HomeMy WebLinkAboutResolution_Prospectus_Intersection Improvements ProjectKITTITAS COUNTY
DEPARTMENT OF PUBLIC WORKS
AGENDA SESSION STAFF REPORT
AGENDA SESSION DATE: April 4, 2023
ACTION REQUESTED: Request to Approve the Resolution Authorizing the
Chair's signature on the Local Agency Federal Aid
Project Prospectus for Intersection Corridor Safety
Improvements, CRP 313-21.
BACKGROUND: Kittitas County was selected to receive $416,000.00,
through the Federal Highway Safety Improvement
Program (HSIP), to use for the Intersection Corridor
Safety Improvement Project. After initial award, Kittitas
County was approved for a funding increase to
$536,900.00. This project will install solar powered LED
embedded signs to enhance driver awareness of
intersections and promote safety, along with upgrading
outdated and obsolete signs currently in use. Example of
signs to be included are "Stop" and "Stop Ahead" signs.
Intersections have been selected based on criteria
including traffic volume and crash history. HSIP
funding is administered through the Washington State
Department of Transportation (WSDOT) Local
Programs Office and requires approval for each phase of
the project.
INTERACTION:
This Project Prospectus covers the Federal Funding for
the construction phase which is estimated at
$479,400.00.
Public Works is preparing to advertise for construction
of this work in May of 2023. Construction phase
reimbursement requires the Local Agency Federal Aid
Project Prospectus to be signed and approved by the
Chair of the BOCC prior to the start of construction.
Public Works.
RECOMMENDATION: Approve the Resolution Authorizing the Chair's
signature on the Local Agency Federal Aid Project
Prospectus for the Intersection Corridor Safety
Improvements, CRP 313-21.
HANDLING: Return one (1) original to Public Works
ATTACHMENTS: Resolution, Local Agency Federal Aid Project
Prospectus
LEAD STAFF: Josh Fredrickson, County Engineer
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION NO. 2023 -
AUTHORIZING THE CHAIR'S SIGNATURE ON THE LOCAL AGENCY FEDERAL AID
PROJECT PROSPECTUS FOR INTERSECTION CORRIDOR SAFETY IMPROVEMENTS,
CRP 313-21
WHEREAS: Public Works has received federal safety funding for intersection safety improvements at
various locations throughout Kittitas County, including along Kittitas and Vantage
Highways; and
WHEREAS: Kittitas County Engineering staff is currently finalizing design of construction plans for
advertisement; and
WHEREAS: In preparation to advertise construction phase work in 2023 Kittitas County Public Works
is requesting the Washington State Department of Transportation release the federal
funds for construction; and
WHEREAS: A Local Agency Federal Aid Project Prospectus must be executed by the Chair
acknowledging the project has been reviewed and is consistent with the County's
comprehensive plan for community development.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners, in the best interest
of the public, does hereby approve the Chair's signature on the Local Agency Federal
Aid Project Prospectus for the Intersection Corridor Safety Improvements, CRP 313-21.
DATED this 4th day of April 2023, at Ellensburg, Washington.
Attest:
❑ Clerk of the Board- Julie Kjorsvik
❑ Deputy Clerk of the Board- Mandy Buchholz
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
Cory Wright, Chairman
Brett Wachsmith, Vice -Chairman
Laura Osiadacz, Commissioner
Washington State
Adw
GDepartment of Transportation
Local Agency Federal Aid
Project Prospectus
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
Prefix
Route
( )
Date
3/29/2023
Federal Aid
HSIP
OOOS
607
DUNS Number
01-020-2547
Project Number
Local Agency
CRP 313-21/ RC2196
r
WSDOT 1
Federal Employer
91-601349
Project Number
`
Use Only J
Tax ID Number
Agency
CAAgency
Federal Program Title
Kittitas CountyPublic Works
❑✓ Yes ❑ No
❑✓ 20.205 ❑ Other
Project Title
Start Latitude N Varies
Start Longitude W Varies
Intersection Corridor Safety Improvements
End Latitude N Varies
End Longitude W Varies
Project Termini From -To
Nearest City Name
Project Zip Code (+4)
Varies Varies
Ellensburg, WA
98926-7129
Begin Mile Post
End Mile Post
Length of Project
Award Type
Varies
Varies
N/A
✓� Local ❑ Local Forces ❑ State ❑Railroad
Route ID
Begin Mile Point
End Mile Point1719
umber
County Number
County Name
Varies
Varies
Kittitas
WSDOT Region
Legislative District(s)
Congresslonal District(s)
Urban Area Number
South Central Region
13
g
Total
Local Agency
Federal Funds
Phase Start
Phase
Estimated Cost
Funding
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P.E.
57,500.00
57,500.00
02 / 2022
R/W
Const.
479,400
479,400.00
05/2023
Total
1536,900.00
1
1536,900.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number
of Lanes
Varies Varies
Multiple all -way and T -intersections have been identified with high accident frequency, low visibility, high
ADT as well as outdated and failing equipment throughout the County.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Add/upgrade signing with LED's for intersections and school zones, also includes associated ADA and utility
work as needed.
Local Agency Contact Person
Title
Phone
Darren Case
Construction Manager
509-962-7019
Mailing Address
City
State
Zip Code
411 N. Ruby, Suite 1
Ellensburg
WA
98926
By
Approving Authority
Project Prospectus
Title County Engineer
DZate��Zo23
DOT Form 140-101 Page 1
Revised 01/2022 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Intersection Corridor Safety Improvements
3/29/2023
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail
❑ 3-R
Varies
Varies
❑ Reconstruction ❑ Pedestrian / Facilities
❑ 2-R
❑ Railroad ❑ Parking
Other
❑ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
❑ Principal Arterial
Federal
❑ Urban
✓❑ Minor Arterial
❑ Urban
❑✓ Minor Arterial
Functional
C Rural
✓❑ Collector
Z Rural
❑✓ Collector
�I�i��otication
El NHS
Major Collector
❑NHS
Major Collector
Minor Collector
Minor Collector
0 Local Access
Local Access
Terrain
❑ Flat ❑ Roll ❑ Mountain
❑ Flat ❑ Roll ❑ Mountain
Posted Speed
Varies
Design Speed
Varies
Existing ADT
Varies
Design Year ADT
Varies
Design Year
2022
Design Hourly Volume (DHV)
N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Kittitas County Public Works
%
100
Construction Will Be Performed By
Contract
Agency
Contractor
100
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS)
❑✓ Class II - Categorically Excluded
(CE)
❑ Project Involves NEPA/SEPA Section 404
❑ Projects Requiring Documentation
Interagency Agreement
(Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
None Anticipated
DOT Form 140-101 Page 2
Revised 0112022 Previous Editions Obsolete
Agency
Project Title
Date
Kittitas County Public Works
Intersection Corridor Safety Improvements
3/29/2023
Right of Way
❑✓ No Right of Way Needed
❑ Right of Way Needed
`AII construction required by the
❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the existing right of way.
Utilities
Railroad
❑ No utility work required
0 No railroad work required
❑ All utility work will be completed prior to the start
❑ AII railroad work will be completed prior to the start of
of the construction contract
the construction contract
OAll utility work will be completed in coordination
F-1 All the railroad work will be completed in coordination
with the construction contract
I with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
One location will have a power service disconnected, which will have to happen after the new solar LED
signs are installed, and before existing signs with electric components are removed.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes [VI No
Remarks
This Droiect has been reviewed by the legislative bodv of the administration agencv or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency Kittitas County
Date By
Mayor/Chairperson
DOT Form 140-101 Page 3