My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELN 019-2022 Concur Award Letter
>
Meetings
>
2023
>
06. June
>
2023-06-06 10:00 AM - Commissioners' Agenda
>
ELN 019-2022 Concur Award Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 1:03:11 PM
Creation date
6/1/2023 1:03:07 PM
Metadata
Fields
Template:
Meeting
Date
6/6/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Award a Construction Bid to Belsaas & Smith Construction Incorporated for the Bowers Field Airport Wetland and Stream Mitigation Project
Order
10
Placement
Consent Agenda
Row ID
104116
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />U.S. Department <br />of Transportation <br />Federal Aviation <br />Administration <br />Northwest Mountain Region <br />Colorado ∙ Idaho ∙ Montana ∙ Oregon ∙ Utah <br />Washington ∙ Wyoming <br />Seattle Airports District Office <br />2200 S. 216th Street, Room 1W-420 <br />Des Moines, WA 98198 <br /> <br /> <br /> <br />April 27, 2023 <br /> <br /> <br />David Ohl <br />Airport Director <br />3010 Airport Rd, Suite #1 <br />Ellensburg, WA 98926 <br /> <br />Bowers Field <br />Ellensburg, WA <br />AIP: 3-53-0026-019-2022 Wetland Mitigation <br />Concurrence in Award <br /> <br />Dear Mr. Ohl: <br />We have reviewed the bid documents, and concur with your recommendation to award Belsaas & <br />Smith Construction Incorporated in the amount of $834,247.70. Furthermore, we accept your <br />statement that the cost is reasonable based on the cost analysis performed by you or your <br />consultant. Please maintain a copy of your cost analysis for future audit purposes. <br />You are reminded that your Disadvantage Business Enterprise (DBE) Accomplishments reports are <br />due annually by on December 1 for the previous Fiscal Year. Details regarding the Federal <br />Aviation Administration (FAA) Airport DBE Program can be found at the address below: <br />http://www.faa.gov/about/office_org/headquarters_offices/acr/bus_ent_program/ <br />FAA regulations require the sponsor certify that adequate construction supervision and inspection <br />have been arranged. Also, the sponsor ensures that construction conforms to the approved plans and <br />specifications. <br />Please provide us with the following documents: <br />1. One copy of the executed contract. <br />2. A copy of the Notice to Proceed so we will be aware of the beginning construction date. <br />This should be provided only after the sponsor determines that all necessary contracts, <br />bonds, certificates of insurance, etc., are satisfactory, so that a Notice to Proceed may be <br />issued to the contractor. <br />A preconstruction conference should be scheduled after the contract is awarded. Please inform us <br />of the time and place of this meeting. The contractor's construction schedule and the overall project <br />should be discussed. We will attempt to attend this meeting, however, in the event that we cannot <br />attend the meeting, please include the FAA preconstruction guidance package, in the agenda for <br />your preconstruction meeting. This information can be found in Advisory Circular 150/5370-12. <br />Please provide us with a copy of the minutes of the meeting and a list of those in attendance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.