My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 2023-109
>
Meetings
>
2023
>
07. July
>
2023-07-05 10:00 AM - Commissioners' Agenda
>
RES 2023-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 3:56:57 PM
Creation date
7/13/2023 3:56:55 PM
Metadata
Fields
Template:
Meeting
Date
7/5/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Initiating a County Road Project Designated as CRP No. 317-23, Vantage Highway Paving
Order
8
Placement
Consent Agenda
Row ID
105344
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 317-23 JOB NO: RC 2296 <br />lT lS HEREBY RESOLVED that the Vantage Highway Paving be improved as follows: <br />The project will plane the existing asphalt surface on Vantage Highway MP 2.027 - MP 6.56 to remove up to 3" of asphalt, <br />and then replace with a new hot mixed asphalt wearing surface and install new roadway striping and markings. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />lT lS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE AMOUNT TOTALS <br />PRELMINARY ENGINEERING $ 200,000 <br />CONSTRUCTION ENGINEERING $ 250,000 <br />RIGHT-OF-WAY ACQUISITION $ <br />SUB-TOTAL $ 450,000 <br />County Forces coNSTRUcloN $ <br />CONTRACT CONSTRUCTION $ 3.499.965 <br />SUB-TOTAL $ 3,499,965 <br />TOTAL PROJECT COST 965 <br />GRANT OR OTHER FUNDS $ 3.416.720 <br />Grant Source: STBG <br />ROAD FUND ALLOCATION $ 533,245 <br />Joshua Fredrickson, P.E. <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED2023 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO WITH RCW 36.77.020 ET.SEQ <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CO <br />wAc 136-18. <br />CE WITH RCW 36.77.065 AND <br />ADOPTEDthis Sth day of July,2023 <br />BOARD OF COUNTY COMMISS]ONERS <br />KITTITAS , WASH <br />cory Chair roner <br />J2AV- t?'l <br />X <br />tr <br />tr <br />g :\base\forms\en g\crp-f rm 6t26t2023
The URL can be used to link to this page
Your browser does not support the video tag.