My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signed Change Order 4 for Bloom Pavillion
>
Meetings
>
2023
>
09. September
>
2023-09-05 10:00 AM - Commissioners' Agenda
>
Signed Change Order 4 for Bloom Pavillion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 10:58:25 AM
Creation date
9/12/2023 10:58:13 AM
Metadata
Fields
Template:
Meeting
Date
9/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order 4 with Concord Construction Inc. for Bloom Pavilion Addition
Order
11
Placement
Consent Agenda
Row ID
108557
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'l <br />CHANGE ORDER NO. OO4 <br />FROJECT NAiIE: KITTITA$ BLOOTTI PAVILION ADDITION <br />OWNEF: KTflTASCOUNTY <br />CONTRACTOR: CONCORD CONSTRUCTION. lilC <br />FROJECTNO: 2018-051 PAGElof 1 <br />DGTCRIPTION OF CHAIIGE: <br />COP t09 - MDF Breakcr <br />COF #10 - Tcmp ElocNdcel Pancl <br />COP fl l - RFlb 43 &44 Sitc Grading and Dryrcll Rcvisions <br />COP #12 - RFI 42 Swinc 8em Siding <br />COP #13 - Rcmovc & Diapo* Unknoulr Coocoto Fooling <br />COP f,14 - Remove & Disposc cxbling conccte foundation <br />Amoum <br />3 3,,15f.81 <br />$ 339r.26 <br />t 12,120.05 <br />3 1.000.96 <br />t 1.506.81t 578.35 <br />TorrlThbChrngcOrdrn J 22,06221 <br />Original Conlract Sum <br />Nct Anount of Previouoly Approvcd Changes: <br />Contncl Sum Friorlo This Change Ordcr <br />Contracl Sum is lncrcerod by fhir Changc Ordcn <br />Flcvised Conhrct Sum: <br />OdglnNl Contrlcl Complcfion Datc: <br />Frcviouely Approvcd lncrcrgcs ln Timc: <br />Gomplction O.tc Prior lo This Changc Ordcr: <br />Contr.cN timc will bc INCREASED by <br />Crlcndrr Dryr Thb Change Order <br />Rcviccd Subrtrntiel CompleUon Drtc: <br />Rovirod Flnrl Acccptsncc Dttc: <br />$1.577.400.00 Acccptod by Conlr.ctor: <br />s74.947.63 <br />$r,652.347.63 By: <br />Oalt <br />S1.67,f.399.87 Rccommendrd 8y: <br />ALSCArchihcb. <br />By' <br />{. <br />Oate <br />il10/?:024 <br />0 <br />5rl8 202,f By: <br />Orlc <br />I
The URL can be used to link to this page
Your browser does not support the video tag.