HomeMy WebLinkAboutRES 2023-028BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTTON NO. 2o2s- c23
A RESOLUTION AMENDING THE SERVICE FEES BY COMMUNITY DEVELOPMENT
SERVICES CHARGED FOR BUILDING AND LAND USE SERVICES
WHEREAS, Kittitas County Code 4.10.010 authorizes Community Development Services fees
to be set by resolution approved by the Board of County Commissioners; and
WHEREAS, ln 2014, the County contracted the services of FCS Group to determine
adequate fees to cover the cost of services provided to process a land use or
building permit;and
WHEREAS, ln 2015, the consultant monitored activities of personnel when processing the
permits and made a determination of the actual cost for providing the service to
process land use and building permits; and
WHEREAS, The consultant developed a fee modelfor Planning Services and Building Fixture
permits that calculated the amount of direct and indirect costs associated with
each development activity; and
WHEREAS,The consultant also developed a fee multiplier modelfor new construction
designed to determine a construction fee which could be adjusted based upon
the amount of new construction activity occurring in a single year; and
WHERAS,The Board of County Commissioners have annually adopted resolutions since
2015 requiring that fees charged by Community Development Services for land
use and building permit services be re-evaluated annually for consideration and
adjustment by the Board of County Commissioners for each fiscal year; and
WHEREAS, The Board of County Commissioners on January 17,2023 set a date for public
hearing to hear comments and consider potential Community Development
Services fee changes; and
WHEREAS, Public notice for such hearing was provided in the Daily Record and North Kittitas
County Tribune on January 19, 2023 and January 26,2023; and
WHEREAS, The Board of County Commissioners conducted a public hearing to consider the
Community Development Services Fee Schedule on February 7,2023; and
WHEREAS,Community Development Services staff recommended fees to the Board of
County Commissioners at the public hearing based on the consultant's fee
models for full cost recovery to provide the building and planning services; and
WHEREAS, Public testimony was received at the February 7,2023 public hearing
NOW, THEREFORE, BE lT RESOLVED AND IT lS HEREBY ORDERED, that the following
fees are adopted for Community Development Services in Kittitas County:
1. Fees for Building Fixtures and Planning Services as shown in the attached Exhibit A
2. The August2022 Building Valuation Data table of the lnternational Building Safety
Journal for the purposes of calculating fees for new construction.
3. A multiplier for building permits for new construction of .0068.
4. A five percent (5%) technology and equipment surcharge for building permits to
cover cost of repair and replacement of vehicles and equipment used to process the
permits; and
BE lT FURTHER RESOLVED AND HEREBY ORDERED, that service monitoring be continued,
and that fees charged by CDS for land use and building permit services be re-evaluated
annually based upon such monitoring for consideration and adjustment by the Board of County
Commissioners for each fiscal year.
ADOPTED this 21st day of Februarv 2023
BOARD OF COUNTY COMMISSIONERS
KI cou INGTON
atrm
rman
Commissioner
.i
OARDBTHE
.FCterU.of the Board- Julie Kjorsvik
n Deputy Qlerk of the Board- Mandy Buchholz
APPROVED AS TO FORM
NeilCaulkins,
Deputy Prosecuting Attorney
Exhibit A
2023 Land Use and Building Fees
Gommunity Development Services
2023 Fees for Building Fixtures 2023 Fee
[Bldg] Permit lssuance Fee
IBldg] One-Time Application / Permit Extension Fee
[Bldg] Misc - Foundation Only Permits
[Bldg] Misc - Fences over 7-foot high
[Bldg] Misc - Woodstove lFireplacelFree Standing Stove
[Bldg] Misc - Modular Buildings (per sq. ft.) (Based on 2300 sq ft)
[Bldg] Misc - Manufactured Homes (per sq. ft.] (Based on 1800
sq ft)
[Bldg] Misc - Demolition
[Bldg] Misc - Move Structure (per sq. ft.} (Based on 1800 sq ft)
IMech/Plum] Furnaces - Forced-air
[Mech/Plum] Suspended heater, recessed wall heater or floor-
mounted unit heater
IMech/Plum] Appliance Vents
[Mech/Plum] Plenum Repairs or Additions
IMech/Plum] Boiler
IMech/Pluml Air handling unit
[Mech/Plum] Air Conditioning Unit - or Mini-Split System
[Mech/Plum] Ventilation fan connected to a single duct (each)
IMech/Plum] Ventilation system which is not a portion of any
heating or air-conditioning system
[Mech/Plum] Hood which is served by mechanical exhaust,
including the ducts for such hood
IMech/Plum] lncinerators - Domestic-type
[Mech/Plum] Incinerators - Commercial or lndustrial-type
[Mech/Plum] Misc - For each appliance or piece of equipment
regulated by the Mechanical Code but not classed in other
appliance categories, or for which no other fee is listed in the
table
lMech/Plum] Misc - Each plumbing fixture on one trap or a set of
fixtures on one trap
[Mech/Plum] Misc - Each Hot Water Heater-Electric
[Mech/Plum] Misc - Each Hot Water Heater-Gas
IMech/Plum] Misc - Orifice change outs (each)
[Mech/Plum] Misc - Gas Piping System of one to five outlets
[Mech/Plum] Misc - Additional gas piping system outlet (each)
Agricultural Building
Re-roofing
In ground Pool/Spas & Hot Tub Permit
Above ground Pool/Spas & Hot Tub Permit
Residential Solar Panel Building Permit per roof face or rack.
Slso.oo
S7o.oo
s7s0.00
Ssro.oo
Slso.oo
S1,170.oo
s730.00
S220.oo
Sego.oo
S14o.oo
s280.00
s40.00
s280.00
Si.4o.oo
s140.00
S14o.oo
S40.oo
s70.00
s210.00
s280.00
s430.00
570.00
s7o.oo
s70.00
s140.00
514o.oo
s140.00
s70.oo
s810.00
S14o.oo
s6s0.00
Si.i.o.oo
S28o.oo
Commercial Solar Panel Building Permit per roof face or rack
system.
Residential Wind Turbine
Commercial Wind Turbine
lifting of StopWork Order
Lifting of Notice to Title
For any permit fee which is not listed above fees may be
determined by an hourly basis of $140.00 per hour review and
inspection, by square foot valuation or by bid amount,
determined by Community Development Services.
*Fees for printing shall be by fee recovery schedule set by CDS.
ssso.oo
s250.00
s3s0.00
s280.00
s460.00
2023 Fees for Planning Services 2023 Fee
Pre Application or Pre Submission (Per Meeting)
Accessory Dwelling Unit
Binding Site Plan
Boundary Line Adjustment
Comp. Plan Amendment {Text)
Comp. Plan Amendment (Map)
Large Lot
Parcel Combination
Cluster Plat - 5 or more lots
Cluster Plat - 4 or less lots
Plat Extension
Short Plat
Preliminary Plat
Final Plat
FinalShort Plat
Short Plat Amendment
Plat Amendment
Public Benefit Rating System Application
Public Facilities
Planned Unit Development
Rezone
*SEPA
SEPA Optional
Shoreline Setback Variance
Shoreline Substantial Development
Shoreline Conditional Use
*Shoreline Exemption
Sign
SmallWind Energy
Transfer of Development Rights
Wind Farm Siting
Zoning Variance
Administrative Conditional Use Permit
Administrative Conditional Use Permit Amendment
Administrative Determination
Appeal
Conditional Use Permit
Conditional Use Permit Amendment
Development Agreement
Title Elimination
Preliminary Site Analysis
Sooo.oo
51,570.00
52,072.00
S810.oo
$3,530.00
$3,850.00
52,Loo.oo
5600.oo
s3,1.50.00
s2,340.oo
s600.0o
S2,34o.oo
$3,190.0o
s1",050,00
s8s0.00
s2,550.00
s3,190.00
S2,3oo.oo
S2,32o.oo
S4,68o.oo
S3,7oo.oo
S600.oo
s600.oo
s4,000.00
s2,380.oo
S4,ooo.oo
Sooo.oo
Slso.oo
Bldg. Fee
s200.00
Dev. Agreement
S2,ooo.oo
s2,870.00
s2,660.00
s83o.oo
Si.,670.oo
S3,43o.oo
S3,3oo.oo
$88o.oo
513o.oo
S160.oo
Pre-application Conference Waiver
Reasonable Use Exception
Public Agency and Utility Exception
Critical Areas Pre-Determination
Critical Areas Determination
s130.00
s2,000.00
Sz,ooo.oo
$gao.oo
S34o.oo