HomeMy WebLinkAboutResolution_CRP_VantageHighwayPavingProjectKITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: July 5, 2023 ACTION REQUESTED: Request to Approve a Resolution initiating County Road Project designated as CRP NO: 317-23, Vantage Highway Paving. BACKGROUND: In early June, Kittitas County was informed that there may be a surplus of Surface Transportation Block Grant (STBG) funds available to Local Agencies that have shovel ready projects able to obligate funding by mid -September of this year. Public Works has identified the repaving of Vantage Highway from City of Ellensburg limits to No. 81 Road as a project that meets the criteria of this funding. In order to meet the requirements of the program the project needs to be initiated as a county road project and needs to be added to the WSDOT Statewide Transportation Improvement Program. Project design will be performed by Kittitas County Public Works. This project will require a 13.5 percent match in local funds for construction. The current estimated total cost of the project is $3,950,000.00, with $534,000.00 being the Local match. INTERACTION: Public Works RECOMMENDATION: Approve a Resolution initiating County Road Project designated as CRP NO: 317-23, Vantage Highway Paving. HANDLING: Return one (1) original to Public Works ATTACHMENTS: Resolution LEAD STAFF: Josh Fredrickson, County Engineer RESOLUTION NO. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter of initiating a county road project designated as: CRP NO: 317-23 JOB NO: RC 2296 IT IS HEREBY RESOLVED that the Vantage Highway Paving be improved as follows: The project will plane the existing asphalt surface on Vantage Highway MP 2.027 - MP 6.56 to remove up to 3" of asphalt, and then replace with a new hot mixed asphalt wearing surface and install new roadway striping and markings. ARTERIAL x ACCESS This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineers estimate, is hereby made in the amounts and for the purposes shown: 0 E Fe-1 PURPOSE AMOUNT TOTALS PRELIMINARY ENGINEERING $ 200,000 CONSTRUCTION ENGINEERING $ 250,000 RIGHT-OF-WAY ACQUISITION $ SUB -TOTAL $ 450,000 County Forces CONSTRUCTION $ CONTRACT CONSTRUCTION $ 3,499,965 SUB -TOTAL $ 3,499,965 TOTAL PROJECT COST $ 3,949,965 GRANT OR OTHER FUNDS $ 3,416,720 Grant Source: STBG A is TOTAL COUNTY ROAD FUND ALLOCATION 533,245 Joshua Fredrickson, P.E. County Engineer THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2023 ANNUAL ROAD PROGRAM AS ITEM NO. THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 IN ACCORDANCE WITH RCW 36.81.130 IT IS FURTHER RESOLVED THAT: THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. ❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND WAC 136-18. Attest: -_..... . _ .. . _. ADOPTED this 5th day of July, 2023. BOARD OF COUNTY COMMISSIONERS ( Clerk of the Board KITTITAS COUNTY, WASHINGTON Cory Wright, Chair Brett Wachsmith, Vice -Chair Laura Osiadacz, Commissioner g:\base\forms\eng\crp-frm 6/26/2023