Loading...
HomeMy WebLinkAboutResolution_FaustRoadBridge_ProspectusKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: July 5, 2023 ACTION REQUESTED: Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 88212 on Faust Road over Town Ditch CRP 316-22. BACKGROUND: On July 14, 2022, Kittitas County Public Works was advised that our Faust Road — Town Ditch bridge replacement project was selected to receive funding through the federal Local Bridge Program. This project will not require match in local funds because we met the goal of authorizing construction before December 2025. This Project Prospectus covers the Federal Funding for the construction phase of the project. Public Works is preparing to also issue notice of call for bids for this project. INTERACTION: Public Works RECOMMENDATION: Approve the Resolution Authorizing the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Replacement of Bridge No. 88212 on Faust Road over Town Ditch CRP 316-22. HANDLING: Return one original to Public Works ATTACHMENTS: Resolution, Local Agency Federal Aid Project Prospectus LEAD STAFF: Josh Fredrickson, County Engineer BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO.2023 - AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID PROJECT PROSPECTUS CONSTRUCTION PHASE FOR THE FAUST ROAD BRIDGE #88212 OVER THE TOWN DITCH REPLACEMENT PROJECT CRP 316-22 WHEREAS: The Faust Road Bridge No. 88212 Replacement Project was awarded Federal Funding through the 2022 Local Bridge Program; and WHEREAS: Kittitas County Public Works along with a team of consultants has prepared plans, specifications and estimate for the project; and WHEREAS: In preparation to advertise a call for bids, Kittitas County Public Works is requesting the Washington State Department of Transportation release the federal funds for the construction phase; and WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair of the Board of County Commissioners acknowledging the project has been reviewed and is consistent with the County's comprehensive plan for community development; and NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby approve the Chair's signature on the Local Agency Federal Aid Project Prospectus for the Faust Road Bridge #88212 Over the Town Ditch Replacement Project CRP 316-22. DATED on this 5th day of July 2023, at Ellensburg, Washington. Attest: ❑ Clerk of the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board- Mandy Buchholz BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman Brett Wachsmith, Vice -Chairman Laura Osiadacz , Commissioner ZL' .I V7Washington State Department ®4 Transportation Local Agency Federal Aid Project Prospectus Prefix i Federal Aid �- Project Number _ BROS Local Agency CRP 316-22 / RC 2195-BR Project Number �_ I Route Date 26/2023 T- 2019 033 DUNS Number 01-020-2547 WSDOT Federal Employer ( 191-601349 \Use Only Tax ID Number Agency Kittitas County Public Works J CAAgency Federal Program Title ] ❑✓ Yes ❑ No IZ 20.205 ❑ Other Local Bridge Program Plactust Road Bridge #88212 Over Towne Start Latitude N 47-0305930 Start Longitude W-120.592656' t Ditch Replacement End Latitude N 47.0305930 End Lon itude_w-120.592656° Project Termini From-b Nearest City Name Project Zip Code (+4) i 0.59 0.59 Ellensburg 98926-6590 — Begin Mile Post End Mile Post 0.59 0.59 — —_ Length of Project Award Type 0.00 �[✓� Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point �0.59 End Mile Point City Number County Number County Name 0.59 N/A Kittitas WSDOT Region Legislative _719 District(s) �Congressional District(s) Urban Area Number ou Sth Ccnval Re ion 13 s Q Total Local Agency— Phase Start Phase Estimated Cost Funding i Federal Funds Date Nearest Hundred Dollar _ Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year __ _ P.E. 317,800.00 317,800.00 10/2022 Const. 2,214,000.00 --- _ 2,214,000.00 7/2023 Total 2,531,800.00 12,531,800.00 Descriptio Roadway Width 20 of and Present Ca Number of Lanes 2 single span, structurally deficient, load posted concrete bridge Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Replace existing single span, structurally deficient, load posted concrete bridge with a longer, single span, prestressed concrete girder structure to meet current design standards and to improve the hydraulic opening. Local Agency Contact Person Darren Case Mailing Address 411 N. Ruby, Suite 1 -- By, Project Prospectut T Title Construction City Ellensburg Phone 509-962-7019 State Zip Code WA 98926 Title County Engineer Form 140-101 Revised 01/2022 LG/S s.�zF73 — --- ---- - Date, Previous Editions Obsolete Page Agency Kittitas County Public Works Project Title Faust Road over Towne Ditch Date 6/26/2023 pe of Proposed Work Type (Check all that Apply) Roadway Width Number of Lanes rProject New Construction ElPath / Trail ❑ 3-R 26 2 Reconstruction ❑ Pedestrian / Facilities ❑ 2-R Railroad ❑ Parking ❑ Other �✓ Bridge l2cnme+r:n r1e�:.... n�a� Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal Urban ❑Minor Arterial ❑ Urban ❑ Minor Arterial Functional �✓ Rural ❑ Collector ❑Rural ❑Collector CIaSSIflCatlOn ❑NHS ❑Major Collector ❑ NHS ❑ Ma or Collector j ❑ Minor Collector ❑ Minor Collector ❑✓ Local Access El Local Access Terrain ❑ Flat ✓0 Roll ❑ Mountain ❑ Flat ❑Roll ❑Mountain Posted Speed 35 Design Speed 35 Existing ADT 100 Design Year ADT 100 Design Year 2022 Design Hourly Volume (DHV) rauvr n1GnuL or vvorK Preliminary Engineering Will Be Performed By split between consultant and agency Others Agency Construction Will Be Performed By 50 ova 50 Contract Agency contract 100 of e, Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class If - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Environmental Considerations work over irrigation canal will be performed while canal system is not in service between November and April. Revised 01/2022 Previous Editions Obsolete Agency Kittitas County Public Works Project Title Faust Road over Towne Ditch Date 6/26/2023 Right of Way ❑✓ No Right of Way Needed ❑ Right of Way Needed * All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the existing right of way. Utilities Railroad ❑ No utility work required ❑✓ No railroad work required ❑✓ All utility work will be completed prior to the start ❑AII railroad work will be completed prior to the start of of the construction contract the construction contract ❑AII utility work will be completed in coordination ❑AII the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Utilities will be required to temporarily relocate prior to the project and then install permanent after the construction project. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes W1 No Remarks t'lIS nrninr4 hoe hnon • ...a 1.., al._ 1i_ - r• -- ••�� �•• -- ,VcU y 1110 I691s auvu uuuy ul the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date By Mayor/Chairperson DOT Form 140-101 Revised 01/2022 Previous Editions Obsolete Page 3