HomeMy WebLinkAbout2023-06-13-minutes-solid-waste-and-maintenanceKITTITAS COUNTY COMMISSIONERS Solid Waste and Maintenance Regular Meeting Tuesday June 13, 2023 - 2:00 PM BOCC Conference Room 205 West 5th Room 108 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Solid Waste Updates: Ryegrass Facility - 1.LPL SEPA 2. Septage Lagoon Land Application 4. Upper County Scale Project 5. New Ellensburg Transfer Station Project 6. Bloom Project 7. Shady Brook 8. Prosecutors' Office 9. Jail Updates 10. Courthouse Relocation 11. Other Business - No Action to be taken 12. Concluded Created on 6/8/2023 6:48:15 AM KITTITAS COUNTY SOLID WASTE AND MAINTENANCE MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Regular Meeting TUESDAY 2:00 PM June 13, 2023 Board members present: Chairman Cory Wright, Vice Chairman Brett Wachsmith (Absent) and Commissioner Laura Osiadacz, Others: Patti Stacey, Erica Luce. Call to Order at 2:00 p.m. Citizen Comments (1 min. time limit) — None Solid Waste Updates: Ryegrass Facility - Patti informed the Board she contacted the County Sheriff's office regarding an ongoing issue with trespassing at the Ryegrass Landfill and the individual was trespassed by the Sheriff's department. Patti worked with Neil Caulkins and Doug Mitchell in the Prosecutor's office and a letter was sent to their lawyer. Patti informed the Board she has updated the Department of Ecology on the actions taken. 1) LPL SEPA — Patti informed the Board Department of Ecology requires proposed landfill expansion area to be lined. Patti received the engineer's estimate and relayed to the Board the cost for lining expansion area would be approximately $7 million. Discussion was held on options and cost recovery. 2) Septage Lagoon Land Application — Patti updated the Board on the lagoon levels and that Soiltest Labs, Inc is scheduled to come out today to resample the field. Upper County Scale Project: Patti informed the Board the project is currently out to bid, she had to issue an Addendum to answer questions, which updated the new bid date to June 131h and she will be opening bids today at 3:30pm. Patti informed the Board she is working on Phase 2 of the project involving a redesign of the Cle Elum transfer station entrance with Pat Deneen on a shared driveway. Neil Caulkins has prepared documents for Mr. Deneen to sign. Brief discussion was held on how the new design will allow for a larger queuing area for customers. 2023-06-13 MINUTES New Ellensburg Transfer Station Project: Patti informed the Board that she had applied for two separate EPA Federal grants, one being $4 million for the compost facility and $800,000 for the new recycling facility and was informed the applications are moving on to final review. Patti informed the Board she had submitted plans to the City of Ellensburg for a building permit. The City has come back with comments that are requiring a redesign for a second exit for fire and a waterline due to the potential HHW storage capacity at the new facility. The Board directed Patti to confirm current HEW amounts being stored on site and clarify requirements from the City Fire Marshall. Bloom Project: Patti updated the Board on the new sewer line installation that had to be rerouted and is scheduled to begin June 201h. The City is assisting the County in locating the sources of older lines as there are no as-builts available. Shady Brook: Patti informed the Board she will be requesting a resolution to award the bid for County owned mobile homes at 1200 E. University Way and BOCC signatures on a professional service agreement with Belsaas and Smith Construction, Inc. Discussion was held regarding the timeline of the project with plans to be completed and the area covered with the County's mulch before rodeo weekend. Prosecutor's Office: Discussion was held on carpet, door and door frame installations. Patti informed the Board certain doors are on backorder until the end of August, Prosecutor's office is aware of delay on doors, and they are scheduled to begin moving in August lst Jail Updates: Patti informed the Board she is preparing RFQ paperwork for an on -call architect to assist with issues at the jail. Patti relayed to the Board problems with the siding and sealing in the outdoor recreational area and the need for a product that can withstand the weather. Further discussion was held on the aging infrastructure and needed preventative maintenance and repairs along with the impact and cost during construction. 2023-06-13 MINUTES 2 Courthouse Relocation: Patti suggested to the Board that public outreach and education should begin on reasons why we need a new facility. Discussion was held on resources for starting an outreach campaign including a presentation from DLR Consulting Group, scheduling town hall meetings, involving local newspapers, and collaboration of department heads. OTHER BUSINESS: Discussion was held on the progress of the north parking lot project. Meeting concluded at 2:52 p.m. Erica Luce 2023-06-13 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Cory Wright, Chairman RYEGRASS LIMITED PURPOSE LANDFILL - PHASE 2 PRELIMINARY ENGINEER'S ESTIMATE OF PROBABLE COST 2023 DOLLARS 20 ACRES 6/1/2023 ITEM DESCRIPTION QUANTITY UNIT Unit Price Total 1 Mobilization 1 LS S470,000 S470,000 2 Surveying 1 LS S40 000 S40 000 3 Site Health and Safety Plan 1 LS $3 000 $3 000 4 Spill Prevention Plan 1 LS $2,000 $2,000 5 Temporary Erosion and Sediment Control 1 LS S30,000 $30 000 6 Excavation Haul and Stockpile 71,000 CY $7 S468 600 7 Embankment and Compaction 7,000 CY $5 $35 000 8 Bedding Layer from Offsite Borrow In-Place 33,000 CY $15 $486,800 9 Leachate Collection Layer from Offsite Borrow In -Place 49,000 CY $9 S460 100 10 Crushed Surfacing Base Course In -Place 1,000 CY $30 $30 000 11 Construction Geotextile for Ditch Lining 19,000 SY $6 $114 000 12 Interim Stormwater Berm In -Place 5,000 LF S13 $67100 13 Containment Berm, In Place 3,100 LF $8 $24 800 14 Rock Armor Lined Ditch In -Place 19,000 SY $18 $347,300 15 Trimming and Cleanup 1 LS $32 000 $32 000 16 8-Inch ADS Solid Wall Corrugated Stormwater Diversion Pipe 45 LF $70 $3,200 17 8-Inch HDPE Solid Wall Stormwater Diversion Pie 45 LF $45 $2,000 18 60-mil HDPE Geomembrane In -Place 103,000 SY $11 $1 081 500 19 Geotextile Cushion Layer 103,000 SY S4 S417 200 20 Geos nthetic Clay Liner GCL , In -Place 98,000 SY $10 S1,010 400 21 Geomembrane Penetrations 4 EA S500 $2,000 22 12-inch HDPE Solid Wall Leachate Transfer Pie 75 LF $80 $6 000 23 6-inch HDPE Perforated Leachate Collection Pie 900 LF $17 $15 500 24 6-inch HDPE Solid Wall Leachate Leak Detection Pie 50 LF S21 $1 000 25 Firewater Storage Tank Relocation 1 LS $5,000 $5,000 26 Native Brush Relocation 1 LS $5001 S500 TOTAL w/o CONTINGENCY $5,149,500 CONTINGENCY 20% $1,029,900 TOTAL w/ CONTINGENCY $6,179,400 KITTITAS COUNTY SALES TAX (2023) 8.1% $501,000 DESIGN AND CONSTRUCTION MANAGEMENT SERVICES 10% $515,000 TOTAL BID SCHEDULE $7,195,400 NOTE: Costs are in 2023 dollars. Construction would be in 2024 or later so inflation will impact these values