HomeMy WebLinkAbout2023-06-12-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS
Public Works Study Session
Regular Meeting
Monday June 12, 2023 -1:30 PM
Commissioners' Auditorium
205 West 5th Room 109 - Ellensburg
1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Request to Approve a Resolution Directing the Examination of a Regional Planning
Organization Serving the Conference of Governments
4. FEMA Letter
5. Annual Water Leases
6. Broadband SOQ Review Committee
7. American Rescue Plan Act Funding Award Considerations
8. West Ellensburg Flood Alleviation and Habitat Enhancement Proposal
9. Other Business - No Action to be taken
10. Concluded
Created on 6/8/2023 9:4253 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM June 12, 2023
Board members present: Chairman Cory Wright and Commissioner Laura
Osiadacz.
Others: Mark Cook, Arden Thomas, Rebecca Cruse, Public Works; Jessica
Miller, Steph Mifflin, Toni Berkshire, Jeremy Larson, Jayme Ayling,
Community Development Services; Neil Caulkins, Prosecuting Attorney's
Office; Joe Poire, County Consultant; Jennifer Nelson, Washington
Department Fish and Wildlife.
At 1:30 PM Chairman Cory Wright opened the Public Works Study
Session.
No Citizen Comments.
REQUEST TO APPROVE A RESOLUTION DIRECTING THE EXAMINATION OF A
REGIONAL PLANNING ORGANIZATION SERVING THE CONFERENCE OF GOVERNMENTS
Mark Cook briefed the Board of County Commissioners on Conference of
Governments (COG) desire to evaluate the future planning structure
and possible creation of a regional planning organization to serve
all COG members and presented Resolution 2023-097 for consideration.
Commissioner Laura Osiadacz moved to approve Resolution 2023-097.
Seconded by Chairman Cory Wright. Motion passed.
FEMA LETTER
Arden Thomas briefed the Board of County Commissioners on resources
provided by the Flood Control Zone District to aid homeowners in the
Palomino Fields Sub -Division to remove those homes from designated
100-year floodplain and federal flood insurance requirements. The
efforts were successful, and Arden Thomas stated staff has received a
letter from FEMA on May 16,2023 formalizing the request for a map
revision for 6 homes in the development.
ANNUAL WATER LEASES
Arden Thomas briefed the Board of County Commissioners on 2 water
right acquisitions obtained by the county that included "lease back"
arrangements for agricultural use and is seeking direction to set
annual water lease rates at that charged by the Kittitas Reclamation
District. The Board of County Commissioners were supportive of
revising the leases to the lowest rate charged by Kittitas
Reclamation District.
2023-6-12 MINUTES
AMERICAN RESCUE PLAN ACT FUNDING AWARD CONSIDERATIONS
Mark Cook briefed the Board of County Commissioners on 2 requests
received to distribute American Rescue Plan Act Funding. The first
request to fund the Roslyn Cemetery irrigation improvements is well
underway. Staff is seeking Board direction on the second request for
the Evergreen Sno-park parking rehabilitation. Mark Cook stated the
estimated cost for improvement is approximately $1.2 million, and
funding source for annual maintenance costs has not been identified.
Staff was directed to schedule a meeting with Commissioner Laura
Osiadacz and the Kittitas County Parks and Recreation District to
discuss how they can participate in the cost of annual park
maintenance before consideration of distributing funds.
BROADBAND SOQ REVIEW COMMITTEE
Mark Cook stated Public Works received 2 submissions from the recent
request for Broadband service providers and the next step is
formation of a Broadband Committee to review the SOQ's submitted.
Discussion pursued. Commissioner Laura Osiadacz requested more time
to consider qualified Broadband Committee members. The Board directed
Mark Cook and Joe Poire, County Consultant, to identify committee
members as well for Board consideration.
WEST ELLENSBURG FLOOD ALLEVIATION AND HABITAT ENHANCEMENT
Mark Cook briefed the Board of County Commissioners on developments
to enhance Whiskey Creek and efforts to alleviate West Ellensburg
flooding. Partnerships with Mid -Columbia Fisheries Enhancement Group
and City of Ellensburg have been successful, and staff asks for the
Board's support to maintain momentum. Recently, Burlington Northern
Sante Fe Railroad has showed interest in eliminating a fish barrier
along their mainline. Staff was directed to move forward with habitat
improvements and reach out to agencies to form a broader stakeholder
group.
Meeting concluded at 2:05 PM
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Rebecca Cruse, Administrative Cory Wright, Chairman
Assistant
2023-6-12 MINUTES
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 12, 2023
ACTION REQUESTED: Request to Approve a Resolution directing the examination
of a regional planning organization serving the Conference
of Governments
BACKGROUND: For the past several months, the Conference of
Governments (COG) has been evaluating various regional
planning organization models. At the May COG meeting,
the COG motioned (unanimously) to evaluate impacts
associated with creating increased authorities allowing the
possible creation of a regional planning organization
serving all COG members.
INTERACTION: Public Works.
RECOMMENDATION: Approve the Resolution directing Public Works evaluate
the likely organizational structure and costs associated with
creating a regional planning organization serving Kittitas
County COG members.
HANDLING: Return one original to Public Works.
ATTACHMENTS: Resolution.
LEAD STAFF: Mark R. Cook, Director.
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO. Od -�OiT
AGREEMENT TO EVALUATE THE VIABILITY OF EXPANDING
CONFERENCE OF GOVERNMENT AUTHORITIES SUPPORTING
REGIONAL SERVICES FOR CONFERENCE MEMBERS
WHEREAS: The Kittitas County Conference of Governments (KCCoG)
formulated on August 24, 1995; "The purpose of the COG shall be
to develop and promote communication, understanding, and
cooperation among the COG member jurisdictions on matters
common to, and affecting the public served by the member
jurisdictions to wit, RCW 36.64.080'; and
WHEREAS: The KCCoG has interviewed multiple regional planning
organizations in the past several months developing an
understanding as to how regional planning organizations operate
and provided a variety of services to members; and
WHEREAS: Revised Code of Washington at Chapter 36.64.080 authorizes
counties, cities and towns and other participating subdivisions of
the state to establish a regional agency for the purpose of studying,
coordinating, assisting and managing matters of regional or
governmental interest and concern, including but not limited to
transportation, land use planning, codes and ordinances,
comprehensive facility and land use planning, government
finances, air and water quality, regional and local social services,
and other matters of local and regional interest of significance; and
WHEREAS: Article II of the current bylaws of KCCoG does contemplate a
variety of purposes but does also appear to limit the actions of
KCCoG to studying issues and making recommendations for
review and action by the member counties and/or cities legislative
body; and
WHEREAS: Expansion of KCCoG organizational structure, finance structure,
service package delivery model will require future actions by
KCCoG members; and
WHEREAS: KCCoG members desire better understanding of the necessary
organizational structure changes required, the finance structure
required, and possible service package delivery model
implementation actions required.
NOW, THEREFORE BE IT RESOLVED: The Board of County Commissioners, after
due consideration, does hereby direct staff develop a proposal for KCCoG consideration
of a reformulated Conference of Governments providing an organizational model, a
finance model and a service package model for council members including planning
services, Geographic Information System service, and regional data collection and
management.
NOW, BE IT FURTHER RESOLVED: Staff is further directed to prepare necessary
amendments to "Articles of Association of the Kittitas County Conference of
Governments" affording the desired reformulation of the conference for member
consideration.
DATED this 12th day of June 2023, at Ellensburg, Washington.
Cott
,N b
T �
SLALAttes,�
\�r C ^• - - �kii
of the Board- Julie Kjorsvik
BOARD OF
KITTITAS,f
Wright, Chairman
ABSENT
COMMISSIONERS
Brett Wachsmith, Vice -Chairman
-❑l Deputy Clerk of the Board- Mandy Buchhol
J Laura Osiadacz, Commissioner
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 12, 2023
TOPIC: FEMA Letter
ACTION REQUESTED: Informational
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Informational
BRIEFING SUMMARY:
• The Palomino Fields sub -division contains land at risk of flooding during a 100-
year event.
• Through the floodplain development permitting process, Kittitas County staff
worked with the Palomino Fields developer to elevate home construction sites on
fill and to mitigate for this fill.
• After home construction, County staff provided technical assistance on an
application to FEMA, requesting six homes elevated on fill be removed from the
100-year floodplain.
• The May 16"', 2023, letter from FEMA removed the six homes from the
regulatory 100-year floodplain. As a result, these homes will not be subject to
mandatory Federal flood insurance requirements.
BACKGROUND:
The Palomino sub -division, located north of Ellensburg, contains land at risk of being
flooded by Currier Creek during a I00-year flood event. Kittitas County code requires
that homes with this type of flood risk be elevated above the predicted flood elevation.
One option for elevation is to construct homes on fill. When fill is imported in the
floodplain, mitigation is required. Homes elevated on fill may be officially removed from
the 100-year floodplain if the lowest adjacent grade next to the home is high enough.
FEMA determines whether homes can officially be removed. There will be subsequent
applications to request homes constructed as part of other Palomino divisions be
removed.
DISCUSSION:
Resources available through the Flood Control Zone District enables us to work pro-
actively with interested developers to better address flood risk at the time of
development. In doing so, we will help prevent future flood issues that the District could
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
be burdened with addressing and have the opportunity to alleviate mandatory flood
insurance requirements for future residents.
FISCAL IMPACTS:
This type of technical assistance is funded by the Flood Control Zone District levy and
included in our annual budget and work plan.
ATTACHMENTS:
Exhibit 1: FEMA Letter dated May 16, 2023
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: FEMA Letter dated May 16, 2023
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
9 Federal Emergency Management Agency
Washington, D.C. 20472
May 16, 2023
THE HONORABLE CORY WRIGHT CASE NO.: 23-10-0271A
CHAIR, BOARD OF COMMISSIONERS COMMUNITY: KITTITAS COUNTY, WASHINGTON
KITTITAS COUNTY (UNINCORPORATED AREAS)
205 WEST 5TH AVENUE, SUITE 108 COMMUNITY NO.: 530095
ELLENSBURG, WA 98926-2887
DEAR MR. WRIGHT:
This is in reference to a request that the Federal Emergency Management Agency (FEMA)
determine if the property described in the enclosed document is located within an identified Special
Flood Hazard Area, the area that would be inundated by the flood having a 1-percent chance of
being equaled or exceeded in any given year (base flood), on the effective National Flood Insurance
Program (NFIP) map. Using the information submitted and the effective NFIP map, our
determination is shown on the attached Letter of Map Revision based on Fill (LOMR-F)
Determination Document. This determination document provides additional information regarding
the effective NFIP map, the legal description of the property and our determination.
Additional documents are enclosed which provide information regarding the subject property and
LOMR-Fs. Please see the List of Enclosures below to determine which documents are enclosed.
Other attachments specific to this request may be included as referenced in the
Determination/Comment document. If you have any questions about this letter or any of the
enclosures, please contact the FEMA Map Insurance eXchange (FMIX) toll free at (877) 336-2627
(877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC
Clearinghouse, 3601 Eisenhower Avenue, Suite 500, Alexandria, VA 22304-6426.
Sincerely,
Patrick "Rick" F. Sacbibit, P.E., Branch Chief
Engineering Services Branch
Federal Insurance and Mitigation Administration
LIST OF ENCLOSURES:
LOMR-F DETERMINATION DOCUMENT (REMOVAL)
cc: State/Commonwealth NFIP Coordinator
Community Map Repository
Region
Mr. Chad Bala
rRECEIVED
'I'rY
R MTTITAS COUNTY
BOARD OF COMMISSIONERS
Page 1 of 2
Date: May 16, 2023
Case No.: 23-10-0271A
LOMR-F
Federal Emergency Management Agency
Washington, D.C. 20472
'�kb St
LETTER OF MAP REVISION BASED ON FILL
DETERMINATION DOCUMENT (REMOVAL)
COMMUNITY AND MAP PANEL INFORMATION LEGAL PROPERTY DESCRIPTION
KITTITAS COUNTY,
Lots 2 through 7, Palomino Fields Plat -- Division III, as shown on the
WASHINGTON
Plat recorded as Document No. 202012030070, in the Office of the
(Unincorporated Areas)
Auditor, Kittitas County, Washington
COMMUNITY
COMMUNITY NO.: 530095
AFFECTED NUMBER:53037C1064D
MAP PANEL
DATE: 912412021
FLOODING SOURCE: CURRIER CREEK
A PR (MATE DE F R PER Y:47.02 •1 0.57b 7
,
SOURCE OF LAT & LONG: LOMA LOGIC
DATUM: NAD 83
DETERMINATION
OUTCOME
1/.ANNUAL
LOWEST
LOWEST
K/
ION
SUBDIV1-
ISIO
STREET
AT IS REMOVED
FROM THE SFHA
FLOOD
CHANCE
FLOOD
ADJACENT
GRADE
LOT
ELEVATION
ZONE
ELEVATION
ELEVATION
(NAVD 88)
(NAVD 88)
(NAVD 88)
Palomino Fiel3000 Roan Drive Structua X 1599.5 feet
Plat - Division
KADDITIONAL
(shaded)
Hazard Area (SFHA) - The SFHA is an area that would be inundated by the Flood having a 1-percent chance of being equaled or
y given year (base flood).
CONSIDERATIONS (Please refer to the appropriate section on Attachment 1 for the additional
considerations listed below.)
N TABLE (CONTINUEDI
PORTIONS REMAIN IN THE SFHA
STATE LOCAL CONSIDERATIONS
Fill for the property described above. Using the information submitted and the effective National Flood nsu ance Program (NFIP) Imap, we have
determined that the structure(s) on the property(ies) istare not located in the SFHA, an area inundated by the flood having a 1-percent chance of
being equaled or exceeded in any given year (base flood). This document revises the effective NFIP map to remove the subject property from the
SFHA located on the effective NFIP map; therefore, the Federal mandatory flood insurance requirement does not apply. However, the lender has
the option to continue the flood insurance requirement to protect its financial risk on the loan.
This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this
determination. If you have any questions about this document, please contact the FEMA Mapping and Insurance eXchange (FMIX) toll free at
(877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC Clearinghouse, 3601
Eisenhower Avenue, Suite 500, Alexandra, VA22304-6426.
Patrick "Rick" F. Sacbibit, P.E., Branch Chief
Engineering Services Branch
Federal Insurance and Mitigation Administration
Page 2 of 2
Date: May 16, 2023
Case No.: 23-10-0271A
LOMR-F
Federal Emergency Management Agency
0OGYAj��frt,
oz
� �. Washington, D.C. 20472
AND 5<<'
LETTER OF MAP REVISION BASED ON FILL
DETERMINATION DOCUMENT (REMOVAL)
ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS)
DETERMINATION TABLE (CONTINUED)
OUTCOME
1%ANNUAL
LOWEST
LOWEST
LOT
BLOCK/
SECTION
SUBDIVISION
STREET
WHAT IS
REMOVEDFROM
FLOOD
CHANCE
FLOOD
ADJACENT
GRADE
LOT
ELEVATION
THE SFHA
ZONE
ELEVATION
ELEVATION
(NAVD 88)
(NAVD 88)
(NAVD 88)
5
--
Palomino Fields
Plat - Division 3
2920 Roan Drive
Structure
X
--
1599.9 feet
(shaded)
7
--
Palomino Fields
Plat - Division 3
3004 Roan Drive
Structure
X
--
1600.1 feet
-
(shaded)
4
--
Palomino Fields
Plat - Division 3
2916 Roan Drive
Structure
X
--
1600.3 feet
(shaded)
3
--
Palomino Fields
Plat - Division 3
2912 Roan Drive
Structure
X
--
1600.3 feet
(shaded)
2
—
Palomino Fields
Plat - Division 3
2908 Roan Drive
Structure
X
1600.5 feet
(shaded)
PORTIONS OF THE PROPERTY REMAIN IN THE SFHA (This Additional Consideration applies to the
preceding 6 Properties.)
Portions of this property, but not the subject of the Determination/Comment document, may remain in the
Special Flood Hazard Area. Therefore, any future construction or substantial improvement the
on property
remains subject to Federal, State/Commonwealth, and local regulations for floodplain management.
STATE AND LOCAL CONSIDERATIONS (This Additional Consideration applies to all properties in the
LOMR-F DETERMINATION DOCUMENT (REMOVAL))
Please note that this document does not override or supersede any State or local procedural or substantive
provisions which may apply to floodplain management requirements associated with amendments to State or
local floodplain zoning ordinances, maps, or State or local procedures adopted under the National Flood
Insurance Program.
This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA
Mapping and Insurance eXchange (FMIX) toll free at 336-2627
(877) (877-FEMA MAP) or by letter addressed to the Federal
Management Agency, LOMC Clearinghouse, 3601 Eisenhower Avenue, Suite 500, Alexandria.
Emergency
VA22304-6426.
Patrick "Rick" F. Sacbibit, P.E., Branch Chief
Engineering Services Branch
Federal Insurance and Mitigation Administration
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 12, 2023
TOPIC: Annual Water Leases
ACTION REQUESTED: Direction to Staff
LEAD STAFF:
Arden Thomas
RECOMMENDATION:
Direct Staff to utilize the lowest rate charged throughout the Kittitas Reclamation District
to set annual water lease rates.
BRIEFING SUMMARY:
• Kittitas County has two long term water leases associated with water right
purchases.
• The water leases specify that Kittitas County will use the annual Kittitas
Reclamation Assessment (KRD) to set the annual water lease rate.
• There are a range of KRD assessment rates used throughout the district.
• It has been Public Works business practice to utilize the property specific KRD
assessment to set the annual lease rate. If KRD assesses more than one rate for a
property, we use the lowest rate.
• One lessee has requested that we utilize the lowest KRD assessed rate throughout
the district to set our annual lease rate.
• Using the current approach, Public Works will collect $9,811.90 through the
leases in 2023. If we revise the lease calculation, we will collect $7,271.37, a
reduction of $2,540.53.
BACKGROUND:
Two Kittitas County water right acquisitions included water "lease -back" arrangements.
Kittitas County acquired the water rights and are leasing the water back to the seller for a
defined period. One lease will expire in 2027 and the other lease will expire in 2038.
Both lease agreements specify that Kittitas County will use the annual Kittitas
Reclamation Assessment to set the annual water lease rate. KRD does not have one
assessment district -wide, rather KRD assessed rates vary based on soil quality on the
assessed property and location on the district. It has been Public Works business practice
to utilize the property specific KRD assessment to set the annual lease rate. In instances
where there is more than one rate for a property, we use the lowest rate. One lessee has
requested that we utilize the lowest KRD assessed rate throughout the district to set our
annual lease rate.
Page 1 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
DISCUSSION:
Utilizing the lowest KRD assessment would standardize rates between lessees. The
lowest KRD assessed rates reflect situations where less KRD infrastructure is used to
deliver the water and where contract obligations to the U.S. Bureau of Reclamation for
water storage is lower. Since Kittitas County has no infrastructure costs or
responsibilities associated with water delivery, utilizing the lowest rate can be justified.
FISCAL IMPACTS:
Using the current approach, Public Works will collect $9,811.90 through the leases in
2023. If we revise the lease calculation and recommended, we will collect $7,271.37, a
reduction of $2,540.53.
ATTACHMENTS:
Exhibit l: Water Lease Summary Table
Page 2 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: Water Lease Summary Table
KRD Assessment
Current
KRD Assessment
Revised
Lease
No.
- Lowest on
Lease
- Lowest on
Lease
Lease
Expiration
Acres
Property
Calculation
District
Calculation
Lease 1
8/15/2038
44.9
$79.00
$3,547.10
$57.30
$2,572.77
Lease 2
10/1/2027
82
$76.40
$6,264.80
$57.30
$4,698.60
Page 3 of 3
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 12, 2023
TOPIC: Broadband SOQ Review Committee
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff distribute SOQ response materials to the Broadband scoring committee and
provide a scoring sheet for committee use.
BRIEFING SUMMARY:
• The county has received two responses to our solicitation for qualified broadband
providers — Thorp and Edgemont.
• A selection committee now needs to review the responses and recommend
selection to the Board of County Commissioners (BoCC).
• PW will prepare the SOQ scoring sheet and distribute it to the selection
committee.
• The BoCC needs to formulate the committee and advise Public Works for SOQ
response and scoring sheet distribution.
BACKGROUND:
For the past several months, the county has worked preparing a solicitation process
attempting to attract potential broadband service providers (Thorp and Edgemont). The
advertising period closed on June 2, 2023, with the county receiving two responses.
DISCUSSION:
An SOQ review committee now needs to review, score, and recommend a service
provider to the BoCC. PW will support the effort by distributing response materials and
creating a scoring sheet for use by the selection committee.
FISCAL IMPACTS:
None.
ATTACHMENTS:
None.
Page 1 of 1
Public Works "Work Session Staff Report", 2023
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 12, 2023
TOPIC: American Rescue Plan Act Funding Award Considerations
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff on Kittitas County Recreation District No. 1's request.
BRIEFING SUMMARY:
• Staff have met with City of Roslyn and Cemetery Commission staff detailing
project design requirements and timelines.
• Staff will prepare a contract for the Board of County Commissioners (BoCC)
consideration once we receive the funding contract model from the Prosecuting
Attorney's Office.
• The County has issued a notice of intent to fund Roslyn not to exceed $275,000.
• The County Engineer has developed an engineer's estimate for rehabilitating the
Evergreen Snow Park (EXHIBIT 1).
• Ongoing maintenance revenues (Kittitas Recreation District No. 1 — KRD1) are
not currently defined.
BACKGROUND:
The BoCC has requested Public Works (PW) assist them distributing some of the
American Rescue Plan Act funding to two potential recipients in the county. The request
to fund irrigation improvements to the Roslyn Cemetery is well underway. Staff is
waiting on a system design for inclusion into the BoCC's funding agreement. Following
a staff site visit to the Evergreen Snow Park last month, PW Design/Construction staff
developed a planning level cost estimate for BoCC consideration (EXHIBIT 1).
DISCUSSION:
The initial engineer's estimate to rehabilitate Evergreen Snow Park is in excess of $1
million. Two possible improvement configurations are provided as EXHIBIT 2. The
conditional use permit for the park is provided as EXHIBIT 3.
Significant capital investment is needed at the snow park. The BoCC may want to
consider discussing long term operations and maintenance support for the park with
KRD1 prior to moving to funding award. KRD1 has previously discussed deeding the
snow park to the county. This approach qualifies the facility to load into the county's
Page 1 of 5
Public Works "Work Session Staff Report", 2023
Capital Facility Plan. All projects in the plan qualify for potential REET 2 or lodging tax
funding.
FISCAL IMPACTS:
Currently unbudgeted capital expense or ongoing revenue supporting long-term
operations and maintenance support.
ATTACHMENTS:
EXHIBIT 1: ENGINEER'S ESTIMATE
EXHIBIT 2: IMPROVEMENT CONFIGURATIONS
EXHIBIT 3: CONDITIONAL USE PERMIT
Page 2 of 5
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: ENGINEER'S ESTIMATE
Page 3 of 5
Public Works "Work Session Staff Report", 2023
NIP TO Job Number: TBD PROJECT LENGTH D.00
CONSTRUCTION DURATION: 2 Weeks
SCOPING ESTIMATE $1,264,382 CREA(ED 5/15/2023 By: CC
1 SnoPark was contemplated in 2008 off 0 County Road All Seasons Drive, The Smoak was started, but never finished. This cost estimate represents the remaining cost to finish building out the parking area.
4alntenance cost is also estimated, but A is sepeate to the construction bost.
PREPARATION
1
LS 0001
MOBILIZATION
10%
$80,380
GRADING
6,BBg
CY 0310
ROADWAY EXCAVATION INLC. HAUL
$30,00
$206,667
DRAINAGE
2,667
CY 1030
DITCH EXCAVATION INCL. HAUL
$20.00
$53.333
6200,
TON iWT
81N. QUARRY ROCK
$5000
$310,000
SURFACING
4,244
TON 5100
CURSHED SURFACING BASE COURSE
$33.00
$140G37
2,679
TON 5120
CURSHED SURFACING TOP COURSE
$3500
$93,765
Data
PROJECT CHANGE TRACKING
By Commmts
BID ITEM SUBTOTAL WIO MOBILIZATION
MOBILIZATION 10.00%
$803,803
$80.38028
151 2323
¢ Ini one eshowe. No dmgn work has been done
BID ITEM SUBTOTAL
DESIGN ALLOCATIONS 0.00%
$884,183
$0
BID ITEM TOTAL
$884183
SALES TAX C 0 00%
PROJECTSUBTOTAL
CONSTRUCTION ENGINEERING Q 10%
$0
$884,183
$88,418
CONTINGENCIES Q 20%
ON ESTIMATE
PE PHASE 10%
FUN ACQUISITION COSTS
$176.837
$1,149,438
114,944
$0
PROJECT TOTAL
$1,264,382
MaintenenceCoat
1 inch CSTC removal from plows/year
124000 SF aNected area/year
3823 U/year'=400 CY/year
400 CY - LA TONS/CY = 560 TON
I 35$/TON=$19600 Annua l Maintenance I
EXHIBIT 2: IMPROVEMENT CONFIGURATIONS
Page 4 of 5
Public Works "Work Session Staff Report", 2023
Section 1
Secflon 0'
00
IN
a
o_
c
z
in
� ;
rn
N
C?
a
■
i
O
cQ' N
Cn
v
CDN,
0 D
CE N
fn �
m
s90y.
o
p(Q
c
CD
C/)
W
n
Qi
n
3
v
N
O
O
cn
mo
0
r4
0)
rF
0
m
CO
r
l<
0
c
EXHIBIT 3: CONDITIONAL USE PERMIT
Page 5 of 5
Public Works "Work Session Staff Report", 2023
KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES
411 N. Ruby St., Suite 2, Ellensburg, WA 98926
CDSCCO.KITTITAS. WA.US
Office (509) 962-7506
"Building Partnerships - Building Communities" Fax (509) 962-7682
CONDITIONAL USE PERMIT
KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES
A Conditional Use Permit (CU-08-00005) is hereby approved and issued to Kittitas County Parks &
Recreation District for a Conditional Use Permit to operate a five (5) acre SnoPark in the Rural 5 zone.
The site is located south of Woods & Steele Road, off of Forest Service Road #4510, Cle Elum, WA
98922, and is located in a portion of Section 07, T. 19 N., R. 15 E., W.M., in Kittitas County.
Assessor's map number 19-15-07060-0015.
This permit is subject to the following conditions:
1. The SnoPark shall be in operation and open to the general public only during the
months of October through March and shall be closed and gated during the months of
April through September.
2. The hours of operation during the winter months shall be 8:00 am to 8:00 pm.
3. Only service and maintenance vehicles shall be allowed within the SnoPark
boundaries during the closed months.
4. Private property signs shall remain visible and posted every 50 feet around the
perimeter of the property.
5. Signage of one -direction traffic flow, rules and regulations of SnoPark usage, exits,
and parking areas shall be visible.
6. Kittitas County shall be notified if a new contractor, differing from the information
submitted to Community Development Services on August 19, 2014, is used for
sanitary waste disposal and maintenance of the site.
7. There shall be no ground water withdrawal to serve the SnoPark.
8. Kittitas County Parks and Recreation District is responsible for creating noise
dampening structures to assist in lowering the amount of noise impact on neighboring
residences.
9. All conditions and requirements of the Board of Adjustment Findings of Fact dated
June 11, 2008
Issued this 15th day of September 2014
By:
Lindsey Ozbolt, Planner II
COMMUNITY PLANNING • BUILDING INSPECTION • PLAN REVIEW ` ADMINISTRATION • PERMIT SERVICES • CODE ENFORCEMENT
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: June 12, 2023
TOPIC: West Ellensburg Flood Alleviation and Habitat Enhancement Proposal
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff formulate a stakeholder group and commence evaluation of potentially using
the Whiskey Creek system for flood alleviation and habitat enhancement.
BRIEFING SUMMARY:
• The City of Ellensburg identified the potential use of Whiskey Creek for flood
alleviation consideration in its 1999 flood management plan.
• The county (Public Works — PW) has been working the past eight years
developing a holistic approach to improving the Whiskey and Mercer Creek
systems for fish habitat and improved flood conveyance.
• The county has demonstrated how flood and fish can work together with the
demonstration project conducted with Washington State Department of Fish and
Wildlife (WDFW) in conjunction with Mid -Columbia Fisheries Enhancement
Group (MCFEG), in Mercer Creek at Helena Avenue.
• Recently, Burlington Northern Santa Fe Railroad (BNSF) expressed interest in
removing the fish passage barrier on the mainline railroad impeding fish passage
to Whiskey Creek.
• Ongoing flood alleviation work by the City of Ellensburg at Dolarway creates an
opportunity for a larger discussion concerning the future of Whiskey Creek.
• It is time to integrate numerous opportunities with a larger stakeholder group.
BACKGROUND:
For over twenty years, the City of Ellensburg (Eburg) has been contemplating
improvements to the Whiskey Creek system for flood alleviation for west Ellensburg.
The Kittitas County Flood Control Zone District (FCZD) has been working in the
Whiskey/Mercer drainage basins for several years producing revised Federal Emergency
Management Agency (FEMA) flood maps. The FCZD completed a joint stream
restoration project with WDFW and MCFEG a couple of years ago that shows promise
for future system improvements integrating flood and fish. Recently, BNSF expressed
interest in jointly working to remove the fish barrier at the mainline railroad near the
Eburg flood alleviation project on Dolarway. Eburg is finalizing plans constructing a
large flood alleviation project on Dolarway.
Page 1 of 4
Public Works "Work Session Staff Report", 2023
DISCUSSION:
Much has happened in the past eight years with respect to fish enhancement, flood
alleviation and floodplain mapping in and around the urban growth area of Eburg. The
FCZD has completed a design for a siphon of the Ellensburg Water Company Canal at
Whiskey Creek eliminating the existing fish barrier. Bowers Field (ELN) is in the midst
of finalizing flood alleviation designs supporting pending construction of the parallel
taxiway and improvements to runway 7-29. There are pending FEMA flood map
revisions that are expected by late summer 2023 for the Whiskey/Mercer Creek systems.
Eburg is ready to finalize construction of a significant flood project on Dolarway. Efforts
are currently underway evaluating the potential to resolve floodplain issues associated
with the west interchange area. PW is currently designing a fish passage at BNSF to
thirty percent supporting permit application to WDFW. All of these actions merit a
coordinated stakeholder approach. An expanded stakeholder group including fish
managers from the Yakama Tribe, WDFW and possibly federal agencies.
Eburg management and staff met with county management and staff recently discussing
the opportunities now in front of both organizations. Those present agreed this unique
cooperative environment lends itself well to a broader solution approach that can help
alleviate flooding concerns associated with Mercer Creek, without any adverse
downstream impacts on Whiskey Creek or the City's current goal of certifying the new
levee. The Yakama Tribe, WDFW, MCFEG and possibly federal agency involvements
are now needed if we are to integrate all current opportunities. What was a dream eight
years ago, is now a pending reality.
FISCAL IMPACTS:
Undetermined at this time. Likely a work program element for the FCZD capital
program in 2024.
ATTACHMENTS:
EXHIBIT 1: WHISKEY/MERCER SYSTEM MAP
EXHIBIT 2: CENTRAL WASHINGTON STRUCTURAL ALTERNATIVE 2 - 1999
ELLENSBURG COMPREHENSIVE FLOOD MANAGEMENT PLAN
Page 2 of 4
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: WHISKEY/MERCER SYSTEM MAP
Page 3 of 4
Public Works "Work Session Staff Report", 2023
Whiskey and Mercer Creek Flood Extents
Nam®
a
��11l. P.e z
Y _
N YFxnv
B 1 1 4 .'i Wn1
� IJN P
[.r 11l
[YIi
S
�
e
E
�/ ♦� Pve
tul,w,e
t
F
IN�nP-
ve•s'.`. nn [
[ nmm[
.iiV
1
- r
1
w
EXHIBIT 2: CENTRAL WASHINGTON STRUCTURAL ALTERNATIVE 2 - 1999
ELLENSBURG COMPREHENSIVE FLOOD MANAGEMENT PLAN
Page 4 of 4
Public Works "Work Session Staff Report", 2023
Exhibit 6-8. Central Ellensburg Alternative 2 Location
Crossing
'. \4
om
„., „� ..
CIPAL AIRPORT Crossing New Levee 1
Crossing I
New Levee 2 —� w
.o,"s.. ! Z
Enhance Existin Road eiCP"
Grade & Crossing t :=Yine V
_.
New Levee 3 &
Canal Crossing
IT
�\ ' JOI-21OF ^w5
25 Enhance
v Existing
'` Levee &
Grossing Road Grade
cem r:( ..
Identification of Flood Hazard Management Measures 6-32