HomeMy WebLinkAboutResolution_Land Use Agmt Renewal_GrantCoPUD_VantageKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
2023 AGENDA STAFF REPORT
AGENDA DATE: July 5, 2023
ACTION REQUESTED: Request to Approve a Resolution to Authorize the Chair's
Signature on the Land Use Cooperative Agreement
Between Kittitas County and Grant County Public Utility
District #2 for Co -management of the Vantage Boat Ramp
Area
BACKGROUND: The Board of County Commissioners approved a
cooperative land use agreement with Grant County Public
Utility District #2 (GPUD2) with Resolution 2021-127.
The one-year agreement expires on July 19, 2023. This
agreement extension (one year) allows completion of boat
ramp overflow parking and potential transfer of the
restroom facility at the boat ramp.
INTERACTION: Public Works; Grant County Public Utility District No. 2
RECOMMENDATION: Approve the Resolution to Authorize the Chair's signature
on the proposed cooperative land use agreement with Grant
County Public Utility District No. 2.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Resolution; Land Use Cooperative Agreement
LEAD STAFF: Mark R. Cook, Director.
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2023 -
AUTHORIZING A f°LAND USE COOPERATIVE AGREEMENT" WITH GRANT
COUNTY PUBLIC UTILITY DISTRICT NO.2 FOR THE VANTAGE BOAT LAUNCH
WHEREAS: Interlocal cooperation agreements between municipal agencies are authorized by
the Revised Code of Washington at Chapter 39.34; and
WHEREAS: Kittitas County and Grant County Public Utility District No. 2 entered into a
cooperative land use agreement for Vantage Boat Launch operations and
maintenance with Resolution 2016 - 105; and
WHEREAS: The current agreement expires on July 19, 2023; and
WHEREAS: Kittitas County and Grant County Public Utility District No. 2 desire sharing
ongoing operations and maintenance responsibilities for the Vantage Boat Launch
facility in Kittitas County for public recreational benefits; and
WHEREAS: The proposed agreement provides sufficient time for both entities to resolve key
operations and maintenance issues associated with boat launch operations.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the
best interest of the public, does hereby authorize the Chairman's signature on Grant County
Public Utility District No. 2 "Land Use Cooperative Agreement" — Vantage Boat Launch.
DATED this 5th day of July 2023, at Ellensburg, Washington
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Attest:
❑ Clerk of the Board- Julie Kjorsvik
Brett Wachsmith, Vice -Chairman
❑ Deputy Clerk of the Board- Mandy Buchholz
Laura Osiadacz, Commissioner
LAND USE COOPERATIVE AGREEMENT
This Land Use Cooperative Agreement (Agreement) is entered into this _ day of
2023, by and between PUBLIC UTILITY DISTRICT NO.2 OF GRANT COUNTY, WA, a municipal
corporation incorporated under the laws of the State of Washington, hereinafter referred to as the
"Grant PUD" and KITTITAS COUNTY, a political subdivision of the State of Washington, "County."
The parties intend that this Agreement shall remain in effect for a period of one (1) year from this
date described above. This Agreement shall be binding upon all successors in interest to the
parties during said term.
WITNESSETH:
WHEREAS, Grant PUD is the owner of record of certain real property located in Kittitas County,
State of Washington, as more particularly described below:
The Northwest quarter of the Northwest quarter of Section 20, Township 17 North, Range 23,
E.W.M., Kittitas County at Vantage, Washington.
WHEREAS, Grant PUD has recreation facility development and operations requirements under the
operating license for the Priest Rapids Hydroelectric Project.
WHEREAS, County desires to share operations and maintenance (0&M) responsibilities for the
Kittitas Boat Launch facility in Kittitas County for public recreational benefits and sustainable social
and economic needs.
Grant PUD desires to enter into an agreement with County regarding site management, operations,
and maintenance of the premises.
WHEREAS, this Agreement for services is authorized by the provisions of Chapter 39.34 RCW, the
Interlocal Cooperation Act.
NOW THEREFORE, in consideration of the mutual promises and covenants contained herein, the
Parties agree as follows:
NOW THEREFORE, it is mutually agreed that Grant PUD does hereby accept responsibility for
planning, design, and construction of recreation facilities and various site management
responsibilities and County does hereby accept 0&M site management responsibilities to allow the
public to use said facilities until termination of this Agreement.
FOR AND IN CONSIDERATION of the mutual benefits to be derived, Grant PUD and County
mutually covenant and agree as follows:
1. Grant PUD and County agree to co -manage this site for public water access and day use
recreation opportunities.
2. Grant PUD and County agree this site will be managed by Grant PUD's policies and
procedures required to meet requirements of the Federal Energy Regulatory Commission
(FERC) license. Grant PUD policies and rules will be posted at the site to provide public
outreach and educational information.
3. Grant PUD and County agree the boat launch, day use areas and parking lot are open
year round. Restrooms may be closed Dec. 1 — Feb. 28 annually.
4. Grant PUD will be responsible for all repairs and maintenance of picnic tables, boat
launch, boarding dock, parking lot, pilings, and trail.
5. Grant PUD shall be responsible for maintaining cleanup for the boat launch, restrooms,
day use areas, and parking area year round.
6. Grant PUD shall provide and maintain all signage/kiosk information.
7. County will be responsible for repairs and maintenance of the restroom building and
associated plumbing and electrical year round.
8. County will provide water, electricity and toilet paper for the restroom building.
9. Detailed tasks and responsibilities regarding operation and maintenance activities and law
enforcement will be coordinated on an annual basis or as needed. based upon the approved
Management Plan (Appendix A).
Each party to this Agreement agrees to be responsible for being appropriately self -insured or
providing adequate liability insurance related to the responsibilities and activities of itself, its
agents, contractors and employees at the premises. To the extent allowed by law, each party to
this Agreement, with respect to damages or injuries arising out of the acts or omissions of itself, its
agents, contractors, and employees at the premises, agrees to indemnify and hold harmless the
other party.
The parties to this Agreement agree to assist each other in preserving and presenting a defense of
limited liability under RCW 4.24.210 by allowing public to use said property for outdoor recreation.
No provision of this Agreement transfers any real property rights from Grant PUD to County or
County to Grant PUD.
IN WITNESS WHEREOF, the parties hereto have mutually agreed upon the terms and conditions
of this instrument and have caused it to be executed as below subscribed.
PUBLIC UTILITY DISTRICT No. 2 OF GRANT COUNTY
Name
Title
Kittitas County
Name
Title
Date
Date
Appendix A
Vantage Boat Launch Management Plan
5/12/16
1.0 Location
The Vantage Boat Launch facility is located on the Columbia River at Vantage on Grant Public Utility
District No. 2 (Grant PUD) Wanapum Reservoir. The project site is located between the Riverstons Resort
Marina and the Interstate-90 causeway.
Northeast'/ of Section 29, Township 17 North, Range 23 E.
Latitude and Longitude: 46,9556 (46 56'28.44")N;-119.9485 (119 59' 3.78")W
2.0 Operations
The Vantage Boat Launch is designed to provide water access for medium sized watercraft and limited
hiking access along the Wanapum reservoir. Recreation amenities were renovated in 2015. For the
purpose of this plan, the Kittitas County Sheriffs Building is not included. This building is wholly owned and
operated by Kittitas County to include all maintenance and operations. See Figure 1 Site Map
2.1 Amenities
An overview of site amenities is described below:
o Boat Launch — two lane
w 2 paved ADA vehicle parking spaces (1 with trailer)
47 paved vehicle w/traller parking spaces
1 paved Sheriffs vehicle w/trailer parking space
0 9 paved single vehicle parking spaces
ADA Restroom
® 9 picnic tables
W Kiosks and interpretive signage
2.2 Operating Season/Hours
Vantage Boat Launch operating times and periods may vary according to conditions. Such times and
periods will be posted at the main kiosk, entrance gate and on the Grant PUD web site. Vantage Boat
Launch will generally be open year around, from dawn to dusk ('% hour prior to sun -rise to % hour after sun-
set).
Overnight camping is not permitted. See Section 2.3 Facilities Use, Scheduling, and Use Permits.
2.3 Facilities Use, Scheduling, and Use Permits
Vantage Boat Launch facilities are available to individual persons, families, and small groups for activities
consistent with the facility design, Grant PUD park rules and regulations.
Grant PUD will be the contact for all site operations. Activities may include commercial sponsored events,
community activities, etc, Grant PUD may develop an appropriate written agreement with the requesting
party. This agreement will act as the mechanism for scheduling and reserving areas for non -routine use, as
well as providing the approval for appropriate activities.
2A Gates
There is a gate installed on the main access road to Vantage Boat Launch to allow the site to be
temporarily closed for unforeseen maintenance. Prior approval for any closure will be coordinated between
Grant PUD and Kittitas County.
2.5 Rules
Park patrons are ultimately responsible to ensure that their conduct follows applicable laws and rules. This
includes:
e Grant PUD Park Rules and Policies
Rules Governing Public Use of Project Lands and Waters
b Washington State Laws
f Kittitas County Code
Park rules are posted at various conspicuous locations where they are applicable. Public use areas and
restricted areas are posted and delineated.
2.6 Emergency Action Plan
In the event that there is an imminent threat to human safety, Grant PUD or contract staff has the authority
to close all or portions of the facility as appropriate. Contact should be made with supervisors, agency
contacts and emergency services if needed. See table below.
Contact List
Agency
Name
Title
Contact Info
Grant PUD
Vanessa Seidel
Site Maintenance
509/793.1557
Manager
Cell509/429.1604
vseldal c uo d.oro
Grant PUD
Ruben Puente
Facilities Contact
5091754-0500 ex 2120
Celt 509/289-0247
Contracted
Brady Phelps
Grant PUD Security
509/750500 ex 2120
Security
Cell 509/237-9025
Kittitas County
Jim Vandeventer or
Kittitas County Public
5091962-7524
Public Works
Ryan Berge
Works
vandeventertittltas wa us
an.berqe@.co.kittitas.wa.us
Kittitas County
Dispatch
Non -emergency 509l962-7525
Sheriff
911
Kittitas Valley Fire
Vantage — Dist. 4
Office 5D91856-7140
& Rescue
Dispatch — Dist. 2,
Office 509/933-7231
Kittitas Valley Fire &
911
Rescue
3.0 Maintenance
Grant PUD and Kittitas County will share maintenance responsibilities throughout the year. If a
maintenance activity is not clearly defined in the following sections, coordination between Grant PUD and
Kittitas County should occur. Grant PUD is ultimately responsible for ensuring that all internal protocol and
external permits are in -place for maintenance activities at Vantage Boat Launch; therefore clear
communication is vital to the future success of this property.
Maintenance tasks and frequencies are designed to meet the Grant PUD goal that all recreation facilities
and equipment will:
+ Look good
o Be in good repair
Be appropriate
• Function
All sites will meet basic standards for health and cleanliness:
* Healthy environment for users and employees
o Minimal odor
Minimal litter
Maintenance extends the usability of all built elements in a recreation site. Maintenance of facilities is
critical to a visitor's experience.
The cleanliness of restroom facilities is the highest priority to most park visitors and sets a first Impression
of the entire park. It is important that the visual cleanliness of the restroom conveys to the visitors a facility
that presents no health risks, no safety concerns, and a feeling of security and nothing that detracts from
the site.
Site cleanliness, including Utter removal and grounds maintenance, frequently rank second in determining
visitor satisfaction, based on user comments at public recreation sites.
3.1 Maintenance Categories
Maintenance will be categorized in the following designations: routine, seasonal, scheduled/capital and
unscheduled.
Grant PUD will be the lead on maintenance but duties will be shared with Kittitas County.
Maintenance will be shared as shown in the following tables:
3.2 Grant PUD Responsibilities
Developed recreation Maintain all FERC required recreation amenities,
area maintenance Maintain grounds, park equipment and boat launch.
Maintain developed parking area and boulder barriers, cleanliness,
parking stripes, and directional arrows.
Maintain trees, ornamental plantings and mitigation plantings.
Manage noxious weeds and spray records.
all
3.3 Kittitas County Responsibilities
Maintenance Task
Kittitas Counq Responsibilities
Maintenance
All building maintenance and re airs
Supply toilet paper for the restrooms
Snow removal on entrance road and within arkin lot
3.4 Shared Responsibilities
Maintenance Task
Grant PUD
Responsibilities
Klttitas County
Respprisibilities
Enforcement
Coordinate with Miles County
Coordinate with Grant PUD
coordination with outside
agencies
Site inspections
Coordinate with Kittbs County
Coordinate with Grant PUD
Complete Grant PUD inspection
form annual)
Restroom
Re rt to Ktttitas County
Garbage
Coordinate with Klttitas County
Coordinate with Grant PUD
Operations and maintenance schedules will be coordinated between Grant PUD and Kittitas County
annually during the first quarter of each calendar year.
3.5 Routine Maintenance
3.5.1 Constructed Recreation Facilities
At recreation sites in general, this is typically cleaning of built features such as restrooms, campsites, swim
beaches, boat launches, and docks. While routine maintenance of facilities is accomplished by people with
the least amount of technical staff training, it is the most critical to a visitor's experience.
Routine facility maintenance can impact the usability of facilities; for example loose gravel and debris can
hinder the ability of a boat launch, route of travel, or roadway to function as intended, If fasteners and
railings are not routinely inspected and tightened or loose gravel is not removed from paved trail surfaces
where wheeled activities such as in -line skating or roller skating takes place, this is a safety issue.
3.5.2 Grounds
This ranges from lifter removal, to turf mowing and routine maintenance of water systems. The cleanliness
of grounds and the quality of turf care frequently rank #2 in determiners of visitor satisfaction based on user
comments at public recreation sites. With Vantage Boat Launch meeting the Grant PUD classification
criteria of an urban site, the user expectations are consistent with the higher level of development. Flush
restrooms, paved parking, concrete sidewalks and multiple garbage cans, all give visitors the impression
that this site is maintained frequently,
Seasonal
Facilities — examples include:
Snow removal/plowing of roadways
Trail surface maintenance for compacted gravel trails
Grounds
Pruning
Fertilize/seed
Noxious Weeds/Pest Control
3.6 Non -Routine Maintenance of Constructed Recreation Facilities
Facilities — unscheduled but vital tasks include, but are not limited to; graffiti removal, utility distribution
system repairs, pavement maintenance, etc.
Grounds — can include replacement of vegetative plantings necessary to meet environmental permit
requirements or operational objectives such as shade at universally accessible facilities.
4.0 Work Assignment
Work Assignment Feedback/Monitoring Activities — will assist Grant PUD in preparing accurate staffing and
budget plans. A Recreation Specialist will coordinate with Grant PUD Facilities Department and contract
staff as needed to verify work durations for specific projects. This information will be reviewed on an
annual basis to adjust estimated work durations for specific tasks.
A combination of the Maximo system (Facilities Department work order system) and site maintenance
spreadsheets will be utilized to schedule, track, and report work at Grant PUD recreation sites. As a goal,
any variances in work durations will be coordinated to improve work planning efficiencies.
4.1 Standard Operating Procedures
Vantage Boat Launch has no complex, interlinked multi -function systems that would warrant the
development of Standard Operating Procedures (SOP). SOPs are developed for systems associated with
the operation of complex, multiple interlinked functions that must all occur for an outcome that fulfills the
expectation for that specific aspect of an operation. SOPS are also written instructions to achieve
uniformity of the performance of functions associated with quality requirements of a system.
5.0 Maintenance Monitoring
5.1 Unplanned Maintenance
All personnel Involved in the operation or maintenance of Vantage Boat Launch will have a means to
provide feedback to Grant PUD Recreation Specialists on observed or reported maintenance needs outside
their direct responsibility. This will assure a means of timely awareness of maintenance needs and
appropriate responses being directed at the issue.
5.2 Inspections
In addition to reporting and tracking of Unplanned Maintenance, Recreation Specialists will conduct site
inspections at Vantage Boat Launch twice a year to evaluate the success of current task schedule
frequencies and to identify any non -routine maintenance that needs to be addressed.
5.3 Maintenance Tracking
Activity tracking will assist Grant PUD in preparing accurate staffing and budget plans, A Recreation
Specialist will coordinate with Grant PUD Facilities department and contract staff as needed to verify work
durations for speck projects. This information will be reviewed on an annual basis to adjust estimated
work durations for specific tasks.
A combination of the Maximo system (maintenance management system) and site maintenance
spreadsheets will be utilized to schedule, track, and report work at Grant PUD recreation sites. As a goal,
any variances in work durations will be coordinated to improve work planning efficiencies.
6.0 Vegetation Management
6,1 Trees
An annual inspection of all trees by staff with training in tree disease and structural failure indicators, will
occur in the fall. If indicators are found that warrant more than increased observation, a trained arborist
should be called to determine if a corrective prescription is needed. Any corrective action can be
implemented prior to the next use season.
All staff performing routine maintenance at the site should be aware and observant of indicators of tree
hazards.
6.2 Weed Control
Noxious weeds will be managed for the site under the Districts Vegetation Management Program,
consistent with the integrated pest management plan for Vantage Boat Launch, The Grant PUD Facilities
staff or a contractor will control the weeds as needed, based upon site vegetation assessments.
Weed Control Methods and Schedule
Weeds will be controlled by herbicide spraying, hand -pulling, or by mechanical methods (weed -whacking or
mowing). These methods and their frequency are described in the table below.
Vegetation Management
Method
Timing and Location(s)
Staff Required
Herbicide Spraying
Initial application of pre -emergent herbicide should
Facilities staff must
occur along the trail, trail shoulders, gravel walkways,
apply herbicides
picnic areas, etc. in late winter or early spring when
that require
temperatures are forecast to be consistently above
application by a
freezing and rain is likely within 24-48 hours after
licensed herbicide
application.
applicator.
Follow-up spot applications of herbicide should be
applied to breakthrough weeds along the trail, trail
LRC or Lands
shoulders, gravel walkways, picnic areas, etc. in June
Specialists can use
through early September. Staff should use a dyed
herbicide when spraying near public areas.
unregulated
herbicides (OTC
Selective herbicides may be used in landscaped areas
Round -up)
(parking lot islands, bioswales, etc.) if necessary.
Application should occur between May and September
as needed.
Hand Pulling
Hand pulling is the preferred method for landscaped
LRC, Contractor,
areas, but if the weed population is large, selective
Lands Specialist
herbicides may be used. Hand pulling should occur as
soon as weeds are spotted. Hand pulling can occur all
year, but mostly during growing season (June through
September).
Mechanical
Mechanical methods should be used where weed
Facilities or
populations cover a large area. Timing and frequency
Contractor
depends on the weed species.
Project
Vantage Boat Launch
vicinhy Alap