1. Call to Order
2. Citizen Comments (1 min. time limit)
3. Surplus Tax Parcel No. 11251 Discussion
4. American Recovery Plan Act Requested Appropriations
5. Public Access of Kittitas County Lands
6. McElroy Bridge Update
7. Other business
8. Concluded
Created on 4/20/2023 8:33:12 AM
KITTITAS COUNTY
PUBLIC WORKS STUDY SESSION MINUTES
COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109
Regular Meeting
MONDAY 1:30 PM April 24, 2023
Board members present: Chairman Cory Wright, Vice -Chairman Brett
Wachsmith, and Commissioner Laura Osiadacz.
Others: Mark Cook, Josh Fredrickson, Rebecca Cruse, Public Works; 6
members of the public.
At 1:32 PM Chairman Cory Wright opened the Public Works Study
Session.
No Citizen Comments.
MCELROY BRIDGE UPDATE
Mark Cook briefed the Board of County Commissioners on the status of
McElroy Bridge accessing the Elk Meadows Community and the impeding
deadline to bring the bridge into compliance. Currently, no action
has been taken by the community to remedy the bridge issues and Mark
Cook asked for the Boards support to use County Staff and expertise
to create a response plan and coordinate with regulatory agencies on
behalf of community members to repair or replace the bridge. Mark
Cook added that Arden Thomas, Water Resource Manager has met with
Regional FEMA staff and outcome of those conversations is that
Kittitas County doesn't have the authority to grant this bridge
variance without jeopardizing the Flood Rate Insurance Program that
benefits property owners throughout flood prone areas in Kittitas
County. Mark Cook requested the Boards support of a short-term land
use moratorium as previously discussed. The Board was not in full
support of a Resolution placing a temporary Land Use Moratorium on
the far shore properties dependent on the failed bridge.
Several members of the public were present and commented. Discussion
pursued and Commissioner Laura Osiadacz suggested another meeting
with landowners to see how well disposed they are to the ideas.
Direction was given to Staff to prepare a scope of work and fee
estimate for county staff support. Ken Wilson, a private bridge
structural engineer, presented a letter to the Board.
SURPLUS TAX PARCEL NO.11251
Mark Cook briefed the Board of County Commissioners on tax parcel
11251 located at the intersection of Dry Creek Road and Reecer Creek
Road. The Flood Control Zone District requested to burden the lot
with a 50 -foot easement around Whiskey Creek for future habitat
enhancement. Mark Cook recognizes the easement will impact the value
of the property and requested the Board set a minimum sale price to
Pie) 1 clsIFZ1ffiILto]"I
reflect this easement. Direction to Staff was given to bring forward
staff report and solicitation for approval and to set Public Hearing.
AMERICAN RECOVERY PLAN ACT REQUESTED APPROPRIATIONS
Mark Cook requested the Board of County Commissioners to allocate
$275,000 of American Recovery Plan Act Funds to the improvement of
the Roslyn Cemetery irrigation system. The Board of County
Commissioners informed staff that the Board supports awarding the
grant and approved this item at a previous Finance Meeting. Mark Cook
then briefed the Board of County Commissioners on the Kittitas County
Parks & Recreation District 1 desires to improve the Evergreen Sno-
Park. Direction to Staff was to prepare a cost estimate for soil
stabilization and rehabilitation of the park and a revenue model for
future maintenance of the Evergreen Sno-Park.
PUBLIC ACCESS OF KITTITAS COUNTY LANDS
Mark Cook presented the Board of County Commissioners with a draft
letter to The Nature Conservancy conveying the County position on
allowance of motorized opportunities on land The Nature Conservancy
manages on Cle Elum Ridge. The Board of County Commissioners directed
staff to bring back this item for consideration when all
Commissioners are present.
OTHER BUSINESS- ROAD VARIANCE COMMITTEE
Mark Cook shared correspondence received by Community Development
Services pertaining to the level of safety considered by the Road
Variance Committee. Commissioners directed Mark Cook to respond to a
reporter with road standards questions.
Meeting concluded at 2:38 PM
Rebecca Cruse, Administrative
Assistant
2023-4-24 MINUTES
KITTITAS COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
INTEGRITY
() STRUCTURAL
® ENGINEERING
PLLC
RECEIVED
4124 INTERLAKE AVENUE NORTH SEATTLE, WA 98103
TEL: (206) 547-1379 FAx: (206) 547-1381 EMAIL: INTEGRITYSE@ATT.NET <
M1I MAS COUNTY
)EPT OF PUBLIC WORKS
April 24, 2023
VIA HAND DELIVERED
Kittitas County
Board of County Commissioners
205 W. 511 Ave. Suite 108
Ellensburg, WA 98926-2887
RE: McElroy Bridge Access and Moratorium on Land Use
Elk Meadows, Inc.
Dear Members of the Board:
I am the owner of Integrity Structural Engineering, PLLC and am both a licensed Washington State
Professional Engineer and a Structural Engineer. 1 have an advanced degree from University of
Washington in Civil Engineering (MSCE) and more than 30 years of professional experience
working on transportation and bridge projects for both municipal and private clients. My municipal
client list has included transportation projects for Washington State, King County, Mason County,
Skamania County, Jefferson County, Yakima County, City of Seattle, City of Redmond, City of
Shoreline, City of Kirkland, and Washington State Parks & Recreation, while my private clients
included Elk Meadows HOA, Carpenter Creek HOA, Storeybrook HOA, and Cascade River
Community Club. I assisted Elk Meadows Inc. with the required emergency repair design,
permitting, and construction in December 2021 - February 2022- 1 am an independent professional
expert retained by Elk Meadows Inc. and have no financial interest regarding the access.
The Kittitas County Department of Public Works Study Session Staff Report is requesting the
Board of County Commissioners enact a moratorium on land use and development within the Elk
Meadows Community across the McElroy Bridge Access. This requested direction is based upon
mistaken conclusions and we ask the request be tabled until after Elk Meadows has been provided
information requested and adequate time to independently verify. Furthermore, Elk Meadows was
only provided this Public Works Directive on April 201h and was never provided the hydraulic
analysis and supporting calculations prepared by the Department of Public Works.
1) December 13, 2021 was a unique confluence of severe weather, unsafe operating conditions,
and a three axle garbage truck operated by a new driver to the route crossing the McElroy Bridge
access fully loaded with added front 2,0001b Curotto-can hydraulic automated carry can. After
crossing the bridge into Elk Meadows, the garbage truck picked up trash from only one property.
Upon returning in the same unsafe severe weather conditions with snow piled on the bridge the
driver did not stop at the bridge, and instead entered the bridge at speed with the Curotto-can
forward, full from various collections, and the top open to the storm. Without stopping the garbage
truck dynamically loaded the bridge during the unsafe crossing and on the third dynamic sway
while trying to adjust the Curotto-can as shown in the cab video, the truck tipped the bridge over
the drivers left into the river and destroying the bridge girders. Elk Meadows was not notified or
allowed to measure or witness the truck's condition and weighing, but despite drying out nearly
three -months (Dec 14 to a weight ticket of Feb 10) and with the rubbish and snow washed out of
the truck, the truck weight was within 1% to over RCW limits. The truck was driven in an unsafe
Kittitas County Members of the Board April 24, 2023
manner, under unsafe operating conditions, allowed to dynamically overload the bridge, and was
over legal limit when crossing.
2) The McElroy Bridge is an existing bridge that was constructed around 1960 and approved in
1963 by Kittitas County Road Engineer D.E. Akins, the then Board of Commissioners, signed by
Chairman Howard P Sorensen, and filed for record at the request of the Kittitas County Board of
Commissioners. There are clear unimpeded sightlines across the 100 -foot long bridge and the
access has safely and efficiently operated as a private one -lane usage without safety incident. The
one -lane bridge functions effectively as it serves only the closed community of Elk Meadows
functioning as a cul-de-sac without through access. Traffic utilization across the bridge is
estimated at a typically about 20 -vehicle trips per day in winter and probably not more than 250 -
vehicle trips per day peak in summer. Traffic safety is assured by the very low traffic volumes, low
traffic speeds of the private community, adequate sight distance, and fully stopped conditions at
each end. The required girder repair did not change the conditions of the original 1963 County
Engineer approval, nor impact the demonstrated historic safe performance. Public Works staff
statements that the bridge must meet a two-lane minimum with of 22 -feet applicable to County
through roads, high speed roads, and higher volume roadways, is mistaken.
3) The McElroy Bridge Access crosses the Yakima River downstream of the Lake Easton dam, for
which flow is regulated by the Bureau of Reclamation. In addition, there are five bridges upstream
of this access including Rail Road Street Bridge with piers in the water, two WA State 1-90 bridges
with piers at the edge of water, the East Sparks Road Bridge, and the private Sun Island Drive
Bridge. Each upstream crossing can have some impact and may reduce the potential for logs and
debris that the McElroy Bridge access must clear. Furthermore, McElroy's repaired girders from
January 2022 were constructed of a stiffer and shallower steel that created a raised flood clearance
over the main Yakima River channel of at least 0.5 -feet as well as an improved floodway opening
by more than 5%. FEMA figures provided from Kittitas County before the repair showed the
calculated 100 -year flood elevation as only 0.5 -feet different than the bottom of old bridge, which
was recently corrected. These installed repairs benefitted local flood performance at the bridge
and it is also a simple matter to lift the bridge up more to further improve flood performance during
required abutment maintenance. Also, historic observation at the bridge showed that in the more
than 60 -years of valuable use, the flood elevation had not reached the bottom of the bridge. In
January 2009 large logs and debris did accumulate at the central pier's upstream independent
protective lead pile, for which it was installed. This debris caused the river to locally divert around
the west approach resulting in erosion of the west approach roadway gravel that was repaired
along with removal of the log debris. The bridge was not impacted, other river debris passed below
the structure, and maintenance repairs were completed very quickly in less than two days. The
flood risk to the bridge has been reduced by the recent girder repairs and can easily be improved
further with allowed maintenance. The County's application of criteria used throughout the state at
other very different, non-regulated flow conditions, should not be applied at this bridge where
upstream structures are changing the debris load and flow is regulated. The bridge was already
improved in January 2022 and had a more than a 60 -year history of successfully clearing flooding
and passing debris that can be easily increased, if verified as necessary.
Finally the Staff Report stated that permits were issued with clear communication to the Elk
Meadows Homeowners Association that the bridge, previously approved by Kittitas County in 1963
and safely operated for more that 60 -years was, temporarily permitted. This is not true. The repair
to the existing structure took place without new environment impact to the river, no new shoreline
impact and was exempt maintenance of existing facilities per WAC 197-800(3). Also, the County
Engineer's letter of February 8, 2023 paragraph three stated, "This letter formalizes those
calculations did not meet HL -93 load rating resulting in the bridge authorized as a temporary
structure." Stamped calculations were provided February 10,• 2023 showing that the bridge repair
satisfied HL -93 (a highway load condition, which would not occur here, of a three axle 72,0001b
truck combined simultaneously with heavy traffic on the bridge of 640lbs per linear foot). Therefore
the bridge resulted in a permanent structure as was previously assured in 1963.
ISE, PLLC Page 2 of 3
Kittitas County Members of the Board April 24, 2023
I recommend that the Members of the Board do not act on Public Works request and instead
require that Public Works provide the requested hydraulic analysis and supporting calculations to
allow for independent verification and the opportunity for Elk Meadows to further maintain the
existing bridge as necessary.
Sincerely,
Kenneth M. Wilson, PE SE
Bridge Consultant
WSDOT/FHWA Certified Bridge Inspector No. D2038
cc: Mark Cook (via HAND DELIVERED)
ISE, PLLC Page 3 of 3
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 24, 2023
TOPIC: Surplus Tax Parcel No. 11251
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff schedule a public hearing setting the minimum sale price of tax parcel 11251.
BRIEFING SUMMARY:
• Kittitas County Board of County Commissioners (BoCC) disposes of real
property pursuant to KCC 2.81.050 (2).
• KCC 2.81.060 directs disposal pursuant to Revised Code of Washington
36.34.100 (EXHIBIT 1).
• BoCC may conclude the property is surplus to county need excluding a retained
flood easement by the Flood Control Zone District (FCZD).
• The FCZD desires to retain a 50 -foot easement centered about the centerline of
Whiskey Creek.
• "TAXSIFTER" identifies a value of $23,020 to Kittitas County Road Department
(EXHIBIT 2).
• The City of Ellensburg recently determined the parcel is "unbuildable" (EXHIBIT
3).
BACKGROUND:
The BoCC has previously been briefed on the status of tax parcel 11251 (corner of
Reecer Creek Road and Dry Creek Road). A local land developer recently acquired the
adjoining abandoned right of way to the parcel. Owing to the listed sales history price of
$23,020 and the parcel not being right of way; the BoCC may not vacate the parcel and
must dispose of the parcel pursuant to KCC 2.80.050(2). At KCC 2.81.060 the county
may dispose of the parcel pursuant to a sealed bid process. County code provides for the
disposal process pursuant to Revised Code of Washington Chapter 36.34.
DISCUSSION:
Public Works (PW) proposes scheduling a public hearing with the BoCC requesting the
Board set the minimum purchase price. PW has considered the impact of retaining a
flood easement centered about Whiskey Creek on the minimum purchase price. The City
of Ellensburg has determined the parcel is "non -buildable" (EXHIBIT 3). The easement
is necessary allowing for future improvements to Whiskey Creek allowing improved
Page 1 of 5
Public Works "Work Session Staff Report", 2023
flood conveyance or fish passage. Given the easement impact to parcel value ($23,020),
the "non -buildable" status and our desire to ensure the property does not become a camp
site; PW is requesting the BoCC set the minimum purchase price at $5,000.
Once the BoCC sets the minimum purchase price, PW will prepare a notice of sale
consistent with RCW 36.34.100. The notice will be brought to the BoCC for action at a
subsequent business meeting of the Board.
FISCAL IMPACTS:
PW has spent approximately $5,000 in towing and enforcement fees the past couple of
years vacating trespassers on the parcel.
ATTACHMENTS:
EXHIBIT 1: REVISED CODE OF WASHINGTON 36.34.100
EXHIBIT 2: TAXSIFTER PARCEL DATA 11251
EXHIBIT 3: CITY OF ELLENSBURG LETTER
Page 2 of 5
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: TAXSIFTER PARCEL DATA 11251
Page 3 of 5
Public Works "Work Session Staff Report", 2023
3/31/23, 2:50 PM Terra Scan TaxSifter- KITTITAS County Washington
...............
KI-1111AS COUNT �tnIE�l�alo�Es1,;
WASHINGTON TA SIFT R
SIMPLE SEARCH SALES SEARCH COUNTY HOMEPAGE CONTACT DISCLAIMER PAYMENT CARTIO)
Mike Hougardy
Kittitas County Assessor 265 W Sth Ave Ste 101 Ellensburg WA 46926
AssessDL Treasurer Appraisal 6,4anfHLev
Parcel
Parcel#;
11251
Owner Name: KITTITAS CO (PUBLIC WORKS)
DOR Code:
67 - Services - Governmental
Addressl:
$100
Situs:
$0
Address2:
411 N RUBY ST STE 1
Map Number:
18-18-27030-0029
City, State:
ELLENSBURG WA
Status:
EXEMPT FULL YEAR
Zip:
98926-6300
Description:
ACRES 1.15, CD. 8753-3; SEC. 27; TWP. 18; RGE.
18; PTN. SEI/4 SWI/4
Comment:
CURRIER CREEK ANNEXATION, CITY OF ELLENSBURG
ORD. # 4847 - CHANGE TAXING DISTRICT FROM 22 TO 18, 20
FOR 21
2023 Market Value 2023 Taxable Value
2023 Assessment Data
Land:
$100 Land:
$0
18 - CIEB SD401 F2
District:
Improvements:
p
$0 Improvements:
$0
Hl CO COF ST
Permanent Crop:
$0 Permanent Crop:
$0
Current Use/DFL: No
Total
$100 Total
$0
Senior/Disability Exemption: No
Total Acres: 1.15000
Owner's Name
KITTITAS CO (PUBLIC WORKS)
Ownership
Sales History
Ovunership V.
100%
Sale Date Sales Document # Parcels Fxcise # Grantor
05/01/96 1698 1 1698 COLASURDO, DOMINIC].ETUX
Year Billed Owner
2023 KITTITAS CO (PUBLIC WORKS)
2022 KITTITAS CO (PUBLIC WORKS)
2021 KITTITAS CO (PUBLIC WORKS)
2020 KITTITAS CO (PUBLIC WORKS)
2019 KITTITAS CO (PUBLIC WORKS)
View Taxes
Building Permits
No Building Permits Available
Historical Valuation Info
Land Impr. PermCrop Value
$100 $0
$100 $0
$100 $0
$100 $0
$100 $0
Parcel Comments
Owner Type
Owner
Grantee Price
KITTITAS CO ROAD DEPT $23,020
taxsifter.m.kittitas.wa.us/Assessor.aspx?keyld=1400530&pareelNumber=11251&typelD=1 1/2
Total
Exempt Taxable
$0
$100
$100
$0
$0
$100
$100
$0
$0
$100
$100
$0
$0
$100
$100
$0
$0
$100
$100
$0
taxsifter.m.kittitas.wa.us/Assessor.aspx?keyld=1400530&pareelNumber=11251&typelD=1 1/2
3/31/23, 2:50 PM
Date Comment
TerraScan TaxSifler- KITTITAS County Washington
08/04/20 CURRIER CREEK ANNEXATION, CITY OF ELLENSBURG ORD. # 4847 - CHANGE TAXING DISTRICT FROM 22 TO 18, 20 FOR 21
12/06/05 RM -6/21/96 -SEG FROM 18-18-2730-0023 CD. 8753 FOR RD. R/W FROM KITT. CO. (1.15@)
Property Images
No images found.
1.0.8368.16162 Data current as of: 3/3D/2023 3:49 PM T —ROIIYear_Search: 2023
taxsifter.co. kiltitas.wa.us/Assessor.aspx?keyld=1400530&parcelNumber=11251 &typelD=1 2/2
EXHIBIT 2: REVISED CODE OF WASHINGTON 36.34.100
Page 4 of 5
Public Works "Work Session Staff Report", 2023
RCW 36.34.010 Authority to sell—lay sell timber, minerals
separately—Mineral reservation. Whenever it appears to the board of
county commissioners that it is for the best interests of the county
and the taxing districts and the people thereof that any part or
parcel, or portion of such part or parcel, of property, whether real,
personal, or mixed, belonging to the county, including tax title land,
should be sold, the board shall sell and convey such property, under
the limitations and restrictions and in the manner hereinafter
provided.
In making such sales the board of county commissioners may sell
any timber, mineral, or other resources on any land owned by the
county separate and apart from the land in the same manner and upon
the same terms and conditions as provided in this chapter for the sale
of real property.
The board of county commissioners may reserve mineral rights in
such land and, if such reservation is made, any conveyance of the land
shall contain the following reservation:
"The party of the first part hereby expressly saves, excepts, and
reserves out of the grant hereby made, unto itself, its successors,
and assigns, forever, all oils, gases, coals, ores, minerals, gravel,
timber, and fossils of every name, kind, or description, and which may
be in or upon said lands above described; or any part thereof, and the
right to explore the same for such oils, gases, coals, ores, minerals,
gravel, timber and fossils; and it also hereby expressly saves and
reserves out of the grant hereby made, unto itself, its successors,
and assigns, forever, the right to enter by itself, its agents,
attorneys, and servants upon said lands, or any part or parts thereof,
at any and all times, for the purpose of opening, developing, and
working mines thereon, and taking out and removing therefrom all such
oils, gases, coal, ores, minerals, gravel, timber, and fossils, and to
that end it further expressly reserves out of the grant hereby made,
unto itself, its successors, and assigns, forever, the right by it or
its agents, servants, and attorneys at any and all times to erect,
construct, maintain, and use all such buildings, machinery, roads and
railroads, sink such shafts, remove such oil, and to remain on said
lands or any part thereof, for the business of mining and to occupy as
much of said lands as may be necessary or convenient for the
successful prosecution of such mining business, hereby expressly
reserving to itself, its successors, and assigns, as aforesaid,
generally, all rights and powers in, to, and over said land, whether
herein expressed or not, reasonably necessary or convenient to render
beneficial and efficient the complete enjoyment of the property and
the rights hereby expressly reserved."
No rights shall be exercised under the foregoing reservation
until provision has been made to pay to the owner of the land upon
which the rights reserved are sought to be exercised, full payment for
all damages sustained by reason of entering upon the land: PROVIDED,
That if the owner for any cause refuses or neglects to settle the
damages, the county, its successors, or assigns, or any applicant for
a lease or contract from the county for the purpose of prospecting for
or mining valuable minerals, or operation contract, or lease, for
mining coal, or lease for extracting petroleum or natural gas, shall
have the right to institute such legal proceedings in the superior
court of the county wherein the land is situated, as may be necessary
to determine the damages which the owner of the land may suffer. Any
of the reserved minerals or other resources not exceeding two hundred
RCW (10/5/2022 10:25 AM) 1 1 1
dollars in value may be sold, when the board deems it advisable,
either with or without publication of notice of sale, and in such
manner as the board may determine will be most beneficial to the
county. [1963 c 4 § 36.34.010. Prior: 1945 c 172 § 3; 1943 c 19 § 1;
1891 c 76 § 1; Rem. Supp. 1945 § 4007.1
RCW (10/5/2022 10:25 AM) [ 2 1
EXHIBIT 3: CITY OF ELLENSBURG LETTER
Page 5 of 5
Public Works "Work Session Staff Report", 2023
COMMUNITY DEVELOPMENT DEPARTMENT
501 N. Anderson St., Ellensburg WA 98926
Land Use Permitting (509) 962-7231 Construction Permitting (509) 962.7239
Jamey Ayling, Director
tea- Phone: (509) 925-8653 Fax: (509) 925-8655 E -Mail: aylingj@ci.eilensburg.wa.us
January 27, 2023
RE: Buildable Status of Parcel 11251
To Whom it may concern:
The parcel located at the intersection of Reecer Creek Road and West Dry Creek Road identified as
parcel 11251 has some significant challenges to being built upon. The property has Reecer Creek
that bisects the middle of the property and retains an 85 foot stream buffer. There are also potential
wetlands on this property which will add additional buffers further hampering the property's ability to
be constructed on. Lastly the property is triangular and bordered on three sides with rights-of-way
which require building setbacks from the edge of the right-of-way. It is the opinion of the Community
Development Director that this property is non -buildable due to these factors and no permits for
buildings would be permitted on said parcel.
If you have any questions please don't hesitate to reach out.
Sincerely,
Jamey Ayling
Community Development Director
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 24, 2023
TOPIC: American Recovery Plan Act Requested Appropriations
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff.
BRIEFING SUMMARY:
• Two American Rescue Plan Act (ARPA) requested appropriations have been
received by the Board of County Commissioners (BoCC).
• The City of Roslyn desires improving irrigation to the city's cemetery.
• KC Parks and Recreation District 1 desires improving the Evergreen Sno-park.
• The County received nearly $9.3 million in federal funding from ARPA.
BACKGROUND:
The American Recovery Plan Act provided approximately $9.3 million in funding to
Kittitas County. Two requests are now in front of the BoCC for funding consideration
the City of Roslyn and Parks and Recreation District 1. The county has previously
awarded grants to recipients using a sub -recipient grant contract prepared by the
Prosecuting Attorney's Office.
DISCUSSION:
The City of Roslyn request to improve cemetery irrigation is estimated at approximately
$257,000. Public Work's review of the provided cost estimate suggests to us that the
design fee is likely low at $4,200. Several other estimated items suggest to PW that a
grant not exceeding $275,000 is a more appropriate request given grant scope.
Our review of submitted documents from Kittitas County Parks and Recreation District 1
(KCP&RDI) rehabilitating failing soil conditions at the Evergreen Sno-park suggest to
us, a better cost estimate is required. Providing we know the square footage of
parking/park area experiencing settlement, we can provide a cost estimate to the BoCC
on likely remedial actions and associated costs stabilizing parking/park areas. We
recommend a site visit with PW staff and KCP&RD1 staff to better understand the scope
of soil stabilization and desired final product outcomes.
Page 1 of 4
Public Works "Work Session Staff Report", 2023
FISCAL IMPACTS:
PW recommends setting a grant award for the City of Roslyn at $275,000.
Once PW has evaluated the Evergreen Sno-park with Recreation District staff, we will
advise the BoCC on likely costs associated with soil stabilization at the park.
ATTACHMENTS:
EXHIBIT 1: CITY OF ROSLYN REQUEST DOCUMENTS
EXHIBIT 2: KC PARKS AND RECREATION DISTRICT NO.1 REQUEST
DOCUMENTS
Page 2 of 4
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: CITY OF ROSLYN REQUEST DOCUMENTS
Page 3 of 4
Public Works "Work Session Staff Report", 2023
Mark Cook
From: Laura Osiadacz
Sent: Wednesday, April 12, 2023 7:43 PM
To: Mark Cook
Subject: FW: City of Roslyn - Cemetery Water Main Extension Cost Estimate/Scope/Project
Timeline
Attachments: Cost Estimate Cemetery (4-05-23).pdf; 0571_001.pdf
Fyi... here is some information for our meeting next week.
Laura Osiadacz (O-Shaw-Dis)
Kittitas County Commissioner, District #2
205 W 51h Ave. Ste. 108
Ellensburg, WA 98926-2887
Office 509-962-7508
Fax 509-962-7679
http://www.co.kittitas.wa.us
From: Planner <planner@ci.roslyn.wa.us>
Sent: Monday, April 10, 2023 9:45 AM
To: Laura Osiadacz <laura.osiadacz@co.kittitas.wa.us>
Cc: Mayor <Mayor@ci.roslyn.wa.us>; Public Works <PublicWorks@ci.roslyn.wa.us>; richardm50@msn.com
Subject: City of Roslyn - Cemetery Water Main Extension Cost Estimate/Scope/Project Timeline
CAUTION: This email originated from outside the Kittitas County network. Do not click links, open attachments,
fulfill requests, or follow guidance unless you recognize the sender and have verified the content is safe.
Hi Laura,
Below is the brief description of the proposed project discussed last week during your meeting. We have also attached a
cost estimate and brief description of the project. I have also attached a brief letter from jeff Adams, Mayor Pro
Tempore regarding the importance of this project within the City. Please feel free to reach out with any questions or
additionally needed information.
The City of Roslyn is proposing to install a new irrigation system for the Cemetery. The existing irrigation system
for the Cemetery was originally installed in 1950's. The system consists of 2 -inch steel lines with on-going issues
that include (undersize lines? low pressure? broken mains? preventing further expansion?). The Cemetery is
located on the west side of Roslyn along Memorial Rd and bounded by the 5th St Alley and Nelson Dairy Rd. The
proposed work for funding would include the planning and design phase as well as construction. Planning will
include coordination with the fire chief and Dept of Health to confirm system capacity for the new looped main
and any new hydrants. Design would include preparation of construction plans and contract documents for
contractor procurement. Construction would include abandoning the existing irrigation system in place,
establishing erosion control measures, and trenching for the installation of the new irrigation lines. The
1
proposed irrigation system will include approximately 2,265 -linear feet of 6 -inch water main with looped
connection points at S Stn St and S 7tb St. The 6 -inch main will include approximately 1,345 -linear feet of 2 -inch
lateral lines with spigot heads. Final proposed design conditions will include layout of all associated fittings and
valves with hydrants as approved by the Fire Chief and Public Works Director. Tentative schedule for the project:
11 Apply for Funding — April 2023
• Contract and Council Approval — May??
Planning and Design —June 2023??
• Contractor Procurement —July 2023??
ff Construction — Aug -Sept 2023??
Thank you,
Phone 509.649.3105 Ext. 2
Web www.ci.roslvn.wa.us
Email plannerOci.roslyn.wa.us
2015 First Street, PO Box 451 Roslyn, WA 98941
The information transmitted by this email is intended only for the person or entity to which it is addressed. This email may contain confidential and/or privileged
material. If you are not the intended recipient of this message, be aware that any use, review, retransmission, distribution, or reproduction is strictly prohibited. if
you received this in error, please contact the sender immediately and delete the material from all devices.
message id: 38eb45916c6dcbdac24bb8719d004al4
.�: : • ' CITY OF ROSLYN
National Historic District and Preserve America Community
April 6, 2023
To Whom it may concern,
I am writing this letter in support of looking for funding in replacing existing
sprinkler system in the Roslyn Historical Cemeteries. There are 26 different cemeteries that date
back to the early 1880's. The existing sprinkler system has been in place since around the 50's
and 60's and has been deteriorating and patch worked together to be able to be used. The
cemetery is one of the biggest tourist attractions for our community along with the rich mining
history of our town. We have a great group of volunteers and city public works that has
continued to maintain the cemetery grounds, but the past several years has been challenging
trying to keep the cemetery grounds green for our visitors as the old water system continues to
have failures often. The funding for this new sprinkler system would be a great improvement to
help maintain the sacred grounds of the Roslyn historical cemeteries for years to come.
Sincerely,
Jeff Adams
Council 5
Mayor pro tempore
City of Roslyn
201 S 1" St., P.O. Box 451, Roslyn, WA 98941
PH 509-649-3105, FAX 509.649-3174
derk@d.rosfyn.wa.us
City of Roslyn
Cemetery Irrigation System
Pre -Construction and Construction
Engineer's Estimate
ITEM
UNIT
UNIT PRICE
QUANTITY
COST
Planning
LS
$3,045
1
$3,045
Design -Contractor Procurement
LS
$4,200
1
$4,200
Mobilization and Demobilization
LS
$5,000
1
$5,000
Temporary Traffic Control
LS
$500
1
$500
Trench Excavation Safety
LS
$500
1
$500
Erosion Control Measures
LS
$1,500
1
$1,500
6 -inch PVC w/bedding material
LF
$45
2265
$101,925
2 -inch PVC w/bedding material
LF
$25
1645
$41,125
Trench Backfill
CY
$60
75
$4,500
Main Fittings
LS
$2,500
1
$2,500
6 -inch Gate Valves
EA
$1,300
6
$7,800
Double Check Valves
EA
$8,000
2
$16,000
Hydrant Assembly
EA
$4,500
2
$9,000
Connection to Existing Water Main
EA
$2,000
2
$4,000
Site Restoration
LS
$1,500
1
$1,500
HMA Repair
SF
$5
750
$3,750
Estimate Subtotal: $206,845
15% Contigency: $31,027
Estimated Sales Tax at 8%: $19,030
Total Estimate: $256,901
-Assume existing native soils are largely acceptable for trench backfill.
-Actual Construction Costs may vary based on the Contractor, Supplier, and unexpected site
conditions.
EXHIBIT 2: KC PARKS AND RECREATION DISTRICT NO.1 REQUEST
DOCUMENTS
Page 4 of 4
Public Works "Work Session Staff Report", 2023
J�ocr
Kittitas County Parks and Recreation District 1
?. P.O. Box 1064 - Roslyn, WA - 98941
RECEIVED
info@kprd1.org
www.ukcparksandrec.org biAR 14 2iJz3
KITTITAS COUNTY
BOARD OF COMMISSIONERS
Board Of County Commissioners March 8, 2023
205 W 5th Ave Suite 108
Ellensburg WA 98926-2887
Subject: ARPA Appropriations Request
KPRD1 is not funded by tax revenue of any kind - we exist and operate on what
we are able to raise through donations. Thankfully, the District owns a five -acre
parcel outside South Cle Elum that was developed into the Evergreen Sno-Park
in 2014. Evergreen provides users with over 90 miles of trail access - the other
five Sno-Parks in the district combined have 115 miles of trails access, making
Evergreen the Sno-Park with the greatest access and the most potential traffic.
We lease the Sno-Park property to Washington State Parks each winter season
for a fee which we then use to pay our annual insurance bill, leaving the District
to function the rest of the year on donations.
The lack of a reliable income source prevents the district from accomplishing
projects we have on our agenda - projects that would benefit any resident or
visitor to the District in their pursuit of recreational activities. We realize there
are a variety of grants that could be applied for but with many requiring
matching funds, we are simply unable to gain any traction in our goal of
improving and expanding recreational opportunities in Upper County.
The Evergreen Sno-Park was established on land that had previously been
used as a dumping site for construction debris and fill dirt. It was then graded
and covered with gravel. Over time, the gravel has sunk into the clay -like
substance below it necessitating several additional gravel applications. These
"band -aide" fixes simply have not lasted long. The lack of proper preparation
Kent Verbeck Ira Astrachan Keegan Fengler Ali Astrachan Lucy Temple
Kittitas County Parks and Recreation District 1
n* P.O. Box 1064 - Roslyn, WA - 98941
info@kprd1.org
www.ukcparksandrec.org
of this site to withstand the rigors of the elements and traffic has resulted in
deep ruts, pot holes, and an eroded border. This decay has lead to numerous
instances of vehicle damage as evidenced by the annual revelation of broken
parts (snowmobile tracks, fairings, body panels, etc) after the snow melts.
Discussions with Kittitas County Snowmobile Groomers Council, Upper County
Recreation Association, and members of the Washington State Snowmobile
Association (one of the original financial backers of the Sno-Park) have sparked
our desire to commit to significant upgrades to the Sno-Park that will ensure its
long-term survivability and usefulness for all to enjoy. The plan includes
surveying, engineering, excavation, fill, and gravel, plus a robust gate and
proper signage to ensure the park lasts well into the future without decaying
and/or causing damage to vehicles and snowmobiles. Estimates for the cost of
these upgrades range from $120,000 - $220,000, depending on the results of
the engineering / surveying (to determine the depth and extent of excavation
prior to proper fill). KPRD1 presently lacks funds necessary to have this
preparatory work done, however we plan to contact Washington State Parks to
see if they have engineering expertise and/or personnel that could assist.
In order to preserve and fortify our one asset - The Evergreen Sno-Park - Kittitas
County Parks and Recreation District 1 formally requests funding for these
improvements via the ARPA program. We believe the investment in this
tourism -based infrastructure will be beneficial to the community at large plus
those who chose Kittitas County as their winter adventure destination.
Thank you for
your time and consideration,
Kent Verbeck
Chairman, KPRD1
Kent Verbeck Ira Astrachan Keegan Fengler Ali Astrachan Lucy Temple
o b IF4.
n`
Diana Dupuis
Director
STATE OF WASHINGTON
WASHINGTON STATE PARKS AND RECREATION COMMISSION
1111 Israel Road S.W.. P.O. Box 42650.Olympia, WA 98504-2650 • (360) 902-8500
TDD Telecommunications Device for the Deaf: 800-833-6388
www.yarlks.statema.us
March 7, 2023
Kittitas County Parks and Recreation District & Kittitas County
Subject: Letter of Support for Evergreen Sno-Park Improvement Grant
Dear County Commissioners:
This letter is in support of any grants or other funding initiatives to improve winter public
parking and services at the Evergreen Sno-Park. The Washington State Parks Winter Recreation
Program provides services such as snow removal, trail grooming, and sanitation during the
winter season to more than 130 Sno-parks statewide including Evergreen Sno-Park. We rely
heavily on our land manager partners to maintain and improve road and parking infrastructure so
that our plowing equipment, grooming equipment, and the parking public can enjoy winter
access.
Kittitas County benefits from the winter recreationalist that visit Evergreen Sno-park which leads
to a positive impact on the area economy. Snowmobilers, snow bikes, tracked all -terrain
vehicles, and skiers use Evergreen Sno-Park for winter recreation and it is vital to keep this
gateway in great shape and improve it for future use. Currently, Evergreen Sno-park requires
more permanent drainage, grading and expansion. Our program years ago funded a temporary
re -grading project, but this was not an ideal solution and did not alleviate the problems we are
encountering at this location today.
With the increase in population to Washington State and the public interest in winter recreation,
approving funding to improve the conditions at Evergreen Sno-park would be a win for Kittitas
County and the winter recreationalist in general. Washington State Parks Winter Recreation
Program strongly supports the Evergreen Sno-park improvement grant application.
Sincerely,
Corey Tolar, Program Manager
Winter Recreation Program
io
WINTER RECREATION PROGRAM
Fwd: EverGreen Sna Berk
Ira Astrachan <ira.astrachan@kprdl.org>
To: Ira Astrachan <Info@kprd1.org>
Tue, Mar 7, 2023 at 6:49 PM
From: Jason Holmes <jay.holmes44@gmail.com>
Date: March 7, 2023 at 10:32:56 AM PST
To: Tim Penelerick <trpsnow@aol.com>
Cc: Bob Seelye <robert.seelye@gmail.com>, Max R <maxrochester@hotmail.com>, Jason Goldstein
<jason.goldstein@parks.wa.gov>, WAYNE MOHLER <wfmohler@msn.com>
Subject: EverGreen Sno Park
Good afternoon:
On behalf of the Upper County Recreation Program I would like to express our
support to allocate funding to properly repair and maintain the Evergreen Sno
Park . The towns of Easton, Cle Elum, Roslyn, Ronald, Kittitas County and
visitors from other municipalities and counties will benefit by having access to one
of the region's finest greenways via the Evergreen Sno Park.
The EverGreen Sno Park is an ideal candidate for grant funding. It incorporates
many important features and is a great model for trail planning and development:
working with corporate/public interests to support trails
securing donations from businesses and the public
planning inter -community linkages for recreationalists
promoting the importance of volunteers in the outdoor
environment
generating tremendous community support
promoting cooperation among agencies and jurisdictions
finding opportunities for outdoor recreational education
Thank you for your consideration of the EverGreen Sno Park . We will look
forward to publicizing this project and coordinating efforts for success.
Best regards,
6 Jason Holmes
Alpine
Principle/Upper Coutny Recreation Association
mail
Funding support for Evergreen Snow Park
Bob Seelye <robert.seelye@gmail.com> Wed, Mar 8, 2023 at 8:16 AM
To: Ira Astrachan <ira.astrachan@kprd1.org>, cory.wright@co.kittitas.wa.us, laura.osiadacz@co.kittitas.wa.us,
brett.wachsmith.co@co.kittitas.wa.us
Kittitas County Commissioners:
On the behalf of the Kittitas County Snowmobile Grooming Council, I urge all
involved to support additional funding for improvements to the Evergreen Snow
Park. This snow park was established on donated land over ten years ago and
has struggled without any funding source.
The Snow Park has seen increased usage as other parking near the top of the
Pass operates at full capacity. Evergreen is one of the very few Snow Parks that
allows winter recreation over a vast area that stretches all the way to the Kittitas
County borders near Highway 410. Users bring many tourism dollars into our
community with their support of local lodging, restaurants, fuel, etc.
Immediate needs to the Snow Park include a gate and engineering to prepare for
grading, rock and gravel. It is currently very muddy when temps are above
freezing. Our Grooming council fields many complaints of users getting their
vehicles stuck in the mud.
Thank you for your consideration. Our grooming council is committed to assist
with funding grants over this next coming season.
Respectfully,
Bob Seelye, Chairman
Kittitas County Snowmobile Grooming Council
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 24, 2023
TOPIC: Public Access of Kittitas County Lands
ACTION REQUESTED: Direction to Staff
LEAD STAFF: Mark Cook
RECOMMENDATION: Direct Staff to finalize letter for Board Signature.
BRIEFING SUMMARY:
• The Central Cascades Forest LLC owns 9,600 acres of forest land on Cie Elum
Ridge. This land is managed by The Nature Conservancy, with the intent to
permanently transfer the land to an entity that will maintain the conservation
value of the land.
The Checkerboard Partnership, which includes The Nature Conservancy, has
identified the Department of Natural Resources as the preferred permanent
landowner, with the intent to manage the land as a community forest.
The Board may desire to communicate a County position to The Nature
Conservancy regarding the potential for motorized use on these lands.
The Nature Conservancy has expressed interest in gaining Board of County
Commissioner support for the transfer of land to the Department of Natural
Resources for management as a community forest.
BACKGROUND:
The Nature Conservancy (TNC) manages 9,600 acres of forest land on Cie Elum Ridge,
which is owned by Central Cascades Forest LLC (CCF). TNC has been working to
transfer ownership to an entity, public or private, that will manage the lands to maintain
conservation values. The Nature Conservancy, after consultation with stakeholders about
potential ownership models, has identified the State Department of Natural Resources as
the preferred owner. Under the proposed model, these lands would be managed as a
Community Forest on Cie Elum Ridge, essentially expanding the adjacent Teanaway
Community Forest.
DISCUSSION:
Individually, as County Commissioners, Commission members have expressed many of
the concerns reflected in the proposed Cie Elum Ridge Economic Analysis, which would
be funded by the Nature Conservancy. TNC seeks to provide the Board of County
Commissioners with additional information, with the aim of addressing concerns so that
the Board can support the proposal. Given TNC's offer to expend funds, the Board may
Page 1 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
desire to communicate a County position to The Nature Conservancy regarding the
potential for motorized use on the Cie Elum Lands.
FISCAL IMPACTS:
The potential impacts to Kittitas County of transferring the 9,600 acres of forest land to
permanent public ownership for management as a community Forest is not well
understood. The proposed Cie Elum Ridge Economic Analysis seeks to clarify those
impacts.
ATTACHMENTS:
Exhibit 1: Draft Letter to the Nature Conservancy
Exhibit 2: Map of Central Cascades Forest LLC Cie Elum Ridge Lands
Exhibit 3: Draft Request for Proposals with Kittitas County Feedback
Page 2 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
EXHIBIT 1: Draft Letter to the Nature Conservancy
Page 3 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
,NOES To IN
4�E �
4Qo� �m
FI'ITiI {9 COI All'
Kittitas County, Washington
BOARD OF COUNTY
COMMISSIONERS
District One District Two District Thee
Cory Wright Laura Osiadacz Brett Wachsmith
April 24, 2023
Darcy Batura
Forest Partnerships Manager
The Nature Conservancy
110 E First Street
Cle Elum, WA 98922
via email: darcy.baturagtnc.org
Dear Ms. Batura,
Thank you for the opportunity to provide feedback on the proposed Cle Elum Ridge Economic
Analysis Request for Proposals. We understand that this analysis is intended, in part, to provide
our Board of County Commissioners with additional information to evaluate the proposed
transfer of Central Cascades Forest LLC (CCF) Cle Elum Ridge lands to the Department of
Natural Resources as a Community Forestl. We have not taken a position on this community
forest proposal and appreciate The Nature Conservancy's efforts to support our evaluation of the
impact on Kittitas County residents and visitors.
The Nature Conservancy (TNC), working in partnership with Yakima Basin Integrated Plan
participants, including staff -level county representation and individual County Commissioner
feedback, has worked to develop the Cle Elum Ridge Economic Analysis Request for Proposals.
Individually, as County Commissioners, Commission members have expressed many of the
concerns reflected in the proposed scope of work. These concerns include impacts to our tax base
associated with the ongoing transfer of land from private to public ownership and the strain on
County resources associated with both the rapid growth in recreational uses and residential
housing demand in the Upper County. We appreciate efforts to date to identify sources of on-
going revenue to help the County meet these needs, such as potential transfer of lands in the
Cabin Creek Forest Legacy grant area to DNR as county state forest lands. To the degree that the
proposed Economic Analysis can identify economic impacts and actionable mitigations and
responses, this effort will be helpful.
1 The Nature Conservancy (TNC) manages 9,600 acres of forest land on Cle Elum Ridge, which is owned by
Central Cascades Forest LLC (CCF). TNC has been working to transfer ownership to an entity, public or private that
will maintain conservation values in its management of the lands. The Nature Conservancy, after consultation with
stakeholders about potential ownership models, has identified the State Department of Natural Resources as the
preferred owner. Under the proposed model, these lands would be managed as a Community Forest on Cle Elum
Ridge, essentially expanding the adjacent Teanaway Community Forest.
Kittitas County Courthouse 205 West 5"Avenue, STE 108 - Ellensburg, WA 98926
(509) 962-7508 -FAX(509)962-7679
We, acting as a full Board of Commissioners, want to clearly communicate the importance of
recreational motorized vehicle opportunities to many of our constituents. We request that TNC
directly consider what motorized opportunities could be supported in the Cle Elum Ridge lands
while still meeting the conservation value goals for the property. In particular, we request an
evaluation of opportunities to improve accessibility of these lands by a diverse user group, allow
for the future development of emergency evacuation routes, and promote connectivity from our
Upper County Communities to State and Forest Service lands. These potential uses include but
are not restricted to off-road vehicle (ORV) trail development.
To summarize, we view the proposed economic analysis as helpful and want to request direct
consideration of motorized opportunities on the Cle Elum Ridge lands. Given that this is a
critical issue for the Board of County Commissioners, we wanted to clarify and emphasize the
scope of our concern.
Sincerely,
Cory Wright Laura Osiadacz Brett Wachsmith
District 1 District 2 District 3
Kittitas County Courlbouse 205 West 5"Avenue, STE 108 Ellensburg, WA 98926
(509) 962-7508 FAX (509) 962-7679
EXHIBIT 2: Map of Central Cascades Forest LLC Cle Elum Ridge Lands
Page 4 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Cle Elm Ridge Community Forest # 20®2044
A Connected Landscape
tt
Kachess Cie Elum
Lake Lake r
zs: Phase3
�t ,
\t Nk`aston \ ff \Y'
�� P,hase 2
Easton
Rnclvn.
7
rte~
t
l�
i
Centrad Cascades Forest,
managed by The Nature
Conservancy
Pacific
Crest Trail U.S. Forest Service
■ Wilderness Arca
4v
` Teanaway
Gotn anuli ty
Forest
Current Phase:
Cie Elum
South
Cie Elum to
i —
! ^N.y�kTdoe`
G an -u ek n �
► 1..
P
r!�nm2 ek
WA Dept. of Natural
Resources
■ WA Dept. of Fish &
Wildlife
Suncadia
Towns to Teanaway
Project Area
■ Roslyn Urban Forest
o9/zs/aozo
EXHIBIT 3: Draft Request for Proposals with Kittitas County Feedback
Page 5 of 5
PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT
Cie Elum Ridge Economic Analysis Request for Proposals
Introduction/Background
The Nature Conservancy (TNC) manages 9,600 acres of forest land on Cie Elum Ridge, Kittitas County
(Figure 1), owned by Central Cascades Forest LLC (CCF), and is working to transfer ownership to an
entity, public or private that will maintain conservation values in its management of the lands. The
parcels are adjacent to the Teanaway Community Forest on the east and the Cities of Roslyn and Cie
Elum, and community of Ronald along its southwest border. The State of Washington purchased the
Teanaway Community Forest from a private timber company in 2013 to protect a vital piece of the
Yakima River Basin watershed under the provisions of the Yakima Basin Integrated Plan.
Interest in transitioning the Cie Elum Ridge into a DNR -owned and managed Community Forest on
Cie Elum Ridge - essentially expanding the existing Teanaway Community Forest - is a major focus
of stakeholder discussions. The Checkerboard Partnership a collaborative effort of diverse
community interests of which TNC is member, has done extensive research, planning, and
outreach to further its goal of a Community Forest on Cie Elum Ridge. The Kittitas County Board of
County Commissioners has not taken a position on the topic, and the economic analysis described
here is intended in part to help the GewRws'-^ Board evaluate merits of the proposal.
The Cie Elum Ridge lands are a significant portion of the Checkerboard Partnership's goal of
protecting 27,000 acres of Kittitas County Forest lands (Taneum, Cabin Creek, and the Cie Elum
Ridge.) The Cie Elum Ridge was identified as a target conservation acquisition in the Yakima Basin
Integrated Plan Watershed Protection element and the transition to a Community Forest model is
aligned with the Yakima Basin Integrated Plan Principles for Land Acquisitions (Yakima Basin
Integrated Plan, Phase 2 Lands Plan, lune 2021). The 2016 Kittitas County Park Recreation and
to work with public and mission related non-profit
orizdmeaaous to Cain, Ind corscrv� a rq_o_T of open space corridor or seoafators and specifically
referenced open spaces created by the Teanaway Community Forest and Cie Elum Ridge Lands The
12021 Kittitas County Recreation and Tourism Plan prioritized trail system resource parks and special
Purpose facility goals from the 2016 plan for County implementation and recognized that other
entities may lead other 2016 plan goals such as the conservancy gpalsITS'^ �^" v""taq CA A'
Re,Fealieiq and To F m Plan def ses these lands as open SpaGe 68FF dOF5 Of SePaRtOls 10 PFeV dir'
flefinit an be; ... PPR FAWF-I-Fe�� and I Fhan land -se� in and adjacent to Reslyn and Cie Elum.,
DNR, asthe owner and co -manager of the Teanaway Community Forest has expressed a willingness
to explore taking ownership of the Cie Elum Ridge under a Community Forest model. Cie Elum Ridge
connects the Teanaway and Cie Elum Watersheds. Heavy recreational use within the Cie Elum
watershed strains local resources currently and will likely continue to intensity. A heightened risk of
wildfire is also a concern; in 2017 the 36,000 -acre lolly Mountain Fire burned the northeast portion
of Cie Elum Ridge and put the communities of Ronald and Roslyn on evacuation alert. To move
forward with the Community Forest ownership model, DNR has asked partners to consider
strategies to ease the strain of increased tourism and recreation on County resources and to explore
ways for the County to achieve benefits from a Community Forest. Finding a way to mitigate these
stressors and risks now and into the future is acknowledged by all involved.
Commented [ATI]: Update link to adopted plan:
httpl/lkifthlupl..d/b/lutionst2a
21 -116 -resolution ndf
Commented [CC2]: Arden review language and
determine if she agrees with this characterization.
Commented [AT3R2]: I've revised to clarify that the
purpose of the 2021 plan was to prioritize the County's
Commented [CC4]: Arden review language and
determine If she agrees with this characterization.
In 2022, the Kittitas Conservation Trust was awarded a $3 million grant from the Washington State
Recreation and Conservation Office to identify a suitable owner for "Cie Elum Ridge Phase 1", the
southernmost 1,250 acres of Cie Elum Ridge lands and move ahead with its acquisition. This
prompted discussions among potential owners and interested parties which surfaced key questions
and information needs related to the entire 9,600 -acre Cie Elum Ridge lands currently owned by
CCF; this economic analysis is intended to address some of those needs. TNC and Yakima Basin
Integrated Plan partners are seeking an economic analysis to identify mechanisms to expand public
benefits and address costs to Kittitas County and fire protection districts related to the development
and/or expansion of community forest on the Cie Elum Ridge.
Purpose for Economic Analysis
The scope of work described in the tasks below addresses key needs recognized by TNC, the Yakima
Basin Integrated Plan Watershed [ands Subcommittee and the Checkerboard Partnership in
planning for eventual community forest management of the Cie Elum Ridge parcels.
1. Aid collaborators in working together to achieve a collective vision for these lands that
provides enduring value for the local community.
2. Understand current economic drivers in upper Kittitas County, and the pressures that
currently exist related to recreational use, affordable housing, and demands for public
services.
3. Provide a basis for informed decision-making regarding eventual ownership and
management of the Cie Elum Ridge parcels; identify direct and indirect benefits and costs of
integrating the Cie Elum Ridge lands into Teanaway Community Forest and enable the local
community to influence these decisions to minimize community impacts.
4. Understand and develop ability to plan for expected benefits and develop strategies to
mitigate impacts.
SCOPE OF WORK
TNC and its collaborators intend to work closely with the consultant to review preliminary findings
and provide direction related to assumptions, data categories, and allowable uses within Cle Elum
Ridge lands. Major checkpoints are identified below under task descriptions.
Task 1—Characterize Existing Economic Conditions related to the Cie Elum Ridge lands in Upper
Kittitas County
Cie Elum Ridge is situated in upper Kittitas County Exhibit 1 which has experienced a huge
population increase in recent years and is also heavily accessed by the Puget Sound population
centers. Many people come to recreate in the area and there are also many second homes that are
not permanently occupied or are used as vacation rental properties. This includes the 4,400 -unit
planned development Suncadia and several adjacent recreational home developments. Two
decades of 20% growth within the county has placed a strain on affordable housing and county
infrastructure. The recent pandenii:. County part time residences
being converted to full time as PUEel>ound owoeu discovered a work from home employment
status. The added residents out additional pressure on existing resources
Task 1 seeks to develop an understanding the current economy of upper Kittitas County.
' - Formatted: Indent: Left: 0"
1. What are the major economic drivers (Agriculture, Forest Products, Recreation, Hospitality,
etc.)?
2. What is the magnitude of these drivers?
3. Who benefits from this economic activity?
4. What is the overall availability of a48Fdal3le ho 'agdevelooable land in the county for
permanent residentials construction and development? How do the Cie Elum Ridge lands
currently contribute or not contribute to this?
5. Specific to recreation—
a. What areas are currently used by recreationists in upper Kittitas County and what is
the type and intensity of usage?
b. What are emerging recreational activities? What magnitude of growth is expected?
c. Specific to ORV recreation, what areas are legally used by recreationists, and what
unique features are available in different ORV areas that are sought by ORV
recreatio na lists?
e,.d. What new ORV sectors are in development that could alter the current landscape
d—What ORV areas enable recreationists to drive ORVs from in -town to ORV trails?
What is needed for ORVs to travel from residential areas near Cie Elum Ridge -to
other ORV areas utilizing Proposed Cie EIum Ridge lands or other infrastructure?
e. How significant is each category of recreation to the upper Kittitas County
economy?
e -f. How will new or expanded recreational uses be supported financially?
6. What public and private services are currently providing the needed support for the current
residential and visitor populations, and where are the shortfalls?
TNC anticipates the consultant to participate in two meetings with its collaborators associated with this
task:
• Kickoff meeting
• Draft results meeting
Task 2 — Economic Analysis of a New/Expanded Community Forest and General Consideration of
Alternative Approaches for the Conservation of the Cie Elum Ridge.
Task 2A
TNC and its collaborators seek to understand the merits and tradeoffs by means of this analysis of the
proposed community forest model and general alternatives in Task 2:
1. What are the merits and trade-offs associated with transitioning the Central Cascade Forest, LLC
land on the Cie Elum Ridge into Community Forest status, and integrated into the Teanaway
Community Forest?
2. What alternative approaches to conservation of the Cie Elum Ridge could be considered that
respect the natural values and provide economic benefits to the local community'?
3. What opportunities, benefits and impacts are projected under the community forest and
alternate conservation approaches? What are the projected changes to existing recreational
These are described in the document" rNC Bookends' linked in the resource list below.
uses? Are there unique opportunities for recreational users or open space corridor uses that
could not be provided in another way or location?
What are the benefits and impacts to the local administration of state-owned DNR lands under the
proposed Community Forest model?
What are the benefits and impacts, both within and outside the proposed Community Forest connected
to the following.
• Local economy (including taxes)
• Roads and infrastructure
• Law enforcement
• Fire response
• Recreation
• Fisheries
• Ecosystem services
Fire -safe community benefits
• Waste Management
TNC anticipates the consultant to participate in one meeting with TNC and its collaborators associated
with this sub -task:
• Meeting to discuss and provide input to consultant's proposed Community Forest and
alternative approach to conservation of Cie Elum Ridge. This will include gaining approval from
TNC and its collaborators on allowed use assumptions to be used for the remainder of the
analysis.
Task 26
Because Kittitas County has jurisdiction over much of the privately owned Cle Elum Ridge area, we are
particularly interested in understanding opportunities and resource needs that pertain to the County,
including the following:
1. Unlike some of its neighboring counties, Kittitas County does not have a Parks and Recreation
division because of the vast areas of public lands in the County which has historically dispersed
recreational impacts. The County is recognizing more impacts from the intensity of recreational
use in the study area and needs to plan for how to provide adequate services (police, fire, roads,
parking, garbage collection, etc.). What services will the County need to provide under the
Community Forest and alternate conservation models? What would the gaps in services be;
what would the expected increase in service needs be?
2. Land along the State Route 903 corridor includes land zoned Rural Recreation. Is the available
land base zoned Rural Recreation adequate to provide services to meet expected demand? This
may include businesses like restaurants, hotels, stores, and campgrounds.
3. Available land for affordable residential development is limited in Kittitas County; access to
water is a major limiting factor. The Cle Elum Ridge lands contain water mitigation "green
zones" meaning that water is available to mitigate new residential development.
a. What are other major economic costs and benefits associated with residential
development on the Cle Elum Ridge lands outside of water availability (i.e. expanding
development in the Wildland Urban Interface, ability to provide residential services,
etc.)
b. What mitigations/benefits could be derived from the conservation and creation of the
Cie Elum Ridge Community Forest to assist with this issue?
c. Could residential development potential be transferred to another area of the County?
L. there other potential lands owned by the public (state) that could be transferred
that would be better suited for residential (and affordable) development and are within
the green zone?
4. What obstacles exist in current growth management legislation that could prohibit the County
from creating offsetting revenue models resulting from intensified recreational use and
increased demand for wildland fire evacuation efforts?
TNC anticipates the consultant to participate in two meetings with TNC and its collaborators associated
with this sub -task:
• Meeting to orient consultant to specific data and context related to Task 2B and to provide
additional direction for consultant in completing this subtask
• Meeting to review and discuss results.
Task 3 —Summary of Mechanisms to Expand Public Benefits and Address Financial Impacts Associated
with Transferring the Cie Elum Ridge into a New/Expanded Community Forest.
Based on results from the analysis described in Tasks 1 and 2, TNC and the Yakima Basin Integrated Plan
partners seek a range of considerations that will aid TNC and its collaborators in achieving the outcomes
we seek for the Cie Elum Ridge lands, including:
1. Approaches to mitigate identified economic impacts.
2. Contextualize benefits and impacts associated with a Cle Elum Ridge addition to the Teanaway
Community Forest within the totality of the 27,000 acres of forest land the Checkerboard
Partnership is working to protect. This includes improvements for non -motorized recreation
(the Cle Elum Ridge), motorized (Taneum parcels owned by CCF) and Cabin Creek (DNR Trust
Lands with the County as beneficiary to help assist with costs of ownership that could not be
realized on lands like the Cle Elum Ridge and offset the impacts to ever increasing recreational
impacts to the County as a whole).
3. Examples of similar situations elsewhere that could inform the Cie Elum Ridge project
TNC anticipates the consultant to participate in two meetings with TNC and its collaborators associated
with this task:
• Meeting to review and discuss results.
TNC also anticipates the consultant participating/presenting at three external meetings that may include
additional stakeholders and parties key to understanding the information developed through this study.
Resource List
YBIP Watershed Lands Conservation Subcommittee Phase 2 Plan
KITTITAS COUNTY IWRMP TARGETED WATERSHED PROTECTIONS AND ENHANCEMENT —LAND USE AND
ECONOMIC ANALYSIS PROJECT- Final Economic Impact Compensation and Policy Recommendations
2021 Kitti[as County Recreation and Tourism Plan
20 Year Forest Health Strategic Plan:
Wildland Fire Protection Strategic Plan
IKittitas County Comprehensive Plan'..
'2016 Kittitas County Parks, Recreation, and Open Space Plan
Teanaway Economic Impact Compensation and Policy Recommendations
�NC Bookends;
6
Commented [ATS]: Update link to adopted plan:
http //www <o kiffit—
21 -116 -resolution ptlt
Commented [AT6]: hft2s7llkittitas.wa.us/unload
s/docume is/ d/ - 1 /2019/2019 Comprehensive -
Commented
hCommented [AT7]: https://www.cp.kitthas.wa us/upload
s/news/press-
releases/8779/addtonal/2016%20Ktt'tas%20Cou tv%20P
rks%20and%20Recreation%20Plan df
FCommented [C e]: Need to link to this document
whereveritis located
Y
I
KITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS
2023 STUDY SESSION STAFF REPORT
STUDY SESSION DATE: April 24, 2023
TOPIC: McElroy Bridge Update
ACTION REQUESTED: Direct Staff
LEAD STAFF:
Mark R. Cook
RECOMMENDATION:
Direct staff notice Elk Meadows Homeowners Association (EMHOA) of staff s decision
directing additional bridge repairs or replacement meeting minimum private bridge
standards.
BRIEFING SUMMARY:
• Responding to a failure of McElroy Bridge (12/13/2021), Public Works (PW)
issued a temporary flood development permit allowing for temporary reuse of the
repaired bridge.
• The Flood Control Zone District (FCZD) recently completed a hydraulic
evaluation of the Easton Reach (Yakima River) and has determined the existing
bridge cannot remain in its current configuration.
• The bridge is one foot under water during the 100 -year storm flow on the Yakima
River.
• The existing one -lane bridge is twelve feet wide — bridge rail to bridge rail.
• Currently, county private bridge minimum width requirements are for a minimum
width of 22 feet (bridge rail to bridge rail).
• PW utilizes the Washington State Department of Transportation Hydraulics
Manual (M23-03) to develop required flood freeboard (greater than 15 foot of
bank full width requires three feet above the 100 -year flow event).
BACKGROUND:
The December 13, 2021, the McElroy Bridge failure in Elk Meadows required immediate
repair of the bridge allowing several full-time residents access to the far shore of the
Yakima River. Responding to the crisis, the FCZD and PW issued a temporary flood
development permit (EXHIBIT 1) and expedited private bridge permit. Both permits
were issued with clear communication to the Elk Meadows Homeowners Association that
the bridge fate was dependent on further analysis by the county. The analysis is
complete, and the bridge is not compliant with Federal Emergency Management Agency
floodway regulations. The temporary bridge is also not compliant with PW private
bridge standards (EXHIBIT 2).
Page 1 of 5
Public Works "Work Session Staff Report", 2023
DISCUSSION:
PW has spent the past couple of months reviewing our regulatory requirements along
with any permit discretion we have in county code and state law. We have also evaluated
the water district serving Elk Meadows to understand operational issues associated with
McElroy Bridge use. Staff have also begun working to secure terrestrial access to the
water district's system reservoir located on the far shore of the Yakima River.
Consultation with the Board of County Commissioners (BoCC) legal advisor (Kittitas
County Prosecuting Attorney's Office) has produced a resolution imposing a temporary
land use moratorium on far shore properties (EXHIBIT 3).
PW proposes notifying the EMHOA of our determination of non-compliant status of
McElroy Bridge. The currently imposed deadline of November 15, 2023, is not a
workable timeline for the EMHOA to develop a course of action. It is essential, however,
that staff define a project timeline that is reasonable for resolving the fate of the existing
McElroy Bridge. Staff proposes engaging the community on potential solution timelines
in concert with the Federal Emergency Management Agency, the Washington State
Department of Ecology and the Washington State Department of Fish and Wildlife.
It will likely take a couple of months for EMHOA to obtain an opinion on the probable
technical solution to making the McElroy Bridge compliant. The FCZD, PW and other
federal and state agencies will likely allow a performance period on the part of EMHOA
(say four months). A detailed plan for compliance will then define project actions and
associated timelines. Permitting actions and associated timelines will also require
definition. Failure in meeting compliance plan implementation actions and timelines will
result in code enforcement actions up to and including closing the bridge to use and/or
bridge removal. Staff believes anything short of this outcome, will not be favorably met
by state and federal regulatory agencies.
The community is not a rich one. PW presumes the EMHOA has limited financial
resources. Navigating state and federal permitting requirements requires skills best
acquired by practice. PW is well skilled in securing the wide range of permits supporting
bridge replacements. Consideration should be given, by the BoCC, affording EMHOA
access to PW permitting expertise with assistance from state and federal agencies. The
BoCC may also desire technical expertise from PW assisting in the development of the
required compliance plan of action. While current PW resources are limited, the
likelihood of success on the part of the EMHOA is low, given the need to demonstrate
significant resolve to state and federal regulatory agencies on a compressed timeline. The
BoCC, in directing support of compliance plan creation, must acknowledge that resources
spent in the effort may ultimately fall short of avoiding bridge closure or removal.
FISCAL IMPACTS:
Undetermined at this time.
ATTACHMENTS:
EXHIBIT 1: FCZD FLOOD DEVELOPMENT PERMIT
EXHIBIT 2: PW PRIVATE BRIDGE STANDARDS REGULATORY EVALUATION
EXHIBIT 3: PROPOSED LAND USE TEMPORARY MORATORIUM
Page 2 of 5
Public Works "Work Session Staff Report", 2023
EXHIBIT 1: FCZD FLOOD DEVELOPMENT PERMIT
Page 3 of 5
Public Works "Work Session Staff Report", 2023
KITTITAS COUNTY
FLOOD CONTROL ZONE DISTRICT
FLOOD DEVELOPMENT PERMIT
Project: FD -21-00002 Integrity Structural Engineering, PLLC
Date: February 1, 2022
Description: Re -install the McElroy Road Bridge for temporary use by replacing the
failed girders with new steel girders and installing new and salvaged
timber decking and curb. This structure can remain in place and in use
under this permit until November 15, 2023.
Landowner: Elk Meadows Homeowners Association
Location: The project is located at the McElroy Road bridge within the SE % of
Section 22, T20N, R14E, WM, in Kittitas County, Washington.
Watercourse: Yakima River
FIRM Panel: 53037C 654 D
Zone: AE
Base Flood Elevation: Estimated between 2048.6 and 2051.8 FT NAVD 88
Permission is granted under the provisions of RCW 86.16 and KCC 14.08, to complete the
Proposed project. This permit is subject to the flood hazard reduction provisions in Kittitas
County Code 14.08. All construction materials shall be resistant to flood damage, and the project
shall be constructed using methods and practices that minimize flood damage.
A Final Inspection with the Flood Control Zone District is required prior to final approval.
Please call Kittitas County Public Works at (509) 962-7523 to schedule the final inspection with
the Floodplain Manager.
Replacement of the McElroy Bridge, which failed on December 13, 2021, is authorized as a
temporary structure. New steel girders and new and salvaged timber decking and curb will be
installed. The McElroy bridge must be removed by November 15, 2023 unless continued use is
authorized in writing by a superseding floodplain development permit.
The bridge will be located within the Floodway. Consistent with FEMA Region X Guidance
Memorandum: Temporary Encroachments into the Floodway (October 1009, attached), a
hydraulic analysis Conditional Letter of Map Revision (CLOMR) or Letter of Map Revision is
not required. for the bridge to be temporarily placed on site.
The Flood Control Zone District will conduct a hydraulic analysis to inform permanent bridge
requirements. KCC 14.08.105 requires that Kittitas County ensure that floodway requirements
are met, that permitted development be reasonably safe from flooding, and that Kittitas County
411 N Ruby St, Suite 1 T: 509.962.7523
Ellensburg WA 98926 F: 509.962.7663
Flood Control Zone District
Page 2
notify FEMA of changes to the base flood elevation within six months of when technical
information ofsuch changes becomes available.
Per FEMA Region X Guidance Memorandum: Temporary Encroachments into the Floodway
(October 2009), the applicant may be liable for any.flood damage resultingfrom the temporary
structure. Information ft•om the current Flood Insurance Study suggests that the McElroy Bridge
does not have sufficient hydraulic capacity to convey the 1% chance annual flood event. The new
bridge girders will elevate the bridge decking by 6 incites. 7 his difference in hydraulic capacity
may decrease base flood elevations upstream of the bridge (an estimated 19 insurable structures
may be affected) and increase them downstream of the bridge (an estimated 5 insurable
structures may be impacted). Since a hydraulic analysis has not yet been conducted, the length of
affected river and the magnitude ofpotential change is uncertain.
Relevant codes that must be followed are shown below:
14.08.105 Duties and Responsibilities of the Floodplain Administrator.
Duties of the Floodplain Administrator shall include but not be limited to
I . Interpretations of the flood insurance rate maps (FIRM), and floodplain and floodway
field designations. The Kittitas County Public Works Department shall maintain and keep
all files and related information regarding the county's National Flood Insurance Program
eligibility.
2. Field verification of lowest floor elevations at the time of framing inspection, and all
other special construction requirements contained in this chapter.
3. Ascertaining whether all building permits issued in areas within the 100 -year floodplain
comply with all of the special construction requirements of this chapter.
4. Review all development permits to determine that the permit requirements of this chapter
have been satisfied; review all development permits to determine that all necessary
permits have been obtained from those federal, state, or local government agencies from
which prior approval is required.
S. Review all development permits to determine if the proposed development is located in
the floodway. If located in the floodway, assure that the provisions of KCC 14.05.300 are
met_
6. Review all development permits to determine that the site is reasonably safe from
flooding.
7. Notify FEMA when annexations occur in the Special Flood Hazard Area.
8. Notify FEMA of changes to the base flood elevation within six months of when technical
information of such changes becomes available. Such notification shall include technical
or scientific information.
14.08.300 Floodways.
Located within areas of special flood hazard established in KCC 14.08.040 are areas designated
as floodways. Since the floodway is an extremely hazardous area due to the velocity of
floodwaters which carry debris and potential projectiles, and erosion potential, the following
provisions apply:
EXHIBIT 2: PW PRIVATE BRIDGE STANDARDS REGULATORY EVALUATION
Page 4 of 5
Public Works "Work Session Staff Report", 2023
McElroy Bridge
Original - April 14, 2023, Josh Fredrickson
Revised —April 18, 2023, Arden Thomas, to add Title 14 requirements and update based on subsequent
conversations with J. Fredrickson and M. Cook
Due to the temporary approval of the current structure, Public Works cannot grant new access permits
to lots dependent on the McElroy Bridge for access.
Table below summarizes bridge design and flood damage prevention requirements. Not all requirements
are shown (i.e. grade, etc.). Please see Kittitas County Code Title 12 and Title 20.
Item
KCC Reference
Standard
Standard to be
Note
Description in
identified in
Code
correspondence
to HOA
Hydraulic Analysis
14.08.300
No rise
No rise
certification
certification or
CLO M R
approved by
FEMA
Filling and grading
14.08.315
Compensatory
Compensatory
in floodplain
storage
storage
deemed
satisfied if no
rise
requirement
met.
Review to
14.08.105(4)
Review all
Before issuance
determine if all
development
of floodplain
necessary permits
permits to
development
have been
determine that all
permit, Kittitas
obtained
necessary permits
County requires
have been
documentation
obtained from
that all
those federal,
necessary
state, or local
permits have
government
been obtained
agencies.
(for example,
WDFW HPA and
DNR aquatic
lease).
Width
12.04.080 Table 4-
Private Road
22 -ft
The use of driveway
4A
width of 22 -ft
criteria is deemed
unacceptable due
to number of lots
served by the
bridge.
Freeboard
12.01.110 (C) and
1-3 ft
1 ft
KCC references
(D)
WSDOT Design
Manual and
WSDOT Bridge
Manual. For
Freeboard the
Bridge Manual
references WSDOT
Design Manual,
which in turn
references the
Hydraulics Manual.
KCC specifically
identifies only the
Bridge and Design
manuals
Loading
12.07.010 (C)
HL -93
HL -93
HL -93 is identified
12.04.090 (B)
75,000 pounds
and then continues
20.02.050
75,000 pounds
with "or as required
by KCC 20.02.050"
Post Loading
12.07.010 (C)
Load rating
Load rating
Also references KCC
posting required
posting
20.02.050
required
Bridge Permit
20.02.050
Permit Required
New Permit
Any new bridge and
Required
Required
repairs of existing
bridge requires a
permit
12.01.110(C) includes WSDOT Design Manual; 12.01.110(D) includes WSDOT Bridge Design Manual,
current edition as amended; as the design standard except where KCC provide otherwise. Below are
excerpts from the Bridge Design Manual, Design Manual and Hydraulics Manual.
WSDOT Bridge Design Manual (M23-50):
2.3.3.0 Vertical Clearances
Water crossings structures shall provide vertical clearance for both freeboard, maintenance, hydraulic
and, where applicable, shall satisfy navigation clearance requirements.
Bridges over navigable waters shall satisfy the vertical clearances required by the Coast Guard.
Communication with the Coast Guard will be handled through the Coast Guard Liaison Engineer. The
actual minimum vertical clearance (to the nearest 0.1 foot) for the channel span shall be shown on the
Preliminary Plan. The approximate location of the minimum vertical clearance shall be noted in the
upper left margin of the plan. The clearance shall be shown to the water surface as required by the Coast
Guard criteria.
Minimum vertical clearances for the 100 -year design freeboard and Maintenance shall be determined
and documented in accordance with the WSDOT Design Manual M 22-01 Section 720.03(5)(b)(4) for
Water Crossing Structures. The roadway profile and the bridge superstructure depth shall accommodate
all minimum vertical clearances provided.
The actual minimum vertical clearance to the 100 -year flood shall be shown (to the nearest 0.1 foot) on
the Preliminary Plan, and the approximate location of the minimum vertical clearance shall be noted in
the upper left margin of the plan.
WSDOT Design Manual (M22-01)
720.03(5)(b)(iv) Water Crossing Structures
When determining the vertical clearance beneath a bridge or inside a buried structure, there are two
elements that must be considered. The first is 100 Year Design Freeboard (Freeboard), and the second is
Maintenance Clearance.
Freeboard is related to the hydraulic capacity of the structure and is required by state and federal
guidance. Typically, all bridges and buried structures are required to have a minimum of 1-3 feet of
Freeboard above the 100 -year water surface elevation (see WSDOT Hydraulics Manual). The State
Hydraulics Engineer determines the Freeboard, and it is documented in the Preliminary/Final Hydraulic
Design Report (PHD/FHD). Approval from the State Hydraulics Engineer is required for any vertical
clearance that is less than Freeboard.
Maintenance Clearance is the distance from the highest ground elevation within the horizontal limits of
the Hydraulic Width to the controlling top elevation. The State Hydraulics Engineer determines the
Hydraulic Width, and it is documented in the PHD/FHD. Providing Maintenance Clearance beyond the
minimum Freeboard is beneficial for required monitoring and inspections, as well as any maintenance
activities that may be required during the life of the structure. Generally, these activities include staff
walking through the culvert, taking measurements and photographs, but could also involve the use of
machinery within the structure limits. Clearances above the minimums provided below are allowed and
may be desirable based on an analysis of the project's contextual needs.
WSDOT Hydraulics Manual (M23-03):
7-4.5.1 Freeboard
The 100 -year design freeboard is the minimum dimension from the 100 -year water surface elevation to
the minimum low chord that is necessary to pass all expected debris, water, and sediment expected over
the life of a structure. The figures in the Standard Plans further illustrate the terms used here (WSDOT
2021d).
A minimum of 3 feet of freeboard above the 100 -year water surface elevation is required on all
structures greater than 20 feet long and on all bridge structures unless otherwise approved by the HQ
Hydraulics Section. The stream designer shall also confirm that local ordinance requirements are met
and any necessary permit conditions are satisfied.
The 100 -year design Freeboard required on all buried structures unless otherwise approved by the HQ
Hydraulics Section are listed in Table 7-2.
Table 7-2 100 -Year Design Freeboard Requirements on Buried Structures
Structure Bankfull Width
Required Freeboard
Less than 8 -foot BFW
1 foot above 100 -year flow event
8- to 15 -foot BFW
2 feet above 100 -year flow event
Greater than 15 -foot BFW
3 feet above 100 -year flow event (bridge)
In areas that are tidally influenced, the impacts of 2 feet of sea level rise shall be considered for the
project. For all projects, the stream designer shall consider providing the clearances in Table 7-2 above
the 100 -year projected 2080 water surface elevation.
The required minimum 100 -year design freeboard shall be maintained across the entire minimum
hydraulic opening, as shown in the SFZ figures in the Standard Plans (WSDOT 2021d). If aggradation is
expected to occur, additional freeboard shall be given above the 100 -year design freeboard equal to the
anticipated aggradation.
If the 100 -year design freeboard requirements listed above cannot be met, a deviation will be required in
the specialty report and approval from the HQ Hydraulics Section is required. At a minimum, the stream
designer shall demonstrate the following:
• The proposed freeboard will pass all expected debris, water, and sediment
• There is no history of repetitive maintenance at the crossing location
• Providing the required freeboard would cause adverse environmental impacts, roadway geometric
impacts, or other unacceptable impacts
• Efforts have been made to maximize the freeboard to the extent practicable
Approval from the HQ Hydraulics Section does not guarantee that permitting agencies will approve the
proposed 100 -year design freeboard.
EXHIBIT 3: PROPOSED LAND USE TEMPORARY MORATORIUM
Page 5 of 5
Public Works "Work Session Staff Report", 2023
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
Resolution No. 2023
ENACTING A MORATORIUM ON LAND USE DEVELOPMENT FOR ANY PARCEL
IN THE ELK MEADOWS COMMUNITY THAT RELIES ON THE MCELROY
BRIDGE FOR ACCESS
WHEREAS: Elk Meadows is a residential community located in Cle Elum WA that is served by
the Elk Meadows Homeowners Association; and
WHEREAS: some of the residences in the community are accessed via the McElroy Road
Bridge; and
WHEREAS: on December 13, 2021, the McElroy Road Bridge collapsed causing a garbage
truck to fall into the Yakima River; and
WHEREAS: local and state authorizations (including Washington State Department of Fish and
Wildlife (WDFW)) were granted to re -install the bridge for temporary use with the stipulation
that a permanent replacement structure would follow; and
WHEREAS: the Flood Control Zone District conditioned the final fate of the bridge on the
pending remapping of the Easton Reach of the Yakima River; and
WHEREAS: the County engaged Watershed Science and Engineering to evaluate the McElroy
Bridge and its impact on flooding as well as to provide a design concept for a replacement
bridge; and
WHEREAS: analysis regarding replacement bridge structure requirements is nearing
completion and reveals that imposing state and local standards will likely be onerous and costly;
and
WHEREAS: it is unknown at this time whether a replacement bridge can or will be built in a
timely manner; and
WHEREAS: without a replacement bridge, existing landowners will not have access to their
property, nor will any potential future buyers; and
WHEREAS: given the status of uncertainty regarding bridge replacement feasibility, the County
believes it prudent to stop future land use development pending a final decision on the fate of the
bridge; and
WHEREAS: RCW 36.70A.390 allows adoption of a moratorium on land use activities for sixty
(60) days without holding a public hearing; and
WHEREAS: public hearing must be held within sixty (60) days of the moratorium's enactment
and findings of fact must be made to support the action. A moratorium may last six (6) months
and be extended for up to one (1) year when accompanied by a work plan for moratorium
research; and
WHEREAS: the Kittitas County Board of County Commissioners finds the need for such
moratorium during the bridge feasibility analysis.
NOW, THEREFORE, BE IT RESOLVED that all land use applications or building permits
for Elk Meadows shall not be accepted for at least sixty days from March _, 2023 or until a
permit for a replacement bridge has been issued.
ADOPTED this day 2023.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Brett Wachsmith, Vice -Chairman
Laura Osiadacz, Commissioner
Clerk of the Board/Deputy Clerk of the Board