Loading...
HomeMy WebLinkAboutRES-2023-152BOARD OF' COUNTY COMMISSIONERS COUNTY OF'KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2023 - / 5 A AWARDING THE CONTRACT FOR THE FAUST ROAD BRIDGE #88212 OVER THE TOWN DITCH REPLACEMENT PROJECT (CRP 316-22') AND AUTHORIZB THE COUNTY ENGINEER TO EXECUTE THE SAME WHEREAS: The call for sealed bids supporting the Faust Road Bridge #88212 Over the Town Ditch Replacement Project (CRP 316-22) was authorizedby the Kittitas County Board of Commissioners on July 5,2023; and WHEREAS: The Department of Public Works solicited bids in accordance with RCW 36.77 .020 Contract Procedures; and WHEREAS: Sealed bids were received and opened on August 17,2023, at l0:00 am; and WHEREAS: There were six (6) responsive bids received for review; and WHEREAS: The lowest responsive bid was from Belsaas and Smith Construction, Inc. in the amount of $1,031,579.00; and WHEREAS: The County Engineer recommends the lowest responsive bid be accepted; and NOW' THEREFORE BE IT RESOLVED that the Board of County Commissioners finds it in the best interest of the County to award the Contract for the Faust Road Bridge #88212 Over the Town Ditch Replacement Project to Belsaas and Smith Construction, Inc.; and BE IT FURTHER RESOLVED that the County Engineer is authorized to sign contract documents for said project. DATED on this 5th day of September 2023, at Ellensburg, Washington BOARD OF COUNTY COMMIS COLINTY, WASHINGTON cory Board- Julie Kjorsvik Brett Vice-Chairman n Deputy Cler{< of the Board- Mandy Buchholz ABSENT e Itt\ trl ar ?r?'L/K Laura Osiadacz, Commisdioner Faust Road Bridge #88212 Replacement BIDS OPENFD PUBLICLY AT t0:0OAM ON Augu( I ?, 2023, AT KTTTITAS COUNTY RC 2195 BR cRP 3t6-22 Fed Aid No. BROS-2O19(033) PUBLIC WORKS {r (ol'\ trEM Inc.Co lOTAL S9,680.@ 520,200.m Ss,sso.m S7;m.oo 511,700-00 s12,200.00 s27,800,@ s30,2so.00 s16300.00 s1S,950.m s91,1@.m s27-m.m s1U.@O.m s490,000,m S101,2m.oo s24,0m.00 s1S,200.00 S45,ooo.m 92,ffi.00 s[.m s360.00 TOtl s65m 00 s75,0m.m S4o.oo slm.@ S8s.oo 985.m s30,000.00 Sm.oo 9so,o@ro S6s.m 52.soo.m S2.so 9141,0@-m S4so,m.m Sso.oo Sso.m Sso.m 3ao.m s10.@ Sroo.m 95.m ss.6 S4s.@ 97,mo.@ s15.00 s1,1m.m s5,000.00 s4S,000.00 s80,000.00 s2,500.00 s20,000.00 s2qo@.o s10,06.@ 950,0@,oo 9s,720.m 575.q)0.m 322,@0.00 310,m.m s12,7sO.00 S17,m.@ s30,0o0.00 S22,@o.m Ss,os.m s7,150.00 5215,mo.m 922,S.00 5141,000.00 S45o,m.0o s46,0m.o 520,000.@ Sro,ooo.oo S1r,ooo.m s20,200.m 58r.m $z.m S78.m 561,m s2Z8m.m sss.m s15,300.m S145.oo s1,@.00 53.00 S1u,@o.m 5490,0m.00 S1,m.oo s50.00 s76.00 519.m 5s0.00 51.00 sx8.oo Ss,?oo.oo S127,soo.oo S9s.oo s13.00 515.60 s53.00 S45,om,m S56.@ s20,500.m Ss8.m S2,9oo.m s3.05 s147,50O,m 53SO,om.m 51,210.00 549.s 96.2s 5163.75 5s8.2s Slm.m 56.20 9.os S62,oo s6,2@.00 33.40 92,725.@ s5,375.m $26,000-00 S27,ooo.m s2,500.00 szqoo.m s9,8s0-00 Sro,ooo.oo 5s0,000,00 51,000.m ss,016.00 s1275m.00 552,2s0.00 s4,300.00 s484O.m 510,500.00 546.mom 9o,8m.m 520,m.00 s6380.m $zes,46q.t s27,1fr.A 9147,s0o.@ s3SO,000,m 5111,320.00 $xg,Boo.m S13,2s.@ 549,125.00 s3,0a.o0 S1,sm.m Su4.m 54,u9.@ s2,32s.m S6,2m.00 s2,040.00 52,725.@ s5,375.m S26,000,00 527,000.m 52,500.m sz4@.00 s9,850.00 s10,000.00 550,000.m 91,@o.oo s2s00.00 s50,000.00 54s.oo 560-00 99o.oo s70.00 s95,000.00 5m.oo S1so,m.00 s1m.m S1,150.m 53.50 s50,m0.00 s385,m.00 S1,m.@ 960.00 $uo.oo s175.m s50.m s150.CO s6.00 S4.oo s65.00 s9,5m.@ s1.50 s3,000-m Sa5oo.m 525,000.@ $8s,0m.@ s2,s00.m s10,000.00 $12,ooo.oo 910,000.00 Sso,m.oo s1.000.00 s6 600.00 s60,000.00 S24,750,m 56.000.00 513,500.m S14,00.00 s95,0m.00 s49,500,00 sso @o.m s19 800.m s98.900.m s31,500.00 s50,mo.00 938s,mo,o s92,@O.m 524,0m.00 s22,Om.m s52,s00.00 s2,5m.00 s2,7m.00 s120.00 s3,8n00 s31.000.m s37.m s29.s0 s69.6 s45.50 S$,m.@ s19.00 S27,mo.oo S72.m s1,282.00 $3.e S44,000.00 s342,000.00 S1,0m.oo 5e.@ Sss.oo s161.00 94o.oo 5s0.m S8.oo S5.so s61m S6,lm.m s3,36 s2,700.00 54m0,m $6,1m.m s5,000.m S2,s.@ 59,roo.m s1tm.6 9lo,mo.oo s50,000.00 S2so.oo SuE.oo H!6 Conrtruction 5r,000.00 51,OOO.@ 980.00 S32,OOO.OO Engrneers Estmde 51,535,015.50 35.00 56,192.@s52.00 s1.950.00 s7.800.0o s7,8OO.@$1.3o S78o.m s2,500.00 s2,sm.oo 37,5m.00 S7,ffi.oo s39,000.00 s39,@O_m S9s,000.m S9s,ooo.m s2,S00.m s2,soo.@ 58,50O.m S8,5m.0o98,s00.o s8,soo-00 S1o,om,m S1o,m.oo Sso.ooo.m SSO,OOO.OO s2,s00.@ s2,500.00ss.@ s2,mo.oo l'lA DeSedrom, lnc, S1,656290.m S39,om.oo ss20.m SLm.m S1m.@ S5,160.m Sr,587.so Szooo.m s9,0m.00 51,ffi.00 Ss,mo.m s45,0m.00 Sao.ooom $2,soo.m s20,000.m $2o,m.m 510,000.6 550,m0.00 54,128.00 S2,437.50 s9JO0.00 s900.m S3,ffi.@ $8,sm.m s25,0m.00 $8s.0@.00 32,sm.oo s10,000,00 9u,m.oo s10.0@,m 950,000.m s1.m.ms2.45 S980.m S25.OO S1O,@0.& Johansen Construdbn Co Selland Condrudion, tnc. s1,6m,06o.00 91,584,435.50 53.388,00 s31,000.m s20.350.m s2,950.m S1o,3s0.m 54,m.oo ssz00o.@ 92s.00 s62.@ t73.m s3.960.00 ss2,0m.@ s13,750.m s5,200.00 s10,950.m s5,000.00 915,ooo.oo 940.o0 5.0.@ 59..m s4.4m.m S15,@o.m s22.m.00 34.mo.m s8.100.0S9,100.m S4d.m Sg,zoo.m s32.@ Ss,4oo.oo3rs,0@.@ S2s,m.oo S2s,mo.m s3o,ooo-00 s3o.m.6S10,4so.m S25.@ S13,7so.m Ss2.m s28.600.00 s27,0@.O0 S2!mo.oo s21,@O.m Ss,soo.oo ss,soo.oo9292o,o0 989,m 59,790.00 Sso.m S8.800.m51r0,2s2.m S1,2f.m s1ozsoo.@ S1,s2.oo S124.012.00s31,5O0.00 S3.SO S31,5OO.m s2.m slE.m.oo S44,0@.00 S$o,m.oo 9t o,m.oo Ssg.ooo.m Sss,ooo.m 5342,0@.00 9330,0m.00 s33o,OOO.OO S2S7,mO.OO S2S7,OOO.OOs92,000.0o 9550.m Sso,60o.m s1.o@.00 s92.mo.m917,5m.@ So.oo St6,m.0o ss1.m s2o.4m.mSlr,om.Oo Ss5.m 511,200.@ Sb7.m S13.aOO.OOS483m.00 Slss.oo S45,sm.oo 91ts.m S34,soo.oos2.O80.m S88.oo s4,576,0O 530.m 'r,str.oo99OC.00 S13o.Oo s2,3{.m Sff.@ 51,OSO.OOs160.00 519.00 S38O.m S$.m S25O.OO96,708.00 SG.OO 56,192.00 56.00 36,192.00s2,287.s0 S69.m $2,5875 9s8.00 s2.17s.m s5,1oO.OO S1o,OOO.00 Sm,m.oo s8.5oo m 58,5m.00$2,016.m 53.so S2,1oo.oo 53 oo Sr,8oo.m52,70o.m S3,30o.oO S3,3OO.m S2,700.m S2.7m.m s4,@0_00 94,@.m 340oo.oo s7,soO.OO g7,soo.@ s6,100.m s82,mo.m ss2,m0.0o srs,ooo.oo s15.0oo.m55@0.m SS0,0m.00 g5o,o0O.OO SS,4OO.Oo SS,4OO,o0$2,S.m S2,5m.OO S2,Sm.m S2,5OO.OO 52.S.mS9,1@.m S9,20o.m Sg,2oo.m S11,5m.00 Str,soo.oos11,O0.m Slo,ooo.@ 510,m.@ 58,m.oo s8.8m.mslo,mo.m S1o,ooo.oo s1O,OOo.m Slo.m.oo sto,ooo.oo Ss0,m0.00 95o,OOO.OO sso,Om.oo 950,OOO.OO S5O,Oo0.o092s0.00 975o.oo $7so.oo E5oo.Oo Ssm.oo946,m.00 s2,oo 5800.00 340.00 516,000.00 lntetuest Construdion tnc. geleas & Smilh Consfuction 51,106,451.50 51,263,525.50 Sr,o3t.579,m 26 )7 2a 6 34 35 36 37 32 31 30 29 21 20 19 7a 16 17 13 12 10 11 8 7 YRUOURF ry'AVAi BRIDGE DF'( -IA l SUP€KRUM'RF HIGH CIEARING AN EEAM GI EEAM GUARDMITTAN<I REMOVAI OF CHANNfL€I MOEII TAOStDE Ct MIilORCH sPcc 9r PERMANEilT BR patm I ilPE 11 AI FILTER gT SHORING OR ENM GMVEL BACTFI @NTROT NSECTiOXilPT 21 +za P COUSI SECOUSE rffuffl 5 N INCI. HAUT RUBBING TON 6 TON ESr 6 s 6 a tt LT DAY LF TON !8 d 0 6 d 1.m 1m 59.m m.m 1.@ LM 1_m 1.00 5m.m 1.O0 37.9O 1.82.m 20.m 400.00 92.m 1.S 110.00 1.00 100.m s50.m 1.m 0.88 1.00 chekcd and confimlql. lbr accuracy. TO: ^-.w lltllashington State Department of Transportation Memorandum Jacki Doty Transportation Engineer 4 THRU:Nina Jones Business Diversity & lnclusion Manager FROM:Rosa Covarrubias DBE Compliance Enforcement Lead SUBJECT: Contract 2019(033)-1 Faust Rd Bridge REGUTATION: CFR 49 Part 26, Appendix A WSDOT General Special Provisions TECHNICAL ELEMENTS: Condition of Award Goal: L5% Advertisement Date : 07 / 27 / 2023 Bid Openi ng Date: O8/ L7 / 2023 Project Engi neer Cost Estimate: S1,636,016. 50 OVERVIEW: The WSDOT General Special Provisions state CFR 49, Part 26, Appendix "A" and are part of the contract and bid documents. On August 23,2023, the Washington State Department of Transportation, Office of Equity & Civil Rights, was asked to conduct a "Good Faith Effort" review on the submittal of Good Faith Effort documentation submitted by Belsaas & Smith Construction about the above project. When an FHWA federal-aid contract has an established Condition of Award (COA) goal, the bidder must make a "Good Faith Effort" to meet the goal. The agency identified placed a COA goal of fifteen percent (15%) on this project. ANALYSIS: Note: To subjectively determine whether the bidder meets the requirements of CFR 49 Part 25.53, the review followed the established procedures in Appendix "A" of CFR 49 Part26. Besides the appendix, OECR reviewed the supplemental bid documentation the bidders can provide within 48 hours of bid time. Within 48 hours, the bidder added DBE supplier, The Bag Lady, for 54703 and DBE subcontractor, Caliber Traffic Solutions LLC for 532,560. The supplemental letter also mentions that they have contacted DBE subcontractor Gilbert Patterson Concrete to provide a quote for the deck slab. ^-,w llllashington State IDepartment of Transportation 1) What reasonable and available means did the bidder use to solicit the interest of all certified DBEs who had the capability to perform work on the contract? (CFR 49, Part 26, Appendix A, tv.A) ln the bidder's letter, they mention listing themselves as a prime bidder on the public planholder's list, including QuestCDN, the Daily Journal of Commerce, and The Plancenter (Yakima, Tri-Cities, Walla Walla, and Hermiston). The bidder also mentioned using the DBE directory to search for DBE companies qualified to bid on the portions of the project and reviewed the planholders list to see which firms had already signed to review plans. Conclusion The bidder did provide evidence that it used all reasonable and available means to solicit potential su bcontractors. 2l Did the bidder solicit interest within a sufficient time to allow the DBEs to respond to the solicitation? (CFR 49, Paft26, Appendix A, tV.A) The bidder's letter states they reached out via email and phone and were able to solicit bids from several DBE subcontractors. ln total, they received 6 DBE bids. However, no copies of the actual bids were included, and no dates were attached to the phone calls or emails made to the DBEs. Conclusion The bidder's documentation did not show if sufficient time was given to respond to the solicitations. The bidder did not meet this requirement. 3) Did the bidder take appropriate steps to follow up on initial solicitations, and did the bidder negotiate in good faith with interested DBEs? (cFR 49, part26, Appendix A, lv.A) The bidder received six bids from DBEs. They used three DBEs of the six: Obunco Engineering, M2 lndustrial, and John Wayne Construction. M2 and John Wayne were not the lowest bid, but because the bidder had used them in past projects, they decided to use them. The bidder also added a DBE supplier, The Bag Lady, and negotiated with Caliber Traffic Control to utilize a portion of their traffic control quote. Conclusion Based on the documentation provided, the bidder did meet this requirement. 4l Did the bidder select scopes/classes of the work to be performed by DBEs to increase the likelihood of DBE participation? (CFR 49, part 26, Appendix An tV.B) Note: CFR 49, Part 26 clearly states, "The ability or desire of a prime contractor to perform the work of a contract with its organization does not relieve the bidder of the responsibility to make good faith efforts." ^-.w llllashington State Ilepartment of Transportation The bidder's letter shows they sought DBE for surveying, guardrail, concrete, and traffic control. Based on the Engineer's estimate, the scopes listed as subcontractable scopes of work include the following: r Excavation o Bridge Deck o Traffic control o Guardrail o Concrete o Fencing o Surveying o Other: SPCC Plan Conclusion The bidder solicited quotes from several subcontractors in different work scopes identified by the Engineer. The bidder did meet this qualification. 5) Did the bidder provide DBEs with adequate information about the plans, specs, and contract requirements in a timely manner? (CFR 49, Parl26,AppendixA,lV.C) The bidder's documentation mentioned that the plans were listed in the public planholder list so the interested firms could review plans. The bidder mentioned checking the list that identified which firms had signed into reviewing the plans for this project to solicit quotes from interested DBE companies. Conclusion The bidder did provide adequate information about plans and specs in their solicitation. 5) Did the bidder negotiate in good faith with interested DBEs? Based on the bidder's supplemental bid documentation, they negotiated in good faith with the three DBE firms that they believed were reasonably priced. After the bid (during the 48 hours supplemental time), they continued to pursue DBE participation and negotiated with two other DBEs that they received quotes. Through these negotiations, they added a DBE supplier, The Bag Lady. They also negotiated using a portion of the Caliber Traffic Control quote and agreed to include them in this contract. Overall, they plan to use five of the six DBEs they received quotes for. Conclusion The bidder's documentation shows that when searching for DBEs for this project, they were willing to work with DBEs that turned in a quote. The bidder did meet this requirement. lltllashington State Ilepartment of Tralrcpo*ation 7l Did the bidder make portions of the work available to DBE subcontractors and suppliers to be consistent with the availability of DBEs to facilitate DBE participation? (CFR 49, part26, Appendix & lV.D) The bidder's letter listed a specific work scope consistent with the Engineer's estimate (traffic control, surveying, guardrail, and concrete). The bidder reached out to DBEs that do different kinds of work, but there were a few other scopes of work that the bidder could have pursued, like excavation, bridge dec( and fencing. ln the future, the bidder should solicit all the scopes of work available in the project. This could increase the chances of receiving more bids. Conclusion However, the bidder did solicit several of the scopes of work available and met this requirement. 8) Did the bidder try to assist interested DBEs in obtaining bonding lines of credit, or insurance? Based on the bidder's documentation, solicitation emails sent to the DBEs did not mention any assistance with bonding or insurance. Conclusion The bidder did not provide any information about bonding and insurance. The bidder did not meet this requirement. 9) Did the bidder try to assist interested DBEs in obtaining necessary equipment, supplies, materials, or related assistance or services? Based on the bidder's documentation solicitation emails to the DBEs, there was no mention of assistance obtaining materials, supplies, or related services. Conclusion The bidder did not provide any information. They offered the DBEs this type of assistance. The bidder did not meet this requirement. 10) Did the bidder effectively use the services of available minority/women community organizations, minority/women contractors'groups, and local, state, and federal minority/women business assistance centers? (CFR 49, parl26, Appendix A, lV.H) Based on the bidder's documentation, they used the DBE directory to solicit quotes from the DBEs. lllllashington State Ilepartment of Transportation Conclusion The bidder did effectively use the services available to minority/women organizations or the OWMBE website. 11) Were other bidders able to meet the Condition of Award goal based on information submitted with their DBE Utilization form? (CFR 49, Paft26,Appendix A, tV.V) There were six total bidders for this project. All other five lowest bidders found DBE participation to meet the 15% goal. SUMMARY: Based on the bidder's letter and documentation, they did not meet every aspect of the GFE, but they did make a good effort for most of the GFE requirements. Overall, the bidder did make a "good faith effort'l to meet the condition of the award even though they fell short. After they turned in their original bid with the three DBEs, they continued to pursue DBE participation through the supplemental timeframe. Showing they are committed to seeking opportunities to meet the goal. Once the bidder is awarded the project, they must continue pursuing DBE participation to meet the total 15% condition of award goal throughout the contract's life. cc: Nina Jones Fatema Aboutalep Cfa/**re Concurrence 08/30/23 Charleena Jones Business Diversity & lnclusion Manager ^-.w