HomeMy WebLinkAboutLPF-23-00001 Suncadia Ph 2 Div 8 Agenda Staff Report
COMMUNITY PLANNING BUILDING INSPECTION PLAN REVIEW ADMINISTRATION PERMIT SERVICES CODE ENFORCEMENT
KITTITAS COUNTY COMMUNITY DEVELOPMENT SERVICES
411 N. Ruby St., Suite 2, Ellensburg, WA 98926
CDS@CO.KITTITAS.WA.US
Office (509) 962-7506
“Building Partnerships – Building Communities”
BOCC AGENDA SESSION
STAFF REPORT
AGENDA DATE: May 2, 2023
ACTION REQUESTED: BOCC Signature of mylar granting final approval for the Suncadia Ph. 2 Div. 8 Plat
(LPF-23-00001 & LP-22-00005).
BACKGROUND: The Suncadia Ph. 2 Div. 8 Preliminary Plat was approved on January 6, 2023 through
Resolution No. 2023-004. The plat covers approximately 290.30 acres accessed via
Swiftwater Drive.
The applicant submitted the final plat application on March 2, 2023, requesting final
mylar approval for the Suncadia Ph. 2 Div. 8 Plat. A second complete submittal
package containing updated information was received on April 10, 2023. This Plat
creates 72 detached residential lots with associated roadways, a clubhouse and pool
amenity, as well as an open space and service tracts. The proposed lots range in size
from 8,400 to 38,000 square feet. Staff reviewed the final mylar with supporting
documentation and finds that it is consistent with the preliminary approval
documents. The mylar has been reviewed by all reviewing departments, and all
signatures have been obtained.
INTERACTION: Board of Commissioners, Community Development Services, Public Works, Public
Health, and Assessor’s Office.
RECOMMENDATION: Signature of the BOCC Chair on the mylar for final plat approval of the Suncadia
Ph. 2 Div. 8 Plat (LPF-23-00001 & LP-22-00005).
HANDLING: Return signed mylar to staff for transmittal to authorized agent for Treasurer
signature and recording.
ATTACHMENTS: Final mylar for Suncadia Ph. 2 Div. 8 Plat (LPF-23-00001 & LP-22-00005).
LEAD STAFF: Kelly Bacon, Staff Planner