Loading...
HomeMy WebLinkAboutRES 2023-024BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTToN NO: 2on-lztlf APPROVING THE 2023 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT WITH CITY OF CLE ELUM WHEREAS: The 1999 Legislature did pass RCW 82.14.370 Sales and Use Tax for Public Facilities in rural counties; and WHEREAS: These funds may only be used to finance public facilities serving economic development purposes in rural counties and finance personnel in economic development offices in the State of Washington; and WHEREAS: The 2023 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with City of Cle Elum has been executed by said entity with funding available January l, 2023; and NOW' THEREFORE BE IT RESOLVED: The Kittitas County Board of County Commissioners hereby approves the attached 2023 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with City of Cle Elum. ADOPTED this 7th day of February 2023. BOARD OF COLINTY COMMISSIONERS KITTIT LINTY,WASHINGTON Board- Julie Kjorsvik lllilill Brett th, Vice-Chairman ssloner I Deputy Clerk of the Board- Mandy 2023 DISTRESSED COUNTY SALES AND USE TAX INFRASTRUCTURE IMPROVEMENT PROGRAM AGREEMENT BETWEEN KITTITAS COUNTY AND CITY OF CLE ELUM This Contract dated 2Q23 is made and entered into by and between KITTITAS COU "Cou , a subdivision of the State of Washington, and CITY OF CLE ELUM ("Funding Recipient") WHEREAS the purpose of this Agreement is to provide for public facility construction and foster economic development opportunities within Kittitas County; NOW THEREFORE, in consideration of the terms and conditions contained herein, or attached and incorporated and made a part hereof, the County and the Funding Recipient mutually agree as follows: Section 1. Scope of Work. a. Funding Recipient shall provide the services and staff described in its Application for Funds submitted to the Council of Governments, as Exhibit "A" which is attached hereto and incorporated herein by this reference. b. Except as othenrvise specifically provided in this Agreement, Funding Recipient shall furnish the following as required to perform the services, described in Paragraph (a) above, in accordance with this Agreement: Personnel, labor and supervision; technical, professional and other services. All such services, property and other items furnished or required to be furnished, together with all other obligations performed, or required to be performed, by Funding Recipient under this Agreement are collectively referred to herein as "Services." Section 2. Pavment. a. As full compensation for satisfactory performance of the Funding Recipient Services, the County agrees to pay Funding Recipient the sum of five hundred and ninety-one thousand dollars ($S9t,000). b. Additional payment terms: The County will make payment to the Funding Recipient only on a reimbursement basis, as receipts for any items including marketing and/or advertising are submitted to the County. c. Requests for reimbursements must be submitted to: Kittitas County Public Works Attn: Joyce White 411 North Ruby, - Suite 1 Ellensburg, WA 98926 iovce.wh ite@co. kittitas.wa. us Distressed County Soles and Use Tdx lnfrastructure lmprovement Program Funding Agr""rfiE1;L , d. Timely and accurate financial reporting is required for fund management by Kittitas County Department of Public Works. Financial reporting requirements for all grant awards are listed below: 1. Using Kittitas County Department of Public Works reporting forms, applicants will submit project status reporting forms within fourteen (14) calendar days from the end of the reporting quarter as specified below: . Quarter 1 ending date:. Quarter 2 ending date:. Quarter 3 ending date:o Quarter 4 ending date: March 31't June 30th September 30th December 31st Recipients may submit reimbursement requests on a monthly basis on Kittitas County Department of Public Works reporting forms. 2. Grant recipients who fail in meeting required reporting requirements are subject to having fundinq withheld on the fifteenth (1Sth) dav followinq the end of the reportinq quarter. Failure in submitting the required project status reports (two consecutive reporting cycles) may result in award cancellation upon COG review. 3. Financial reporting forms shall be signed by the identified grant official or designee. Section 3. Performance bv Fundinq Recipient. a. Funding Recipient shall not (by contract, operation of law or othenruise) delegate or subcontract performance of any Services to any other person or entity without the prior written consent of the County. Any such delegation or subcontracting without the County's prior written consent shall be voidable at the County's option. b. Funding Recipient shall at all times be an independent Funding Recipient and not an agent or representative of the County with regard to performing the Services. Funding Recipient shall not represent that it is, or hold itself out as, an agent or representative of the County. ln no event shall Funding Recipient be authorized to enter into any Agreement or undertaking for or on behalf of the County. lt is understood that the Funding Recipient and the Funding Recipient's staff and employees are not employees of the County and are not, therefore, entitled to any benefits provided employees of the County. c. Funding Recipient shall comply with all applicable laws, ordinances, rules, regulations, orders, licenses, permits, and other requirements, now or hereafter in effect, of any governmental authority (including, but not limited to, such requirements as may be imposed upon the County and applicable to Services). Funding Recipient shall furnish such documents as may be required to effect or evidence such compliance. All laws, ordinances, rules, and orders required to be incorporated into agreements of this character are incorporated into this Agreement by this reference. Funding Recipient agrees to obtain all required licenses and permits, and further agrees to keep them in full force and effect during the term of this Agreement. Distressed County Sales and Use Tox Infrostructure lmprovement Program Funding Onr""TEgL , d. The County and the Funding Recipient agree that in fulfilling the terms and conditions of this Agreement neither shall discriminate on the basis of race, creed, color, national origin, age, sex, marital status, or the presence of a physical, sensory, or mental handicap. e. The Services shall at all times be subject to inspection by and approval of the County, but the County's making (or failure or delay in making) such inspection or approval shall not relieve Funding Recipient of its responsibility to perform the Services in accord with this Agreement, notwithstanding the County's knowledge of defective or non-complying performance, or the substantiality or ease of discovering the same. Funding Recipient shall provide the County with sufficient, safe, and proper facilities and equipment for such inspection and free access to such facilities. f. This contract is subject to review by any Federal or State auditor. Funding Recipient shall promptly furnish the County or its designee, or such Federal or State auditor with such information related to the Services as may be requested by the applicable governmental entity. Funding Recipient shall preserve and maintain all financial records and records relating to performance of Services under this Agreement for six (6) years after contract termination. For such duration after the County makes final payment of compensation due hereunder, Funding Recipient shall provide the County access to (and the County shall have the right to examine, audit and copy, with or without notice) all of Funding Recipient's books, documents, papers and records related to the Services or this Agreement. g. Funding Recipient understands and acknowledges that Funding Recipient is solely responsible for its own reporting and accounting of all state, federal, social security, and local taxes, of every nature, arising from Funding Recipient's performance of this Agreement. All compensation received by the Funding Recipient will be reported to the lnternal Revenue Service at the end of the calendar year in accord with the applicable IRS regulations. h. The grantee shall obligate funding towards construction of the project no later than six months from the time of grant execution (providing the grantee has not submitted the project as being "banked" - COG Policy 2018-05). Obligation is expected to take two forms: consultant contracting or contractor award. Presuming the COG recommends a design only phase of a proposed Public Facility grant, obligation requirements are met on the date of grantee signature on consultant design contract(s). COG recommended construction awards will complete obligation requirements on the date of grantee signature on construction contracts. Failure in obligating grant awards within the prescribed timeframe results in the grant award being remanded back to COG for recommended re-purposing by the Board of County Commissioners. The grantee is obligated to follow Public Facility Fund COG policies in effect at the time of grant award as reflected in the Resolution signature date authorizing recipient contracting. COG policies may be obtained from the Department of Public Works (50e) e62-7523. Distressed County Sales dnd Use Tax lnfrostructure lmprovement Program Funding Agr""rfiE1;L g Section 4. Release. lndemnitv. and Hold Harmless. The County assumes no liability for the Funding Recipient's actions under this Agreement. Funding Recipient releases and shall defend, indemnify, and hold harmless the County, its officers and employees, agents, representatives, attorneys and/or volunteers, from and against all claims, costs, liabilities, damages, and expenses, (including, but not limited to, reasonable attorney fees) which arise or may arise or be alleged to arise out of or by reason of this Agreement including: Any fault, negligence, strict liability or product liability of Funding Recipient in connection with the Services for this Agreement; Any lien asserted upon any property of the County in connection with the Services for this Agreement; Any failure of Funding Recipient, or of the Services, to comply with any applicable law, ordinance, rule, regulation, order, license, permit and other requirement, now or hereafter in effect, of any governmental authority; or o Any breach of or default under this Agreement by Funding Recipient. Section 5. Compliance with Public Records Law. a. ln compliance with Washington's public records law, the County will retain copies of any documents associated with this Agreement, which may be required by law unless legally exempt from such retention, for any applicable legally required retention period. b. ln the event a public records request is made to the County for documents created in relation to this Agreement, should legal uncertainty arise regarding the disclosability of any documents under federal or state public records laws, the County shall provide notice to Funding Recipient pursuant to Washington's public records act, chapter 42.56 RCW, to allow Funding Recipient to seek a court injunction. c. The County specifically shall not be liable to Funding Recipient for the County's release under public records laws of any documents not protected by trademark, copyright or other law. Section 6. lndustrial lnsurance Waiver. With respect to performance of this Agreement and as to any claims against the County, its Additional lnsureds, officers, agents and employees, the Funding Recipient expressly waives its immunity under Title 51 of the Revised Code of Washington, the lndustrial lnsurance Act, for injuries to Funding Recipient's employees and agrees that the obligations to indemnify, defend and hold harmless provided in this Agreement extend to any claim brought by or on behalf of any employee of the Funding Recipient. This waiver is mutually negotiated by the parties to this Agreement. a a o Distressed County Sales and Use Tdx lnfrostucture lmprovement Progrdm Funding Aareement' Page 4 Section 7- lnsuran ce and Endorsements. a. The County may require through a request in writing that the Funding Recipient provide the County with a certificate, binder, or policy of liability insurance, acceptable to the County in an amount specified by the County. b. Such liability insurance shall be such as will protect Funding Recipient, its employees, agents and representatives, from all claims, losses, harm, costs, liabilities, damages and expenses arising out of personal injury (including death) or property damage that may result from performance of the Services or this Agreement, whether such performance is by Funding Recipient or any of its employees, agents or representatives. c. Should the County require such liability insurance, the Funding Recipient agrees to provide proof of insurance prior to commencing performance of this Agreement. d. Copies of the County's written request and the insurance documents provided by Funding Recipient shall be attached to this Agreement and by this reference will be made part hereof. e. Where insurance is requested by the County, all liability insurance policies shall be endorsed to include the County as an Additional lnsured and shall stipulate that the insurance afforded by the policies shall be primary insurance, and that any insurance, self-insured retention, deductibles, or risk retention trusts maintained or participated in by the Parties shall be excess and not contributory to any other insurance maintained by the County. Funding Recipient shall furnish the County a certificate of insurance with Endorsement as evidence that the required policies are in full force and effect. Section 8. Termination The County may, by written notice thereof to Funding Recipient, terminate this Agreement as to all or any portion of the Services not yet performed, whether or not Funding Recipient is in breach or default. Upon receiving such notice of termination, Funding Recipient shall, except as otherwise directed by the County, immediately stop performing the Services to the extent specified in the notice. ln the event the County terminates the Funding Recipient's Services, the Funding Recipient is obligated and hereby agrees to refund to the County all monies paid for Services not yet rendered by the Funding Recipient, if any, as of the date of the notice of termination. Section 9. Miscellaneous. a. Funding Recipient shall not (by contract, operation of law or otherwise) assign this Agreement or any right or interest in this Agreement without the County's prior written consent. b. This Agreement embodies the entire Agreement between the County and Funding Recipient, and supersedes any and all prior oral or written communications, proposals, conditions, promises, representations, or understandings regarding the Services. No change, amendment or modification of any provision of this Agreement shall be valid Distressed County Soles and Use Tax lnlrastructure lmprovement Program Funding Adreement- Page 5 unless set forth in a written amendment to the Agreement signed by both parties. c. Notice for any purpose under this Agreement, except service of process, shall be given by the Funding Recipient to the Kittitas County Commissioners and the Kittitas County Public Works Director, 411 North Ruby, Suite 1, Ellensburg, WA 98926. For all purposes under this Agreement, any notice by the County to the Funding Recipient shall be given to the Funding Recipient's address provided on the signature page. Notice may be given by delivery or by depositing in the U.S. Mail, first class, postage prepaid, certified mail, return receipt requested. d. The section and paragraph headings of this Agreement are for reference convenience only and are not intended to restrict, affect or be of any weight in interpreting or construing the provisions of such sections or paragraphs, e. This Agreement may be executed in one or more counterparts and by facsimile, each of which will be deemed an original, but all of which together will constitute one and the same instrument. f. Funding Recipient warrants to the County that the individual signing on Funding Recipient's behalf has the requisite power and authority to enter into and to perform Funding Recipient's obligations under this Agreement. Funding Recipient further warrants to the County that Funding Recipient has made no misrepresentation or misleading statement in connection with this Agreement, and is not in violation of any applicable law, ordinance, or regulation the consequence of which will or may materially affect Funding Recipient's ability to perform its obligations under this Agreement. g. lf any term or condition of this Agreement or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect the other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this Agreement are declared severable. h. The exclusive venue for any action brought to enforce this Agreement or any of its terms shall be in Kittitas County, State of Washington. Distressed County Sales and Use Tox lnfrostructure Improvement Program Funding Aareement' Page 6 KITTITAS COUNTY BOARD OF COUNTY cory ht, Chai acz, Commissioner ERS CITY OF CLE ELUM ntative Address 509 - W4- *etaL, Chairman Telephone \ rnza" usa nffi el e-elu rn, 4 p t){_-- JEmatl J Dated Dated Attest: Clerk of the Board- Julie Kjorsvik tr Deputy Clerk of the Board- Mandy Bu APPROVED AS TO FORM Deputy Prosecuting Attorney Distressed County Sales and Use Tax Infrastructure lmprovement Progrdm Funding Agr""rFEEL Z @49"fl,r* 119 West First Street Cle Elum, WA 98922 Telephone: (509) 67 4-2262 Fax: (509) 674-4097 www. citvofcleelum. com Re: October 7,2022 Kittitas County Department of Public Works Distressed County Sales and Use Tax Grant Fund 411 North Ruby Street, Suite 1 Ellensburg, WA 98926 Gity of Cle Elum 2023 Kittitas County Distressed Gounty Sales and Use Tax Grant Application Phase 3C - First Street Downtown Revitalization Dear Council of Governments Review Committee: We at the City of Cle Elum are most appreciative of the tremendous support that Kittitas County has demonstrated toward our Downtown Revitalization project, including the most recent award towards construction of the expanded Phase 3,A project. Attached for your consideration is the City of Cle Elum's Phase 3C south block improvements between Pennsylvania Avenue and Harris Avenue, including the southeast corner of the First Street and Harris Avenue intersection. This project will create critical public and private utility system connections necessary to construct all proposed improvements between the previous Phase 3A and Phase 38 project limits, as well as complete the City's revitalization vision, previously expressed only in pen-and-ink concept drawings, along another block of our downtown. Our total funding request for the First Street Revitalization Phase 3C - Pennsylvania Avenue to Harris Avenue project is $756,684, with a City match of $85,000. The application and attachments convey our pride in the strides we have made so far to make our revitalized downtown a reality, as well as our desire to continue construction for all of Phase 3. We have greatly benefitted from Kittitas County grant programs in the past and look forward to the potential of continuing our partnership on the Downtown Revitalization. Let's keep the momentum going! Thank you again for this opportunity. Should you have any questions, please feel free to contact me at (5Og) 674-2262. Sincerely, Ja v Mayor o w Kittitas County Department of Public Works 2023 Application Round DTSTnESSED COUNTy SaTnS AND UsE Tnx INTruSTRUCTURE IMPROVEMENT PROGRAM APPTTCATION The Distressed County Sales and Use Tax Infrastructure Improvement Program supports improvements to infrastructure systems that foster economic development in Kittitas County. The goal is to create economic opportunity through Infrastructure investment. APPLICANT INF'ORMATION Applicant: Contact Name: Address: City: Telephone: E-mail Address Office Location: Project Name: Jurisdiction: Funds Request: City of Cle Flum Rob Omans 119 West First Street i Cle Elum 509-674-2262 romans@cleelum.qov WA Zip:98922 FAX: I l9 West First Street, Cle Elum, WA 98922 First Street Revitalization Phase 3C City of Cle Elum $756,684 i i APPLICATION THRESHOLDS Applicant Requirement: Check-off: I 1. The project is improvement to an infrastructure system(s) linked to economic development. 2. A detailed 8 %X ll" vicinity map that clearly shows the project is included in the application package. 3. Distressed County funds are not being substituted for other funds that are already secured. 4. The project involves traditional improvements, instead of "non-traditional" improvements eligible for 6(Enhancementtt funding 5. Applicant has submitted only one application this round. 6. The local/regional economic development organization has been informed of the project. PROJECT BUDGETFundingSourcesDistressed County Funds Requested:$756.684Other Federal:ruState:Local Government:$85.000PreliminaryEngineeringPhaseRight of WayPhaseConstructionPhaseProjectTotalIs FundingSecured - Yor N?$15,000$0$741,684 $756,684 NY$0$0$0$0$0$0$0$0$0$0$85,000$0$0s0$0$0$0$0$0$0$0$85,oooPrivate:*Other:$0Project Total:Distressed County Fund Matching Ratio:l5o/o100.,900**Note: Your Distressed County Fund matching ratio must be at least or greater than 10% in order to quaffiforfunding consideration. TheCOG will not consider any requests which do not provide at least l0% matchingfandsfrom a locul soarce.s741,684 $841,641$100,000 $o,f/o2 PROJECT NARRATTVE 1. Project Description: Describe the scope of work. Indicate the major work involved, including a brief comparison of existing and proposed conditions. The City of Cle Elum is proposing a construction project for improvements to the south block of First Street between Pennsylvania Avenue and Harris Avenue, including the southwestem bulbout at the First Street and Harris Avenue intersection. This project would complete all revitalization efforts in approximately 40o/o of the Downtown Revitalization corridor and establish critical utility system connections between the limits of the current Phase 34. and Phase 38 projects. Background ln 2017, the City of Cle Elum initiated a Downtown Revitalization effort to enhance the appearance of First Street, increase economic growth and vitality, and create a safe walkable streetscape consistent with their Complete Streets Ordinance. Stakeholders including business and property owners, residents, the general public, Cle Elum's Planning Commission, and City Council provided valuable input throughout the planning process. In June 2017, the City Council unanimously adopted the Preferred Alternative as shown in the conceptual plan by resolution. The resolution established the City's commitment to implement the concepts for street and parking configuration, streetscape amenities, and landscape improvements for First Street. The Downtown Revitalization Preferred Alternative brochure is attached for reference. To implement the Plan, the First Street corridor defines Billings Avenue as the west termini and Peoh Avenue as the east termini. To seek funding for all of the improvements identified in the concept plan, the corridor was separated into three succinct phases: 1. Phase I - Peoh Avenue and SR 903 (First Street) Intersection Improvements; 2. Phase 2 - First Street Stormwater Improvements and Billings Avenue to Oakes Avenue Improvements; and 3. Phase 3 - Downtown Revitalization including First Street pedestrian and street improvements. Since adopting the Prefened Alternative in 2017, over $5.8 million in funding has been secured from 21 sources, including local, state, and federal programs. The Downtown RevitalizationFunding Summary is attached for reference. Phase l, completed in December 2018, constructed all stormwater, sidewalk, and roadway improvements at the First Street and Peoh Avenue Intersection. Phase 2, completed in the fall of 2020, constructed: o all remaining stormwater improvements for the six-block project corridor, o sidewalk and roadway improvements at the First Street and Billings Avenue intersection, ando the north block between Billings Avenue and Oakes Avenue. Phase 3 includes: o streetscape improvements on the south block between Billings Avenue and Oakes Avenue, o intersection improvements along First Street at Oakes Avenue, Pennsylvania Avenue, Harris Avenue, Wright Avenue, and Bullitt Avenue, and o the north and south blocks between the intersections of Oakes Avenue and Peoh Avenue. Funding was secured for Phase 3 design and the City completed o'shovel-ready" plans and specifications in November 2020. Due to funding limitations, the construction of Phase 3 is underway in several subphases. Phase 3,{, including various improvements from Billings Avenue to Pennsylvania Avenue, and Phase 38, including improvements to the north block of First Street from Pennsylvania Avenue to Harris Avenue, will be completed this fall. The updated Downtown Revitalization Project Summary brochure is attached for reference. Scope of Work Successful award of this application will complete the third subphase, Phase 3C, consisting of improvements on the south side of First Street from Pennsylvania Avenue to Harris Avenue, including the southwest bulbout at the intersection of First Street and Harris Avenue. This project will complete nearly all proposed improvements between Pennsylvania Avenue and Harris Avenue, bringing the City's vision to reality along another block and maintaining momentum towards completion of the entire Downtown Revitalization project. The City anticipates development and private investment will be spumed along the improved blocks (see related discussion in Question 4). The City has prepared the following summary comparing existing conditions (before the project) with proposed conditions (following project completion). Existing Conditions Sidewalk Sidewalk is deteriorating on both sides of First Street throughout the project corridor. There are currently two large driveway entrances to a single business on the south side of First Street between Pennsylvania Avenue and Harris Avenue, The comer ofthe Harris Avenue intersection includes deteriorating pedestrian ramps. Mismatched street lights, inconsistent site amenities, and minimal landscaping exist in the sidewalk. Street First Street is an auto-centric thoroughfare. Since First Street was the original state highway through Cle Elum prior to construction of Interstate 90 (I-90), travel lanes along the project corridor were constructed 17-ft wide. The roadway also includes a l2-fttwo-way turn lane and l8-ft paved and striped parking strips on both sides of the street. First Street from Oakes Avenue to Peoh Avenue, including the Phase 3C project area,remains State Route 903 to this day. Proposed Conditions Sidewolk Phase 3C will construct sidewalk improvements along the south side of First Street between Pennsylvania Avenue and Harris Avenue (excluding the south bulbout at First Street and Pennsylvania Avenue), nearly completing another block of the six-block revitalization corridor. These improvements include patterned sidewalks, planters with columnar street trees and GFCI receptacles, irrigation, pedestrian and street illumination, site amenities, overhead banner pole and foundation, mid-block bulbout, and the southeast bulbout at the intersection of First Street and Harris Avenue. The overhead banner pole and foundation and the two bulbouts will constructed opposite their northern counterparts constructed in Phase 3B, completing each pair. Construction of all subphases under Phase 3 will complete a continuous and unencumbered sidewalk system on both sides of First Street accommodating pedestrians of all abilities. The wide sidewalks allow for amenities such as seating, shade, bicycle racks, planter boxes, public art, and trash receptacles without 4 impacting pedestrian mobility. The bulbouts are specifically designed to shorten pedestrian crossings at each intersection of the corridor, while heightening driver awareness throughout Cle Elum's pedestrian- interactive downtown setting. Street The now auto-centric thoroughfare of First Street will be placed on a road diet. Driving lane widths will be reduced to 11 feet to promote speed calming through the corridor. Both driveway entrances on the southem block will be removed and allow for more diagonal parking at 30-degree desirable angles without adding more impervious surfacing. Street lighting will be a blend of pedestrian-level and street lighting. Electrical GFCI receptacles, incorporated into the light poles, will increase access to City planned downtown events such as holiday lighting. Designing and constructing the street for a right-sized downtown feel and dimension allows the City to better maintain the roadway and integrated infrastructure systems. 2. Explain how the infrastructure project will help meet the economic development goals of your community and/or region. If this project is not done, will the anticipated private development still take place? Although Phase 3 has required project division due to the overall cost being greater than available funding opportunities, construction of Phase 3C completes both sides of First Street between Pennsylvania Avenue and Harris Avenue, completing approximately 40%o of all improvements as planned for in the Downtown Revitalization Plan. With completion of streetscape improvements, the City's residents and businesses will witness implementation of the expressed downtown vision of stakeholders on another half block prepared for immediate economic development opportunities. By planning the proposed streetscape improvements in the subphase manner, necessary interruptions to local transportation, coflrmerce, and day-to-day operations on each block of First Street will be limited to one occasion, placing Cle Elum in a positive light with existing and prospective businesses not only on that block, but throughout the corridor. Separately, project elements in Phase 1, Phase 2, and Phase 3 addressed infrastructure issues that are linked to economic development. When considered together, the Phase 3C streetscape improvements project is undeniably well aligned with the purpose of the Distressed County Sales and Use Tax Infrastructure Improvement Program. Though all Phase 3 streetscape improvements have been completed at the easternmost and westemmost intersections and along various blocks throughout the corridor, the City is already experiencing redevelopment and reinvestment along First Street. In 2019 and 2020, the City saw seventeen new businesses, seventeen building sales, one infill project, one redevelopment, and four aesthetic improvement projects for local businesses. Several businesses have experienced record sales each month since the start of the pandemic, but even prior to COVID-I9, the entire Upper Kittitas County was experiencing record tourism Thursdays through Mondays, primarily from the Seattle metropolitan area. As a result of the tourist-generated transportation gridlock, the County has initiated a coalition to work with WSDOT and other stakeholders to accelerate the 6-laning of I-90 from Snoqualmie Pass all the way to Cle Elum. This Downtown Revitalization, with an emphasis on a safe and walkable streetscape will bolster Cle Elum's already thriving tourist economy, enticing many of the 30,000 vehicles that pass Cle Elum every day to stop and spend money at local businesses. However, it is not just tourists or Cle Elum's population of 2,000 that will benefit. A flourishing downtown will also positively reach all of Upper Kittitas County's 5,000 residents as Cle Elum's "downtown" is considered the Upper Kittitas County downtown. With very limited commerce opportunities in the neighboring communities of South Cle Elum, Roslyn, Ronald, and Suncadia, Cle Elum's regionally significant Downtown Revitalization can meet all of Upper Kittitas County's day-to-day needs including retail, dining, service, medical, grocery, fuel, amongst many other industries. Completing Phase 3C 5 continues to implement the vision of community stakeholders and the City's formulated actions to provide for infill opportunities and encourage commerce expansion. Streets cape Improvements Cle Elum enjoys year-round outdoor tourism. Ample amounts of snow provide wintertime outdoor activities and considerable spring and fall rain provides lush and attractive forests encouraging outdoor recreation for much of the year. Though the natural environment attracts people to Cle Elum, the built environment has not been welcoming for commerce oriented toward or promoting a walkable downtown. On unimproved intersections in the downtown area, pedestrians are required to traverse close to 80 feet of paved State Route highway to cross First Street. Oakes Avenue acts as the busy connector, south of First Street, for traffic exiting Interstate 90 and entering Cle Elum's downtown. The intersection at Oakes Avenue is also a short but important portion of SR 903, by which SR 903 transitions from west-east travel on Second Street to continue west-east travel on First Street towards the east edge of downtown. Differentiating the streetscape to the extent proposed will enhance drivers' sense of place and increase traffic calming. Both of these principles are included in Cle Elum's Downtown Revitalization economic development goals. Creating a safer and inclusive environment for both motorized and non-motorized transportation is also promoted in the City's Complete Streets Ordinance No. 1455. In such an environment, many types of businesses can be co-located and thrive amongst the diversity. Consistency in design and ensuring infrastructure was brought up to a state of good repair throughout the First Street corridor was expressed by stakeholders as important for economic development. Currently, the sidewalks along First Street are not continuous, have ADA compliance deficiencies, and are in an overall state of disrepair. Bulb-out design and size, parking orientation, and amenities in Phase 3C are designed to provide perceived comfort, shade, illumination, and safety for people whether moving by automobile or using the sidewalk system. The design of incorporating ADA opportunity at each intersection, moving poles, hydrants and other obstacles out of the travel way of the sidewalk, and widening sidewalks to allow for businesses to create entryways, increases walkability and offers downtown businesses unique opportunities to interact harmoniously with those seeking their goods and services. Walkability and unique commerce interaction in the downtown corridor are also goals of Cle Elum's Downtown Revitalization. Ro a dw ay I nfr as t r uc t ur e First Street is an unusually wide street in a small City. The width is a legacy of the street acting as the highway before Interstate 90 was constructed. The proposed road diet consisting of narrowing the roadway, increasing parking in a safer orientation, increasing sidewalk and pedestrian amenities, together should slow traffic in the downtown area and may reduce the frequency and severity of auto-related collisions. The extensiveness of economic development opportunity will not be achieved without Phase 3C construction. 3. Indicate if the project is consistent with the following applicable stateo regional and local plans and prioritization processes: Overall Economic Development Plan - Officially Adopted Yakima and Kittitas Counties Regional Comprehensive Economic Development Plan (2015) o Strategy Goals: relates to - Goal one, Goal two, Goal three, Goal four, Goal five, and Goal six. o Listed as #4 of the 17 Comprehensive Economic Development Strategy (CEDS) projects identified in Kittitas and Yakima Counties combined emphasizing its "importance for: job 6 tr creation, funding leverage, readiness to proceed, likelihood ofsuccess, and overall need for the project" (pg 6). Comprehensive Land Use Plan - Officially Adopted: June 2019 Kittitas Counqt Comorehensive Plan (06/2019\- : Cle Elum Land Use Plan (06/2019) o Project consistent with multiple goals in Chapter 2, Chapter 3, Chapter 4, Chapter 5, Chapter 6, and Chapter 10. Capital Facility Plan - Officially Adopted: Anril 2019 Cle Elum Capital Facilities Plan o Project consist with multiple Kittitas County Countywide Planning Policies as listed in Appendix A and Cle Elum goals in multiple infrastructure sections in the Cle Elum Capital Facilities Plan - Transportation Systems, Domestic Water System, Stormwater System, Sanitary Sewer System, Parks and Recreation sections. Community Action Plan (or other community-based plan) - Officially Adopted: June 2017 Cle a SI City Council Planning Commission Study Session and Public Forum (2017) AKA "Preferred Alternative." tr Six-YearTransportationImprovementPlan_officia|lyAdopted Cle Elum 2023-2028 Transportation Improvement Programo This project is included in Cle Elum's 2023-2028 Transportation Improvement Program as the City's Number 1 project. Site-specific development plans; e.g., Community Master Plan - Officially Adopted: 2015 & 2018 Downtown Association Main Street Studlt (20151: Master Plan I Other 4. Public Benefit: Please describe the public benefit derived from project completion. Conceptual plans and studies have been prepared for Cle Elum's downtown corridor over the past 20 years to improve traffic flow, optimize parking, and build a pedestrian-friendly environment. The latter has always been a focal point to enhance Cle Elum's tourism experience. The plans also addressed the need for improvements to stormwater facilities throughout the City. Past plans and studies continually lost momentum as the City's limited budget restricted possibilities for advancing forward without financial assistance. With procurement of grants/loans totaling $5.8 million in 6.5 years, Cle Elum residents and business owners have acknowledged the reality of the downtown revitalization coming to fruition. The rigorous planning process discussed in Question 5 included feasibility analysis of design alternatives, followed by adoption of the prefered alternative by City Council. Though the planning process did not include a market study and potential economic outcomes following completion of the revitalization, comparisons were made 7 to many of the eastern Washington neighboring communities implementing main street revitalizations, with overwhelming positive results. Eastern Washington examples of economic revitalization resulting from revitalized Main Streets/downtowns include Grandview, Sunnyside, and Yakima, Washington. The consultant team contracted by the City (HLA and HBB) led these three efforts, including the award-winning Grandview ooAlive" Downtown Revitalization, where over twenty store fronts were vacant prior to the project, and today, there are no downtown vacancies in the thriving community. As discussed in Question 2, this economic revitalization has already begun in Cle Elum's downtown. Public benefits from the project completion are improved transportation flow and decrease in multi-modal conflict. For the motoring public, reduced travel lanes and increased streetscape defines the space of the walkable downtown and prepares the driver for slower and mixed mobility activity. The majority of improvements are for people using the sidewalk system in the downtown core. Wide, unobstructed sidewalks, a mix of street and pedestrian level lighting, bulb-outs designed to reduce the crossing distance at every intersection in the corridor, and shade and amenities to provide comfort are all elements included in the design with public benefit as the focus. 5. Define the total number of project partners demonstrating project support. The City retained the services of HLA Engineering and Land Surveying, Inc. (HLA), together with HBB Landscape Architecture (HBB), to facilitate the downtown planning process to arrive at a concept titled the "Preferred Alternative" as shown on the attached pamphlet titled "Downtown Revitalization Planning lst Street Concept." The planning process was initiated in April 2017 with a Walk and Talk downtown tour, which included City staff and the Mayor, primarily to discuss existing themes, deficiencies, and opportunities. Next, four focus group sessions were administered with assistance from Central Washington University land-use planning students, including business owners, longtime residents, students, and Suncadia Resort members. From the focus groups, HLA and HBB created two geometric layouts of a typical block and three amenity grouping concepts. These layouts and concepts were presented at a community stakeholder workshop with 28 participants, and public preferences were noted. Based on workshop findings, a preferred concept was born and presented at a combined City Council and Planning Commission study session, see attached titled "Cle Elum Downtown Planning - Focus on lst Street Design Concepts." Following the study session, the concept was presented at a public forum with32 participants, continuing to gain traction. After detailing the preferred concept to address public desires, the Planning Commission prepared an official recommendation to the City Council on June 26,2017,to adopt the Preferred Alternative, see attached. On June27,2017, the City Council adopted by Resolution2}lT-011 (attached) the Preferred Alternative with an overwhelming amount of support from the community, 45 participants and standing room only in the Council Chambers. All remaining street improvements will take place within existing Washington State Department of Transportation (WSDOT) right of way, while the City has control of access points. As a result, the City has been required to and will continue to receive WSDOT approval on plans and specifications prior to construction (see Question 6). Since the initial outreach in2077,and as the City completed Phases 1,2,3A, and 3B, the City has continued partnering with funding providers such as: Kittitas County Conference of Governments, USDA, FHWA, Department of Ecology, Department of Commerce, QUADCO, Public Works Board, Washington State Legislators, and TIB. The remainder of Phase 3, including Phase 3C, will require an estimated $10,444,000 to complete. 8 The City is continuing to aggressively seek funding for the Phase 3 subphases. Kittitas County Conference of Governments generously contributed towards the 2022 Phase 3.A improvements from Billings Avenue to Pennsylvania Avenue. As evidenced by the Phase 3,A' construction, funding for Phase 3C can be used to leverage assurance to stakeholders and partners and continue crucial momentum towards completion of the entire Downtown Revitalization project. 6. Explain how construction ready this infrastructure project is relative to design completeness and the permitting process. Design funding for Phase 3 was previously secured through a Public Works Board loan, and "shovel- ready" plans and specifications were completed for the project in November 2020. Due to funding limitations, the construction of Phase 3 will be completed in subphases. Phase 3,{ and 38 will be completed this fall with the remaining construction work (including the Phase 3C project described in Question I of this funding request) from Oakes Avenue to Peoh Avenue is estimated at$I0,444,000. The City recognizes the importance of continued momentum towards construction of the entire corridor and continues to aggressively pursue funding opportunities for future subphases. As First Street from Oakes Avenue to Peoh Avenue also serves as SR 903, WSDOT approval is required for all future subphases. WSDOT has reviewed and approved the Phase 3 design plans, and coordination with affected public and private agencies, such as WSDOT, Puget Sound Energy, Lumen, and Inland Networks has been underway since 2018. As the Phase 2 andPhase 3 project footprints are the same, many of the approvals and permits for the extensive environmental processes completed during Phase 2 also apply to the upcoming Phase 3 subphases. This includes: a a Consultation with affected tribes. Tribal consultation was completed on March 26, 2019, No comments were received from tribes. Consultation with Department of Archaeology and Historic Preservation (DAHP). An extensive cultural resources survey was completed for Phase 2 at DAHP's request. The survey examined 53 potential historic properties along the corridor. Per DAHP's concurrence letter dated April26,2019, a monitoring plan was established and enacted during Phase 2 construction from March to August 2020. There were no artifacts or features noted during monitoring. Coordination with Department of Ecology (DOE). The SEPA checklist was prepared for and transmitted to DOE for the Phase 2 project in December 2018. The Final Determination of Nonsignificance was issued on December 20,2018. No comments were received and the Notice of Action Taken was issued on January 29,2019. The NEPA re-evaluation was approved on March 23,2022, and extends the NEPA approval to March 23,2025. a o 7. Indicate the Estimated Number of Short Term and/or Permanent Jobs Created/Retained by the Project. In the shorter term, the City anticipates between32 and 38 people will be employed during the four months of this construction project: One general contractor with 7-8 employees and additional subcontractors: o Roadway subcontractor (paving, bulb-outs): 8-10 employees o Sidewalk/Curbing/Planting subcontractor: 8-10 employees o Lighting subcontractor: 4-5 employees . Traffic control subcontractor: 4-5 employees o Construction administation services: 5 employees 9 Indirectly, and in the longer term, the completion of Phase 3C improvements will retain existing jobs in the corridor (estimated at eight jobs per business within the project limits; 600 total) and spur job creation as infill is experienced in vacant store fronts and restaurants expand business hours to serve additional customers. NOTE: Supplemental materials, including transmittal letter, are limited to a maximum of twenfy (20) pages single sided or ten (10) pages doubled sided including all graphics. Submittals shall be l2-point font. COG reserves the right to decline review of submittals that exceed the stipulated length or fail to provide sufficient font size. Submit the original application to: Kittitas County Department of Public Works 411 N. Rubyo Suite #1 Ellensburg, WA 98926 And to: candie.leader@co.kittitas.wa.us l0 Applicant Certification Certification is hereby given that the information provided is accurate and the applioable attachments are complete and included as part of the application package. I certifu that applicati resholds are met at the time of application. o€f. 6 2ozL Official Representative Date Sponsoring Agency (If Applicable) Signature of Agency Representative Date Ilped or Printed Name Date Associate Economic Development Organization Notification The organization listed below has received notilication of this project as demonstrated by the signature of the organization's representative. f a of 0rganization t w p/alanae Date ll List of Attachments Vicinity Map Cost Estimate Downtown Revitalization Funding Summary Downtown Revitalization Project Brochure - Phase 3C Pennsylvania Avenue to Harris Avenue Downtown Revitalization - l't Street Concept (Prefened Alternative) The following documents can be made available upon request: Comolete Streets Policy - Ordinance 1455 Yakima and Kittitas Counties Regional Comprehensive Economic Development Plan (2015) Cle Elum Capital Facilities Plan (2019) Cle Elum Downtown Planning - Focus on I't Street - City Council/Planning/Commission/Study Session Cle Elum Transportation Improvement Program (2023-2028) t2 CITY OF CLE ELUM FIRST STREET DOWNTOWN REVITALIZATIONVicinity MapzC."1tolrJo-JD!o(5G;,=.at,GEat,(5z,z,z.Irfo-.:,J-v,lrl-oa,- ' )*ri-:l{(A1^:::, !-{1l,t{!lTOYAKIMAIO SEATTTE.I it 'l*Phase 3C Request- $756,684Fr.;ture Fhase 3,ffi'Future Phase 3ErFUTURE PHASESI Phase 1 - First Street & Peoh Avenue lmprovementsf Design & Construction Compl*eO ZOfgPhase 2 - First Street Stormwater & Billings Avenuelntersection I mprovementsConstruction Comillete d 2O2OPhase 3 - Downtown RevitalizationDesign Completed 2020Phases 3A and 38 - Various Blocks2022 Under Construction*H__LJ HBB!4fi O5CTPI ARCXIl!CiORT CITY OF CLE ELUM First Street Revitalization Phase 3C Pennsylvania Avenue to Harris Avenue Engineefs Opinion of Construction Cost 7120t2022 HIr{ Projecl No. 22010G Item No.Descriptlon Payment Specification Unit Unit Cost Ov€rall Quantlty Overall CoBt 1 Minor chenoe 1-O4_4f1 I FA s10,000,00 s10.o00.00 SPCC Plan 1-07.15(1)LS $1.000.00 1 s1_000.00 3 and Historical 1-O7.16(4)FA sl 00 00 sloo 00 4 Mobillzation 'l-o9.7 LS s43.OO0 00 $43,000 00 Prolec{ TemDorary Trafiic Control 1-10.5 LS $15.000.00 1 s1 5.000.00 o Clearino and Grubbinq %o1.5 LS $4.000.00 1 $4.000.oo 7 Removal of Structures and Obstruc'tions 2-O2.5 LS $15_OO0 00 'l $15.000 00 ljnclassified Excavalion lncl. Haul 2-O3 5 CY s,too 00 320 $32.000.00 I Crushed Surfaclno Base Cou6e 4-04.5 TON s75.00 EO $5-O00-o0 10 Crushed Surfacino Too Course 4'O4.5 TON sloo.00 s2.400 00 11 HMA Cl. 1 l2-lndt PG 64H-2A 5-()4.5 TON s325 00 32 $'10.400.00 Storm Selver Pipe 6 ln. Diam 7-O4 5 LF $95.00 13 s1.235.00 13 AdluBt C8tch Basin 7-05.5 EA s600_00 s2.400 00 14 D.l. Pioe brWater Main 6 ln. Diam.7-O9.5 LF t8330 00 sl s80 00 5 Relocete waier Meter 7-1 5.5 EA $1.400 00 1 s1.400.00 6 nlei Prolection a-o't 5 EA $125.00 3 $375.00 't7 flant Selection - RedDoinle MaDle e-1l2" Calioer\8-02.5 EA $625.O0 $2.475 00 18 Plani Selection - Melro Gold MaEl€ (2-112" Cello€r)8-O2.5 EA sE25.O0 $4,125.00 19 Plant Selection - Kelsevi Dodwood (2 Gallon)8-02.5 EA s70 00 u $3.780-00 20 ,lant Seledion - Dwarf Mud6 Pine 12 Gallonl 8-02,5 EA $80.00 10 s800.00 21 Plant Selectlon - Woods Comoacl Kinnikinnick (2 Gallon)8-02.5 EA 660_OO 203 $12.180.00 22 Plant Selectlon - Golden Nuodet Barbenv (2 Gallon)8-02.5 EA tB70_o0 34 $2.380.00 23 Plant Selection - Flower Camet Pink Rose (2 Gallonl 8-O2.5 EA $70 00 23 s'1.610.00 4 ,lant Seleclion - Sun Rose Buroundv Dezzlrr (1 Gallonl 8-02.5 EA $60.00 61 $3.680.00 25 ,lant Selec{ion - Moonbeam CoreoDsis (1 Gallon)8-02.5 EA s60.00 75 $4.500.00 26 )ement Conc. Traflic Curb and Gutter a-o4 5 LF $75.OO 31 $23_250.O0 27 Bench 8-05.5 EA s4.250.OO s8.50D O0 Trash ReceDtacle 8-O5 5 EA s3 000.oo 1 $3.000,00 (e Rack 8-05.5 EA $2.500.00 2 $5.000.oo 3r Banner Pole and Foundation 8-05.5 LS s15.000.00 1 s15.000.oo 31 Cement Conc. Sidewalk 6-lnch Thick 8-'14 5 SY s1 15.O0 2',lo $24 150 00 32 Cement Conc- Sidelvalk 4-lnch Thick Pafterned 8-14.5 SY s180.o0 70,0 $126.000.00 3 ;ement Conc. Curb RamD 8-14.5 EA $3,500.00 3 $10.500.00gfree Liohtinq Svstem, Comolete 8-20,5 LS s50.000.00 1 $50_ooo.o0 35 SDare Conduit 1 ln. Diam. (Soeaker Wre)8-20,5 LF $6.OO $2_EEO.O0 36 Conduit lnstallation (PSE llluminationl E-20.5 LF $24.OO 3 $9,360,00 37 Peamanent Sionlno 8-2't 5 LS $5.000.00 'l s5.000,00 38 Pavemenl Mailinds 8-22.5 LS $10.000.00 1 $10.000.00 Assumptions:1. South side of Pennsylvania Ave. to Hanis Ave. not including bulbout at Pennsylvania Ave.2, Phase 3G taken from Phase 3 "shovel ready" PS&E. Design Engine€ring @sts are to pull Phase 3C from full Phase 3 PS&E. 3 3'wide asphalt tie in (0.42' HMA, 0.17' CSTC, 0.75'CSBC).4. 16'wide sidewalks include amenity zone for pedestrlan llghting, planters, bgnches, trash rcceptacles, elc.5. Street lights and pedestrian illumination are consistent with Council- adopted preferred concept.6, Unit costs taken from 2022 First Street Phase 3A 3B bld summary, May 2022. 7, f llumination system based on the costs inlhe 2022 illumination agreement with PSE. Subtotal Contingency',l0% 8474,440.OO $47,44/..00 lllumination System (PSE)$1 10,000 00 Total Estimated Construction Cost s63r,884.00 WSDOT CN Fees Design Engineering Construction Engineering 1 5% $15,000.00 $1s,000-00 $94,800.00 2g,6:u 9*///z BgdlfilfiA. Annen, PE Date HLA Englneering and Land Survsying, lnc Total Estlmated Project Cosl $756,684.00 GTPROJECTS\2022\2201 oG\TlB\First Strest Ph. 3C (S. Ha[ls to Pennsylvenla)\First Street R€vitalization Phase 3C - PennBylvania Avenue to hanis Avenue Cost EstimatE onstruction unded onstruction unded iign unded onstruction unded 20L8 Distressed County Sales Tax Grant 2018 Surface Transportation Block Grant (STBG) 201-8 Cle Elum Downtown Association 2017 Complete Streets Grant 20L7 County Small-Scale Municipality Grant (Site Amenities) Secured Funding 201"9 Surface Transportation Block Grant (STBG) 2018 CDBG Economic Opportunity Grant 2017 Distressed County Sales Tax Grant 20L7 USDA PPG Grant 2019 Distressed County Sales Tax Grant 2019 TIB Complete Streets of Cle Elum General Fund 20 Distressed County Sales Tax Grant 2019: P se Secured Funding 2019 Surface Transportation Block Grant (STBG) 2018 PWB Pre-construction Loan 2022: Phase 3A and 38 - Billin Avenue Streetsca e h Secured Funding 21 Distressed County Sales Tax Grant 22 Surface Transportation Block Grant (STBG) Total Secured Fundin Avenue and Pen nra n COMPI NOVEMBER 2018 COMPLEfE COMPtgTE ue Streetsca . DESIGN Total Secured Fundi ue ocfoBER 2020 Total Secured Funding 2020 '"""$:$:J:s31- coNsrRu"i"^tJi#Distressed County Sales Tax Grant 2022 T lB Complete Streets 2022 Surface Transportation Block Grant (STBG) Supplement 2O22 Capital Budget Appropriation Total Secured Funding 2023: Phase 3C. 3D. & 3E - Billines Avenue to Oakes Avenue. Pennsvlvania Avenue to Street Stormwater a ven Harris Aven ue StreetscaDe (South Sidel. and Harris Aven e to Peoh Avenue rnstruction ding ON Planned Fundine Remaining Need Total Planned Fund Total Secured Funding: 55,814064 Total lJnsecured Funding: StD,qqq,Ooo ,:,.EITY SF ffiLH HtU&4 F!RST STRHET NOWNTOWN REVITALIZATIONEiias*-' 33 Fe,l-is;':,:,:g--1r, -. c t, e ta i=i arris Auentie Fuite'ing ReqL{est {Csnstnue tsmn 0z.. j'cnlrl-oGz,,4,F.t'ase 1 - First Street & Peoh Avenue lmprovementssign & Construction Completed 2018 | $460,000ase 2 - First Street Stormwater & Billings Avenue lntersectionprovements (includes north sidewalk Billings to 0akes)nstruction Completed 2020 | $2,153,500rwntown Revitalizationeted2020 I $710,000rases 3A and 38 - Various Blockst22 Under Constmction I Secured $2,490,564Jture Phase 3DJture Phase 3Ehase 3C Request- $756,684PROJECT PARTNERS & STAKEHOLDERSBUSIN ESS OWNERS AND MERCHANTS,GASTIGHT DISTRICT,RESIDENTS,vtslT0Rsd':hpJ-hbefore\....\AFTER.. ,'';h-**e*USDA-PUGETSOUNDENERGY/n".oli\L2"-"CLE ELUMDOWNTOWNASSOCIAT!ON:It.t{I trir4fr: ..l..-.?n wsDoTffi,*@t--/:r n. afl -r:_ | I ;c r -{ rIaR a rnrsrlYir c\Yo! r Hofrerown ConnEnonLUME UR YEARS, thecityofCte800,00fi of construction and designon approximately 1/3 of thending work within the roadwayWSDOT paving project on First St),stormwater system (including 55dy" construction plans for Phase 3andfor First Street to:CITY OF CLE ELUM FIRST STREET DOWNTOWN REVITALIZATIONFhase 3C Femrisylu,eamia '&venile to l{arris Avenue Fundinrg Request (Construction O"{cz!..t|i'-PHASE 3 GOALS &Funding to complete pfiect by 2Complete Streets phi losophyCEDA comm unication/coord inatiorPreseruing historic character0ngoing maintenance planSafe, amenitized, walkablelncreased parkingEconomic revitalizationLRECREATIONLake Cle Elum, Cle ElumRiver, Yakima River,Teanaway CommunityForest, Cle Elum Ridge,Palouse to CascadesState Trail (akaJohn WayneTrail)CITY OF CLE ELUMSrnall town - - 1,950 residents"Downtown" of Upper Kittitas County, incl.Suncadia, Rosyln, and South Cle ElumRecreationa I ly based tourismTown events, incl, ,pioneer Days, Boo Elurn,Christrnas in Cle Elum, etcK ITT ITASCO U NTYl-90 3o,oooADTbetween Cle Elum exitsIIr.-WHAT'S NDCT FOR CtE ELUMEconomic Revitalization Population Growth lncreased DevelopmentPrioritization & Preservation of Recreational Resources' ANDSecond StMulti-UsePathRailrcadStreetErtensionCo'umbiaAve. RRCrossingCity-WideSafetyProjectsCi$-WideWayfindingsignage IPlanning CommissionKerry ClarkMarc KirkpatrickDebra DavisTheo LeonardTravis HarrisScotty SewellCity StaffLucy Temple - Planner, Project ManagerRobert Omans - City AdministratorJim Leonhard - Public Works DirectorltDowntown Revita lizafion F1st Street Concept E Jrr scL)tyoPE)rdinance.fners,lommissiont throughoutommission\lternativelouncil:rnative bya conceptualn, streetscapes for l-sttunding andopmmissionForum/'IEEIgEnEEFocus Group SessionCity Council Planning Commission Study Session and Public ForumTypical Block PlanConcrete Sidewalk Paving PatternBanner to Announce EventsPublic AArtist -in MLB700 Wood BenchSidewalkCenterTurn LoneCoal Cartat intersections,tL*Street LigWestport No ScBike RacknnershecLandscarPlaiMidblock Cross