Laserfiche WebLink
Bl1l23, 1:01 PM newspaper-text (7).htmt <br />Public Notice <br />Kittitas County, Ellensburg WA <br />KITTITAS COUNTY <br />COOKE CANYON ROAD BRIDGE #80T81 REPLACEMENT <br />I(TTITAS COUNTY <br />ELLENSBURG, WASI{INGTON <br />Sealed bids will be received by Kittitas County Public Works, at the reception desk located at 4II North Ruby Street, Suite <br />1, Ellensburg, Washington until 10:00 AM on Thursday, September 7,2023, and will then and there be opened and publicly <br />read for the construction of the Cooke Canyon Road Bridge #80181 Replacement Project. <br />All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in <br />an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such <br />contract and furnish satisfactory pertbrmance and payment bonds within the time stated in the specifications, the bid <br />proposal deposit shall be fbrf-eited to the Kittitas County Public Works. <br />The right is reserved to reject any and all bids and to waiver informalities in the bidding. <br />Complete digital project bidding documents, including plans and specifications, are available at www.questcdn.com. You <br />may download the digital plan documents for $22by inpuffing Quest Project #8608969 on the website's Project Search <br />page. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, <br />downloading, and working with this digital project information. <br />lnfornational copies of maps, plans and specifications are on file for inspection at the Kittitas County Public Worts, 411 <br />North Ruby Street, Suite 1, Ellensburg, WA 98926. <br />The Kittitas County in accordance with Title VI of the Civil Rights Act of 1964, (78 9tat.252,42U.5.C.2000d to 2000d-4) <br />and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant ro <br />this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to <br />this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an <br />award. <br />This project has a 14% DBE Goal, and 400 Training Hours Goal <br />The improvement for which bids will be received is described below: <br />The work to be performed within 90 (ninety) working days from the date of Notice to Proceed consists of fumishing all <br />materials, equipment, tools, labor, and other work or items incidental thereto for: <br />The removal of the existing canal bridge and replacement with a new concrete bridge structure as shown on the Plans. The <br />project includes excavation for removal of the existing substructure and construction of the new substructure, wing walls, <br />super structure, CIP toping slab, temporaty canalbypass, canal restoration, removal of existing roadway pavement, raising <br />the roadway grade and establishing a new roadway profile, HMA pavement, new driveway approaches, and new canal road <br />approaches. Additional items of work include, but are not limited to, traffic control, installation and removal of haffic <br />detour, permanent signage, pavement marking, culverts, relocation of fences and gates, shoulder and ditch grading, and other <br />work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. <br />Engineer's estimated range for the project is $1.6 - 92.2 Million. <br />Specifications may be seen at the office of the Board of Commissioners and online at http://www.co.kittitas.wa.us/notices/ <br />file :///C :/Userslcand ie.leader/Downloads/newspaper-text (7). html 1t2