HomeMy WebLinkAboutRES 2023-061BOARD OF COUNTY COMMISSIONERS
COLINTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTTON No. 2o?3 -JzQ I
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY F'EDERAL AID
PROJf,CT PROSPECTUS FOR INTERSECTION CORRIDOR SAFETY IMPROVEMENTS,
cRP 313-21
WHEREAS: Public Works has received federal safety funding for intersection safety improvements at
various locations throughout Kittitas County, including along Kittitas and Vantage
Highways; and
WHEREAS: Kittitas County Engineering staff is cumently finalizingdesign of construction plans for
advertisement; and
WHEREAS: In preparation to advertise construction phase work in2023 Kittitas County Public Works
is requesting the Washington State Department of Transportation release the federal
funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development.
NOW' THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby approve the Chair's signature on the Local Agency Federal
Aid Project Prospectus for the Intersection Corridor Safety Improvements, CRP 313-21.
DATED this 4th day of April 2023, at Ellensburg, Washington.
BOARD OF COLINTY COMMISSIONERS
KITTITAS GTON
Wright,
Julie Kjorsvik
llt ttttt\\Vice-Chairman
tr Deputy Clefk of the Board- Mandy Buchholz
ABSENT
Laura Osiadacz, Commissioner
)
^-.w Washington State
Department of Transportation Local Agency Federal Aid
Project Prospectus
Date 312912023
DUNS Number 0r-020-2s47
FederalEmployer
Tax lD Number 9t-601349(WSDOT
Use 0nly
Prefix Route
FederalAid
Project Number HSIP 000s 607
Local Agency
Project Number cRP 3 r3-2tlRC2t96
Agency
Kittitas County Public Works
CAAgency
M ves [-l tlo
Federal Program Title
Yzo.zos n otner
Project Title
Intersection Corridor Safety Improvements
StartLatitude N Varies
End Latitude N Varies
Start Longitude W Varies
End Lonqitude W Varies
Project Termini From-To
Varies Varies
Nearest City Name
Ellensburg, WA
Project Zip Code (+41
98926-tr29
Begin Mile Post
Varies
End Mile Post
Varies
Length of Project
N/A
Award Type
fl tocat ! locat Forces ! State E Raitroad
Route lD Begin Mile Point
Varies
End Mile Point
Varies
City Number County Number
t9
County Name
Kittitas
WSDOT Region
South Central Region
Legislative District(s)
t3
Congressional District(s)
8
Urban Area Number
Phase
Total
Estimated Cost
(Nearest Hundred Dollar)
Local Agency
Funding
(Nearest Hundred Dollar)
Federal Funds
(Nearest Hundred Dollar)
Phase Start
Date
Month Year
P.E 57,500.00 57,500.00 02 I 2022
R/W
Const 479,400 419,400.00 0s I 2023
Total 536,900.00 536,900.00
Description of Existing Facility (Extsttng Design and Present Condition)
Roadway Width
Varies
Number of Lanes
Varies
Multiple all-way and T-intersections have been identified with high accident frequency, low visibility, high
ADT as well as outdated and failing equipment throughout the County.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Add/upgrade signing with LED's for intersections and school zones, also includes associated ADA and utility
work as needed.
Local Agency Contact Person
Darren Case
Title
Construction Manager
Phone
509-962-70t9
Mailing Address
411 N. Ruby, Suite I
City
Ellensburg
State
WA
Zip Code
98926
Approving Authority
By
Project Prospectus
1;11s County Engineer (r!(!a/k/bL>
Revised 0112022 Previous Editions 0bsolete
Agency
Kittitas County Public Works
Project Title
Intersection Corridor Safety Improvements
Date
312912023
Type of Proposed Work
Project Type (Check all thatApply)
! t',tew Construction ! eatn trrait E s-n
! ReOestrian / Facilities n Z-n
I Parking Z ottrer
! Reconstruction
I nailroad
tr grioge
Roadway Width
Varies
Number of Lanes
Varies
Geometric Design Data
Description Through Route Grossroad
Federal
Functional
Glassification
! urnan
Z Rural
n ruHs
! PrincipalArterial
fl Vinor Arterial
f, Cottector
Z Vajor Collector
M Minor Collector
E Local Access
n uroan
Z Rurat
n ruHs
Principal Arterial
MinorArterial
Z Collector
Z wajor Collector
f, Vinor Collector
{Local Access
{
Terrain n rtut fl nott I Mountain Flat Roll n Mountain
Posted Speed Varies
Design Speed Varies
Existing ADT Varies
Design YearADT Varies
Design Year 2022
Design Hourly Volume (DHV)N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Kittitas County Public Works
Others
o//o
Agency
100 o
Construction Will Be Performed By
Contractor
Conhact
100 %
Agency
o/
Environmental C lassification
n Ctass I - Environmental lmpact Statement (ElS)
! Project lnvolves NEPA/SEPA Section 404
lnteragency Agreement
n Ctass lll - EnvironmentalAssessment (EA)
Project lnvolves NEPA/SEPA Section 404
I nteragency Ag reements
Z Ctass ll - Categorically Excluded (CE)
Projects Requiring Documentation
(Documented CE)
Environmental Considerations
None Anticipated
01
Revised 0112022 Previous Editions 0bsolete
Agency
Kittitas County Public Works
Project Title
Intersection Corridor Safety Improvements
Date
312912023
Right of Way
M ruo Right of Way Needed
* All construction required by the
contract can be accomplished
within the existing right of way.
Right of Way Needed
n f,lo Relocation n Relocation Required
Utilities Railroad
n ruo utility work required
nnt utility work will be completed prior to the start
of the construction contract
Z rul utility work will be completed in coordination
with the construction contract
Z tlo railroad work required
Erut railroad work will be completed prior to the start of
the construction contract
Entthe railroad work will be completed in coordination
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures lnvolved in the Project
One location will have a power service disconnected, which will have to happen after the new solar LED
signs are installed, and before existing signs with electric components are removed.
FM lnvolvement
ls any airport located within 3.2 kilometers (2 miles) of the proposed project? f] Ves Z ruo
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for.community development.
Agency
ByDate
DOT Form 140-101
Revised 0112022
Mayor/Chairperson
Previous Editions Obsolete
a l+22
Page 3