Loading...
HomeMy WebLinkAboutRES 2023-028BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTTON NO. 2o2s- c23 A RESOLUTION AMENDING THE SERVICE FEES BY COMMUNITY DEVELOPMENT SERVICES CHARGED FOR BUILDING AND LAND USE SERVICES WHEREAS, Kittitas County Code 4.10.010 authorizes Community Development Services fees to be set by resolution approved by the Board of County Commissioners; and WHEREAS, ln 2014, the County contracted the services of FCS Group to determine adequate fees to cover the cost of services provided to process a land use or building permit;and WHEREAS, ln 2015, the consultant monitored activities of personnel when processing the permits and made a determination of the actual cost for providing the service to process land use and building permits; and WHEREAS, The consultant developed a fee modelfor Planning Services and Building Fixture permits that calculated the amount of direct and indirect costs associated with each development activity; and WHEREAS,The consultant also developed a fee multiplier modelfor new construction designed to determine a construction fee which could be adjusted based upon the amount of new construction activity occurring in a single year; and WHERAS,The Board of County Commissioners have annually adopted resolutions since 2015 requiring that fees charged by Community Development Services for land use and building permit services be re-evaluated annually for consideration and adjustment by the Board of County Commissioners for each fiscal year; and WHEREAS, The Board of County Commissioners on January 17,2023 set a date for public hearing to hear comments and consider potential Community Development Services fee changes; and WHEREAS, Public notice for such hearing was provided in the Daily Record and North Kittitas County Tribune on January 19, 2023 and January 26,2023; and WHEREAS, The Board of County Commissioners conducted a public hearing to consider the Community Development Services Fee Schedule on February 7,2023; and WHEREAS,Community Development Services staff recommended fees to the Board of County Commissioners at the public hearing based on the consultant's fee models for full cost recovery to provide the building and planning services; and WHEREAS, Public testimony was received at the February 7,2023 public hearing NOW, THEREFORE, BE lT RESOLVED AND IT lS HEREBY ORDERED, that the following fees are adopted for Community Development Services in Kittitas County: 1. Fees for Building Fixtures and Planning Services as shown in the attached Exhibit A 2. The August2022 Building Valuation Data table of the lnternational Building Safety Journal for the purposes of calculating fees for new construction. 3. A multiplier for building permits for new construction of .0068. 4. A five percent (5%) technology and equipment surcharge for building permits to cover cost of repair and replacement of vehicles and equipment used to process the permits; and BE lT FURTHER RESOLVED AND HEREBY ORDERED, that service monitoring be continued, and that fees charged by CDS for land use and building permit services be re-evaluated annually based upon such monitoring for consideration and adjustment by the Board of County Commissioners for each fiscal year. ADOPTED this 21st day of Februarv 2023 BOARD OF COUNTY COMMISSIONERS KI cou INGTON atrm rman Commissioner .i OARDBTHE .FCterU.of the Board- Julie Kjorsvik n Deputy Qlerk of the Board- Mandy Buchholz APPROVED AS TO FORM NeilCaulkins, Deputy Prosecuting Attorney Exhibit A 2023 Land Use and Building Fees Gommunity Development Services 2023 Fees for Building Fixtures 2023 Fee [Bldg] Permit lssuance Fee IBldg] One-Time Application / Permit Extension Fee [Bldg] Misc - Foundation Only Permits [Bldg] Misc - Fences over 7-foot high [Bldg] Misc - Woodstove lFireplacelFree Standing Stove [Bldg] Misc - Modular Buildings (per sq. ft.) (Based on 2300 sq ft) [Bldg] Misc - Manufactured Homes (per sq. ft.] (Based on 1800 sq ft) [Bldg] Misc - Demolition [Bldg] Misc - Move Structure (per sq. ft.} (Based on 1800 sq ft) IMech/Plum] Furnaces - Forced-air [Mech/Plum] Suspended heater, recessed wall heater or floor- mounted unit heater IMech/Plum] Appliance Vents [Mech/Plum] Plenum Repairs or Additions IMech/Plum] Boiler IMech/Pluml Air handling unit [Mech/Plum] Air Conditioning Unit - or Mini-Split System [Mech/Plum] Ventilation fan connected to a single duct (each) IMech/Plum] Ventilation system which is not a portion of any heating or air-conditioning system [Mech/Plum] Hood which is served by mechanical exhaust, including the ducts for such hood IMech/Plum] lncinerators - Domestic-type [Mech/Plum] Incinerators - Commercial or lndustrial-type [Mech/Plum] Misc - For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which no other fee is listed in the table lMech/Plum] Misc - Each plumbing fixture on one trap or a set of fixtures on one trap [Mech/Plum] Misc - Each Hot Water Heater-Electric [Mech/Plum] Misc - Each Hot Water Heater-Gas IMech/Plum] Misc - Orifice change outs (each) [Mech/Plum] Misc - Gas Piping System of one to five outlets [Mech/Plum] Misc - Additional gas piping system outlet (each) Agricultural Building Re-roofing In ground Pool/Spas & Hot Tub Permit Above ground Pool/Spas & Hot Tub Permit Residential Solar Panel Building Permit per roof face or rack. Slso.oo S7o.oo s7s0.00 Ssro.oo Slso.oo S1,170.oo s730.00 S220.oo Sego.oo S14o.oo s280.00 s40.00 s280.00 Si.4o.oo s140.00 S14o.oo S40.oo s70.00 s210.00 s280.00 s430.00 570.00 s7o.oo s70.00 s140.00 514o.oo s140.00 s70.oo s810.00 S14o.oo s6s0.00 Si.i.o.oo S28o.oo Commercial Solar Panel Building Permit per roof face or rack system. Residential Wind Turbine Commercial Wind Turbine lifting of StopWork Order Lifting of Notice to Title For any permit fee which is not listed above fees may be determined by an hourly basis of $140.00 per hour review and inspection, by square foot valuation or by bid amount, determined by Community Development Services. *Fees for printing shall be by fee recovery schedule set by CDS. ssso.oo s250.00 s3s0.00 s280.00 s460.00 2023 Fees for Planning Services 2023 Fee Pre Application or Pre Submission (Per Meeting) Accessory Dwelling Unit Binding Site Plan Boundary Line Adjustment Comp. Plan Amendment {Text) Comp. Plan Amendment (Map) Large Lot Parcel Combination Cluster Plat - 5 or more lots Cluster Plat - 4 or less lots Plat Extension Short Plat Preliminary Plat Final Plat FinalShort Plat Short Plat Amendment Plat Amendment Public Benefit Rating System Application Public Facilities Planned Unit Development Rezone *SEPA SEPA Optional Shoreline Setback Variance Shoreline Substantial Development Shoreline Conditional Use *Shoreline Exemption Sign SmallWind Energy Transfer of Development Rights Wind Farm Siting Zoning Variance Administrative Conditional Use Permit Administrative Conditional Use Permit Amendment Administrative Determination Appeal Conditional Use Permit Conditional Use Permit Amendment Development Agreement Title Elimination Preliminary Site Analysis Sooo.oo 51,570.00 52,072.00 S810.oo $3,530.00 $3,850.00 52,Loo.oo 5600.oo s3,1.50.00 s2,340.oo s600.0o S2,34o.oo $3,190.0o s1",050,00 s8s0.00 s2,550.00 s3,190.00 S2,3oo.oo S2,32o.oo S4,68o.oo S3,7oo.oo S600.oo s600.oo s4,000.00 s2,380.oo S4,ooo.oo Sooo.oo Slso.oo Bldg. Fee s200.00 Dev. Agreement S2,ooo.oo s2,870.00 s2,660.00 s83o.oo Si.,670.oo S3,43o.oo S3,3oo.oo $88o.oo 513o.oo S160.oo Pre-application Conference Waiver Reasonable Use Exception Public Agency and Utility Exception Critical Areas Pre-Determination Critical Areas Determination s130.00 s2,000.00 Sz,ooo.oo $gao.oo S34o.oo