between Central Washington University and employers to
create opportunities for learning and employment for students and community members.
• Expanding the aviation sector in Kittitas County will provide more jobs for graduating students and
encourage talent retention.
• An increase of employment opportunities in the aviation sector will provide higher -wage jobs.
• Identify infrastructure investments needed to ensure sites are shovel ready to attract manufacturing
companies and support expanding aviation training programs.
D. Project Goals
Kittitas County will have a completed Master Plan that will be used as a north star for future development. This Plan
will identify the long-term vision for Bowers Field with flexible plan implementation approaches that respect market
conditions and interests within the Plan's anticipated build out period.
E. Project Concept
The scope of work will include:
Topographic Survey
• Public Involvement
• Inventory of existing conditions (environmental, land ownership, existing development plans, site topography,
local and regional demographics (existing/projected), community land use issues, utility and roadway
information, future and existing land use maps/plans, zoning designations, land use restrictions/encumbrances,
and airspace analysis)
• Economic/Market Feasibility
• Conceptual Site Plan
• Utility/infrastructure Analysis (traffic, water, sewer, storm, utilities, cost opinions)
• Funding assistance
F. Economic Diversity
The County aims to create more diversification in the industries and jobs currently available to CWU graduates and
community members. This lack of diversification is a major challenge for retaining young talent. As stated in the
Kittitas County Economic Development Strategic Plan, "light manufacturing, aviation, craft brewing, agriculture
innovation, logistics and distribution all offer opportunities for diversification." These industries strengthen the case
for pursing the Bowers Field Master Plan and making large strides to preparing a shovel ready site.
STAFF RECOMMENDATION
IF CERB APPROVES FUNDING, staff recommends the project take the form of a $75,000 grant.
Staff recommends pre -contract requirements be completed within 4 months and due prior to January 18, 2024.
Pre -Contract Requirements
Staff recommends that execution of the final contract be contingent upon completion of the following conditions:
1. Finalized scope of work.
2. Evidence that consultant services have been selected to complete the study.
3. Evidence that the $47,200 cash match is in place, from the following or alternate sources:
a. Kittitas County $47,200 cash
EXHIBIT 2: CERB GRANT PRESENTATION
Page 4 of 4
Public Works "Work Session Staff Report', 2023
cn
CD CD 0
C 0
07
TT�
\V
a
3
a
4A
MO
CD
Mi
w
c
•
•
•
U)
n
m
'0
()
0
CD
O
o
O
C
O•
-
N
o
0O
c
CD
-I
`_
`
cn
V
_>_
r l•
I
:Eo-n,.d-11
--Y
o1 wm ? --
i
7.0
A :0
cn
to CO
0 —4
-4
rn
G)
0
K
M,
0
r_
3
cr
CD
CD
CL
n-
w
m
i •
Ant
f
�rtrtV
kJ
+
I4
I
�F
I
ySy�yy
ay
Q}
E
D
3
6
L'.
:46 - 4'
•
i
•
•
•
CD.
cm
rn
-0
n
CD
0
v
o
-
p
0
0.
0
3
c
3
0
CD
3
CD
CD
0
O
C
cn
CY
C
r
i
(D
0-
(D
rf
!rt
Fo
3
0
3
41 U
N1
aL
CD
3
cn
.l.)
o
cn n
CD C:
CLCn
—, c
° CD
CL
M
0
0
1 F4
a C
pr2
(D
(D
c�
- & \\
IA
17
ch
4
4A
0,
A
a I
CIL
W
Ilk
0
0 z
c
rn �
44
Pk` I, - I.