HomeMy WebLinkAbout2023-09-11-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday September 11, 2023 - 1:30 PM
BoCC Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Request to Approve a Resolution Ratifying the Chair's Signature on the Local Agency
Federal Aid Project Prospectus for the Vantage Highway Paving CRP 317-23
4. Other Business - No Action to be taken
5. Concluded
Created on 9/8/2023 8:05:07 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM September 11, 2023
Board members present: Vice Chairman Brett Wachsmith, and Commissioner
Laura Osiadacz.
Others: Josh Fredrickson, Rebecca Cruse, Public Works; Jessica Miller,
Community Development Services; Stephanie Hartung, Prosecuting
Attorney's Office; No members of the public.
At 1:30 PM Vice Chairman Brett Wachsmith opened the Public Works Study
Session.
No Citizen Comments.
REQUEST TO APPROVE RESOLUTION RATIFYING THE CHAIR'S SIGNATURE ON THE
LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS FOR THE VANTAGE HIGHWAY
PAVING CRP 317-23
Josh Fredrickson briefed the Board of County Commissioners on the Local
Agency Federal Aid Project Prospectus previously signed and requested
their support for Resolution 2023-154. Commissioner Laura Osiadacz moved
to approve Resolution 2023-154 and seconded by Vice Chairman Brett
Wachsmith.
Meeting concluded at 1:34 PM
2
/ � /Ak- ox�k
uReb6cca Cruse, Administrative
Assistant
2023-9-11 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Brett Wachsmith, Vice Chairman
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: September 11, 2023
ACTION REQUESTED: Request to Approve a Resolution Ratifying the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Vantage Highway Paving CRP 317-23.
BACKGROUND: Kittitas County was informed there may be a surplus of
federal funds available to Local Agencies that have shovel
ready projects able to obligate funding by mid -September
of this year.
Public Works identified the repaving of Vantage Highway
from City of Ellensburg limits to No. 81 Road as a project
that meets the criteria of this funding.
Project design will be performed by Kittitas County Public
Works. This project will require a 13.5 percent match in
local funds for construction. The current estimated total
cost of the project is $3,950,000.00, with $534,000.00
being the Local match.
Notice was received September 1, 2023, that Kittitas
County was awarded federal redistribution funding in the
amount of $3,416,720.00. Owing to the short timeline
required by WSDOT for obligation, the Chair signed the
project prospection and Public Works is now requesting the
Board ratify the signature.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Ratifying the Chair's signature on
the Local Agency Federal Aid Project Prospectus for the
Vantage Highway Paving CRP 317-23.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSIOi
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2023 - I �5' 1
RATIFYING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID
PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE VANTAGE HIGHWAY
PAVING PROJECT CRP 317-23
WHEREAS: Federal fund redistribution was requested for the resurfacing of Vantage
Highway and notice was received of award September 1, 2023; and
WHEREAS: Kittitas County Public Works has worked to prepare plans, specifications and
estimate for the project; and
WHEREAS: In order to obtain obligation authority for project funding, Kittitas County Public
Works is requesting the Washington State Department of Transportation release
the federal funds for the construction phase; and
WHEREAS: The Chair did sign a Local Agency Federal Aid Project Prospectus
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby ratify the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Vantage Highway Paving Project
CRP 317-23.
DATED on this 1 Ith day of September 2023, at Ellensburg, Washington.
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
ABSENT
Julie Kjorsvik
❑ Deputy Clerk of thg Board- Mandy Buchholz
TrWashEngton State
Aff Department of Transportation
Local Agency Federal Aid
Project Prospectus
Prefix
Route
( )
Date
8/31/2023
Federal Aid
DUNS Number
01-020-2547
Project Number
Lo al Agency
RC 2296
r WSDOT
Federal Employer
91-601349
Project Number
` Use Only I
Tax ID Number
Agency
CA Agency
Federal Program Title
Kittitas County Public Works
❑✓ Yes ❑ No
❑✓ 20.205 ❑ Other STBG(R)
Project Title
Start Latitude N 46.999658
Start Longitude W-120.512097
Vantage Highway Paving
End Latitude N 47.000621
End Longitude W-120.411552
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
2.027 6.570
Ellensburg
98926-9081
Begin Mile Post
End Mile Post
Length of Project
Award Type
2.027
6.570
4.543
❑✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
2.027
6.570
19
Kittitas
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
South Central Region
13
8
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
R/W
Const.
3,950,000
533,300
3,416,700
September 2023
Total
3,950,000
53 5,300
13,416,700
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
Number of Lanes
28'-42'
2-3
Existing roadway structure is failing and in need of rehab.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Grind and overlay of asphalt on Vantage highway within the existing pavement limits along with temporary
and permanent pavement marking for repair, rehabilitation and preservation.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address City
State
Zip Code
411 N. Ruby, Suite 1 Ellensburg
WA
98926
By
Approving Authority
Project Prospectus
Title County Engineer
Date `A%/z023
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Vantage Highway Paving
8/31/2023
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail ❑ 3-R
28' - 42'
2-3
❑ Reconstruction ❑ Pedestrian / Facilities ❑✓ 2-R
❑ Railroad ❑ Parking ❑ Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban ❑ Minor Arterial
❑ Urban
❑ Minor Arterial
Functicna�
WRural ❑Collector
W1Rural
❑Collector
(Massification
❑ NHS 0 Major Collector
❑ NHS
Major Collector
❑ Minor Collector
Z Minor Collector
❑ Local Access
❑ Local Access
Terrain
0 Flat [--]Roll [:]Mountain
0 Flat ❑ Roll ❑ Mountain
Posted Speed
50mph
Design Speed
50mph
Existing ADT
2833 - 7311
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
County
%
100
Construction Will Be Performed By
Contract
Agency
Contract
100 %
%
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
DOT Form 140-101 rage z
Revised 01/2022 Previous Editions Obsolete
----T
enProject
Title
Date
�Kltt'i'tasCounty Public Works
Vantage Highway Paving
8/31/2023
Right of Way
❑✓ No Right of Way Needed
❑ Right of Way Needed
`AII construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities
Railroad
❑✓ No utility work required
❑✓ No railroad work required
❑ All utility work will be completed prior to the start
[:]All railroad work will be completed prior to the start of
of the construction contract
the construction contract
❑ All utility work will be completed in coordination
❑ All the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation orAdjustments and Existing Major Structures Involved in the Project
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No
Remarks
I
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date see+ By
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete