HomeMy WebLinkAboutResolution_FaustRoadBridge_ProspectusKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA STAFF REPORT
AGENDA DATE: July 5, 2023
ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's
Signature on the Local Agency Federal Aid Project
Prospectus for the Replacement of Bridge No. 88212 on
Faust Road over Town Ditch CRP 316-22.
BACKGROUND: On July 14, 2022, Kittitas County Public Works was
advised that our Faust Road — Town Ditch bridge
replacement project was selected to receive funding
through the federal Local Bridge Program.
This project will not require match in local funds because
we met the goal of authorizing construction before
December 2025.
This Project Prospectus covers the Federal Funding for the
construction phase of the project.
Public Works is preparing to also issue notice of call for
bids for this project.
INTERACTION: Public Works
RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature
on the Local Agency Federal Aid Project Prospectus for the
Replacement of Bridge No. 88212 on Faust Road over
Town Ditch CRP 316-22.
HANDLING: Return one original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO.2023 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL
AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE FAUST ROAD
BRIDGE #88212 OVER THE TOWN DITCH REPLACEMENT PROJECT CRP 316-22
WHEREAS: The Faust Road Bridge No. 88212 Replacement Project was awarded Federal
Funding through the 2022 Local Bridge Program; and
WHEREAS: Kittitas County Public Works along with a team of consultants has prepared
plans, specifications and estimate for the project; and
WHEREAS: In preparation to advertise a call for bids, Kittitas County Public Works is
requesting the Washington State Department of Transportation release the federal
funds for the construction phase; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
of the Board of County Commissioners acknowledging the project has been
reviewed and is consistent with the County's comprehensive plan for community
development; and
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best
interest of the public, does hereby approve the Chair's signature on the Local
Agency Federal Aid Project Prospectus for the Faust Road Bridge #88212 Over
the Town Ditch Replacement Project CRP 316-22.
DATED on this 5th day of July 2023, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY
COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Brett Wachsmith, Vice -Chairman
Laura Osiadacz , Commissioner
ZL' .I
V7Washington State
Department ®4 Transportation
Local Agency Federal Aid
Project Prospectus
Prefix
i Federal Aid �-
Project Number _ BROS
Local Agency
CRP 316-22 / RC 2195-BR
Project Number �_
I Route Date 26/2023
T-
2019 033 DUNS Number 01-020-2547
WSDOT Federal Employer
( 191-601349
\Use Only Tax ID Number
Agency
Kittitas County Public Works
J CAAgency Federal Program Title
] ❑✓ Yes ❑ No IZ 20.205 ❑ Other Local Bridge Program
Plactust Road Bridge #88212 Over Towne Start Latitude N 47-0305930 Start Longitude W-120.592656'
t Ditch Replacement
End Latitude N 47.0305930 End Lon itude_w-120.592656°
Project Termini From-b
Nearest City Name Project Zip Code (+4) i
0.59 0.59 Ellensburg 98926-6590
—
Begin Mile Post End Mile Post
0.59 0.59
— —_
Length of Project Award Type
0.00 �[✓� Local ❑ Local Forces ❑ State ❑ Railroad
Route ID Begin Mile Point
�0.59
End Mile Point City Number County Number County Name
0.59 N/A Kittitas
WSDOT Region Legislative
_719
District(s) �Congressional District(s) Urban Area Number
ou
Sth Ccnval Re ion 13
s
Q
Total Local Agency— Phase Start
Phase Estimated Cost Funding i Federal Funds Date
Nearest Hundred Dollar _ Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year
__ _
P.E. 317,800.00
317,800.00 10/2022
Const. 2,214,000.00
---
_ 2,214,000.00 7/2023
Total 2,531,800.00
12,531,800.00
Descriptio
Roadway Width
20
of
and Present Ca
Number of Lanes
2
single span, structurally deficient, load posted concrete bridge
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Replace existing single span, structurally deficient, load posted concrete bridge with a longer, single span,
prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening.
Local Agency Contact Person
Darren Case
Mailing Address
411 N. Ruby, Suite 1
-- By,
Project Prospectut T
Title
Construction
City
Ellensburg
Phone
509-962-7019
State Zip Code
WA 98926
Title County Engineer
Form 140-101
Revised 01/2022
LG/S s.�zF73
— --- ---- - Date,
Previous Editions Obsolete Page
Agency
Kittitas County Public Works
Project Title
Faust Road over Towne Ditch
Date
6/26/2023
pe of Proposed Work
Type (Check all that Apply)
Roadway Width
Number of Lanes
rProject
New Construction ElPath / Trail ❑ 3-R
26
2
Reconstruction ❑ Pedestrian / Facilities ❑ 2-R
Railroad ❑ Parking ❑ Other
�✓ Bridge
l2cnme+r:n r1e�:.... n�a�
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
Urban
❑Minor Arterial
❑ Urban
❑ Minor Arterial
Functional
�✓ Rural
❑ Collector
❑Rural
❑Collector
CIaSSIflCatlOn
❑NHS
❑Major Collector
❑ NHS
❑ Ma or Collector
j
❑ Minor Collector
❑ Minor Collector
❑✓ Local Access
El Local Access
Terrain
❑ Flat
✓0 Roll ❑ Mountain
❑ Flat
❑Roll ❑Mountain
Posted Speed
35
Design Speed
35
Existing ADT
100
Design Year ADT
100
Design Year
2022
Design Hourly Volume (DHV)
rauvr n1GnuL or vvorK
Preliminary Engineering Will Be Performed By
split between consultant and agency
Others
Agency
Construction Will Be Performed By
50 ova
50
Contract
Agency
contract
100
of
e,
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class If - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Environmental Considerations
work over irrigation canal will be performed while canal system is not in service between November and
April.
Revised 01/2022 Previous Editions Obsolete
Agency
Kittitas County Public Works
Project Title
Faust Road over Towne Ditch
Date
6/26/2023
Right of Way
❑✓ No Right of Way Needed
❑ Right of Way Needed
* All construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities
Railroad
❑ No utility work required
❑✓ No railroad work required
❑✓ All utility work will be completed prior to the start
❑AII railroad work will be completed prior to the start of
of the construction contract
the construction contract
❑AII utility work will be completed in coordination
❑AII the railroad work will be completed in coordination
with the construction contract
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utilities will be required to temporarily relocate prior to the project and then install permanent after the
construction project.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes W1 No
Remarks
t'lIS nrninr4 hoe hnon • ...a 1.., al._ 1i_
- r• -- ••�� �•• -- ,VcU y 1110 I691s auvu uuuy ul the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
DOT Form 140-101
Revised 01/2022 Previous Editions Obsolete Page 3