Loading...
HomeMy WebLinkAbout2023-03-27-minutes-public-works-study-sessionKITTITAS COUNTY COMMISSIONERS Public Works Study Session Regular Meeting Monday March 27, 2023 - 1:30 PM Commissioners' Auditorium 205 West 5th Room 109 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Executive Session RCW 42.30.110 (1) To discuss with legal counsel representing the agency matters relating to agency enforcement actions, or to discuss with legal counsel representing the agency litigation or potential litigation to which the agency, the governing body, or a member acting in an official capacity is, or is likely to become, a party, when public knowledge regarding the discussion is likely to result in an adverse legal or financial consequence to the agency. 4. Request to Approve a Resolution Authorizing Chair Signature on Digital Submittal Certification to the County Road Administration Board S. Equipment Rates and Rental (Eli & R) Policy for Public Works G. 47 Degrees North Transportation Appendix SETS Discussion 7. Robbins Road Discussion 8. Land Use Moratorium in Elk Meadows Discussion 9. Other business 10. Concluded Created on 3/23/2023 9:24:04 AM KITTITAS COUNTY PUBLIC WORKS STUDY SESSION MINUTES COMMISSIONERS' AUDITORIUM, 205 WEST 5TH ROOM 109 Regular Meeting MONDAY 1:30 PM March 27, 2023 Board members present: Chairman Cory Wright, and Commissioner Laura Osiadacz. Others: Mark Cook, Josh Fredrickson, Rebecca Cruse, Public Works; Dan Carlson, Community Development Services; Neil Caulkins, Chris Horner, Prosecuting Attorney's Office; No members of the public. At 1:30PM Chairman Cory Wright opened the Public Works Study Session. No Citizen Comments. At 1:31PM the Board of County Commissioners announced they would recess into Executive Session for 5 minutes with Mark Cook, Chris Horner, and Neil Caulkins per RCW 42.30.110 (i) To discuss with legal counsel representing the agency matters relating to agency enforcement actions, or to discuss with legal counsel representing the agency litigation or potential litigation to which the agency, the governing body, or a member acting in an official capacity is, or is likely to become, a party, when public knowledge regarding the discussion is likely to result in an adverse legal or financial consequence to the agency. At 1:36PM the Board of County Commissioners reconvened out of Executive Session requesting an additional 5 minutes for discussion. At 1:44PM reconvened out of Executive Session with direction to challenge the claim and follow-up on laws related. LAND USE MORATORIUM IN ELK MEADOWS DISCUSSION Mark Cook briefed the Board of County Commissioners on the non- compliant condition. of McElroy Bridge and the risks associated with current use. Mark Cook stated that at the time of failure it was temporarily repaired, and conditional use of the bridge was for a limited time. Staff requested direction to place a land use moratorium for 6 months on the properties reliant on the McElroy Bridge while issues are addressed. Arden Thomas stated she has spoken with FE[S.A and Washington State Military Fund to gain insight into buyout programs and time constraints associated with those at -risk properties. Neil Caulkins briefed the Board on the risk of continued building in an area reliant on the non-compliant structure and that a moratorium on building until a viable bridge is brought up to code reduced risk. The Board directed Staff to bring forward legislation for discussion. 2023-3-27 MINUTES REQUEST TO APPROVE A RESOLUTION AUTHORIZING CHAIR SIGNATURE ON DIGITAL SUBMITTAL CERTIFICATION TO THE COUNTY ROAD ADMINISTRATION BOARD Josh Fredrickson briefed the Board of County Commissioners on the report requirements and the change in the diversion of funds to the Sheriff's office due to acquisition of land for Search and Rescue Facility. Josh Fredrickson requested the Chairs signature on CRAB reporting. Commissioner Laura Osiadacz moved to approve Resolution 2023-046. Chairman Cory Wright seconded the motion. Approved. EQUIPMENT RATES AND RENTAL (ER & R) POLICY FOR PUBLIC WORKS Mark Cook briefed the Board of County Commissioners on the County Road Administration Board (CRAB) requirement for Public Works to establish an ER & R policy, articulating fleet management, purchase, and use. The Board directed staff to bring forward legislation for approval. 47 DEGREES NORTH TRANSPORTATION APPENDIX SEIS DISCUSSION Mark Cook briefed the Board of County Commissioners on conversations with City of Cle Elum and developers. Mark Cook expressed concern with insufficient plan to address increased weekend traffic and the second access onto Bullfrog Rd that has not been approved by the County with potential for accumulating stress on intersections and ramps in the area. At 2:28PM the Board of County Commissioners announced they would recess into Executive Session for 10 minutes with Mark Cook, Josh Fredrickson, and Neil Caulkins per RCW 42.30.110 (i) To discuss with legal counsel representing the agency matters relating to agency enforcement actions, or to discuss with legal counsel representing the agency litigation or potential litigation to which the agency, the governing body, or a member acting in an official capacity is, or is likely to become, a party, when public knowledge regarding the discussion is likely to result in an adverse legal or financial consequence to the agency. At 2:38PM the Board of County Commissioners requested 5 additional minutes. At 2:43PM the Board of County Commissioners reconvened out of Executive Session. No action taken. ROBBINS ROAD DISCUSSION Mark Cook requested the Board of County Commissioners direction on improving Robbins Road from the turnaround to Sun East maintained area and discussed potential for public access to National Forest land. The Board supports starting communications with landowners. Meeting concluded at 2:52 PM 2023-3-27 MINUTES KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Rebecca !ruse, Administrative Cory Wright, Chairman Assistant 2023-3-27 MINUTES KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS STUDY SESSION STAFF REPORT STUDY SESSION DATE: March 27, 2023 TOPIC: Digital Submittal Certification to County Road Administration Board ACTION REQUESTED: Request to approve a Resolution authorizing Chair signature on the Digital Submittal Certification to the County Roao Administration Board LEAD STAFF: Joshua Fredrickson RECOMMENDATION: Approve a resolution authorizing Chair signature on the Digital Submittal Certification to the County Road Administration Board. BRIEFING SUMMARY: • Kittitas County Public Works Department is required (WAC 136-04) on an annual basis to send an Annual Certification to the County Road Administration Board (CRAB). Reporting is related to departmental information on management and administration, policies, and operations. Signature from the Board of County Commissioners Chair, Sheriff, Auditor and Engineer are required for submittal. BACKGROUND: Public Works is required to provide the County Road Administration Board (CRAB) with an annual certification covering administration, policies, and operations. In addition, annually the County Sheriff, County Auditor and the Board Chair are required to certify traffic law enforcement diversions from the Road Fund. The County Engineer is also required to sign certification documents. DISCUSSION: Annually, the Chair of the Board of County Commissioners and County Engineer are required to certify reports to CRAB covering administration, policies, and operations of Public Works. This includes any Diversion of Road Fund Expenditures for Traffic Law Enforcement as well as annual certification. The Sheriff, Auditor and County Engineer have each signed. The Board Chair's signature is now needed completing the annual reporting document. FISCAL IMPACTS: Reporting to CRAB is included as part of Public Works annual work program. ATTACHMENTS: Resolution, Digital Submittal Certification Form, County Road report documentation Page 1 of 1 Public Works "Work Session Staff Report" 2023 Kittitas County 2022 CERTIFICATION OF DIVERSION AND ROAD FUND EXPENDITURES FOR TRAFFIC LAW ENFORCEMENT WAC 136-150-022 Total Road Levy_ Budgeted Road Levy revenue (as listed on the Road Levy Certification - WAC 136-150-021): Actual Road Levy revenue produced: Road Levy Diversion: Budgeted Road Levy Diversion (as listed on the Road Levy Certification - WAC 136-150-021): Actual amount of Diverted Road Levy: Was Diverted Road Levy deposited in a specific and identifiable account (RCW 36.82.040): Traffic Law Enforcement Paid by Road Fund Expenditures: Budgeted cost reimbursements and/or operating transfers from the Road Fund: Actual total amount of cost reimbursements and/or operating transfers from the Road Fund: Total Road Portion Traffic Law Enforcement Expenditures. Total Traffic Law Enforcement Expense (ALL COUNTY FUNDS)_ $7,877,965.00 $7,840,622.90 $0.00 $0.00 NIA $0.00 $0.00 $0.00 $284,580.00 RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all revenues collected for road purposes only for such purposes, including traffic law enforcement, as are allowed by Article II, Section 40 of the Washington State Constitution, are eligible to receive funds from the Rural Arterial Trust Account. This form must be reviewed and certified (on the "Engineer's Certification Form") by_ • County Sheriff • County Auditor OR Charter designated Chief Financial Officer + Chair, Board of County Commissioners OR County Executive Kittitas County Annual Certification For Calendar Year 2022 WAC 136.04 AANAGEMENT AND ADMINISTRATION A. During 2022 the County Engineer performed the duties and had the responsibilities specified in RCW 36.80,030, Explanation: B. At any time during 2022 was there a vacancy/change in the position of County Engineer? If so, were the procedures in WAC 136-12 followed? Explanation: C. The processing of County Road Accident Reports during 2022 complied with WAC 136-28. Explanation: D. Priority Programming techniques were applied to the ranking of all potential projects on the arterial road system in 2022 per WAC 136-14-020. Yes Yes Yes Explanation: E. As of December 31, 2022 the management of the county road department was in accordance with policies set by the county legislative authority including, but not limited to, the following specific policies required by WAC 136-50-050: *Has your agency sent the most recently adopted version to CRAB WAC 136-50-050, 136-14-030, 136-600-070? POLICY WAC DATE OF CURRENT VERSION Re: Organization 136-50-050(1) 11/03/2020 Re: Complaint Handling 136-50-050(2) 03/23/2020 Re: Work for Others 136-50-050(3) 04/07/2020 Re: County Road Standards 136-50-050(4) 12/05/2015 Re: Survey Monument 136-50-050(5) 03/07/2023 Preservation Annual Construction Program 136-16-040 Re: Priority Programming 136-14-030 12/04/2018 Re: ER & R Policy 136-600-070 136-300-060 Re: ER & R (Adopted Rates) 136-600-070 12/22/2021 Re: ER & R (Adopting Road Fund Budget Resolution) 136-600-070 12/22/2021 Explanation: ER&R Policy is pending for final review and approval in April. F. The following were submitted to CRAB in a timely manner: DOCUMENT WAC DUE DATE DATE OF ADOPTION / DATE SENT TO PREPARATION CRAB 122 Six -Year Program 136-15-050 31 -DEC -21 10/05/2021 12/22/2021 '22 Annual Construction Program 136-16-040 31 -DEC -21 10/05/2021 12/22/2021 '22 CAPP Program 136-300-060 31 -DEC -21 10/05/2021 12/22/2021 122 Road Fund Budget 31 -DEC -21 10/28/2021 12/22/2021 '22 Maintenance Management Work Plan 136-11-040 31 -DEC -21 11/18/2021 12/22/2021 & Budget '22 Road Levy 136-150-021 01 -FEB -22 11/29/2021 01/18/2022 121 Certification of Diversion and Road 136-150-022 01 -APR -22 02/22/2022 03/18/2022 Fund Exp. For Traffic Law Enforcement '21 Engineer's Certification of Fish 136-150-023 01 -APR -22 02/22/2022 03/18/2022 Barrier Removal Costs '21 Certification of Road Fund Exp, for 136-150-025 01 -APR -22 Marine Navigation and Moorage 121 Annual Construction Report 136-16-050 01 -APR -22 03/08x2022 03/31/2022 '21 CAPP Report 136-300-090 01 -APR -22 03/11/2022 03/18/2022 '21 Maintenance Management 136-11-050 01 -APR -22 03/11/2022 03/18/2022 Certification 121 Annual Certification 136-04-030 01 -APR -22 03/15/2022 03/18/2022 '21 Road Log Update 136-60-030 01-MAY-22 06/02/2023 '22 PMS Certification for CAPA 136-70-070 31-DEC-22 12/09/2022 12/09/2022 Eligibility '22 ER & R Submittals: Adopted Rates 136-600-070 31-DEC-22 12/21/2021 12/21/2021 '22 ER & R Submittals: Adopting 136-600-070 31-DEC-22 12/21!2021 12/21/2021 Resolution Explanation: Certification of Road Fund Exp. for Marine Navigation and Moorage. Our County does not have this type of expense. Road Log Update. In 2021/2022 State reporting software was switching from Mobility to Gis-Mo. Due to software change, Road Log was submitted June 4, to meet the June 17 submittal date. Received acceptance from CRAB in July 2022 that submittal from had been accepted. G. Projects to which construction expenditures were charged were all on the originally adopted 2022 Annual Program or Yes as amended per WAC 136-16-042 - Attach Amendments. (If No, please attach a brief explanation.) Explanation: H. The County's construction by county forces limit for 2022 computed in accordance with RCW 36.77.065: $1,267,162.50 I. The actual expenditure for construction by county forces as reported in the 2022 Annual Const. Report: $7,595.00 J. As required by WAC 136-20-060, a written Bridge and Inspection Report for 2022 was furnished to the legislative 02/07/2023 authority on (attach a copy): # of NBI Bridges as of December 31, 2022: 113 BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. 2023 - AUTHORIZE THE CHAIR'S SIGNATURE ON THE DIGITAL SUBMITTAL CERTIFICATION TO THE COUNTY ROAD ADNIINISTRATION BOARD FOR 2022 ROAD FUND EXPENDITURES WHEREAS: The County Road Administration Board (CRAB) requires annual reporting of various Road Fund expenditures by the County Engineer; and WHEREAS: The County Sheriff, County Auditor, County Engineer, and the Chair of the Board of County Commissioners are required to annually certify Road Fund diversions supporting Traffic Law Enforcement (TLE) activities; and WHEREAS: The County Sheriff, County Auditor and County Engineer have all signed the certification reporting no Road Fund diversion in 2022; and WHEREAS: The County Engineer has signed the required reports and said reports are now ready for Chair signature; and WHEREAS: The Chair of the Board of County Commissioners signature is now required to complete 2022 County Road Administration Board (CRAB) reporting requirements; NOW, THERE+ VORL+' BE ii' RESOLVED that the Board of County Commissioners, in the best interest of the public, does hereby authorize the Chair's signature on the Digital Submittal Certification to the County Road Administration Board for 2022 Road Fund Expenditures and the Annual Certification. DATED this 27th day of March 2023, at Ellensburg, Washington. c�ot, rrJ��ii Cj "J&test: Ilerksof the Board- Julie Kjorsvik ❑ Deputy Clerk of the Board --Mandy Buchholz 4J 1 ) BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, -'"Cory Wright, Chairman I Y3041 I1 UCKML ABSENT 7Bre hsmzth, Vice -Chairman L Osiadac issioner Kittitas County Reports for 2022 Digital Submittal Certif cation for Forms Due April 1st The documents checked below are hereby submitted from Kittitas County for the review and acceptance of the County Road Administration Board. 2022 RAP Certification of Diversion and Road Fund Expenditures for Traffic Law Enforcement I hereby certify that the above report is true and accurate and that I have reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC 136. Signed: ,z,.,,� Date: 3 yZ� County Sheriff Signed: Date: IS.Z3 County Auditor Signe Date: Z� Chair xecutive 2022 Certification of Road Fund Expenditures for Fish Passage Barrier Removal 2022 Annual Certification I hereby certify that the F' h Passage Removal and Annual Certifications are true and accurate and that I have reviewed and approved the report for submiss' theCounty Road Administration Board in accordance with WAC 1_ . Signed: Date: Chair 1 e e.— Signed: s Signed: - Date: County Evgweiir 2022 County Ferry System Operations Report 2022 Annual Construction Report 2022 County Arterial Preservation Report 2422 Certification of Road Fund Expenditures for Marine Navigation and Moorage 2422 Maintenance Management Annual Certification I hereby certify that the County Ferry System Operations Report, Annual Construction Report, County Arterial Preservation Report, Marine Navigation and Moorage Certification, and Maintenance Management Certification are true and accurate and that I have reviewed, approved, and submitted said reports to the County Road Administration Board in accordance with LC 136. Signed: Date: Id r+/ioz3 County En - eer KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS 2023 STUDY SESSION STAFF REPORT STUDY SESSION DATE: March 27, 2023 TOPIC: Equipment Rental and Revolving Fund — Replacement Policy ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff prepare enabling legislation. BRIEFING SUMMARY: • Public Works (PW) formulated an equipment rental and revolving fund (Fund 501- ER&R) in the early 1990s. • The fund has operated for thirty plus years without a formal equipment replacement policy. • The County Road Administration Board (CRAB) is now requiring a formal policy from PW. • A draft policy (EXHIBIT 1) is attached for Board of County Commission (BoCC) consideration. BACKGROUND: County PW agencies have been required to create, and operate, equipment rental and revolving funds for over thirty years in the state of Washington — pursuant to Revised Code of Washington at Chapter 36.33A (EXHIBIT 2). Recently, CRAB noticed the County Engineer of their desire forcing PW to create a formal policy rather than relying on existing business practices (EXHIBIT 3). DISCUSSION: While PW has operated its ER&R for over thirty years, the recent retirement of Finance Director Remeto underscores the need to formalize operational characteristics of Fund 501. The need is underscored by recent discussions regarding future expansion of the Fund for use by all departments of the BoCC and elected offices. The policy has been written to codify existing business practices and address recent questions asked by the Finance Division of PW. During policy formulation, .FW examined numerous city and county policies from around the state. Staff has attempted codify existing business practices and anticipate future demands on Fund 501. The policy will likely be amended at some point in the future as it begins implementation second quarter of 2023. Significant inflation the past several Page 1 of 5 Public Works "Work Session Staff Report", 2023 years has resulted in higher rental rates as staff adjusts to ensure appropriate value accumulates in the fund offsetting inflationary demands impacted the cost of new equipment. Several years ago, staff determined to maintain a ending fund balance in Fund 501 allowing for replacement of critical PW equipment — but not all. The idea being that inevitably, some equipment will exceed our predictive replacement schedule and force early replacement. The likelihood of the entire fleet being destroyed in a single catastrophic event is unlikely. Our current minimum ending fund balance is set at one million dollars and the operating fiuid balance is set at two million dollars. PW business practices (daily, weekly, monthly, and annual) will continue within the framework of the adopted policy. FISCAL IMPACTS: None anticipated. ATTACHMENTS: EXHIBIT 1: DRAFT ER&R POLICY 101,412,11,610 MROMATIMM"N' EXHIBIT 3: PW BUSINESS PRACTICE 05/28/2018 Page 2 of 5 Public Works "Work Session Staff Report", 2023 EXHIBIT 1: DRAFT ER&R POLICY Page 3 of 5 Public Works "Work Session Staff Report", 2023 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS FUND 501 (EQUIPMENT RENTAL AND REVOLVING) POLICY NO. 1 MARCH 21, 2023 Page 1 of 11 Table of Contents 1.0 PURPOSE............................................................................................................4 1.1 Applicability.......................................................................................................4 1.2 Authorities..........................................................................................................4 1.3 Vehicle or equipment purchase requests....................................................................4 1.4 Replacement........................................................................................................4 1.5 Appeal Division Manager's Decision on Replacement Request ...................................... 5 2.0 EQUIPMENT RENTAL............................................................................................ 5 2.1 Fund 501 Rental Rates..........................................................................................5 2.2 Base Vehicle/Equipment........................................................................................5 2.3 Auxiliary Equipment.............................................................................................6 2.4 Upgrades............................................................................................................6 2.5 Cost Efficiency....................................................................................................6 2.6 User Responsibility.............................................................................................. 6 2.7 Department Responsibility.....................................................................................6 2.8 Fuel..................................................................................................................6 2.9 Damaged Vehicle/Equipment..................................................................................6 2.10 Pool Vehicles......................................................................................................6 2.11 Minimum Rental..................................................................................................7 2.12 Inventory............................................................................................................ 7 2.13 Accumulated Funding...........................................................................................7 2.14 Surplus of Equipment............................................................................................7 3.0 EQUIPMENT RENTAL AND REVOLVING CENTRAL STORES.................................7 3.1 Staff Time Reporting............................................................................................ 7 3.2 Inventory Charges................................................................................................ 7 3.3 Bidding..............................................................................................................7 3.4 Accounting......................................................................................................... 7 3.5 Consolidated Ordering.........................................................................................8 4.0 FUEL......................................................................................................................8 4.1 Fuel Charges....................................................................................................... 8 4.2 Competitive Prices...............................................................................................8 4.3 Fuel Card Limitations...........................................................................................8 4.4 County Fuel Credit Cards.......................................................................................8 5.0 MECHANIC SHOP...................................................................................................8 Page 2 of 11 5.1 Shop Rates.........................................................................................................8 5.2 Outsourcing........................................................................................................8 5.3 Vehicle/Equipment Maintenance.............................................................................8 5.4 Broken Down Vehicle/Equipment............................................................................9 5.5 Misuse/abuse......................................................................................................9 5.6 Renter Responsibility............................................................................................9 6.0 PITS AND QUARRIES..............................................................................................9 6.1 Unit Prices..........................................................................................................9 6.2 Rates for Manufactured Products.............................................................................9 6.3 Future Pit Operations............................................................................................ 9 6.4 Storage..............................................................................................................9 7.0 SIGN FABRICATION SHOP...................................................................................10 8.0 FACILITY RENTAL AND CONSTRUCTION...........................................................10 8.1 Facility Space Rental Rate...................................................................................10 8.2 Shop Rental Rate...............................................................................................10 8.3 Cost Distribution................................................................................................10 9.0 FINANCE DEPARTMENT FUND 501 DATA PROCESSING......................................10 Weekly:....................................................................................................................10 Monthly: ................................................................................................................... 10 Annually: .................................................................................................................. 11 Page 3 of 11 EQUIPMENT RENTAL AND REVOLVING FUND 501 POLICY NO. 1 1.0 PURPOSE • To provide policies and procedures for administration of the EQUIPMENT RENTAL AND REVOLVING Fund. (R.C.W. 36.33A.010 directs every county to establish, by resolution, an "equipment rental and revolving fund" but does not provide specific policies for administering this fund). The Kittitas County Board of Commissioners created the Equipment Rental and Revolving Fund prior to 1992 to identify procedures for establishing rates, service levels, and equipment replacement along with services provided within this fund. This fund is designed Fund 501 for county budgeting purposes. The following purposes are identified: To establish cost containment procedures that reflect proper fiscal management of these resources and ensure proper equipment maintenance and replacement pursuant to state law consistent with auditing requirements as stipulated by the State Auditor. • To provide safe, cost effective, reliable transportation and equipment that meets the County's needs and mission directives. • To establish property and asset management procedures ensuring ongoing viability of public works assets. 1.1 Applicability This policy applies to all Kittitas County offices and departments and to county officials (elected officials and department heads), and their employees, that utilize Public Works Fund 501 resources and services. 1.2 Authorities Pursuant to revised code of Washington at 36.33A.010 and as ordered by the Kittitas County Board of County Commissioners, FUND 501 is designated as the county's equipment rental and revolving fund. 1.3 Vehicle or equipment purchase requests. Vehicle or equipment purchase requests will be made on the appropriate Fund 501 requesting form. The request must be signed by the appropriate county official before it will be processed by Public Works. 1.4 Replacement Fund 501 Division Manager shall make the initial decision as to whether a piece of equipment qualifies for replacement and with what make, model, or type of equipment it is to be replaced with. If the requested vehicle or equipment is an appreciable upgrade, a cost overrun contribution may be required from the requesting department. Page 4 of 11 1.5 Appeal Division Manager's Decision on Replacement Request If the decision made by the fund Division Manager is not acceptable to the county official, their reasons for disagreement, along with their specific request shall be given to the Director of Public Works for review. The Director of Public Works will either determine in favor of the Division Manager, or provide an alternative decision based on additional information received. The decision of the Public Works Director will be given to the county official for approval. If the department approves the decision, the Division Manager will pursue replacement on behalf of the county official. If the decision is not approved the county official may appeal the decision to the Board of County Commissioners, whose decision will be final. 2.0 EQUIPTM ENT RENTAL 2.1 Fund 501 Rental Rates Rates shall reflect 100 percent of annual expense, including depreciation, fuel, labor and parts for repairs and service, insurance, indirect costs and overhead. The amount of collected depreciation per vehicle is defined by its assigned useful life. Equipment purchased under $5,000 is expensed in the year of purchase. A surcharge will be added annually adjusting for anticipated inflation. The surcharge rate will not be applied when developing rental rates for use during declared federal disasters. The rates are subject to annul review by the Board of County Commissioners. The rates for all Fund 501 services will be developed by the Division Manager and submitted to the County Engineer for approval. The proposed rates will be presented to the Director of Public Works who, as part of the annual budget process, will consider the rates along with the Fund budget and submit a recommended rate resolution to the Board of Kittitas County Commissioners for approval, along with specific budget documents. The Board of Kittitas County Commissioners shall set Fund 501 rates by resolution. Four considerations make up a blended rate per vehicle in the fleet: operational expenses, depreciation, corrections for prior years and a surcharge for equipment replacement. The surcharge accounts for known pending costs such as annual inflation. The Public Works Director determines the surcharge rate in conjunction with the Finance Manager. The surcharge rate is not assigned to fleet vehicles during response to a declared federal emergency. Prior to finalizing annual rates, current federal equipment rental rates are compared to Fund 501 draft rates to inform decisionmakers. Adjustments to the rates are made as needed in order to work toward an equitable status, as one fund should not make a profit over another fund. Equipment purchased under $5,000 will be assigned an annual rental amount. 2.2 Base Vehicle/Equipment The Division Manager shall determine the base vehicle or equipment to be provided and what standard accessories are supplied with the vehicle or equipment. Standard equipment shall include fire extinguisher, first aid kit (users to keep stocked after original installation), and factory/dealership installed accessories ordered with vehicle or equipment as stipulated by the Department Director. Page 5 of 11 2.3 Auxiliary Equipment Fund 501 shall recover costs for all auxiliary vehicle and equipment accessories at the time of purchase and installation, rather than recovering costs over life of vehicle or equipment. Requesting parties will be noticed of the anticipated cost of auxiliary equipment or accessories prior to acquisition. 2.4 Upgrades Fund 501 shall recover costs for renting department's requested upgrades to standard vehicle or maintenance parts, not typically stocked, or supplied by the central stores portion of Fund 501 assets, at the time of purchase and installation. 2.5 Cost Efficiency In an effort to keep rental rates cost-effective, the Division Manager shall place an emphasis on purchase price, fuel efficiency, and appropriate class size, make, and models when purchasing vehicles and equipment. The requesting County Official will be consulted if the requested vehicle or equipment creates concern on the part of the Division Manager. 2.6 User Responsibility Each Department or its assigned user shall be responsible to keep Fund 501 vehicles and equipment appropriately clean, both inside and outside. Fund 501 will not pay car washing or interior detail costs. 2.7 Department Responsibility Each Department will be responsible for paying its own ferry fees, traffic infractions, and parking fees. They will not be charged to or paid through Fund 501. 2.8 Fuel Fund 501 will not reimburse renting departments for any fuel purchases made at non -approved fuel depots unless Fund 501 provided fuel credit cards are used or prior authorization is given. Renting departments may check out Fund 501 provided fuel credit cards at the Public Works accounting office for trips outside the County. Upon completion of the trip, the renting department shall promptly return the credit card to the Public Works accounting office. 2.9 Damaged Vehicle/Equipment If a vehicle or piece of equipment is wrecked or damaged, or for any other reason outside of Fund 501's responsibility, its service is lost prior to its depreciated life, and it will be the responsibility of the renting department to pay the difference in costs to replace or repair it. Fund 501 does not carry collision insurance on vehicles or equipment. 2.10 Pool Vehicles The Fund 501 Division Manager will provide pool vehicles for those departments that don't have need for permanently assigned vehicles or for vehicles such as travel vans used periodically for group travel. Short-term rental rates shall be established for these vehicles and invoiced to the requesting department. Page 6 of 11 2.11 Minimum Rental For vehicles or equipment that are not used enough to cover their depreciation or do not meet fiscal yearly requirements established by Fund 501, renting department shall pay the annual minimum set for such equipment. Public Works uses a monthly rental rate for all equipment. Equipment utilized outside of the Road Fund is tracked by actual usage and current FEMA hourly equipment rental rates apply. 2.12 Inventory If a vehicle or piece of equipment is turned back to Fund 501 and is no longer needed by the department, it shall become part of the Fund 501 inventory. The department shall not receive any reimbursement from Fund 501 for past use or surplus value. 2.13 Accumulated Funding Monthly, the Finance Manager reviews funding balance in Fund 501 and advises the County Engineer of any necessary adjustments required out of the equipment's annual review cycle. Monthly monitoring of the fund minimizes significant year-end adjustments for any particular piece of equipment. 2.14 Surplus of Equipment Public Works utilizes electronic surplus services for disposing of surplus equipment. The Road Maintenance Manager is responsible for preparing equipment for surplus and managing the surplus process. Surplus value of equipment is returned to Fund 106 (Road Fund). 3.0 EQUIPMENT RENTAL AND REVOLVING CENTRAL STORES 3.1 Stam Time Reporting All time reporting by staff will be posted to the appropriate accounting codes (job accounting system), division, and department. All equipment is tracked for expense within the department's accounting software and assigned individual numbers within the 4000 range. 3.2 Inventory Charges Inventory shall be charged out, including cost plus overhead associated with managing the inventory, to the appropriate vehicle, equipment, division, or department. Corrections from prior year charges for equipment that was either overly profitable or took a loss, the additional gain/loss will be calculated into the following year's rental rate. 3.3 Bidding Fund 501 strives to consolidate ordering, properly bid out purchases, and keep the vendor list to a minimum. Where possible, attempts will be made to use state contracts or other approved procurement methods meeting state law requirements. 3.4 Accounting Fund 501 will strive to keep monthly voucher counts and accounting workload as low as Page 7 of 11 possible. Annually, the Public Works Director will confer with the Finance Manger ensuring proper annual overhead rates are being assessed to all Fund 501 assets. 3.5 Consolidated Ordering When there is a cost or labor savings, centralized shop ordering for both shops to Fund 501 will be considered. 4.0 FUEL 4.1 Fuel Charges Fuel will be charged against vehicle or equipment at cost plus proper overhead. Adjustments will be made off of the previous month's average price. 4.2 Competitive Prices Fund 501 will pursue bid procedures or piggyback onto already bid contracts for fuel, fuel delivery, and service contracts to secure competitive price and service. 4.3 Fuel Card Limitations Renting departments shall use fuel cards for Fund 501 vehicles only and not for personal use. Fund 501 shall maintain an accurate fuel card inventory. 4.4 County Fuel Credit Cards Fuel purchases for Fund 501 vehicles other than at County fuel depots will be made with County fuel credit cards. Cash or personal credit card purchases are strongly discouraged, as federal fuel taxes are assessed and not reclaimable. County fuel credit cards are available for use for extended trips. 5.0 MECHANIC SHOP 5.1 Shop Rates Shop rates will be set based on wages, benefits, shop supplies, environmental surcharges, training, utility fees, indirect costs, and overhead. Shop rates will be reviewed and adjusted annually as necessary. 5.2 Outsourcing Outsourcing will be used when necessary and cost-effective as determined by the Division Manager. 5.3 Vehicle/Equipment Maintenance The user department and the equipment or vehicle user shall be responsible to deliver vehicle or equipment to the shop for regular scheduled maintenance and/or repair service. Page 8of11 Public Works utilizes various equipment management software to track use, expenses and associated costs to prioritize replacement needs. 5.4 Broken Down Vehicle/Equipment When vehicle or equipment is broken down or cannot be safely brought in for service by user, the user shall contact the Division Manager or the maintenance shop, and they will arrange for pickup or service in the field. 5.5 Misuse/abuse Any service or repair outside of routine service or regular repairs, determined to be the result of misuse and/or abuse of the vehicle or equipment by the renting department, will be reviewed by the Division Manager and the renting department to determine if additional charges for the work will be assessed to the renting department or if the life span will be extended to cover repair costs. 5.6 Renter Responsibility The renting department is responsible to protect the finishes of the vehicle or equipment, other than normal wear and tear, and to use the vehicle or equipment in the most appropriate manner to protect its useful life. Cosmetic repairs will be charged directly to the renting department outside of the regular rental rate. The fund Division Manager will review repairs and cost estimate(s) with renting department. 6.0 PITS AND QUARRIES 6.1 Unit Prices Unit prices for fund aggregates will be established to recover the annual costs of permits, stormwater controls, pit reclamation, required testing, and pit management operations and will be adjusted annually if/as necessary to meet these costs. 6.2 Rates for Manufactured Products Rates for manufactured products will be established based on unit contract prices, stockpile costs, and appropriate indirect costs and overhead. The fund Division Manager will review this, along with product needs, with the County Engineer before establishing the rates each year. 6.3 Future Pit Operations Rates for products are not set to collect additional funds for future pit operations, only management of the pits and existing products. 6.4 Storage Storage of road equipment and supplies will be allowed as long as they meet the pit permit and management requirements. Road crews will coordinate their use of pits with the Division Manager. The Road Maintenance Manager shall be responsible for security and ongoing cleanup and organization of the pit and quarry sites. Page 9 of 11 7.0 SIGN FABRICATION SHOP Rates will be established and charged out according to costs plus overhead and rates established by the sign shop foreman. The rates will be evaluated annually by the County Engineer and recommended to the Director for annual budget inclusion. 8.0 FACILITY RENTAL AND CONSTRUCTION 8.1 Facility Space Rental Rate Facility space rental rate will be established to recover the costs of supplies, utilities, and general maintenance of existing structures. All Fund 501 facility assets will develop rental rates specific to each asset. It is anticipated that useful life assignment is highly variable and will be determined using input from various Public Works Division managers in concert with the Public Works Director. 8.2 Shop Rental Rate Shop rental rate does not include collection of funds to replace structures or make improvements or alterations to them. The rate will include all associated operational costs. 8.3 Cost Distribution Fund 501 Division Manager and the Road Fund Manager (County Engineer) will determine appropriate cost distribution for facility rental, crew laundry costs, medical supply costs, operating supplies, and cleaning of the spaces, so that items are charged against the all fund users. 9.0 FINANCE DEPARTMENT FUND 501 DATA PROCESSING VOn a weekly basis, the finance department will process through crew cards any equipment hours by equipment number used for non -road maintenance projects/jobs. The payment for non -road maintenance equipment rental will be transferred from the fund renting the equipment to the ER&R fund within the Monthly processes. TA07-L-t I_!y: 1. Depreciation is processed for all ER&R equipment (listed in Cayenta as AREA -EQ, TYPE - PV) 2. Replacement Factor is processed for all ER&R equipment (thru a User Defined J.V. entry using the transaction group RPL (Replacement Factor) 3. Bills are processed as they are received and coded to Equipment as necessary. 4. Equipment Charges for Rent are processed through the Crew Card processing program and coded to Road Maintenance jobs as per Management direction. 5. Funds are transferred from the divisions renting the equipment to the ER&R fund 501. Page 10 of 11 6. The Cayenta Equipment report is reviewed for any high-cost O&M amounts. 7. New equipment is set up under the 4000 equipment numbers as needed. 8. Equipment ready to be placed into service is transferred into permanent equipment numbers, and the monthly equipment rental rate is added to the monthly equipment charges. 9. Equipment disposed of is adjusted off of the books in Cayenta. 10. The fund amount in the ER&R fund is reviewed and amounts transferred to/from investment as needed. 1. All new equipment is reviewed and listed for resolution to the Board of County Commissioners. 2. All disposed of equipment is reviewed and listed for resolution to the Board of County Commissioners. 3. The Cayenta Equipment Report is reviewed for accuracy and equipment showing abnormal profit or loss is identified. 4. Rates are reviewed and set for the New Year. A replacement rate based on annual inflation is selected by the Finance Manager, County Engineer, and Public Works Director. 5. Costly equipment is identified for further review and possible replacement. 6. New Year rates are presented to the Board of County Commissioners for consideration/adjustment and/or adoption. 7. The ER&R fund is reviewed, and adjustments are made to the fund amount as needed. Page 11 of 11 EXHIBIT 2: RCW 36.33A Page 4 of 5 Public Works "Work Session Staff Report", 2023 Chapter 36.33A RCW EQUIPMENT RENTAL AND REVOLVING FUND Sections 36.33A.010 Equipment rental and revolving fund—Establishment— Purposes. 36.33A.020 Use of fund by other offices, departments or agencies. 36.33A.030 Administration of fund. 36.33A.040 Rates for equipment rental, 36.33A.050 Deposits in fund. 36.33A.060 Accumulated moneys. RCW 36.33A.010 Equipment rental and revolving fund— Establishment—Purposes. und— EstablishmentPurposes. Every county shall establish, by resolution, an "equipment rental and revolving fund", hereinafter referred to as "the fund", in the county treasury to be used as a revolving fund for the purchase, maintenance, and repair of county road department equipment; for the purchase of equipment, materials, supplies, and services required in the administration and operation of the fund; and for the purchase or manufacture of materials and supplies needed by the county road department. [1977 c 67 § 1.] RCW 36.33A.020 Use of fund by other offices, departments or agencies. The legislative body of any county may authorize, by resolution, the use of the fund by any other office or department of the county government or any other governmental agency for similar purposes. [1977 c 67 § 2.] RCW 36.33A.030 Administration of fund. With the approval of the county legislative body, the county engineer, or other appointee of the county legislative body, shall administer the fund and shall be responsible for establishing the terms and charges for the sale of any material or supplies which have been purchased, maintained, or manufactured with moneys from the fund. The terms and charges shall be set to cover all costs of purchasing, storing, and distributing the material or supplies, and may be amended as considered necessary. [ 1977 c 67 § 3.1 RCW 36.33A.040 Rates for equipment rental. Hates for the rental of equipment owned by the fund shall be set to cover all costs of maintenance and repair, material and supplies consumed in operating or maintaining the equipment, and the future replacement thereof. The rates shall be determined by the county engineer or other appointee of the county legislative body and shall be subject to annual review by the legislative body. This section does not restrict the ability of the county road administration board to directly inquire into the process of setting rental rates while performing its statutory oversight responsibility. [2007 c 195 § 1; 1977 c 67 § 4.] RCW 36.33A.050 Deposits in fund. The legislative authority of the county may, from time to time, place moneys in the fund from any 1 1 1 source lawfully available to it and may transfer equipment, materials, and supplies of any office or department to the equipment rental and revolving fund with or without charge consistent with RCW 43.09.210. Charges for the rental of equipment and for providing materials, supplies, and services to any county office or department shall be paid monthly into the fund. Proceeds received from other governmental agencies for similar charges and from the sale of equipment or other personal property owned by the equipment rental and revolving fund, which is no longer of any value to or needed by the county, shall be placed in the fund as received. [1977 c 67 § 5.] RCW 36.33A.060 Accumulated moneys. Moneys accumulated in the equipment rental and revolving fund shall be retained therein from year to year; shall be used only for the purposes stated in this chapter; and shall be subject to the budgetary regulations in chapter 36.40 RCW. [1977 c 67 § 6.] 1 2 1 EXHIBIT 3: PW BUSINESS PRACTICE 05/28/2018 Page 5 of 5 Public Works "Work Session Staff Report", 2023 Kittitas County Department of Public Works Equipment Rental and Replacement Fund Rate Setting Business Practice Anticipated Effective Date: May 28, 2018 Fund Administration: Finance Division of Public Works Equipment Rental Rates: Prepared annually by the finance department. Equipment rental rates are authorized for Board of County Commission consideration for adoption by: Finance Manager, County Engineer and the Public Works Director. Expense tracking and new equipment: All equipment is tracked for expense within the department's CAYENTA software program and assigned individual numbers within the 4000 range. The 4000 range is an indicator that the item is a capital purchase not yet put into service. Once all costs related to the new equipment asset are verified as complete, the new equipment asset is transferred into a newly established equipment number and is PLACED INTO SERVICE. New equipment purchases are added to the counties ASSETS by resolution. Equipment Disposal: On an ongoing basis decisions are made by the public works management as to the need to either replace or dispose of equipment. Information as to the cost of any specific piece of equipment is accumulated and reviewed on an annual basis at a minimum. A list of equipment to be disposed of or replaced is then authorized by resolution. Depreciation: As a new piece of equipment is placed into service, its life cycle is started. For smaller vehicles such as pickups, the life cycle is set at 5 to 7 years; larger pieces of equipment are set at 10 to 15 years. Equipment under the purchase price of $5000 is expensed in the year of purchase. Replacement Factor: The replacement factor is the amount of currency needed above the amount of the original purchase price to purchase the same piece of equipment in the future. This total amount (depreciation plus replacement factor) would be considered the future value (price) of a current (new) asset. This replacement factor should be set annually and should be based on the inflation factor as it relates to the specific type of equipment. Rates for equipment rental: Rates for the rental of equipment owned by the fund shall be set to cover all costs of maintenance and repair, material and supplies consumed in operating or maintaining the equipment, and the future replacement thereof. The rates shall be determined by the county engineer or other appointee of the county legislative body and shall be subject to annual review by the legislative body. This section does not restrict the ability of the county road administration board to directly inquire into the Page 1 of 4 process of setting rental rates while performing its statutory oversight responsibility. Public Works uses a monthly rental rate for all equipment. For work outside the Road Fund (106) equipment is tracked by actual usage and current FEMA hourly equipment rental rates apply. ER&R Fund rental rate structure includes the following costs: A. EXPENSES DUE TO OPERATION AND MAINTENANCE —Accounts payable invoices are coded to specific equipment numbers. Payroll labor is also coded to specific equipment numbers when maintenance work is involved. B. DEPRECIATION- depreciation is charged out monthly based on the purchase price of the equipment and the equipment life cycle. Equipment costing under $5000 is valuated separately. C. SURCHARGE FOR REPLACEMENT- the current inflation rate is reviewed and a surcharge percentage is decided on by management. D. CORRECTIONS FROM PRIOR YEAR CHARGES- for equipment that was either overly profitable or took a loss, the additional gain/loss will be calculated into the following years rental rates. Annual Basis of Rate: All costs are calculated based on the above criteria. The revenue gained through charging rental rates is then compared against the costs to validate whether the equipment rental rates are set appropriately. Adjustments to the rates are made as needed in order to work toward an equitable status, as one fund should not make a profit over another fund. Equipment under $5000 purchase price will be bucketed into an annual rent amount. ER&R Fund Deposits: The Road Fund shall pay 100 percent of new equipment costs by transferring funds from the Road Fund (106) to the ER&R Fund (501). The ER&R Fund purchases the new equipment and sets the monthly rate for the equipment rental. Proceeds from the sale of the equipment that is not being replaced is transferred back to the Road Fund (106). Accumulated Monies: Annually, the Finance Manager reviews the monies accumulated in the ER&R Fund (501). The fund maintains an annually replacement reserve of two million dollars ($2,000,000). The reserve is maintained so as not to reduce below one million dollars ($1,000,000). From time to time the ER&R Fund may elect to create additional reserve accounts to cover assets other than equipment such as building replacements or repair. Page 2 of 4 Financial Processes: Weekly: On a weekly basis, the finance department will process through crew cards any equipment hours by equipment number used for non -road maintenance projects/jobs. The payment for non -road maintenance equipment rental will be transferred from the fund renting the equipment to the ER&R fund within the Monthly processes. Monthly: 1. Depreciation is processed for all ER&R equipment (listed in Cayenta as AREA - EQ, TYPE -PV) 2. Replacement Factor is processed for all ER&R equipment (thru a User Defined J.V. entry using the transaction group RPL (Replacement Factor) 3. Bills are processed as they are received and coded to Equipment as necessary. 4. Equipment Charges for Rent are processed through the Crew Card processing program and coded to Road Maintenance jobs as per Management direction. 5. Funds are transferred from the divisions renting the equipment to the ER&R fund 501 6. The Cayenta Equipment report is reviewed for any high cost O&M amounts. 7. New equipment is set up under the 4000 equipment numbers as needed. 8. Equipment ready to be placed into service is transferred into permanent equipment numbers, and the monthly equipment rental rate is added to the monthly equipment charges. 9. Equipment disposed of is adjusted off of the books in Cayenta. 10. The fund amount in the ER&R fund is reviewed and amounts transferred to/from investment as needed. Annually: 1. All new equipment is reviewed and listed for resolution to the board of commissioners. 2. All disposed of equipment is reviewed and listed for resolution to the board of commissioners. 3. The Cayenta Equipment Report is reviewed for accuracy and equipment showing abnormal profit or loss is identified. 4. Rates are reviewed and set for the New Year. A replacement rate based on annual inflation is selected by the Finance Manager, County Engineer and Public Works Director. 5. Costly equipment is identified for further review and possible replacement. 6. New Year rates are presented to the Board of County Commissioners for consideration/adjustment and/or adoption. 7. The ER&R fund is reviewed and adjustments are made to the fund amount as needed. Page 3 of 4 Field Processes: Weekly: On a weekly basis, the road crews will identify any equipment used for non- road maintenance. The road crew will provide finance with a report showing the equipment number, the number of hours used, and the project/job the equipment was used on. This information will be used to charge the various funds for equipment rental using an hourly rate. The hourly rate will be calculated using the current FEMA rate plus replacement factor. This business practice is adopted for use by Public Works upon Board of County Commission adoption (see enabling legislation — Resolution ): Director Page 4 of 4 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS 2023 STUDY SESSION STAFF REPORT STUDY SESSION DATE: March 27, 2023 TOPIC: 47 Degrees North Final SEIS ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff provide SEIS comments within the prescribed comment period (April 20, 2023). BRIEFING SUMMARY: • The City of Cle Elum issued a "Combined Notice of Adoption of an Existing EIS Document and Notice of Addendum" on March 9, 2023 — revised 47 degrees North Master Site Plan Amendment. • The approximate 889 -acre site requests approval for 707 residential units, RV resort with 627 RV sites and a 25 -acre future commercial development (SEIS Alternative 6). • Previous attempts by Public Works to require weekend traffic mitigation failed. • Revised SEIS presents concerns for PW. BACKGROUND: SEIS Alternative 5 — approved Bullfrog Flats Master Site Plan (no action alternative) results from a 2002 adopted subarea plan (Ordinance 2000-012 — EXHIBIT 1). That subarea plan authorized 1,334 residential units and a 75 -acre business park. The revised request is for 707 residential units, RV resort with 627 RV sites and a 25 -acre future commercial development (SEIS Alternative 6). The original Sun Communities application did not result in required weekend traffic mitigation. DISCUSSION: PW has worked tirelessly supporting the applicant prepare traffic simulation modeling for the original proposal from Sun Communities. We have afforded the applicant access to our county transportation model and to our modelers — Fehr and Peers. PW has cooperated throughout the SEIS process with the city of Cle Elum and the applicant. We were significantly disappointed to learn that no weekend mitigation for traffic impact resulted from the analysis — even though the analysis identified probable weekend traffic impact. Page 1 of 4 Public Works "Work Session Staff Report", 2023 PW is attempting to understand how an adopted subarea plan incorporated into the County's comprehensive plan can be significantly modified by the City of Cle Elum without action by the Board of County Commissioners. We are left with presuming city annexations have somehow circumvented Board action. It appears that the county now must sit by and see if the city is willing to pursue mitigations for county road network impacts resulting from Sun's proposal. Our draft review of the "Transportation Analysis Addendum", April 2021 and "Appendix F — Summary of Mitigation Measures & Significant Unavoidable Adverse Impacts" is attached as EXHIBIT 2 for Board consideration. PW will let the matter rest for a period of time before taking another look at submitted documents and prior to finalizing our comments back to the City of Cle Elum. FISCAL IMPACTS: Undetermined at the time of the briefing. ATTACHMENTS: EXHIBIT 1: ORDINANCE 2000-012 EXHIBIT 2: DRAFT SEIS COMMENTS FROM PUBLIC WORKS Page 2 of 4 Public Works "Work Session Staff Report', 2023 EXHIBIT 1: ORDINANCE 2000-012 Page 3 of 4 Public Works "Work Session Staff Report", 2023 f BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON ORDINANCE NO. 2000-12 An Ordinance Providing For The Addition Of The MountainStax Master Planned Resort Subarea Plan to the Kittitas County Comprehensive Pian As An Amendment To The County's Comprehensive Plan Land Use Designation Map WHEREAS, Trendwest Investments, Inc., a Washington corporation ("Trendwest Investments'), owns approximately 6,217 acres of real property in Kittitas County ("Trendw---z w: Property"); WHEREAS, the Trendwest Property is more particularly shown in the drawing attached as EXHIBIT A and more particularly described in the legal description attached as EXHIBIT B; WHEREAS, Trendwest Investments is a wholly owned subsidiary of Trendwest Resorts, f' Inc., an Oregon corporation registered to conduct business in the state of Washington ("Trendwest Resorts); WHEREAS, Trendwest Investments and Trendwest Resorts are collectively referred to herein as "Trendwest"; WHEREAS, Trendwest applied to Kittitas County {"County") on March 7, 1997 for approval to develop the Trendwest Property as the MountainStar Master Planned Resort ("MPR Application") pursuant to RCW 36.70A.360 and the County's Comprehensive Plan Master Planned Resort policies; WHEREAS, the County adopted its Comprehensive Pian pursuant to the Washington State Growth Management Act, Chapter 36.70A RCW ("GMA'), by Ordinance No. 96-10 on July 26, 1996; WHEREAS, RCW 36.70A.360 authorizes a county to permit the development of Master Planned Resorts ("MPRs"), which may constitute urban growth outside of designated urban growth areas, if such county adopts comprehensive plan policies to guide the development of MPRs; WHEREAS, the County amended its Comprehensive Plan by Ordinance No. 96-20 on December 11, 1996 to adopt policies to guide the development of MFRS in Kittitas County ("MPR Policies"); Ordinance 2000-I2 Page 1 .4ountain5tar Resort Subarea Pian WHEREAS, following review and remand of the MPR Policies by the Eastern Washington Growth Management Hearings Board ("Eastern Board"), the County adopted revised MPR Policies ("Revised MPR Policies," now codified as Chapter 2.4 of the County's Comprehensive Plan) by Ordinance No. 07-20 on December 30, 1997, and further amended the Revised MPR Policies by Ordinance No. 98-20 on September 18, 1998; WHEREAS, the Eastern Board concluded by order dated November 18, 1998, that the Revised MPR Policies, as amended, fully comply with the GMA, and that order was not appealed; WHEREAS, on July 28, 1999, the County published a draft environmental impact statement ("MountainStar DEIS") pursuant to the State Environmental Policy Act ("SEPA"), Chapter 43.21 C RCW, analyzing the impacts of the MountainStar Master Planned Conceptual Master Plan on the elements of the environment set forth in WAC 197-11-444; WHEREAS, on April 10, 2000, the County published a final environmental impact statement ("MountainStar FEIS") pursuant to SEPA, analyzing the impacts of the MountainStar Master Planned Conceptual Master Plan on the elements of the environment set forth in WAC 197-11-444; WHEREAS, the MountainStar DEIS and the MountainStar FEIS are collectively referred to herein as the `.`MountainStar EIS"; WHEREAS, following appeal hearings conducted pursuant to adopted rules of procedure, the Board of County Commissioners issued a written decision through -Resolution No. 2000.79 dated July 24, 2000, concluding that the MountainSiar EIS is legally adequate under SEPA and denying the EIS adequacy appeals filed by RIDGE, REBOUND arid- the City of Roslyn; WHEREAS, the County's Planning Department has conducted a thorough review of the proposed MountainStar Master Planned Resort development; WHEREAS, the Revised MPR Policies, and specifically GPO 2.184, require an amendment to the County's Comprehensive Plan Land Use Designation Map for a specific site, such as the Trendwest Property, proposed to be developed as an MPR; WHEREAS, RCW 3 6.70A. 080(2), RCW 3 6.70A. 130(2)(a)(i) and KCC 15B.03.010(1) authorize the County to adopt a Subarea Plan for the Trendwest Property in connection with the proposed MountainStar Master Planned Resort development as an amendment to the Comprehensive Plan Land Use Designation Map outside the annual Comprehensive Plan amendment process; WHEREAS, the adoption of such subarea plan and amendment would thereby apply the Revised MPR Policies to the Trendwest Property; Ordinance 2000-12 Page 2 vlountainStar Resort Subarea Plan WHEREAS, the MountainStar FEIS included the initial Conceptual Master Plan for the MountainStar Master Planned Resort; WHEREAS, such Conceptual Master Plan has been amended from tune to time as Planning and environmenial review of the MountainStar Master Planned Resort has progressed and to meet the requirements of various anticipated conditions of the Trendwest MPR Application approval; -WHEREAS, such amended Conceptual Master Plan ("MountainStar Resort Conceptual Master Pian, September, 2000") is attached hereto as EXHIBIT C and incorporated herein; WHEREAS, the Kittitas County Planning Commission entered ten procedural findir►gs of fact related to the MountainStar Master Planned Resort Subarea Plan on August 28, 2000; WHEREAS, the Kittitas County Planning Commission entered eleven findings of fart related to the MountainStar Master Planned Resort Subarea Plan on August 28, 2000 :r recommended'approval of the Subarea Plan; WHEREAS, the Board of Commissioners enter the following procedural findings of fact related to the MountainStar Master Planned Resort Subarea Plan; e, 1. The Kittitas County Planning Commission and the Board of Commissioners held a consolidated hearing on July S, 2000 to consider the MountainStar Resort application package, including the proposed MountainStar Master Planned Resort Subarea PIan, concurrent with hearings on the EIS appeals. The Planning Commission subsequently continued its portion of the consolidated public gearing to July 12, 2000. 2. On July 12, 2000 the Kittitas County Planning Commission and Board of County Conunissioam held a continued consolidated public hearing to consider the MountainStar Resort application package, and public testimony and comments were accepted. The consolidated public hearing was again continued to July 13, 2000. 3. The Kittitas County Planning Commission and Board of County Commissioners held a continued consolidated public hearing on July 13, 2000 to consider the MountainStar Resort application package, and accepted public testimony and comments. The consolidated public hearing was subsequently continued to July 17, 2000. 4. On July 17, 2000 the Kittitas County Planning Commission and Board of County Commissioners held a continued consolidated public hearing to consider the MountainStar Resort application package and to accept public testimony and comments. Public testimony was closed at the conclusion of the consolidated public hearing and the consolidated public hearing was continued to July 20, 2000 for the staff and proponent presentations. Ordinance 2000-12 Page 3 MounrainS= Raurt Subarea Plan 5. The Kittitas County Planning Commission and Board of County Commissioners held a continued consolidated public hearing to hear the staff and proponent presentations for the MountainStar Resort application package. The consolidated public hearing was continued to July 24, 2000 to hear additional information from staff and the proponent. d. On July 24, 2000 the Kittitas County Planning Commission and Board of County Commissioners held a continued consolidated public hearing to hear additional staff and proponent presentations for the MountainStar Resort application package. The consolidated public hearing was continued to August 8, 2000 to begin preliminary review of the MountainStar Resort application package. 7. The Kittitas County Planning Commission and Board of County Commissioners held a continued consolidated public hearing on August 8, 2000 to begin preliminary review of the MountainStar Resort appkcation package. At the conclusion of the consolidated public hearing, the Kittitas County Planning Commission continued its portion of the consolidated public hearing to August 21, 2000 to begin deliberation on the MountainStar Resort application package. In addition, the Kittitas County Board of Commissioners continued its portion of the consolidated public hearing to August 29, 2000 to accept the Planning Commiss'ion's Recommendation and Findings of Fact. 8. On August 21, 2000 the Kittitas County Planning ' Commission held, a continued public hearing and began its deliberations for the MountainStar Resort application package. Specifically, the Planning Commission reviewed the Planned Action Ordinance, Master Planned Resort Zoning District Ordinance, MountainStar Master Planned Resort Subarea Plan, Rezone, and the MountainStar MPR Conditions of Approval. The Planning Commission subsequently continued the public hearing to August 22, 2000 to further deliberate on the MountainStar MPR Conditions of Approval and the Tr=dwest Development Agreement. 9. The Mttitas County Planning Commission held a continued public hearing on August 22, 2000 to resume deliberations on the MountainStar MPR Conditions of Approval and the Trendwest Development Agreement. The Planning Commission then continued the public hearing to August 28, 2000 for final deliberations on the MountainStar Resort application package and to enter a formal Recommendation and Findings of Fact for the application. 10. On August 28, 2000 the Kittitas County Planning Commission held a continued public hearing for final deliberations on the MountainStar Resort application package. The Planning Commission completed its deliberations and recommended approval of the Planned Action Ordinance, Master Planned Resort Zoning Ordinance, MountainStar Master Planned Resort Subarea Plan, Ordinance 2000-12 Page 4 MountainStar Resort Subarea Flan Rezone and the Trendwest Development Agreement. In addition, the Planning Commission entered Findings of Fact for the MountainStar Resort application package and included recommended MountainStar MPR Conditions of Approval. 11. On August 29, 2000 the Kittitas County Board of Commissioners held a continued public hearing to accept the Planning Commissions recommendations and set additional continued public hearings for September 18`h and September 200' . to accept public testimony on the Planning Commission's recommendations. 12. On September 12, 2000 the Kittitas County Planning Department published proposed revisions to the Planning Commissions recommendations and provided public notice as to the availability of the documents. 13. On September 18, 2000 the Kittitas County Board of Cormnissioners held M continued public hearing in Cle Blum, WA, to accept testimony on the Planning Commission's recommendations and proposed revisions. 14. On September 20, 2000 the Kittitas County Board of Commissioners held a continued public hearing in Ellensburg, WA, to accept testimony on the Planning Commission's recommendations and proposed revisions. Public testimony and, the record were closed at the close of this hearing. This hearing was subsequently continued to September 25, 2000 to conduct a study session for continued review of the documents. This study session was subsequently continued to October 4, 2000 for additional review- 15. eview_ 1S. On October 4, 2000 the Kittitas County Board of Commissioners held a. continued public heating to review the application packet. Amer reviewing the preliminary final documents, the Board voted to approve the application packet, through a unanimous vote, and directed staff to prepare the necessary documents for final signatures on October 10, 2000. WHEREAS, the Board of County Commissioners enter the following findings of fact related to the MountainStar Master Planned Resort Subarea Pian: 1. The Kittitas County Board of Commissioners find that the County adopted its Comprehensive Plan pursuant to GMA by Ordinance No, 96-10 on July 26, 1996; 2. The Kittitas County Board of Commissioners find that the GNU, specifically RCW 36.70A.360, authorizes the County to permit the development of MPRs, which may constitute urban growth outside of designated urban growth areas, if the County has adopted Comprehensive Plan policies to guide the development of MPRs; Ordinance 2000-12 Pn2e 14 NIL�untainStar Resort Subarea Plan 3. The Kittitas County Board of Commissioners find that the County amended its Comprehensive Plan by Ordinance No. 96-20 on December 11, 1996 to adopt policies to guide the development of MPRs in Kittitas County "MPR Policies"), 4. The Kittitas County Board of Commissioners find that following review and remand of the MPR Policies by the Eastern Washington Growth Management Hearings Board ("Eastern Board"), the County adopted revised MPR Policies (the "Revised MPR Policies," now codified as Chapter 2.4 of the County's Comprehensive Plan) by Ordinance No. 97-20 on December 30, 1997, and further amended the Revised MPR Policies by Ordinance No. 9&24 on September 18, 1998; 5. The Kittitas - County Board of Commissioners find that the Eastern Washington Growth Management Hearings Board concluded by order dated November 18, 1998, that the Revised MPR Policies, as amended, fully comply with the GMA, and that such order was not appealed; 6. The Kittitas County Board of Commissioners find that RCW 36.70A.080(2), RCW 36.70A.130(2)(a)(i) and KCC 15B.03.010(1) authorize the County to adopt a Subarea Plan as an amendment to the Comprehensive Plan Land Use Designation Map outside the annual Comprehensive Plan amendment process; 7. The Kittitas County Board of Commissioners find the Revised MPR Policies (specifically, GPO 2.184) contained in the Kittitas County Cornpr6ensive Plan require an amendment to the County's Comprehensive Plan Lamd Use Designation map for a specific site proposed to be developed as an MFR; 8. The Kittitas County Board of Commissioners find that Trendwest has applied to the County for approval to °develop the Trendwest Property pursuant to RCW 36.70A-360 as the MountainStar Master Planned Resort, 9. The Kittitas County Board of Commissioners find that the County published the MountainStar FEIS pursuant to SEPA for the MountainStar Master Planned Resort on April 10, 2000, which includes the initial Conceptual Master Plan for MountainStar. Such Plan has been amended from time to time as planning and environmental review of the MountainStar Master Planned Resort has progressed and to meet the requirements of various anticipated conditions of the Trendwest MPR Application approval. The most recent amended version of such Plan, the MountainStar Resort Conceptual Master Pian, September, 2000, was available for review and public comment at the continued public hearings before the Commissioners on September 18 and 20, 2000, and is attached hereto as EXHIBIT C and incorporated herein; 10. The Kittitas County Board of Commissioners find that the unusually large size of the Trendwest Property, and the unique nature of the proposed Ordinance 2000-12 Page 5 Mountain&ar Resort Subarea Plan development, warrant adoption of a separate subarea plan as an amendment to the County's Comprehensive Plan Land Use Designation Map for the MountainStar Master Planned Resort; 11. The Kittitas County Board of Commissioners find that the development of a Master Planned Resort on the Trendwest Property will be specifically governed by (a) the terms and conditions of a Development Agreement entered into between the County and Trendwest pursuant to RCW 36.70B.170 et sea. and Chapter 15A.11 KCC, Development Agreements, (b) the terms and conditions of an MPR Project Development Permit and associated MountainStar MPR Conditions issued by the County, and (c), in accordance with such Development Agreement and Permit, development regulations adopted by the County to implement the Revised MPR Policies in the Comprehensive Plan; and 12. The Kittitas County Board of Commissioners find and conclude, for the reasons set forth in greater detail in the Kittitas County Planning Department's Staff' Report On Proposed MountainStar Master Planned Resort & Subarea Plan dated August, 2000, that the addition of the MountainStar Master Planned Resort Subarea Plan to the Comprehensive Plan as an amendment to the Comprehensive Plan Land Use Designation Map will comply with all applicable provisions of the GMA, including without limitation RCW 36.70A.080(2), RCW 36.70A.130(2)(a)(1) and RCW 36.70A.360, and the Revised MPR Policies, including without limitation, GPO 2.184. WHEREAS, testimony was taken and documentary evidence received by the Board of County Commissioners from those persons washing to be heard; and, WHEREAS, due notice of the hearings has been given as required by law. NOW, THEREFORE, BE IT ORDAINED by the Board of Kittitas County Commissioners, after due deliberation, that the MountainStar Master Planned Resort Subarea Plan, attached hereto as EXHIBIT D and incorporated herein, is adopted for inclusion in the Kittitas County Comprehensive Plan as new Chapter Nine thereof; and BE IT FURTHER ORDAINED that the Board of Kittitas County Commissioners, after due deliberation, hereby adopts the MountainStar Planned. Resort Subarea boundary as set forth in the drawing and legal description for the Trendwest Property attached hereto as EXHIBITS A and B and incorporated herein, for inclusion as an amendment to the Kittitas County Comprehensive Land Use Designation Map. ADOPTED this / 0 day of October, 2000, at Ellensburg, Washington. BOARD OF COUNTY COrYMUSSIONERS KITTITAS COUNTY, WASHINGTON Ordinance 2000-1 _ Pace 7 MountainStar Resort Subarea Plan h F7 vu. Perry D. HustoI4 Chair William R. Hinkle, Vice -Chair r Max A. Golladay, Commissioner APPROVED AS TO FORM ONLY: James E. Hurson Deputy Prosecuting Attorney Ordinance 2000-12 Page S titountainStar Resort Subarea Plan Ordinance 2000-12 Exhibit A Ordinance 2000-12 Exhibit B Trendwest MPR Legal Description Lots IA, 2A, 3A, 4A, 2B, 3B, and 4B as described and or delineated on the face of dw certain Survey recorded dune 13, 1995 under Auditor's File No. 582255 and filed in Book 21 of Surveys, Pages 44 and 45, Records of Kittitas County, State of Washington; being a portion of Section 11, Towzasbip 20 North, Range 14 East, W.M., Kittitas County, State of Washington; Lot B I as described and/or delineated on that certain Survey as recorded September 19, 1996, in Boole 22 of Surveys, Page 83, under Auditor's File No. 199609180020, records of Kittitas County, Washington; being a portion of the East Half of the Northwest Quarter and of the Northeast Quarter of the Northeast Quarter of Section 11, Township 20 North, Range 14 East, W.M., in the County of Klass, State of Washington. Lots IA, 2A, 3A, 4A, 1B, 2B, 3B and 4B, as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's File No. 581730 and filed in Book 21 of Surveys, Pages 28, and 29, Records of Kittitas County, State of Washington; being a portion of Section 13, Township 20 North, Range 14 East, W.M., Kittitas County, State of Washington. PARCEL Q Lots IA, 2A, 3A,'4A,1B; 2B, 3B and 4B, as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's File No. 581729 and filed.in Book 21 of Surveys, Pages 26 and 27, Records of Kittitas County, State of Washington; being all of Section 14, Township 20 North, Range 14 East, W.M., Kittitas County, State of Washington. PARCEL D: Lots 2 and 4 as descried and/or delineated on the face of that certain Survey recorded July I1, 1995 under Auditor's File No. 583027 and filed in Book 21 of Surveys, Page 64, Records of Kittitas County, State of Washington; being a portion of Section 15, Township 20 North, Range 14 East, W.M, Kitfitas County, State of Washington. PARCEL E: Lots 1, 2, 3 and 4 as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's File No. 581725 and filed in Book 21 of Surveys, Page 19, Records of Kittitas County, State of Washington; being all of Section 23, Township 24 North, Range 14 East, W.M, Kittitas County, State of Washington. EXCEPT that portion of Lot 3 of said Survey Iying Southerly and Westerly of the Yakima River. (Continued) MPR LEGAL DESCR LIMON (CONTIN=) PARCEL F: Lots IA, 2A, 3A and 4A as described and/or delineated on the face of that certain &Vvey recorded May 23, 1995 under Auditor's File No. 581724 and filed in Book 21 ofSurveys, Page 18, Records of Kittitas County, State of Washington; being a portion of Section 24, Township 20 North, Range 14 East, WN., Kittitas County, State of Washington. Lots IA, 2A, 3A, 4A, 1B, 2B, 3B and 4B as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's File No. 581723 and fled in Hook 21 of Surveys, Page 17, Records of Kittitas County, State of Washington; being a portion of Section 25, Township 20 North, Range 14 East, W.M., Kittitas County, State of Washington. resMI: Lots 1, 2, 3 and 4 as described and/or delineated on the face of that certain Survey recorded May 23, 1995 ander Auditor's File No. 581728 and filed in Book 21 of Surveys, Page 25, Records of Kittitas County, State of Washington; being a portion of Section 18, Township 20 North, Range 15 East, W.M., Kittitas County, State of Washington MEN All that portion of the East Half of the Southeast Quarter of Section 18, Township 20 North, Range I5 East, W.M., Kittitas County, State of Wasbington, lying Southerly of the following described line: Beginning at the Southeast Comer of said Section 18; thence North 0044'15" East, along the East line of said Section 1;155.00 feet and the true point o€beginning of said line; thence North 67000'00" West, 11424.23 feet to the West line of said East Half of the Soatheast Quarter and terminus of said line. Lots IA, 2A, IB, 2B, 3B, 4B, IC, ID, 2D, 3D and 4D as described and/or delineated on the face of that certain Survey recorded .tune 13, 1995 under Auditor's File No. 582254 and filed in Book 21 of Surveys, Pages 42 and 43, Records of Kittitas County, State of Washington; being a portion of Section 19, Township 20 North, Range 15 East, W.M., Kittitas County, State of Washington. PARCEL K: Lots IA, 2A, 3A, 4A, IB, 2B, 3B, 4B, IC, 2C, 3C, 1D, 2D, 3D, 4D, IE, 2E, 3E, 1F,.2F,1G and 2G as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's File No. 581725 and filed in Book 21 of Surveys, Pages 20, 21 and 22 and as amended November 7, 1997 in Book 23 of Surveys, Pages 17,18 and 19 under Auditor's File No. 199711070002, Records of Kittitas County, State of Washington; being a portion of Section 20, Township 20 North, Range 15, East, W.M., Kittitas County, State of Washington. Except That portion of Lot 2G, of that certain Tract Segregation for Plum Creek Tuber Company, recorded under recording number 199711070002, records of Kittitas County, Washington. Together with that portion of Lot B2, of that certain Tract Segregation for PIum Creek Timber Company, recorded under recording number 199905190001, records of Kinitas County, Washington. More particularly described as follows: (Continued) MPR LEGAL DESCRIPTION (CONTINUED) Commencing at the Quarter Section comer common to Section 20 and Section 21, Tbuatship 20 North, Range 15 East, W.M.; thence South 00°06'07" West along the section line, a distance of. 49.18 feet more or less to the southwesterly margin of State Route 903 and the beginning of a 1323.00 foot radius, non -tangent curve to the left, whose radius point bears North 65°16'25" East; thence sou,dy along said southwesterly margin and arc, through a central angle of 04026'38", and an arc dist= of 102.61 feet to the TRUE POINT OF BEGINNING: Thence South 50°37'06" West, parallel with, and 150.00 feet southeasterly of the soud=strly margin of No. 9 Mining Road, a distance of 376.85 feet; thence South 20'°33'36" East, a distance of 619.4$ feet to a point that is 75.00 feet north, measured at tight angles, of the centerline of the abandocc&Burlington Northern Railroad right of way; thence North 86°3529" East, parallel with said abawgleeW railroad right of way, a distance of 588,84 feet more or less to said southwesterly margin of State Rouse 903, thence North 33°28'40" West, along said southwesterly margin, a distance of 838.26 feet to the beginning of a 1323.00 foot radius curve to the right, whose radius point bears North 56°3 i' 12" East; thence mc&westerly along said southwesterly margin and arc, through a central angle of 04°18'22", and an arc distauce of 99.43 feet to the True Point of Beginning. Said parcel contains 348,480 square feet or 8.00 acres. PARCEL L: All that portion of the Southwest Quarter of Section 21, Township 20 North, Range 15 ,. W.M., Kittitas County, State of Washington, lying Southwesterly of the Southwesterly line of State may 2-E (SR 903) ` EXCEPT beginning at a point on the Southwesterly line of said State Highway, said pajotbearing North 4742' West, 1031.14 feet from the South Quarter corner of said Section 21; thence SoA 28°00' West, 300 feel; thence North 6200' West to the intersection with the But line of County Rc ed.$nown as Bullfrog Road; thence North along said East line to the intersection with the Southwesterly line of said State Highway; thence Southeasterly along said Southwesterly litre to the point of begit oiW, EXC>~PT that portion of the Southwest Quarter of said Section 21, lying within the fol1mviug described tract, Beginning at the intersection of the Southwesterly right of way line of State Highway NL 903 with the Southeasterly boundary of the tract of land heretofore conveyed by the Northwestern hap "ement Company to Fred W. Schulz under Deed dated September 10, 1938, which point'bears North 48014'23" West, 1,028.73 feet from the South Quarter corner of said Section 21; thence Southeasterly along the Southwesterly right of way line of said State Highway No. 903, 1,597 feet; thence Souciwm*71y at right angles thereto, 900 feet; thence Northwesterly parallel to the Southwesterly right of way line of said State Highway No. 903, 1,597 feet, more or less, to a point on the extension of the Southeastedy boundary of the said tract conveyed by the Northwestern Improvement Company to Fred W. Schulz; thcoce Northeasterly along said extension and boundary, 900 feet to the point ofbeg' nni ; EXCEPT that portion of the Southwest Quarter of said Section 21, described as follows: Beginning at the intersection of the centerline of the Burlington Northern Railroad Spur to No. 9 Mine and the Southwesterly margin of Cle Elum to Roslyn Highway No. 903; thence South 36045'23" East along the said road margin 355.21 feet to the West margin of the Bullfrog Cutoff Road; thence South 6008'50" West along said road margin 375.00 feet; thence North 79°30'46" West 800.92 feet to the West line of said Section 21; thence North 0°06' 18" East, along said Section line 475,00 feet to the centerline of said Railroad Spur; thence North 86'35'06" East 615.36 feet to the point of beginning; (Continued) MPR LEGAL DESC LIMON (CONTFNLMD) EXCEPT that portion of the Southwest Quarter of the Southwest Quarter of said Secfm 21, Township 20 North, Range 15 Fast, W.M., Kittitas County, Sate of Washington, described as follow= Beginning at a point 29I.99 feet North and 800.30 feet East of the Southwest corner ofsaid Section, said point being on the Easterly right of way line of the County Road as established November 13, 1947 date of that deed recorded January 13, 1948, under Auditor's File No. 198871, Records of said County; thence North 89044' East, parallel with the South line of said Section 548.30 feet to a point of the Bast line of said Subdivision; thence North 00°26' ,East, along said East line, 305 feet, more or less to a point 30 feet Southwesterly, when measured at right angles, from that tract of land conveyed by the Northwestern Improvement Company to Mike Pass by rhe Deed dated June 20, 1934; thence north 62°00' West, 557.90 feet to the Easterly right of way of said County Road; thence South 05051' West, along said right of way line, 572,20 feet to the point of beginning; EXCEPT that portion of the Southwest Quarter of the Southwest Quarter of said Section 21, described as follows: Beginning at a point 800.30 feet East of the Southwest corner of said Section; thence 291.99 feet North, said point being on tate Easterly right of way line of the County Road as established November 13,'l 947, date of deed recorded January 13, 1948, tinder Auditor's File No. 198871, Records of said County; thence North 6°8'50" East, along said right of way, 572.20 feet to the point of beginning; thence South 62°00' East, 557.90 feet; thence North 0°14'31" East, 32.40 feet; thence North 62000' West, 557.90 feet; thence South 6008'50" West, 32:40 feet to the point of begkT&g. EXCEPT that portion of the Southwest Quarter of said Section 21, lying .within the foMming described tract: Beginning at the intersection of the Southwesterly margin of State Highway No. 903 with. the Southeasterly boundary of tract of landheretofore conveyed by Northwest Improvement Company to Fred W. Schulz under Deed dated September 10, 1938, which paint bears North 47°46'25" West; 1,028.73 feet from the South Quarter corner of said Section 21; thence continuing South 61039'23" East along said road margin 1,597 feet to the true point ofbeginning; thence continuing South 61'39'23" East, 901.16 feet to the intersection of said road margin and the Northwesterly margin of the Rocky Reach -Maple. Valley No. 1 Bonneville Transmission Line; thence South 73'16'17" West along said Bonneville Line margin 585.77 feet; thence continuing along said Bonneville Line rmar& South 73°07'39" West, 824A feet; thence North 61039'23" West, 1,603.62 feet; thence North 28'2017" East, 706.0 feet to a poW on the South fence line of the aforementioned Fred W. Schulz Tract; thence South 61°39'23" East along said Schulz fence line 100.0 feet to a point on the Westerly line of the Cle Blum -Roslyn Public School District No. 404 Tract as deeded by Northern Pack Railway Company tmdcr Deed dated October 27, 1967; thea South 28'20'37" West along said school Westerly line 606.0 feet to the Southwest corner thc=f; thence South 61 °39'23" East along said school Southerly line 1,597 feet to a point which bears South 2$"20137' West from, tate true point of beginning, thence North 28020'37" East, 900.0 feet to the true point of beginning. PARCEL N: That portion of Lot IA lying Northwesterly of the Southwest boundary of thye County Road known as Bullfrog Road, as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's No. 581722 and filed in Book 21 of Surveys, Pages 14, 15 and 16, records of Kinitas County, State of Washington; being a portion of Section 28, Township 20 North, Range 15 East, W.M., Kittitas County, State of Washington. (Continued) MPR LEGAL DESCRIPnON (CONTiNI M) PARCEL Lots 1A, 2A, 3A and 4A as described and/or delineated on the face of that certain Survey recorded May 23, 1995 under Auditor's File No. 581721 and filed in Book 21 of Surveys, Pages 12 and 13, Records of Kittitas County, State of Washington; being a portion of Section 29, Township 20 North, Range 15 East, W.M., K.ittiias County, Sate of Washington. FARCE. P: Lots IA, 2A, 3A, 4A, 1B, 2B, 3B, 4B, IC, 2C, 3C, 4C, 1D, 2D, 3D and 4D as described and/or delineated on the face that certain Survey recorded May 23, 1995 under Auditor's File No. 581720 and filed is Book 21 of Surveys, Pages 10 and 11, and as amended by that certain Amended Survey recorded October 11, 1996 under Auditor's File No. 199510110005 and filed in Book 22 of Surveys, Pages 96 and 97, Records of Kittitas County, State of Washington; being a portion of Section 30, Township 20 North, Range 15 East, W.M., Kittitas County, State of Washington. PARCEL 0: Lots 1, 2, 3 and 4 as described and/or delineated on the face of that certain Survey recorded June 13, 1995 under Auditor's File No. 582256 and filed in Book 21 of Surveys, Pages 46 and 47, Records of Kittitas County, State of Washington; being a portion of the North Half of Section 31, Township 20 North, Range 15 East, W.M., Kittitas County, State of Washington; EXCEPT that portion of said Lots 1 and 2 conveyed to the State of Washington by deed dated February 25, 1999, recorded March 12, 1999 under Kittitas County Auditor's File No. 199903120019 described as follows: All that portion of the hereinafter desenbed Tract "A" lying southerly of a lisle beginning at a point opposite Highway Engineer's Station (hezemafier refeffed to as HES) 432 + 00 on the LW Line Survey of SR 90, Easton to Cle Elum and 300 feet northerly therefirom; thence easterly parallel with said LW Line Survey to a point opposite HES 446 + 25; thence southerly to a point opposite said HES 446 + 25 and 110 feet northerly therefrom; thence eastea3y to a point opposite HES 450 00 on said LW Line Survey and 90 feet northerly therefrom thence easterly parallel with said LW Line Survey to a point opposite HES 456 + 00 and the end of this line description. TI] A J' ! "A 19 Lots I and 2, as described and/or delineated on that certain survey recorded June 13, 1995 under Auditor's File No. 582256 in Book 21 of Surveys, pages 46 and 47, records of Kittitas County, State of Washington; being a portion of the North Half of Section 31, Township 20 North, Range 15 East, W.M., EXCEPT that portion of said Lot 2 lying within the Northeast Quarter of Section 31. Ordinance 2000-12 Exhibit C Al 1W.6f. ow 02 ca CLI co ..w q.. 0. all OL 0 0 CA d-5 1W.6f. ow 02 ca CLI co ..w q.. pu 1W.6f. ow 02 ca CLI co ..w q.. Ordinance 2000-12 Exhibit D CHAPTER NINE. MOUNTALNS'!'AR PLANNED RESORT SUBAREA PLAN 9.1 SUBAREA DEFINED (a) The MountainStar Master Planned Rewt Subarea shall include the real property show on the MountainStar Master Planned Resort Seim= Map attached hereto as Exhibit A, and m - - pwdcttlarly described in the legal description atad hereto as Exhibit B, (b) Adjacent lands are not included wAin the MounwinStar Master Planned Resm Subarea. Lands outside the MountainStar Mastr Planned Resort Subarea boundary have been phased and are regulated by the County's Comprehcasiw Plan and development regulations. 9.2 &UAREA POLIMa The County hereby adopts the Master Phi d Resort Policies in Chapter 2A of the Comprehensive Plan as the planning policies to guide the developiat of the MouatainStar Master Planned Resort Subarea 9.3 Land Us Land uses within the MountainStar Masai Planned Resort Subarea shall be as shown on do Conceptual Master Plan attached hereto as Exhibit C; as =y be amended upon approval of the County. Lard saes within the MountainStar Master Planned Resort Sdn= shall be consistent with (a) any developmW! >,egtlations adopted by the County to Implement the MomaWnStar Master Planned Resort Subarea, (b)' the same and conditions of any MPR Development Pesti aWoved by the County for MountakStar, (c) the brlAfS and conditions of any Development Agreement em=d into by the County pursuant to RCW 36.708.170 through .200, and Ch. I5A.1 I KCC, Development agreements, and (d) RCW 36.70A.360. 9.4 Services and Faciiiiies Adequate provision for services and facili tks to the MountainStar Master Piatmed Resort Subarea as set forth in the Conceptual Master Plan for mauntainStar shall be ensured by the terms and conditions of any MPR Development Permit approved by the County to implement the MountainStar Master PWurd Resort Subarea, and by the terms and condid= of any devefopment agreement entered into by the County pursuant to RCW 36.7013.I70 through .200, and Ch. ISA. I l KCC, Development,Igreements. 9.5 eve10 anent Regulations Development regulations applicable to the MountainStar Master Planned Resort Subarea shall be those established through the Subarea Implementation as set forth in Section 9.6. 9.6 -Sitbam Implerinentation Development of the MountainStar Master Planned Resort Subarea shall be governed by (a) the Subarea Policies set forth in Section 9.2, (b) any development regulations adopted by the County to implement the MountainStar Master Planned Resort Subarea, (c) the terms and conditions of any MPR Development Permit approved by the County for MountainStar, and (d) the terns and conditions of any development agreement entered into by the County pursuant to RCW 36.70B.170 through .200, and Ch. 1$A.11 , KCC, Development Agreements. Kirtiras County Comprehensive Plan 183.9 October 2000 Ytslttme I EXHIBIT 2: DRAFT SEIS COMMENTS FROM PUBLIC WORKS Page 4 of 4 Public Works "Work Session Staff Report", 2023 Kittitas Department of Public Works SEIS comments 47 Degrees North Final SEIS, Cle Elum , WA April 2021 March 22, 2023 General The MountainStar Subarea Plan was created with Kittitas County Ordinance 2000-12. The land uses contemplated in the Subarea Plan do not contemplate an RV component. Additionally, the Subarea Plan contemplates a "Business Park" and not commercial area. Since the Ordinance is a public driven process, has the county's comprehensive land use amendment process been negated by subsequent City of Cle Elum annexations? Transportation Analysis Addendum A 12021 Page 3: We note throughout the document that "baseline" conditions are referenced but are not defined. This is important to understand as developer mitigation is driven by background traffic growth unless developer mitigation is based solely on "new" traffic impact. We note with interest that Alternative 6 trip generation is based on occupancy assumptions vetted by applicant data from other locations in the country. Why has not applicant data been utilized when developing RV trip generation values? Page 4: TENW mis-identifies the County's LOS standards as being intersection based. Kittitas County utilizes LOS C for rural Iands and LOS D for urban areas. It does not appear that Bullfrog Road has been annexed into the city, hence LOS C is appropriate for Bullfrog Road from the I-90 ramp termini to the foundabout at HWY 903. Our concern is the carrying capacity of our bridge crossing the Cle. Elum River. We continue voicing our concerns regarding impacts resulting from weekend traffic. The two times of the weekend that impacts are most apparent are mid-morning Saturday (9 —11 AM) and early afternoon Sunday (2 — 4 PM). These are not typical times usually evaluated in transportation impact studies. These are known periods of significant congestion Memorial Day through Labor Day in Upper County. We desire a discussion regarding the avoidance of these specific periods of the weekend as apposed to "PM Peak Hour" on Sunday. Page 6: Impacts to Bullfrog Road from the I-90 ramp termini to the roundabout at HWY 903 are not contemplated in the study. Page 8: Added for emphasis: "Future Baseline Intersection LOS" — what are the assumptions for `Baseline"? Page 1 of 4 Page 15: Please quantify `Baseline" traffic. LOS breaks cannot be fully understood in the absence of understanding background traffic growth. Page 10 "fable 9: Please quantify `Baseline" traffic. LOS breaks cannot be fully understood in the absence of understanding background traffic growth. Page 24: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe `Baseline" is applied in the analysis. Page 27: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe `Baseline" is applied in the analysis. Page 28: Given that the analysis relies partially on applicant supplied data, why does the analysis neglect to consider actual trip generation data from existing similar developments? Page 29 Table 11: Why are the amenity/adventure center use, community recreation center and the affordable housing use omitted from trip generation? Page 31: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe `Baseline"is applied in the analysis. Page 32: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe "Baseline" is applied in the analysis. Page 33: We previously commented on the "RV'' component without fully understanding the applicant's business model. Previously, we assumed truck and trailer configurations entering and leaving the development. We know believe larger diesel -powered motor homes are the predominant RV utilizing the "RV" component of the land use proposal. We desire better understanding the turning movement delays associated with large diesel -powered motor homes versus truck and trailer configurations. Until we are better educated, we cannot accept acceptable levels of service will exist at accesses to Bullfrog Road. Appendix F: Summar- of Mitigation Measures & Significant Unavoidable Adverse ImDacts Page F-1: We understand the basis of the supplemental to the EIS is the 2002 Cle Elum UGA Final EIS. The MountainStar Subarea Plan was created with Kittitas County Ordinance 2000-12. The land uses contemplated in the Subarea Plan do not contemplate an RV component. Additionally, the Subarea Plan contemplates a "Business Park" and not commercial area. Since the Ordinance is a public driven process, has the county's comprehensive land use amendment process been negated by subsequent City of Cle Elum annexations? Page F-2: We note that approved conditions of approval contained in the 2002 Development Agreement will depend on changes to the adopted Development Agreement that may be proposed in conjunction with major modifications and new or updated Development Agreement. Page 2 of 4 How will we be able to provide comment on "major modifications and new or updated Development Agreement" — if not here in the SEIS? Page F-3: The 2015 International Building Code is referenced for foundation setbacks — the current edition is likely no longer 2015. Page F-5: We note with interest: "The transfer of water rights to the City is pending as of this writing". What is the quantity of water being considered for transfer? Page F-12: The referenced 100 feet of natural buffer will be maintained along the entirety of Bullfrog Road? Page F-13. The Mounta.inStar Subarea Plan was created with Kittitas County Ordinance 2000- 12. The land uses contemplated in the Subarea Plan do not contemplate an RV component. Additionally, the Subarea Plan contemplates a "Business Park" and not commercial area. Since the Ordinance is a public driven process, has the county's comprehensive land use amendment process been negated by subsequent City of Cle Elum annexations? Page F-20: The MountainStar Subarea Plan was created with Kittitas County Ordinance 2000- 12. The land uses contemplated in the Subarea Plan do not contemplate an RV component. Additionally, the Subarea Plan contemplates a `Business Park" and not commercial area. Since the Ordinance is a public driven process, has the count y's comprehensive land use amendment process been negated by subsequent City of Cle Elven annexations? Kittitas County will evaluate proposed access locations along Bullfrog Road and make final determination as to suitability of access location during the civil engineering review process. Page F-21: We cannot make.an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe `Baseline" is applied in the analysis. Page F-22 Table 1: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe `Baseline" is applied in the analysis. Page F-23: We continue voicing our concerns regarding impacts resulting from weekend traffic. The two times of the weekend that impacts are most apparent are mid-morning Saturday (9 —11 AM) and early afternoon Sunday (2 — 4 PM). These are not typical times usually evaluated in transportation impact studies. These are known periods of significant congestion Memorial Day through Labor Day in Upper County. We desire a discussion regarding the avoidance of these specific periods of the weekend as opposed to "PM Peak Hour" on Sunday. Page F-24: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe "Baseline" is applied in the analysis. TENW mis-identifies the County's LOS standards as being intersection based. Kittitas County utilizes LOS C for rural lands and LOS D for urban areas. It does not appear that Bullfrog Road Page 3 of 4 has been annexed into the city, hence LOS C is appropriate for Bullfrog Road from the 1-90 ramp termini to the roundabout at HWY 903. Our concern is the carrying capacity of our bridge crossing the Cle Elum River. Page F-25: We cannot make an informed decision regarding the two different pro -rata share methods in the absence of understanding hoe "Baseline" is applied in the analysis. Page F-26: Kittitas County will evaluate proposed access locations along Bullfrog Road and make final determination as to suitability of access location during the civil engineering review process. Page F-27: We cannot make an informed decision regarding the two different pro-rata"share methods in the absence of understanding hoe "Baseline" is applied in the analysis. Page F-29: A secondary access to Bullfrog Road will be evaluated by Kittitas County during the civil design review process. Page F-31: We request consultation with Solid Waste regarding transfer station impacts prior to development approval. Page F-32: Will all or a portion of the surplus city revenue be dedicated to mitigating failed intersection LOS? Page F-33: Increased call volume is a likely consequence of the proposed land use action. We request consultation with KITTCOM regarding emergency response impacts prior to development approval. Page F-35: What means will impact service providers utilize to obtain mitigation as stated? Page 4 of 4 KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS 2023 STUDY SESSION STAFF REPORT STUDY SESSION DATE: March 27, 2023 TOPIC: Elk Meadows Land Use Moratorium ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff prepare enabling legislation. BRIEFING SUMMARY: • Public Works (PW) has been working with the Board's legal advisory exploring options surrounding the McElroy Bridge. • One of the options results in McElroy Bridge abandonment. • PW is within 30 days from advising a course of action for Board consideration. • The Prosecuting Attorney's office has prepared a temporary land use moratorium limiting new land use development on the far shore of the Yakima River — until such time that the status of the McElroy Bridge is clarified. BACKGROUND: The McElroy Bridge in Elk Meadows was repaired last year under emergency permits (County and State). Recently, staff met with Elk Meadows leadership defining additional land use considerations — namely the public water supply. While several key decisions remain, staff believes it necessary to limit any additional land uses on the far shore as we move nearer to defining our expectations for the community and its bridge. DISCUSSION: Currently, a handful of full-time residents utilize the McElroy Bridge as their only access option. Numerous legal properties exist across the bridge that are currently undeveloped. As PW and the Board of County Commissioners continue vetting options to bridge replacement, staff believes it prudent to place a temporary land use restriction on far - shore properties. Staff suggests preparing a resolution for Board consideration in concert with Community Development Services and Prosecuting Attorney's Office. Pursuant to Revised Code of Washington (RCW) Chapter 36.70A.390, staff is recommending a six- month land use and building permit application moratorium as we finalize our approach to defining the future of McElroy Bridge. A public hearing would be required within 60 days of the moratorium's enactment. Page 1 of 4 Public Works "Work Session Staff Report," 2023 FISCAL IMPACTS: Undetermined at this time. ATTACHMENTS: EXHIBIT 1: RCW 36.70A.390 EXHIBIT 2: MAP Page 2 of 4 Public Works "Work Session Staff Report " 2023 EXHIBIT 1: RCW 36.70A.390 Page 3 of 4 Public Works "Work Session Staff Report," 2023 3122123,3:44 PM RCW 36.70A.390: Moratoria, interim zoning controls—Public hearing—Limitation on length—Exceptions. PDF RCW Moratoria, interim zoning controls --Public hearing—Limitation on length— Exceptions. A county or city governing body that adopts a moratorium, interim zoning map, interim zoning ordinance, or interim official control without holding a public hearing on the proposed moratorium, interim zoning map, interim zoning ordinance, or interim official control, shall hold a public hearing on the adopted moratorium, interim zoning map, interim zoning ordinance, or interim official control within at least sixty days of its adoption, whether or not the governing body received a recommendation on the matter from the planning commission or department. If the governing body does not adopt findings of fact justifying its action before this hearing, then the governing body shall do so immediately after this public hearing. A moratorium, interim zoning map, interim zoning ordinance, or interim official control adopted under this section may be effective for not longer than six months, but may be effective for up to one year if a work plan is developed for related studies providing for such a longer period. A moratorium, interim zoning map, interim zoning ordinance, or interim official control may be renewed for one or more six-month periods if a subsequent public hearing is held and findings of fact are made prior to each renewal. This section does not apply to the designation of critical areas, agricultural lands, forestlands, and mineral resource lands, under RCW 38.YOA.1 0, and the conservation of these lands and protection of these areas under RCW 3r_.70A'.X3G, prior to such actions being taken in a comprehensive plan adopted under RCW 30.70A.070 and implementing development regulations adopted under RCW 23.70A.11 2'C', if a public hearing is held on such proposed actions. This section does not apply to ordinances or development regulations adopted by a city that prohibit building permit applications for or the construction of transitional housing or permanent supportive housing in any zones in which residential dwelling units or hotels are allowed or prohibit building permit applications for or the construction of indoor emergency shelters and indoor emergency housing in any zones in which hotels are allowed. [ ?;:2 i g .5; 1992 c 2C7 § 2.] hftps:llapp.leg,wa.gov/RCW/default.aspx?cite=36.70A.390 tlt EXHIBIT 2: MAP Page 4 of 4 Public Works "Work Session Staff Report," 2023 RD :-itnh 100634 270634 110634 1 600634 9206347+ 640634 320634 S o ►� t, o� 860734 -So 850734 1� 840734 760734 72073483--" 820754 740734 810734 7�13� 800734 100134 734 6g0�''a Cap73�► do tio�� 660734 586334 ` 576334 A� "+ 566334 01 o� Oc d'� Elk Meadows Prop( 460734 5��1 470734 5407 480734 530734 490734 520734, 500734 510734 S o ►� t, o� 860734 -So 850734 1� 840734 760734 72073483--" 820754 740734 810734 7�13� 800734 100134 734 6g0�''a Cap73�► do tio�� 660734 586334 ` 576334 A� "+ 566334 01 o� Oc d'� Elk Meadows Prop( KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS 2023 STUDY SESSION STAFF REPORT STUDY SESSION DATE: March 27, 2023 TOPIC: Robbins Road and Sun East ACTION REQUESTED: Direct Staff LEAD STAFF: Mark R. Cook RECOMMENDATION: Direct staff evaluate public access to the National Forest through the Sun East community. BRIEFING SUMMARY: * Last fall, a group of Sun East residents contacted Public Works (PW) discussing a pavement gap at the end of Robbins Road. • Discussions are ongoing about public access at Lillard Hill. • Recently, staff inquired about the possibility of improving Sun East access to the National Forest. BACKGROUND: Currently, there is a gap in pavement from the end of Robbins Road turnaround to the paved road limit on Robbins maintained by the Sun East Homeowners Association. Initial discussions surround a road improvement district or upgrading the road section for county dedication. DISCUSSION: PW has prepared a cost estimate to upgrade approximately one and one half miles of Robbins Road bringing the new road section onto the county network. Our preliminary cost estimate is approximately $422,000 (EXHIBIT 1). Owing to ongoing issues associated with Wilson Creek Road and Lillard Hill public access, PW solicited a limited number of Sun East community residents to gage reaction to accessing the National Forest through Sun East public right of way. The proposal is to improve the first paved section and then construct a county gravel road to the national. forest. This will allow snowplowing for a large number of landowners who currently do not have this service. PW has verified that developing Lillard Hill will not afford access to the national forest. PW believes the two improvements (at county expense) will offset resident concerns about public access. Access to public lands is often discussed with resource agencies as county residents increasingly are losing access to state and federal lands. Large portions of privately held Page 1 of 4 Public Works "Work Session Staff Report", 2023 lands are being moved into public ownership by state resource agencies limiting access to these lands by county residents. PW believes the potential for public access to the national forest through Sun East warrants evaluation. Once conditions warrant, PW suggests a route evaluation from our design construction group. PW will then prepare cost estimates and return to the Board for consideration. FISCAL IMPACTS: Undetermined at this time. ATTACHMENTS: EXHIBIT 1: PW COST ESTIMATE ROBBINS ROAD (1.6 MILES) EXHIBIT 2: SUN EAST PLAT MAP Page 2 of 4 Public Works "Work Session StafReport", 2023 EXHIBIT 1: PW COST ESTIMATE ROBBINS ROAD (1.6 MILES) Page 3 of 4 Public Works "Work Session Staff Report', 2023 0 it z z W ILZX LU O zU LL a a CL O Q � O a z A � Lo F O @ W z o' Q Q? W N U T = rA Um U ? L) zw z g z z BE Q aY a O O a a a z a a a a a� U U V y D Z_ N X W LL_ J _ :n co z m 4 U Z a K O a U W LL 0 O w O 4 Cl) r U) N U U O O O C3 0 C3 OT C+ M R m W k M 'w X fi Z E E M N O N I_r7 N N dc tl C L -1p z z W ILZX LU O zU LL a a CL O Q � O a z A � Lo F O @ W z o' Q Q? W N U T = rA Um U ? L) zw z g z z BE Q aY a O O a a a z a a a a a� U U V y D Z_ N X W LL_ J _ :n co z m 4 U Z a K O a U W LL 0 O w O 4 Cl) r U) N U U O O O C3 0 C3 OT C+ M R m W k M 'w X fi Z E E EXHIBIT 2: SUN EAST PLAT MAP Page 4 of 4 Public Works "Work Session Staff Report", 2023 SUN EAST ="•"••".: �'""`" 20 ACRE 84MCHES K/77lTAd co A rrr wAsX bnsw� ¢�ro[bar a rroe [ElL[ r•me fol Y S NO[[Y L Mp[ itF/I[[ wri