HomeMy WebLinkAbout2023 - 2028 Six-Year Capital Improvement Plan
From the Cascades … to the Columbia
Adopted __________ by the Board of County Commissioners
● Ordinance No. _________
Kittitas County Capital Improvement Program 2023-2028 Six Year Plan
Kittitas County Capital Improvement Program December 20, 2022
Table of Contents Page i
Table of Contents
0BSix-Year Plan .................................................................................... 1
Introduction ....................................................................................... 1
2023-2028 Summary ........................................................................ 2
1. 2BAirport Facilities ................................................................... 13
2. Kittitas County Administrative Offices .................................. 20
3. Kittitas Valley Event Center / Fairgrounds ............................ 27
4. 5BKittitas County Maintenance Shops, Storage, & Parking ..... 33
5. 6BKittitas County Roads .......................................................... 35
6. 7BRegional Parks and Trails .................................................... 36
7. 8BSolid Waste .......................................................................... 37
8. 9BLibrary Services ................................................................... 40
9. 10BEmergency Services ............................................................ 42
10. Education ............................................................................. 51
11. 12BWater - Group A Systems .................................................... 68
12. 13BSanitary Sewer ..................................................................... 71
13. 6BKittitas County Flood Control Zone District .......................... 72
14BFrequently Asked Questions ........................................................... 73
Kittitas County Capital Improvement Program December 20, 2022
Six-Year Plan Page 1
0BSix-Year Plan
Introduction
The Six-Year Plan shows capital improvements that are needed to provide adequate public
facilities in Kittitas County. The County either directly provides these capital improvements or
coordinates with other agencies to provide them. The Six-Year Plan is reviewed and updated
annually. Annual updates are made to correct or modify project costs, revenue sources, and dates
of construction.
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 2
2023-2028 Summary
The following table summarizes the 2023-2028 Six-Year Plan.
Table 1 - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
1. Airport Facilities
Project Name Location & Description Funding Source Schedule Total Cost
Wetland Mitigation for EA
Projects
Bowers Field Airport.
Following the
Environmental
Assessment and
Advanced Design, the
airport will undergo a
wetland mitigation
project.
FAA GA
Entitlement and
Local Match
2023-2026 $2,585,000
Runway 11/29 Parallel
Taxiway and Taxiway
Lighting Project
Bowers Field Airport.
Construct runway new
taxiway including
pavement, lighting, and
marking installation
FAA GA
Entitlement and
other funding,
Local Match
2023-2026 $5,555,000
Rehabilitate Runway 11/29
including AGIS, Runway
Lighting, and Runway
Width Reduction
Bowers Field Airport.
Rehabilitate Runway
11/29 including AGIS
survey, reducing the
runway width, drainage
improvements, and
replacing the runway
lighting system.
FAA GA
Entitlement,
Local Match
2023-2026 $550,000
East Apron Utilities
Extension
Bowers Field Airport.
Extension of utilities to
13 additional lots.
WSDOT
CARB Loan,
Local Match
2023-2027 $105,000
Industrial Park Building
Development
Bowers Field, Design
and construct two new
industrial buildings in
the Bowers Field
Industrial Park.
TBD 2023-2027 TBD
Fire Wise Program for
Agricultural Lands
Bowers Field.
Agricultural Land Fire
Wise Program with DNR
DNR Grant
Program 2023 $50,000
2. Kittitas County Administrative Offices
Project Name Location & Description Funding Source Schedule Total Cost
Permit Center Building
Improvements
411 N Ruby, Ellensburg.
Upgrade outdated
facilities for CDS, PWD,
and Fire Marshal offices.
Constructed in 1959 and
the County purchased
the building in 2002.
General
Obligation
Bonds
2022-2026 $250,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 3
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
County Administration
Building
N of Courthouse.
Consolidating
administrative offices
including
Commissioner’s Office,
Auditors Office,
Assessors’ Office,
Treasurers Office, Fire
Marshal, CDS, and
Public Works Admin
Office.
REET 2023-2026 $133,862,513
Public Safety Building
Improvements
205 W. 5th. Various
improvements to include
new siding for old
portion of jail and
replace ceiling in
hallways.
General Fund
and 1/0th Sales
Tax
2022-2027 $3,680,000
Juvenile Detention Holding
Facility
205 W. 5th, Ellensburg.
Building remodel to
provide a temporary
holding cell for juvenile
detention.
Law & Justice
Sales Tax 2022-2026 $30,000
Expansion of Prosecutor’s
Office
Expansion of
Prosecutors Office to
consolidate offices to
one location.
General Fund 2022-2026 TBD
Kittitas County Corrections
Facility
Construction of new
Courthouse Commissioner
approved Bond 2023-2027 $249,703,704
3. Kittitas Valley Event Center/Fairgrounds
Project Name Location & Description Funding Source Schedule Total Cost
Rodeo Arena Grandstands
901 E. 7th, Ellensburg
Replace old rodeo
grandstands complex
to include the seating
bleachers and box
seats along with
Behind the Chutes
Revenue Bonds 2022-2026 $2,670,000
Multi-Purpose Addition to
Bloom Pavilion
Southwest corner of
Fairgrounds in
Ellensburg
Add a new multi-
purpose addition with
wash racks to existing
Bloom Pavilion at the
Kittitas Valley Event
Center to be used for
various events and
livestock housing.
REET 1 2022-2026 $1,500,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 4
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Bloom Pavilion Upgrades
Southwest corner of
Fairgrounds in
Ellensburg, replace
windows and footing,
and install protective
materials for multi-
purpose uses. Install
retractable bleachers.
Gen. Obligation
Bonds 2022-2026 $840,000
Barn Expansion
901 E. 7th Ave, add
space for various types
of livestock
Gen. Obligation
Bonds 2022-2026 $3,500,000
Emergency Animal Shelter
Kittitas Valley Event
Center / Fairgrounds
Upgrade existing barn
facilities to allow for
different types of animal
shelter at the Kittitas
Valley Event Center.
General Fund 2022-2026 $500,000
4. Kittitas County Maintenance Shops, Storage, Parking, & Pits/Quarries
Project Name Location & Description Funding Source Schedule Total Cost
Upper County Maintenance
Shop
Automated wash bay
design and construction. 2028 $400,000
Lower County Maintenance
Shop
Potential land acquisition
and shop relocation
ER&R Fund
501 2023-2027 $8,650,000
Hyak Joint Maintenance
Facility with SPUD
Ongoing operations, On
capital improvements
planned.
TBD TBD TBD
Hansen Pit
Potential Advanced
Environmental
Mitigation site.
Airport Fund
107, Flood
Control Fund
107, FAA
Grant
2024 $1,750,000
Other Pits and Quarries
Ongoing operations, On
capital improvements
planned.
TBD TBD TBD
5. Roads – County Owned (capital improvements scheduled for construction)
Project Name Location & Description Funding Source Schedule Total Cost
Manastash Road Creek
Bank Stab, and Snow Park
Improvements
MP 10.65-MP 11.01
Roadway safety, repair
and improvements
Planned
FLAP/FHWA
funds, local
funds
2023 $1,700,000
Liberty Road Swauk Creek
Bridge
MP 0.2 Liberty Road
Bridge replacement –
safety
Planned
FLAP/FHWA
funds, local
funds
2023-2024 $3,207,000
Dickey Creek Bridge
Replacement
Teanaway Road
Bridge replacement Local Funds 2023 $400,000
I-90 Widening (State
Project)
Cle Elum to Easton
Improve capacity and
safety
Local funds 2023-2024 $750,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 5
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Hungry Junction Road
Widening
MP 0-MP 1.74, Hungry
Junction Road,
Ellensburg
Reconstruction and
safety
Planned RAP
funds, local
funds
2023-2025 $4,101,000
Cooke Canyon Rd Bridge
Replacement
MP 0.24, Cooke Canyon
Rd, Bridge replacement
Local Bridge
Program, Local
Funds
2023-2024 $2,673,000
Faust Rd Bridge
Replacement
MP 0.59, Faust Rd.,
Town Ditch, Bridge
Replacement
Local Bridge
Program, Local
Funds
2023-2024 $2,532,000
Intersection and Corridor
Safety Improvements
Various
Safety improvements
and countermeasures
HSIP, Local
Funds 2023 $382,000
Bridge Rail Improvements
Code 3, (MD A-F)
Various.
Safety improvements
and countermeasures
HSIP, Local
Funds 2023 $601,000
Vantage Highway over
Cascade Canal (89342)
Replacement
MP 5.17-5.33,
Ellensburg
Safety improvements
and countermeasures
STBG 2023 $249,000
Airport Road Sidewalk
Replacement
MP 1.35-1.85, Bowers
Road, Ellensburg
Improvements and
increased drainage
Local funds 2023 $78,000
Progress Path – Ph. 2, Cle
Elum to Roslyn
Cle Elum to Roslyn,
Develop a paved path
from existing.
Safe Routes to
School, Local
Funds
2023-2024 $410,000
HSIP 2023-2025 Awarded
Project Various, TBD HSIP, Local
Funds 2024-2025 $1,150,000
Badger Pocket Area Road
Improvements, Payne Rd,
Phase 1
MP 0.0 – MP 1.55,
Safety, rehabilitation,
and improvements
Local Funds 2024-2025 $3,700,000
Yellowstone Rd Culvert
Replacement
MP 0.65 – MP 0.75
Snoqualmie Pass,
Culvert Replacement
Local Funds 2024-2025 $1,755,000
Denmark Road
Improvement
MP 3.08-4.35
Safety, bridge
replacement, and other
improvements
RAP, Local
Funds 2025-2027 $4,610,000
Badger Pocket Area Road
Improvements, Phase 2
Various.
Safety, rehabilitation,
and improvements
Local Funds 2025-2026 $2,780,000
Airport Road Culvert
Replacement
MP 2.25-2.4, Cle Elum
Drainage improvement
and flood reduction
Local Funds 2026-2027 $1,290,000
Short Span Bridge
Replacement, Phase 1
Snoqualmie Pass
Safety
Planned STBG,
Local Funds 2025-2026 $1,400,000
Badger Pocket Road HMA
MP 0.0-0.57, Ellensburg
Rehabilitation and
maintenance
Local Funds 2025-2026 $1,640,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 6
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
HSIP 2025-2027 Awarded
Project
Various, TBD
Safety
HSIP, Local
Funds 2026-2027 $450,000
Reecer Creek Rd Bridge
Replacement
MP 0.86 Reecer Creek
Road/Town Ditch
Bridge replacement
Local Bridge
Program, Local
Funds
2026-2027 $2,734,000
Lambert Road Bridge
Maintenance
MP 0.67 over Teanaway
River
Maintenance and repairs
Planned BRAC
Funds, Local
Funds
2027-2028 $479,000
Bender Road Widening and
Pedestrian Improvements
MP 0.0-MP 0.68, New
construction and
improvements
RAP, Local
Funding 2027-2028 $2,300,000
Sanders Road Improvements
MP 0.13 to MP 0.25
Safety, stormwater
drainage, roadway
improvement
Local Funds 2028 $500,000
Parke Creek Road
Turnaround Improvement
MP 5.79 - 11.64, Parke
Creek Road, Ellensburg
Improvements and
increased drainage
Local Funds 2023-2024 $1,100,000
Pheasant Lane Turnaround
MP 0.0 - 2.04, Pheasant
Lane, Ellensburg
Road and access
improvements
Local Funds 2027-2028 $700,000
Bar 14 Turnaround
MP 1.11 - 1.21 Bar 14
Road, Ellensburg
Repair flood damage and
school bus turnaround
Local Funds 2023-2024 $200,000
Gravel Road Upgrades Various Local Funds 2023-2028 $4,650,000
6. Regional Parks and Trails
Project Name Location & Description Funding Source Schedule Total Cost
Manastash Trailhead
Parking Lot
Manastash Trail, Design
& build parking lot 2023-2025 $599,260
Vantage Boat Ramp
Overflow Parking (LC)
Lower County.
Acquire property, design
& build overflow
parking lot.
2023-2024 $907,895
Dunford Interpretive Center
Design and construct
parking and restroom
improvements
2023-2024 $785,764
Gladmar Park (MC)
Mid County.
Design and construct
bridge access; construct
island improvements.
2024-2026 $850,000
Upper County ATV Trail
(UC)
Upper County.
Build trails. 2026-2028 $1,500,000
Ellensburg Rotary Indoor
Soccer (LC)
Lower County, County
cost share with
Ellensburg
2027-2028 $4,000,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 7
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Vantage River Walk (LC) Lower County. 2027-2028 $1,000,000
7. Solid Waste
Project Name Location & Description Funding Source Schedule Total Cost
Relocate Ellensburg
Transfer Station and
Compost Facility
925 Industrial Way,
Ellensburg. Build a new
Transfer Station and
Compost Facility.
Solid Waste
Fund / Grant /
Loan
2022-2027 $23,000,000
Cle Elum Transfer Station
Entrance
Cle Elum Transfer
Station 50 No. 5 Mine
Road.
Construct a new entrance
to allow for better
queuing for the scales.
Solid Waste
Fees and Grants 2022-2027 $1,600,000
8. Library Services
Project Name Location & Description Funding Source Schedule Total Cost
Ellensburg Public Library
HVAC System
209 N Ruby St.,
Ellensburg WA
Install new HVAC
system to replace current
system.
Commissioner
Approved Bond 2023 $175,000
9. Emergency Services
Project Name Location & Description Funding Source Schedule Total Cost
Station 26 Replacement –
No Update Provided for
2023-2028
Fairview and Brickmill
Road.
Relocate and replace
volunteer station.
Property Tax
(existing) 2022-2027 $950,000
Upper County Emergency
Operations Center & Search
and Rescue Base
Airport Road off Cle
Elum Airport Access
Road.
Establishing primary
Emergency Operations
Center in growing upper
county.
General Fund,
Federal Funds
(anticipated)
2024-2028 $5,250,000
Sheriff’s Office Upper
County Precinct
Cle Elum Area.
Base for convenient law
enforcement services to
upper county including
dedicated patrol,
investigations, records
and other front office
services
General Fund 2024-2028 $4,250,000
Sheriff’s Office
Administration Bldg. #2
307 W. Umptanum Rd,
Ellensburg, Storage
building with footprint
identical to current
KCSO admin building.
ARPA or
General Fund 2023 $1,300,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 8
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Kittitas Valley Healthcare
Hospital Expansion
603 S. Chestnut,
Ellensburg
Hospital expansion to
surgery, materials
management, and
radiology.
TBD 2023-2028 $13,586,000
10. Education
Project Name Location & Description Funding Source Schedule Total Cost
Central Washington
University, Health
Education
Parcel # 313534, E Dean
Nicholson Blvd, CWU
campus, Ellensburg, WA
Renovation and
expansion of existing
Nicholson Pavilion for
academic programs
supporting Health
Education.
State OFM
Capital,
Internal &
Donor Funding
2023 $55,505,000
Central Washington
University, Barge Hall
Envelope Upgrade
Parcel # 123534, 400 E
University Way, CWU
campus, Ellensburg, WA
The project incorporates
the replacement of the
existing roof and brick
tuck pointing of the
envelope.
State OFM
Capital 2023 $1,710,000
Central Washington
University, Electrical Grid
Security
Parcel # 313534, E Dean
Nicholson, CWU
campus, Ellensburg, WA
The project reduces the
electrical load of two
aging feeders on the
northern end of campus
and provides a level of
redundancy for the
campus electrical grid.
State OFM
Capital 2023 $1,508,000
Central Washington
University, Multicultural
Center
Parcel # 143534, 400 E
University Way, CWU
Campus. The project
establishes a student
focused academic
facility dedicated to the
celebration of Equity &
Diversity.
State OFM
Capital, CWU
Self-Funded
2023 - 2028 $22,797,000
Central Washington
University, North Academic
Complex
Parcel # 143534, E Dean
Nicholson Blvd, CWU
campus, Ellensburg, WA
The North Academic
Complex is a
replacement project
for the existing Farrell
Hall, L&L Building.
State OFM
Capital 2023-2028 $104,467,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 9
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Ellensburg School District,
Tennis Courts (Joint with
the City of Ellensburg)
Mountain View Park.
Construct tennis courts. General Fund FY 2024-
2028 $250,000
Ellensburg School District,
TVF Support to Increased
Student Growth / 30-Year
Bus Replacement
Transportation
Department: 1300 E.
Third Avenue.
30-year bus replacement.
General Fund
Transfer
FY 2022-
2028 $832,808
Ellensburg School District,
Valley View Elementary
Parking Lot Improvements
1508 East Third Avenue.
Improve parking lots to
the north, south, and
west sides of Valley
View Elementary.
General Fund
Transfer
FY 2024-
2028 $286,663
Ellensburg School District,
Lincoln Elementary
Remodel/Addition
200 South Sampson
Street. Remodel/addition State Match FY 2022-
2023 $500,000
Ellensburg School District,
Lincoln Elementary, Roof
Restoration
200 South Sampson
Street. Roof Restoration
General Fund
Transfer
FY 2022-
2023 $654,628
Ellensburg School District,
Valley View Elementary
Blvd Resurfacing
1508 East Third Avenue.
Valley View Blvd.
resurfacing.
General Fund
Transfer
FY 2024-
2028 $321,997
Ellensburg School District,
Maintenance Warehouse
1300 East Third Avenue.
Construct
maintenance/grounds
equipment warehouse.
General Fund
Transfer
FY 2024-
2028 $325,200
Ellensburg School District,
IT Mitigation Plan
1300 East Third. IT
Mitigation. Tech Levy FY 2022-
2028 $5,771,427
Ellensburg School District,
Central Office HVAC
1300 E. Third Ave.
Replace HVAC. ESSER FY 2022-
2028 $300,000
Ellensburg School District,
Mt. Stuart Elementary
Parking Lot Resurfacing
705 W. 15th Avenue.
Mt. Stuart Elementary
resurfacing
General Fund
Transfer
FY 2022-
2023 $569,259
11. Water – Group A Systems - No projects planned for 2023-2028 period
12. Sanitary Sewer - No projects planned for 2023-2028 period
13. Flood Control Zone District
Project Name Location & Description Funding Source Schedule Total Cost
Flood Hazard Risk and
Repetitive Loss Program
Yakima River.
Comprehensive Flood
Planning and Repetitive
Loss Hazard Assessment
FCZD Levy,
future phases
by grant
2023-2027 $230,000
Repetitive Loss: Easton
Reach Flood Study
Collect necessary data,
conduct a flood hazard
analysis, and engage the
local community to
develop a reach-level
plan informed by natural
processes.
FCAAP, FCZD
Levy. Future
phases will be
grant eligible
2023 $80,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 10
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Ringer Loop Property
Improvements
Ringer Reach.
Control for invasive
species, riparian buffer
plantings, and building
decommissioning at
County-owned
properties.
Yakima Basin
Integrated Plan,
FCZD Levy,
USBR In-Kind
Services,
MCFEG In-
Kind Services,
grant funding
2023-2026 $800,000
Hanson Levee and Private
Berm Removal
Ringer Reach.
Implementation of
preferred alternative
from Hanson Pits
Restoration Plan and
Design. 2023 SRFB
design only grant.
Yakima River
Basin
Integrated Plan
(potential),
Salmon
Recovery
Funding Board
(potential)
2023-2026 $1,265,0000
Reecer Creek Dolarway to
University
Flood Control Zone
District Cost share in
support of City of
Ellensburg Project to
purchase property,
construct setback levees
and construct second
bridge along Dolarway
Rd.
FCZD Levy 2023 $850,000
Stream Gaging and Early
Warning System
2023 site additions:
Wilson Creek, Reecer
Creek, Crystal Creek
FCZD Levy 2023-2027 $250,000
CTP Flood Studies
General.
Continued funding
through FEMA's
Cooperating Technical
Partnership (CTP)
program to improve
flood models and
channel migration zone
mapping.
Community
Technical
Partnership
Program
(potential),
FCZD Levy
2023-2027 $650,000
Whisky Creek at EWC
Siphon
WNC.
Increase flood
conveyance, eliminate
canal / creek
intermingling, and
address fish passage
barrier by replacing
current EWC crossing at
Whiskey Creek with a
siphon. KCCD managed
project, with FCZD cost-
share.
FCZD Levy,
Grant or partner
support for
construction
2028 -
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 11
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Wilson-Naneum-Cherry –
Phase 2 Whisky Reroute
Feasibility Study
WNC.
Hydrologic analysis with
existing 2-d model to
evaluate Whiskey Creek
tie-in at Reecer Creek
project. Evaluate effects
of Mercer Creek flow
routing north of the
airport on hydrologic
regime, design
specification needed at
proposed railroad
crossing, and within
Reecer Creek floodplain
site, and water needs
downstream of proposed
reroute site
FCZD Levy 2023 $100,000
Wilson-Naneum-Cherry –
Phase 3 Whisky Reroute
Design
WNC.
Implement capital
recommendations from
Phase 2 Feasibility Study
FCZD Levy,
Flood Control
Assistance
Account
Program
(potential)
2025-2027 $600,000
Flow Conveyance
Restoration – Site 2
WNC.
Implementation of
project similar to Mercer
at Helena flow
conveyance project, site
TBD
FCZD Levy,
Ecology
Centennial
Clean Water
grant
(potential)
2023-2024 $360,000
Flow Conveyance
Restoration – Site 3
TBD. Implementation of
project similar to Mercer
at Helena flow
conveyance project, site
TBD
FCZD Levy,
Ecology
Centennial
Clean Water
grant
(potential)
2025-2026 $392,000
Crystal Creek Conveyance
Project
Crystal Creek.
Implement project
identified through
Crystal Creek CTP
study.
Grant funding
TBD 2023-2024 $120,000
Manastash – Cove Road
Replacement
Manastash.
Replace existing Cove
Road bridge with bridge
of sufficient freeboard
and span to pass
sediment and flood
flows.
2026: Design and
Permitting.
FCZD Levy,
Road Fund,
Flood Control
Assistance
Account
Program
(potential)
2027-2028 $200,000
Kittitas County Capital Improvement Program December 20, 2022
2023-2028 Summary Page 12
Table 1 continued - Six-Year Plan Summary
2023-2028 Summary Kittitas County Public Facility Projects
Project Name Location & Description Funding Source Schedule Total Cost
Hazard Mitigation Plan
Update
County-wide.
The Multi-jurisdictional
Hazard Mitigation Plan
needs to be updated
every 5-years.
FCZD Levy 2023 $200,000
Additional Property
Acquisition
Potential property
acquisition in Ringer
Road Vicinity
FCZD Levy,
SRFB
(potential)
2023-2024 $5,500,000
West Ellensburg Interchange
Flood informed
development effort in
West Ellensburg
Interchange. 2023:
Testing design
alternatives and impacts
and perpare a CLOMR
application.
FCZD Levy 2023-2027 $3,100,000
Fire District No. 7
Address critical facility
at flood risk from
Yakima River flooding.
Construction cost
estimates based on flood
wall cost estimate.
FCZD Levy 2023 $1,000,000
Wilson Creek Re-Route
Implementation funding
for proposal to relocate
Wilson Creek in Brook
Lane vicinity.
FCZD Levy,
Ecology:
Centennial
Clean Water
Funding
2026 $750,000
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 13
1. 2BAirport Facilities
This section includes an inventory of the existing airport facilities in Kittitas County and a
detailed description of each airport facility improvement that is included in the six-year plan. The
inventory of facilities in Table 2 below also describes each facility’s size in order to determine if
it addresses the County’s long-term community needs.
Table 2
Existing Public Facilities and Services
Airport Facilities
Facility Provider Description Size
Bowers Field
Airport
Kittitas County Asphalt, 11/29 Runway, 4,300’x150’,
asphalt.
1,300 acres
Bowers Field
Hanger Bldg 404
Kittitas County Built 1997. 20,000 sq. ft.
Bowers Field T-
Hanger
Kittitas County Built 1960. 12,500 sq. ft.
Cle Elum
Municipal Airport
City of Cle Elum 50,000 sq. ft. parking apron area, 07/25
Runway, 2,552’x40’, asphalt, 1,000 aircraft
usage per year.
135 acres
De Vere Field Jim De Vere
(private owner)
08/26 Runway, 2,055’x30’, asphalt, 6 single
engine aircraft based.
50 acres
Easton State
Airfield
WSDOT 09/27 Runway, 2,640’x100’, turf, 30
aircraft usage per month, built in 1930’s.
15 acres
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 14
Airport Facilities – Wetland Mitigation for EA Projects
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Following the Environmental Assessment and Advanced
Design, the airport will undergo a wetland mitigation
project.
Justification (Need/Demand)
This project allows for the construction of the parallel
taxiway and other facility needs at Bowers Field. It also
mitigates flooding and other wetland concerns for the
county.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Design and Environmental
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023 2024-2026 Total
Design and Engineering $385,000 $385,000
Construction $2,200,000 $2,200,000
TOTAL $2,585,000
Funding Sources 2023 2024-2026 Total
FAA GA Entitlement $2,350,000 $2,350,000
Local Match $235,000 $235,000
TOTAL $2,585,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Airport Department
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 15
Airport Facilities – Runway 11/29 Parallel Taxiway and Taxiway
Lighting Project
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Construct runway new taxiway including pavement, lighting,
and marking installation
Justification (Need/Demand)
This project is needed to provide adequate facilities for
projected airplane operations.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New facility construction
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023 2024-2026 Total
Design and Engineering $495,000 $495,000
Construction $5,060,000 $5,060,000
TOTAL $5,555,000
Funding Sources 2023 2024-2026 Total
FAA GA Entitlement & Other Funding $495,000 $4,555,000 $5,050,000
Local Match $505,000 $505,000
TOTAL $5,555,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for
Operations Airport Department
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 16
Airport Facilities – Rehabilitate Runway 11/29 including AGIS,
Runway Lighting, and Runway Width Reduction
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description
Rehabilitate Runway 11/29 including completing an AGIS
survey, reducing the runway width from 150 feet to 75 feet
(per FAA requirements), drainage improvements, and
replacing the runway lighting system.
Justification (Need/Demand)
This project removes the outer 75 feet of failed asphalt
pavement and replaces the runway lighting system that has
outlived its useful life.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility repair and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023 2024-2027 Total
Design and Engineering $165,000 $165,000
Construction $385,000 $385,000
TOTAL $550,000 $550,000
Funding Sources 2023 2024-2027 Total
FAA GA Entitlement $500,000 $500,000
Local Match $50,000 $50,000
TOTAL $550,000 $550,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for
Operations Airport Department
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 17
Airport Facilities – East Apron Utilities Extension
Project Information and Selection Criteria
Location Bowers Field Airport, Ellensburg
Links to Other Projects or Facilities N/A
Description Extension of utilities to 13 additional lots.
Justification (Need/Demand)
This project allows for the design and construction of
infrastructure to meet the need for hangar development.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Design and Construction
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023 2024-2028 Total
Design and Engineering $10,000 $10,000
Construction $95,000 $95,000
TOTAL $105,000
Funding Sources 2023 2024-2028 Total
WSDOT CARB Loan $105,000 $105,000
Local Match
TOTAL $105,000 $105,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
utility improvements.
Estimated Revenues $20,000 annually for new hangar leases.
Anticipated Savings Due to Project None
Department Responsible for
Operations Airport Department
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 18
Airport Facilities– Industrial Park Building Development
Project Information and Selection Criteria
Location Bowers Field
Links to Other Projects or Facilities
Centerfuse Initial Development Concept for EBDA at
Bowers Field.
Description
The design and construction of two new industrial
buildings in the Bowers Field Industrial Park.
Justification (Need/Demand)
The Kittitas County Airport has significant land to manage
and under FAA recommendations the airport should work
to be self-sufficient with support of the Sponsoring
Agency, (Kittitas County) to relieve the financial burden on
the local municipality. In an attempt to move towards this
FAA goal, these buildings would be a highly positive initial
step.
Level of Service (LOS) / Project Type LOS: N/A. Project Type: New Facility
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering TBD TBD TBD
Construction 2,500,000 $2,500,000
TOTAL TBD
Funding Sources 2023 2024-2028 Total
County Funding Options TBD TBD TBD TBD
TOTAL
Annual Operations and Maintenance
Estimated Costs $12,000 Annually
Estimated Revenues $200,000 Annually
Anticipated Savings Due to Project
Department Responsible for Operations Airport Department
Example Purposes Only
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Airport Facilities Page 19
Airport Facilities – Fire Wise Program for Agricultural Lands
Project Information and Selection Criteria
Location Bowers Field
Links to Other Projects or Facilities
Description Agricultural Land Fire Wise Program with DNR
Justification (Need/Demand)
Excessive brush and woody debris on the eastern portion of
the airports agricultural lands has created a wildland fire
risk
Level of Service (LOS) / Project Type LOS: N/A. Project Type: Construction
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering
Construction $50,000 $50,000
TOTAL $50,000
Funding Sources 2023 2024-2028 Total
DNR Grant Program $50,000 $50,000
TOTAL $50,000
Annual Operations and Maintenance
Estimated Costs
Costs of the project are reimbursed by the DNR up to a
predetermined amount, approximately $400 per acre. We
have cut the estimated project area to 120 acres and are
pending the report on reimbursable costs from the
Department of Natural Resources Fire Wise assessment.
Initial Cost will be estimated at $50,000.
Estimated Revenues None
Anticipated Savings Due to Project $50,000
Department Responsible for Operations Airport Department
Vicinity Map
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 20
2. Kittitas County Administrative Offices
This section includes an inventory of Kittitas County Administrative Offices and a detailed
description of each facility improvement that is included in the six-year plan. The inventory of
facilities in Table 3 below also describes each facility’s size in order to determine if it addresses
the County’s long-term community needs.
Table 3
Existing Public Facilities and Services
Kittitas County Administrative Offices
Facility Department Description Size
Armory Building Extension, Noxious Weed, and
Kittitas Valley Event Center
901 E. 7th, built 1950.
Remodel completed in 2014
13,140 sq. ft.
Cle Elum Public
Health
Public Health 415 E. First Ave., Cle Elum,
leased building
2,400 sq. ft.
County
Courthouse
Assessor, Auditor, Clerk,
Commissioners, Lower District
Court, Human Resources,
Information Services, Juvenile
Probation, Maintenance,
Prosecutor, Superior Court,
Treasurer
205 W. 5th, built 1958. 47,691 sq. ft.
Permit Center Public Works, Community
Development Services, and Fire
Marshal
411 N. Ruby, built 1959 13,625 sq. ft.
Public Safety
Building
Sheriff/Corrections 205 W. 5th, built 1985.
Remodeled 2010 to 2012.
33,209 sq. ft.
Sheriff
Administration
Office
Sheriff 307 Umptanum Rd., built
2009
11,880 sq. ft.
Sorenson
Building
Public Health and Misdemeanant
Probation
507 Nanum, built 1942. 17,648 sq. ft.
Upper District
Court Building
Upper District Court 700 E. 1st, Cle Elum,
remodeled in 2013
6,000 sq. ft.
Vantage Marine
Storage Building
Sheriff Vantage Boat Launch, built
in 2014
1,024 sq. ft.
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 21
Kittitas County Administrative Offices – Permit Center Building
Improvements
Project Information and Selection Criteria
Location 411 N Ruby, Ellensburg– see existing facility inventory
Links to Other Projects or Facilities N/A
Description Remodel building
Justification (Need/Demand)
This project is needed to upgrade outdated facilities for
CDS, PWD, and Fire Marshal offices. This building was
constructed in 1959 and the County purchased the building
in 2002.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility repair, remodel, and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering To Be Determined To Be Determined
Construction $250,000 $250,000
TOTAL $250,000 $250,000
Funding Sources 2022-2026 Total
General Obligation Bonds $250,000 $250,000
TOTAL $250,000 $250,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 22
Kittitas County Administrative Offices – County Administration
Building
Project Information and Selection Criteria
Location New Courthouse
Links to Other Projects or Facilities Courthouse, Permit Center, and Morris Sorenson bldg.
Description New County Administration Building
Justification (Need/Demand)
Office space is needed for all county functions.
Consolidating administrative offices. This includes
Commissioner’s Office, Auditors Office, Assessors’ Office,
Treasurers Office, Fire Marshal, Community Development
Services, and Public Works Administrative Office. The
Courts and related offices would remain in the existing
Courthouse.
Level of Service (LOS) / Project Type
Established LOS: N/A.
Project Type: New facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2021 2023-2026 Total
Master Plan / Conceptual Site Plan $120,000 $250,000 $370,000
Design and Engineering $1,500,000 $1,500,000
Construction $131,992,513 $131,992,513
TOTAL $120,000 $132,742,513 $133,862,513
Funding Sources 2021 2023-2026 Total
Real Estate Excise Tax (REET) $120,000 Undetermined $120,000
TOTAL $120,000 $0 $120,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 23
Kittitas County Administrative Offices – Public Safety Building
Improvements
Project Information and Selection Criteria
Location
205 W. 5th, Ellensburg – see existing facility inventory
Public Safety Building
Links to Other Projects or Facilities N/A
Description
Various improvements to include new siding for old portion
of jail and replace ceiling in hallways.
Justification (Need/Demand)
This project is needed to provide safe and adequate facilities
for inmates and correctional officers.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility remodel and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2021 2023-2024 Total
Design and Engineering $50,000 $0 $50,000
Construction $130,000 $3,500,000 $3,630,000
TOTAL $180,000 $3,500,000 $3,680,000
Funding Sources 2021 2022-2026 Total
General Fund & 1/10th sales tax $180,000 $3,500,000 $3,680,000
TOTAL $180,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Sheriff Office
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 24
Kittitas County Administrative Offices – Juvenile Detention Holding
Facility
Project Information and Selection Criteria
Location
205 W. 5th, Ellensburg – see existing facility inventory
County Courthouse
Links to Other Projects or Facilities N/A
Description
Building remodel to provide a temporary holding cell for
juvenile detention.
Justification (Need/Demand)
This project is needed to provide a secure area for
temporarily holding juveniles at the Courthouse. Permanent
detention facilities are rented by Yakima County and
juveniles are transported as needed.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility remodel and renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering To Be Determined To Be Determined
Construction $30,000 $30,000
TOTAL $30,000 $30,000
Funding Sources 2022-2026 Total
Law & Justice sales tax $30,000 $30,000
TOTAL $30,000 $30,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 25
Kittitas County Administrative Offices – Expansion of Prosecutor’s
Office
Project Information and Selection Criteria
Location To be determined
Links to Other Projects or Facilities Sheriff’s Administrative building and Courthouse
Description
Expansion of Prosecutors Office to consolidate offices to
one location.
Justification (Need/Demand)
The Prosecutors Office needs additional office space to
consolidate offices located in different buildings to one
primary location. This is to be part of the new courthouse
project.
Level of Service (LOS) / Project Type
Established LOS: N/A.
Project Type: Facility repair, remodel, & renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering
Construction To Be Determined To Be Determined
TOTAL To Be Determined To Be Determined
Funding Sources 2022-2026 Total
General Fund To Be Determined To Be Determined
TOTAL To Be Determined To Be Determined
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Administrative Offices Page 26
Kittitas County Administrative Offices – Kittitas County Corrections
Facility
Project Information and Selection Criteria
Location To be Determined
Links to Other Projects or Facilities New Kittitas County Jail Facility
Description Construction of New Kittitas County Corrections Facility
Justification (Need/Demand)
Construct a new Kittitas County Corrections Facility to
replace the aging facility that was built in 1980. The
existing.
Level of Service (LOS) / Project Type
New Facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023-2027 Total
Design and Engineering $1,000,000 $74,919,208
Construction $174,811,493
TOTAL $249,730,704
Funding Sources 2023-2027 Total
Commissioner approved bond $249,730,704
TOTAL $249,730,704
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Facilities and Maintenance Office
Kittitas County Capital Improvement Program December 20, 2022
Kittitas Valley Event Center / Fairgrounds Page 27
3. Kittitas Valley Event Center / Fairgrounds
This section includes an inventory of Kittitas Valley Event Center/Fairgrounds facilities and a
detailed description of each facility improvement that is included in the six-year plan. The
inventory of facilities in Table 4 below also describes each facility’s size in order to determine if
it addresses the County’s long-term community needs.
Table 4
Existing Public Facilities and Services
Kittitas Valley Event Center / Fairgrounds
Facility
Built
date Size Facility Built date Size
Frontier Village
Buildings 1890's Unknown Restrooms / R.A.
(1) 1960's 2,035 sq. ft.
Grandstand -
Main/Heritage Bldg. 1925 18,965 sq. ft. Fair Office and
Restrooms 1974 3,954 sq. ft.
8th Street Ticket Office 1930’s 1,568 sq. ft. Behind the Chutes 1976 1,000 sq. ft.
Souvenir Booth 2004 Unknown Bloom Pavilion 1980 26,400 sq.
ft.
Posse Barn (1) 1940’s 3,000 sq. ft. Restrooms / R.A.
(2) 1982 645 sq. ft.
Posse Barn (2) 1940’s 4,800 sq. ft. Maintenance Shop 1986 1,500 sq. ft.
Light Horse Barn 1940’s 3,200 sq. ft. Gazebo 1989 450 sq. ft.
Cattle and Swine Barn 1940's 12,000 sq. ft. Buckaroo's Stands
& Pens 1991 5,984 sq. ft.
Draft Horse Barn 1940's 10,450 sq. ft. Gold Buckle
Building 2001 2,400 sq. ft.
Teanaway/Umtanum
Building 1940's 17,556 sq. ft. Western Village 2004 3,140 sq. ft.
First Rodeo Director’s
Barn 1940's 3,250 sq. ft. Fair Storage Shed 2004 600 sq. ft.
Second Rodeo
Director’s Barn 1940 3,250 sq. ft. East Rodeo
Concession 2005 600 sq. ft.
Dog Barn 1940 1,200 sq. ft. Bronze Pig Statue 2007 N/A
Ellensburg Armory 1950 13,920 sq. ft. Rodeo Arena
Bleachers 2007 3,950 sq. ft.
Bleachers W. (Covered) 1960's 10,756 sq. ft. Fair shed (Fuel) 2008 100 sq. ft.
Bleachers E.
(Uncovered) 1960's 10,000 sq ft West Rodeo
Concession Unknown Unknown
Kittitas County Capital Improvement Program December 20, 2022
Kittitas Valley Event Center / Fairgrounds Page 28
Kittitas Valley Event Center / Fairgrounds – Rodeo Arena
Grandstands
Project Information and Selection Criteria
Location 901 E. 7th, Ellensburg
Links to Other Projects or Facilities N/A
Description
Replace old rodeo grandstands complex to include the
seating bleachers and box seats along with Behind the
Chutes
Justification (Need/Demand)
Phase 1 of this project is the replacement of section AA-JJ
with the adjoining Behind the Chutes and phase 2 is the
replacement of section MM-KK. The cost to the County for
phase 2 is $630,000 and the cost for phase 1 is $2,040,000.
Work includes removing existing structures and foundation,
site work, new foundations and walls, seating structure and
assembly, interior finishing for the skyboxes, fees, and taxes.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering
Construction $2,670,000 $2,670,000
TOTAL $2,670,000 $2,670,000
Funding Sources 2022-2026 Total
Revenue Bonds $2,670,000 $2,670,000
TOTAL $2,670,000 $2,670,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Kittitas Valley Event Center and Ellensburg Rodeo
Kittitas County Capital Improvement Program December 20, 2022
Kittitas Valley Event Center / Fairgrounds Page 29
Kittitas Valley Event Center / Fairgrounds – Multi-Purpose Addition
to Bloom Pavilion
Project Information and Selection Criteria
Location Southwest corner of Fairgrounds in Ellensburg
Links to Other Projects or Facilities N/A
Description
Add a new multi-purpose addition with wash racks to
existing Bloom Pavilion at the Kittitas Valley Event Center
to be used for various events and livestock housing.
Justification (Need/Demand)
Equestrian activities and other events take place throughout
the year and create demand for additional facilities.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New Facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering
Construction $1,500,000 $1,500,000
TOTAL $1,500,000 $1,500,000
Funding Sources 2022-2026 Total
REET 1 $1,500,000 $1,500,000
TOTAL $1,500,000 $1,500,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Kittitas Valley Event Center
Kittitas County Capital Improvement Program December 20, 2022
Kittitas Valley Event Center / Fairgrounds Page 30
Kittitas Valley Event Center / Fairgrounds – Bloom Pavilion
Upgrades
Project Information and Selection Criteria
Location Southwest corner of Fairgrounds in Ellensburg
Links to Other Projects or Facilities N/A
Description
Replace windows and footing in Pavilion and install new
protective materials in order to improve multi-purpose
usage. Install retractable bleachers along West wall.
Justification (Need/Demand)
Non-equestrian events have created demand for large indoor
facilities. Proper equestrian arenas also require footing
replacement to maintain safe use. There is an increased
demand for spectating at indoor events, but also need to
store seating away for certain events.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility Renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering
Construction $840,000 $840,000
TOTAL $840,000 $840,000
Funding Sources 2022-2026 Total
General Obligation Bonds $840,000 $840,000
TOTAL $840,000 $840,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues Increased use and type of use will increase revenue
Anticipated Savings Due to Project None
Department Responsible for Operations Kittitas Valley Event Center
Kittitas County Capital Improvement Program December 20, 2022
Kittitas Valley Event Center / Fairgrounds Page 31
Kittitas Valley Event Center / Fairgrounds – Barn Expansion
Project Information and Selection Criteria
Location 901 E. 7th, Ellensburg
Links to Other Projects or Facilities N/A
Description
Add additional barn space and replace current barn facilities
for various types of livestock at the Kittitas Valley Event
Center. This upgrade will allow for facilities to be used as
emergency animal shelter during an emergency.
Justification (Need/Demand)
Equestrian activities and other livestock events take place
throughout the year and create demand for additional
facilities.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering
Construction $3,500,000 $3,500,000
TOTAL $3,500,000 $3,500,000
Funding Sources 2022-2026 Total
General Obligation Bonds $3,500,000 $3,500,000
TOTAL $3,500,000 $3,500,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues Increased use will generate more revenue.
Anticipated Savings Due to Project Maintenance and painting costs lowered.
Department Responsible for Operations Kittitas Valley Event Center
Kittitas County Capital Improvement Program December 20, 2022
Kittitas Valley Event Center / Fairgrounds Page 32
Kittitas Valley Event Center / Fairgrounds – Emergency Animal
Shelter
Project Information and Selection Criteria
Location 901 E. 7th Avenue, Ellensburg
Links to Other Projects or Facilities N/A
Description
Upgrade existing barn facilities to allow for different types
of animal shelter at the Kittitas Valley Event
Center. Currently the barn facilities are built for specific
animal species and are difficult to alter when being used as
an emergency animal shelter during an emergency.
Justification (Need/Demand)
The Kittitas Valley Event Center was used to house animals
that were evacuated during the August 2012 fire and the
inflexible design made it difficult to provide appropriate
shelter for various animals.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility renovation
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022-2026 Total
Design and Engineering
Construction $500,000 $500,000
TOTAL $500,000 $500,000
Funding Sources 2022-2026 Total
General Fund $500,000 $500,000
TOTAL $500,000 $500,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities and Maintenance
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Maintenance Shops, Storage, and Parking Page 33
4. 5BKittitas County Maintenance Shops, Storage, & Parking
This section includes an inventory of Kittitas County Maintenance shops, storage, and parking
facilities and a detailed description of each facility improvement that is included in the six-year
plan. The inventory of facilities in Table 5 below also describes facility’s size in order to
determine if it addresses the County’s long-term community needs. The proposed projects for
Kittitas County Maintenance Shops, Storage, and Parking are detailed in Appendix A.
Table 5
Existing Public Facilities and Services
Kittitas County Maintenance Shop, Storage, and Parking
Facility Department Description Size
Lower County PWD Heavy
Equipment Storage West Shed
Public
Works
15th & Okanagon, built 1951 4,875 sq. ft.
Lower County PWD Heavy
Equipment Storage East Shed
Public
Works
15th & Okanagon, built 1951 4,875 sq. ft.
Lower County PWD Main
Heavy Equipment Shop
Public
Works
15th & Okanagon, built 1951 6,240 sq. ft.
Sheriff Central Storage Sheriff 307 Umptanum Rd., built 2009 2,160 sq. ft.
Upper County PWD main heavy
equipment shop / admin
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021
13,750 sq. ft
Upper County PWD Salt / Sand
storage
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021
10,370 sq. ft
Upper County PWD Large
Equipment Storage Shed
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021
9515 sq. ft
Upper County PWD Equipment
Storage Shed
Public
Works
51 No. 5 Mine Road, Cle Elum, built
2021
4,400 sq. ft
Upper County PWD Parking Lot Public
works
Asphalt parking area 18 stalls +2
ADA stalls
20 stalls
Vantage Boat Launch Parking
Lot
Public
Works
Vantage Boat Launch built approx.
1990. Includes large stalls for boats
62 stalls
Armory Parking Lot Ext, Weed,
& Event Ctr
Asphalt parking area 20 stalls
S Courthouse Parking Lot Courthouse
Offices Off-street parking adjacent to
Courthouse
21 stalls
W Courthouse Parking Lot Courthouse
Offices Off-street parking adjacent to
Courthouse
7 stalls
SW 6th Ave. & Water Street Courthouse
Offices
Improved parking lot 44 stalls
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Maintenance Shops, Storage, and Parking Page 34
Table 5 – Continued
Existing Public Facilities and Services
Kittitas County Maintenance Shop, Storage, and Parking
Facility Department Description Size
NW 6th Ave. & Water Street Courthouse
Offices
Improved parking lot in 2010 58 stalls
NE 6th Ave. & Water Street Courthouse
Offices
Semi-improved parking lot 18 stalls
N Permit Center Public
Works
Improved off-street parking next to
bldg.
14 stalls
S Permit Center CDS Improved off-street parking next to
bldg.
10 stalls
Sheriff Administration Office
Parking Lot
Sheriff and
Prosecutors
Improved off-street parking next to
bldg.
51 stalls
SW Sorenson Building Parking
Lot
Public
Health
Improved off-street parking next to
bldg.
24 stalls
W Upper District Court Building
Parking Lot
Upper
District
Improved off-street parking next to
bldg., 700 1st St., Cle Elum
22 (shared)
Cle Elum Centennial Center -
Parking Lot for Public Health
services by appointment
Public
Health
Improved off-street parking next to
bldg., 719 E. 3rd St, Cle Elum.
Building space and parking are
provided for Upper County Public
Health services
30 (shared)
Suncadia / Upper County Sheriff
Office Parking Lot
Sheriff Improved off-street parking next to
bldg., 4240 Bullfrog Rd, Suite 1, Cle
Elum
22 (shared)
Kittitas Valley Event
Center/Fairgrounds Parking Lots
KV Event
Center
Does not include the unimproved
parking areas used for large events
136
Lower County PWD Shop
Parking Lot
Public
Works
Unimproved off-street parking next to
bldg.
20(approx.)
E UPS Store Courthouse Improved off-street parking 35
Kittitas County Capital Improvement Program December 20, 2022
Kittitas County Roads Page 35
5. 6BKittitas County Roads
The Kittitas County’s Six-Year Transportation Improvement Plan provides further detail of the
facility improvements that were indicated in Table 1. The Six-Year Transportation Improvement
Plan is adopted once a year in the fall and amended as needed throughout the first year of the
program. Appendix B provides a detailed description of the proposed projects, mapping of the
projects, and the funding plan.
The latest version of the Six-Year Transportation Improvement Plan is available at the County
website at:
https://www.co.kittitas.wa.us/public-works/construction/default.aspx
Kittitas County Capital Improvement Program December 20, 2022
Regional Parks and Trails Page 36
6. 7BRegional Parks and Trails
This section includes an inventory of Regional Parks and Trails facilities and a description of
additional facility improvements that are included in the six-year recreation plan. The inventory
of facilities in Table 6 below also describes existing facility’s size in order to determine if it
addresses the County’s long-term community needs according to level of service standards.
Appendix D provides a detailed description of the proposed 2023 – 2028 projects and the
associated funding plan.
Table 6
Existing Public Facilities and Services
Regional Parks and Trails
Facility Provider Description Size
Coal Mines Trail Coal Mines Trail
Commission, Cle Elum,
Roslyn, and Kittitas
County
From Cle Elum to Ronald, Northern
Pacific Railway bed
10.4 mi
John Wayne Trail /
Iron Horse State
Park
Washington State Parks
Department
From North Bend to Vantage,
Chicago-Milwaukee-St. Paul-Pacific
Railroad bed.
100 mi
Vantage Boat
Launch and
Restrooms
Kittitas County Vantage Boat Launch, built 1990 342 sq ft
The Cove
Recreation Area
Grant County PUD and
Washington State Parks
West of Huntzinger Road near
Wanapum Dam. Public access is for
day use from Thursdays through
Mondays.
20 acres
Kittitas County
Outdoor Recreation
Inventory
Varies All other Parks and Trails are listed in
the comprehensive inventory of
recreation facilities adopted by
reference in the Comprehensive Plan.
varies
Evergreen Sno-Park 1 mile east of Snoqualmie Summit. A
trail system comprised of 23 miles.
Kittitas County Capital Improvement Program December 20, 2022
Solid Waste Page 37
7. 8BSolid Waste
This section includes an inventory of Solid Waste facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 7
below also describes each facility’s size in order to determine if it addresses the County’s long-
term community needs.
Table 7
Existing Public Facilities and Services
Kittitas County Solid Waste
Facility
Built
date Size Facility
Built
date Size
Ellensburg Scale House
(Storage), 801 Industrial
Way
1981 160 sq. ft. Transfer Station - Cle
Elum, 50 #5 Mine Rd., Cle
Elum
2003 9,000 sq. ft.
Cle Elum Scale House,
Hwy 903 Cle Elum
1981 160 sq. ft. MRW - Cle Elum, 50 #5
Mine Rd., Cle Elum
2003 2,000 sq. ft.
Cle Elum Bunker
Building, Hwy. 903 Cle
Elum
1981 3,000 sq. ft. MRW - Ellensburg, 50 #5
Mine Rd., Cle Elum
2001 3,000 sq. ft.
Cle Elum Storage, Hwy.
903 Cle Elum
1981 925 sq. ft. Office/Admin Bldg., 50 #5
Mine Rd., Cle Elum
2003 120 sq. ft.
Transfer Station
Building, 1001 Industrial
Way
2000 9,078 sq. ft. Cle Elum Scale House -
new, 50 #5 Mine Rd., Cle
Elum
2003 284 sq. ft.
Scale House Bldg., 1001
Industrial Way
2000 1,000 sq. ft. Ryegrass Equipment
Storage, 25900 Vantage
Hwy.
1980 1,620 sq. ft.
Transfer Station Office,
925 Industrial Way
1963 1,980 sq. ft. SW 400 sq. ft. building,
25900 Vantage Hwy.
2008 400 sq. ft.
Transfer Station Shop,
925 Industrial Way
1963 1,680 sq. ft.
Kittitas County Capital Improvement Program December 20, 2022
Solid Waste Page 38
Solid Waste – Relocate Ellensburg Transfer Station and Compost
Facility
Project Information and Selection Criteria
Location
925 Industrial Way, Ellensburg – 50-acre site on Highway
97
Links to Other Projects or Facilities N/A
Description
Build a new Transfer Station and Compost Facility in the
Ellensburg vicinity.
Justification (Need/Demand)
The current transfer station has inadequate access and space.
It is also in an environmentally sensitive location.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New Facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2022 2023-2027 Total
Design and Engineering 2,000,000 $2,000,000 $3,000,000
Construction $3,000,000 $17,000,000 $20,000,000
TOTAL $5,000,000 $19,000,000 $23,000,000
Funding Sources 2022 2023-2027 Total
Solid Waste Fund/Grant/Loan $5,000,000 $19,000,000 $23,000,000
TOTAL $5,000,000 $19,000,000 $23,000,000
Annual Operations and Maintenance
Estimated Costs
Currently, the County does not track maintenance costs for
these improvements.
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Solid Waste
Kittitas County Capital Improvement Program December 20, 2022
Solid Waste Page 39
Solid Waste – Cle Elum Transfer Station Entrance
Project Information and Selection Criteria
Location Cle Elum Transfer Station 50 No. 5 Mine Rd.
Links to Other Projects or Facilities N/A
Description
Construct a new entrance to allow for better queuing for the
scales.
Justification (Need/Demand)
Eliminate a traffic hazard on Highway 903
Level of Service (LOS) / Project Type
Comprehensive Plan Citations
Capital Cost 2022 2023-2027 Total
Design and Engineering $50,000 $250,000 $300,000
Construction $1,350,000 $1,350,000
TOTAL $50,000 $1,600,000 $1,600,000
Funding Sources 2022 2023-2027 Total
Solid Waste Fees and Grants $50,000 $350,000 $1,600,000
TOTAL
Annual Operations and Maintenance
Estimated Costs
$5,000 per year to maintain
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Solid Waste
Kittitas County Capital Improvement Program December 20, 2022
Library Services Page 40
8. 9BLibrary Services
This section includes an inventory of Library Services facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 8
below also describes facility’s size in order to determine if it addresses the County’s long-term
community needs.
Table 8
Existing Public Facilities and Services
Library Services
Facility Provider Description Size
Gilmour
Memorial Library
(Kittitas)
Kittitas 2nd & Pierce Streets, Kittitas
Carpenter
Memorial Library
(Cle Elum)
Cle Elum 302 Pennsylvania Ave., Cle Elum
Ellensburg Public
Library
Ellensburg 209 N. Ruby St, Ellensburg, founded in 1910,
recently expanded in 2003.
Roslyn Public
Library
Roslyn 201 S. First St., Roslyn, $3 million remodel
began in 2009 to repair and update
Kittitas County Capital Improvement Program December 20, 2022
Library Services Page 41
Library Services – Ellensburg Public Library HVAC System
Project Information and Selection Criteria
Location 209 N Ruby St, Ellensburg WA 98926
Links to Other Projects or Facilities
Description
New HVAC system to replace current system
Justification (Need/Demand)
Current HVAC is failing
Level of Service (LOS) / Project Type Replacement
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering $175,000 $175,000
Construction
TOTAL $175,000 $175,000
Funding Sources 2023 2024-2028 Total
Commissioner Approved Bond City of Ellensburg $175,000
TOTAL $175,000
Annual Operations and Maintenance
Estimated Costs
$175,000
Estimated Revenues
Anticipated Savings Due to Project $5000
Department Responsible for
Operations Ellensburg Public Library
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 42
9. 10BEmergency Services
This section includes an inventory of Emergency Services facilities and a detailed description of
each facility improvement that is included in the six-year plan. The inventory of facilities in
Table 9 below also describes each facility’s size in order to determine if it addresses the County’s
long-term community needs.
Table 9
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Station #11 Thorp Fire District No. 1 Thorp – 10700 N. Thorp Hwy., all
District 43.5 sq. mi. and serves 2,500
residences, built in 2000, remodeled in
2005, 2 engines, 1 Tender, 2 brush
trucks, 1 aid unit, and 1 rescue.
6,400 sq. ft.
Station #12 Clark
Flats
Fire District No. 1 Thorp - 10941 SR 10, 2 buildings at site,
1 tender, 1 brush truck, and 1 engine
2,300 sq. ft.
for both
bldgs.
Station #13 Elk
Heights
Fire District No. 1 Elk Heights – 152 Clubhouse Rd., Cle
Elum, 1 building at site, and 1 engine.
1600 sq. ft
Station #21 Fire District 2 (Kittitas
Valley Fire and
Rescue)
280 sq. mi. for all Dist 2, 2020 Vantage
Highway B-211, E-211, T-211, B-212,
M-211, M-212, M-213 - Living
Quarters – 2020’s, Bay – updated 2020,
maintenance and training - 2020
Station #22 Fire District 2 2672 Tjossem E-221 – 2018 Station 22S
– 3301 Denmark Road –2015
Station #24 Fire District 2 4901 4th Parallel Road: B-241, E-241,
B-242, T-241 - 2004
Station #23 Fire District 2 Main St, Kittitas – E-231, B-231, A-231
- 2010
Station 23 S Fire District 2 890 Cleman Road, Kittitas – E-232, B-
232, T-231 - 2010
Station #26 Fire District 2 6651 Brick Mill Road – E-261, B-261 –
1940’s – anticipate replacing in 2024
Station #26
Satellite
Fire District 2 2380 Game Farm Road – E-262 – 1950’s
– anticipate decommission and sale 2022
Station #27 Fire District 2 8800 Reecer Cr. Rd – E-271 – 1950’s
Station #28
Fire District 2 5640 Cove Road – B-281, E-281, T-281
– 2002
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 43
Table 9 - Continued
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Station #28
Satellite
Fire District 2 51 Barnes Road – E-282 – 1960’s
Station #29 Fire District 2 400 E. Mountainview Ave – M-291, M-
292, M-293, R-291, B-291, E-291, L-
291, E-292 - 2018
Easton Station Fire District No. 3
(Easton)
180 Cabin Creek Easton WA. 98925, PO
Box 52, 12 sq. mi. for all Dist. 33182 sq.
ft., built in 1992, 1- aid car, 1-engine, 2-
tankers, 1-rescue truck
3,182 sq. ft.
Vantage Station Fire District No. 4
(Vantage)
Information Not Available
Snoq. Pass Station
#46
King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
1211 SR 906 E. of I 90 Exit 53, houses
E146, E246, A146, A246, Battalion 146,
Brush146, Brush 246, Polaris ranger with
trailer, built in 2011. Basic Life Support
Ambulance Service
16,551 sq.
ft.
Station #61 KCFP District No. 6
(Ronald/Lk. Cle Elum)
Serves south end of district / 7 sq. mi. for
all Dist. 6.
Station #62 KCFP District No. 6
(Ronald/Lk. Cle Elum)
14030 Salmon La Sac Road, Ronald, WA
98940. Serves north end of district / 7 sq.
mi. for all Dist. 6, 1 engine, 1 brush truck,
1 tender, and 1 aid unit.
South Cle Elum
Fire Station
South Cle Elum 523 Lincoln Ave., South Cle Elum, 1
pumper, 1 utility truck, and serves 0.5
mile area with 580 people. Can handle
twice the size area.
1,200 sq. ft.
Station #1 Peoh
Point Rd.
Fire District No. 7
(Upper County Area)
80 sq. mi. for all Dist. 7,1 fire engine, 1
wild land brush truck, 1 water tender, 1
aid unit, and ambulance
Station #2 SR 970
and Airport Rd.
Fire District No. 7 Information Not Available
Station #3 off I-90
at Golf Course
Exit 77
Fire District No. 7 Information Not Available
Station #4 Ballard
Hill Rd.
Fire District No. 7 Information Not Available
Station #5
Teanaway Valley,
Middle Fork Rd.
Fire District No. 7
Information Not Available
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 44
Table 9 - Continued
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Station #48 King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
Located in Kachess Village, 1 engine
148, 1 aid car, and 1 brush truck, Basic
Life Support Ambulance Service
Small 3 bay
garage No
bathrooms
Leased
Station #49 King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
Located at intersection of Kachess Lake
and Via Kachess Roads, 1 brush truck,
rescue snowmobiles & trailer
Small 2 bay
garage. No
bathrooms
Leased
Station #47 King & Kittitas FD 51
Snoqualmie Pass Fire
& Rescue
Located at intersection of Stampede Pass
and Lost Lake Roads, 1 pumper/Tender
engine, 1 brush truck, snowmobiles with
trailer
Small 2 bay
garage, no
bathrooms
Kittitas Valley
Community
Hospital
Hospital District No. 1 Located at 603 S. Chestnut. Level IV
trauma service & 24-hr emergency care,
S. Chestnut St. & E. Manitoba,
Ellensburg
81,000
Cle Elum
Medical Center
Hospital District No. 2 Located at 201 Alpha Way, Cle Elum.
Family Medicine of Cle Elum. No urgent
care services provided.
13,500
Cle Elum Urgent
Care
Hospital District No. 1 Located at 214 W. 1st St., Cle Elum. 2,864
New Cle Elum
Ambulance
Garage
Hospital District No. 2 Exact address undetermined. Adjacent to
201 Alpha Way, Cle Elum. Approximate
completion date 2021.
8,500
Medical Arts
Building
Hospital District No. 1 Located at 100 E. Jackson, Ellensburg.
No urgent care services provided at this
building. KVH clinics include Pediatrics,
Women’s Health, Lab, and Family
Medicine of Ellensburg. Some space also
currently leased to other non-KVH
clinical services. TI completed February
2020.
33,671
KVH Physical
Therapy
Hospital District No. 1 Located at 301 Mountainview,
Ellensburg. Entire building dedicated to
physical therapy services. No urgent care
services provided. Leased property.
6,912
KVH
Occupational
Therapy and
Speech
Hospital District No. 1 Located at 309 Mountain, Ellensburg.
Also houses KVH IT Services. No urgent
services provided. Leased property.
6,631
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 45
Table 9 - Continued
Existing Public Facilities and Services
Emergency Services
Facility Provider Description Size
Ellensburg Clinic Hospital District No. 1 Located at 700 Manitoba, Ellensburg.
Houses Internal Medicine, KVH Quality
Department, and soon to house
Neurology Clinic. No urgent care services
provided.
9,434
Valley Clinic Hospital District No. 1 Located at 716 Manitoba, Ellensburg.
Formally Family Medicine of Ellensburg.
This facility is now a pop-up clinic for
COVID-19, and Lab annex. No urgent
care services provided. Leased property.
7,230
Empty Building Hospital District No. 1 Located at 708 Manitoba, Ellensburg.
This building is currently vacant but will
most likely only be used for office space.
1,000
Mediplex Hospital District No. 1 Located at 611 S. Chestnut, Ellensburg.
This has suites A-E and are all clinical
use. No urgent care services provided by
KVH or tenants.
10,291
Work Place
Health
Hospital District No. 1 Located at 702-B Mountainview,
Ellensburg. No urgent care services
provided. Leased suite.
1,710
Radio Hill Annex Hospital District No. 1 Located at 1506 Radio Road, Ellensburg.
Currently half office space and half
storage. Office space for accounting,
Home Care, and Hospice. Will most
likely never be clinical space. No urgent
care services provided.
21,082
Hospice Friends Friends of Hospice Located at 302 E. 2nd Ave, Ellensburg.
Non-KVH office space for Friends of
Hospice. KVH owned.
2,325
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 46
Emergency Services – Station 2-5
Project Information and Selection Criteria
Location TBD – somewhere in the west interchange area.
Links to Other Projects or Facilities
Description
A three bay fire station to house an engine, medic unit, and
a brush truck.
Justification (Need/Demand)
Growth in housing developments in the City of Ellensburg
and Kittitas County, commercial development of Dolarway.
Level of Service (LOS) / Project Type
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering - property $500,000
Construction $3,500,000
TOTAL $4,000,000
Funding Sources 2023 2024-2028 Total
Commissioner approved bond $4,000,000
TOTAL $4,000,000
Annual Operations and Maintenance
Estimated Costs $50,000
Estimated Revenues None
Anticipated Savings Due to Project None
Department Responsible for Operations Kittitas County Fire District 2
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 47
Emergency Services – Upper County Emergency Operations Center
& Search and Rescue Base
Project Information and Selection Criteria
Location Cle Elum Airport Access Rd
Links to Other Projects or Facilities
Description
Establishing a primary Emergency Operations Center in the
growing upper county and relocating Search and Rescue
operations from current leased facility in Cle Elum.
Justification (Need/Demand)
Increasing scope and complexity of Emergency
Management dictate an EOC capable of supporting a Type
II Incident Management Team. Increasing SAR call volume
and complexity for upper county calls make this an
excellent location for a permanent, dedicated SAR base of
operations.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New Capital Facilities
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering $250,000
Construction $5,000,000
TOTAL $5,250,000 $5,250,000
Funding Sources 2023 2024-2028 Total
General Fund $4,050,000
Federal Funds Anticipated $1,200,000
TOTAL $5,250,000
Annual Operations and Maintenance
Estimated Costs $25,000 per year
Estimated Revenues n/a
Anticipated Savings Due to Project n/a
Department Responsible for Operations Sheriff’s Office (with KSAR)
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 48
Emergency Services – Sheriff’s Office Upper County Precinct
Project Information and Selection Criteria
Location Cle Elum area; specific location TBD
Links to Other Projects or Facilities Possibly a partially shared facility with Cle Elum PD
Description
Office and operations base for efficient emergency
response and routine services to upper county including
dedicated patrol division, investigations, records and other
front office services.
Justification (Need/Demand)
Upper county growth and development create increased
needs for law enforcement presence and services. A shared
facility would build efficiencies, avoid duplication, and
create a one-stop-cop-shop for the upper county.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023 2024-2028 Total
Design and Engineering $250,000
Construction $4,000,000
TOTAL $4,250,000
Funding Sources 2023 2024-2028 Total
General Fund $4,250,000
TOTAL $4,250,000
Annual Operations and Maintenance
Estimated Costs
Currently the county does not track maintenance costs for
these improvements
Estimated Revenues n/a
Anticipated Savings Due to Project n/a
Department Responsible for Operations Sheriff’s Office
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 49
Emergency Services – Sheriff’s Office Administration Bldg #2
Project Information and Selection Criteria
Location 307 W Umptanum Rd, Ellensburg
Links to Other Projects or Facilities Bldg 2 of proposed KCSO admin facility expansion
Description
Storage building with footprint identical to current
KCSO admin building.
Justification (Need/Demand)
Meets foreseeable need for Sheriff’s Office facilities in
lower county for 15-20 years; reasonable and economic
alternative to construction of new SO facility.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New facility
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost 2023 2024-2028 Total
Design and Engineering
Construction
TOTAL $1,300,000
Funding Sources 2023 2024-2028 Total
ARPA or General Fund
TOTAL $1,300,000
Annual Operations and Maintenance
Estimated Costs
$10,000
Estimated Revenues n/a
Anticipated Savings Due to Project $20,220/yr rent for currently occupied portions of bldg.
Department Responsible for
Operations Sheriff’s Office
Kittitas County Capital Improvement Program December 20, 2022
Emergency Services Page 50
Emergency Services – Kittitas Valley Healthcare Hospital Expansion
Project Information and Selection Criteria
Location 603 S Chestnut
Links to Other Projects or Facilities
Description
Hospital expansion to surgery, materials management, and
radiology.
Justification (Need/Demand) Growth in patient counts.
Level of Service (LOS) / Project Type Addition and TI of the above departments
Comprehensive Plan Citations
Capital Cost 2023 2024-2028 Total
Design and Engineering $739,500 $246,500 $986,000
Construction $2,520,000 $10,080,000 $12,600,000
TOTAL $3,259,500 $10,3267,500 $13,586,000
Funding Sources 2023 2024-2028 Total
TBD TBD TBD
TOTAL
Annual Operations and Maintenance
Estimated Costs
We do not track
Estimated Revenues Unknown
Anticipated Savings Due to Project None
Department Responsible for Operations Facilities, Surgery, Materials Management, and Radiology
Kittitas County Capital Improvement Program December 20, 2022
Education Page 51
10. Education
This section includes an inventory of education facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 10
below also describes each facility’s size in order to determine if it addresses the County’s long-
term community needs.
Table 10
Existing Public Facilities and Services
Education
Facility Provider Description Size
Central
Washington
University
Washington State Comprehensive public university main
campus, 1500 employees, 94 buildings
11,110
students
statewide
(fall 2020)
Cle Elum / Roslyn
High School
Cle Elum/ Roslyn
School District
2692 - SR 903, Cle Elum, 9th grade to
12th grade
239
students
Cle Elum / Roslyn
Elementary School
Cle Elum/ Roslyn
School District
2696 - SR 903, Cle Elum, pre-school,
Kindergarten to 5th grade
348
students
Cle Elum / Roslyn
Alternative School
Cle Elum/ Roslyn
School District
200 W. Oakes St., Cle Elum, 3rd grade to
12th grade
38
students
Walter Strom
Middle School
Cle Elum/ Roslyn
School District
2694 - SR 903, Cle Elum, 6th grade to 8th
grade
221
students
Cle Elum/ Roslyn
School District
Music Building
Cle Elum/ Roslyn
School District
Music Building for Walter Strom
Middle School and Cle Elum-Roslyn
Middle School
Cle Elum/ Roslyn
School District
Transportation
Facility
Cle Elum/ Roslyn
School District
School bus covered parking,
maintenance facility, and transportation
staff office building.
Damman
Elementary School
Damman School District Kindergarten to 6th grade, 1 school, 2
teachers, 3712 Umptanum Rd.
38
students
Easton Elementary,
Jr., Sr. High School
Easton School District 1893 Railroad St., Easton 127
students
Lincoln
Elementary School
Ellensburg School
District
26 classroom teachers, 200 S. Sampson
St., Ellensburg
454
students
Mount Stuart
Elementary School
Ellensburg School
District
27 classroom teachers, 705 W. 15th Ave.,
Ellensburg
434
students
Valley View
Elementary School
Ellensburg School
District
26 classroom teachers, 1508 E. 3rd Ave.,
Ellensburg
526
students
Kittitas County Capital Improvement Program December 20, 2022
Education Page 52
Table 10 - Continued
Existing Public Facilities and Services
Education
Facility Provider Description Size
Morgan Middle
School
Ellensburg School
District
40 classroom teachers, 400 E. 1st Ave.,
Ellensburg
752
students
Ellensburg High
School
Ellensburg School
District
40 classroom teachers of a total 67
professional staff, 1203 E. Capitol Ave.,
Ellensburg
926
students
Kittitas Elementary
School
Kittitas School District Kindergarten to 5th grade, 7571 Kittitas
Hwy, Kittitas
258
students
Kittitas High
School
Kittitas School District 6th grade to 12th grade, 7571 Kittitas
Hwy, Kittitas
282
students
Parke Creek
Treatment Center
Kittitas School District 11042 Parke Creek Rd. 15
students
Thorp Elementary,
Jr., and Sr. High
Schools
Thorp School District Kindergarten to 12th grade, 10831 N.
Thorp Hwy, Thorp
164
students
Kittitas County Capital Improvement Program December 20, 2022
Education Page 53
Education – CWU, Health Education, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 313534, E Dean Nicholson Blvd, CWU campus,
Ellensburg, WA 98926
Links to Other Projects or Facilities Purser Hall – West adjacent
Description
Renovation and expansion of existing Nicholson Pavilion
for academic programs supporting Health Education.
Justification (Need/Demand)
The Health Education project modernizes and expands
facilities for the Department of Sport and Movement
studies (SAMS) and the Bachelor of Science in Physical
Education and School Health (PESH) degree program,
which is one of the largest providers of public-school health
and fitness teachers for Washington State.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility Renovation
Comprehensive Plan Citations N/A
Capital Cost 2023 2024-2028 Total
Design and Engineering
Construction $55,505,000 $55,505,000
TOTAL $55,505,000 $55,505,000
Funding Sources 2023 2024-2028 Total
State OFM Capital $55,505,000 $55,505,000
Internal & Donor Funding $1,700,000 $1,700,000
TOTAL $55,505,000 $55,505,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Office of the Provost serving SAMS & PESH
Kittitas County Capital Improvement Program December 20, 2022
Education Page 54
Education – CWU, Barge Hall Envelope Upgrade, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 123534, 400 E University Way, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Shaw Smyser Hall – West adjacent
Description
The project incorporates the replacement of the
existing roof and brick tuck pointing of the envelope.
Justification (Need/Demand)
The Barge Hall Envelope Upgrade is a project includes
a total replacement of the existing metal, built-up and
membrane roof. The project also includes brick tuck
pointing and weatherization that ensure the building is
weather tight and preserve the university’s oldest and
most historic building.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility Envelope Upgrade
Comprehensive Plan Citations N/A
Capital Cost 2023 2024-2028 Total
Design and Engineering $125,000 $125,000
Construction $1,585,000 $1,585,000
TOTAL $1,710,000 $1,710,000
Funding Sources 2023 2024-2028 Total
State OFM Capital $1,710,000 $1,710,000
TOTAL $1,710,000 $1,710,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Operations Division of Business & Financial Affairs
Kittitas County Capital Improvement Program December 20, 2022
Education Page 55
Education – CWU, Electrical Grid Security, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 313534, E Dean Nicholson, CWU campus,
Ellensburg, WA 98926
Links to Other Projects or Facilities Health Education Building – East Adjacent
Description
The project reduces the electrical load of two aging
feeders on the northern end of campus and provides a
level of redundancy for the campus electrical grid.
Justification (Need/Demand)
A large area of the northern portion of campus is fed by
aging electrical feeders come closer to end of life. This
project re-routes and establishes an expanded electrical
feeder which will lower the load on adjacent feeders,
therefore extending their life.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Infrastructure
Comprehensive Plan Citations N/A
Capital Cost 2023 2024-2028 Total
Design and Engineering $150,000 $150,000
Construction $1,358,000 $1,358,000
TOTAL $1,508,000 $1,508,000
Funding Sources 2023 2024-2028 Total
State OFM Capital $1,508,000 $1,508,000
TOTAL $1,508,000 $1,508,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Operations Division of Business & Financial Affairs
Kittitas County Capital Improvement Program December 20, 2022
Education Page 56
Education – CWU, Multicultural Center, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 143534, 400 E University Way, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Student Union & Rec Center – East adjacent
Description
The project establishes a student focused academic
facility dedicated to the celebration of Equity &
Diversity.
Justification (Need/Demand)
The Multicultural Center is intended to be a central hub
for students, staff, and faculty to build community and
celebrate diversity and create a sense of belonging for
traditionally underrepresented students, staff, and
faculty.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: New Construction
Comprehensive Plan Citations N/A
Capital Cost 2023 2024-2028 Total
Design and Engineering $3,000,000 $3,000,000
Construction $19,797,000 $19,797,000
TOTAL $3,000,000 $19,797,000 $22,797,000
Funding Sources 2023 2024-2028 Total
State OFM Capital $6,000,000 $6,000,000
CWU Self-Funded $16,797,000 $16,797,000
TOTAL $6,000,000 $16,797,000 $22,797,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Associated Students of Central Washington University
Kittitas County Capital Improvement Program December 20, 2022
Education Page 57
Education – CWU, North Academic Complex, Ellensburg, WA
Project Information and Selection Criteria
Location
Parcel # 143534, E Dean Nicholson Blvd, CWU
campus, Ellensburg, WA 98926
Links to Other Projects or Facilities Brooks Library – West adjacent
Description
The North Academic Complex is a replacement project
for the existing Farrell Hall, L&L Building (Adjacent)
Justification (Need/Demand)
The North Academic Complex project provides a new
and modern facility that will house several social
science related programs such as Humanities, Law &
Justice. The new project will result in the demolition
of Farrell Hall & L&L that suffer from a large backlog
of deferred maintenance, inadequate and inefficient
mechanical and electrical systems, current ADA,
building code and energy efficiency. The new complex
will provide state of the art design and pedagogy that
will be experienced by a majority of collegiate
freshmen, boosting the opportunity for retention and
academic growth.
Level of Service (LOS) / Project Type
Established LOS: N/A
Project Type: Facility Replacement
Comprehensive Plan Citations N/A
Capital Cost 2023 2024-2028 Total
Design and Engineering $5,205,000 $5,205,000
Construction $99,262,000 $99,262,000
TOTAL $5,205,000 $99,262,000 $104,467,000
Funding Sources 2023 2024-2028 Total
State OFM Capital $5,205,000 $99,262,000 $104,467,000
TOTAL $5,205,000 $99,262,000 $104,467,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations Office of the Provost serving Humanities
Kittitas County Capital Improvement Program December 20, 2022
Education Page 58
Education – Ellensburg School District, Tennis Courts, Joint with
City of Ellensburg
Project Information and Selection Criteria
Location Proposed Mountain View Park
Links to Other Projects or Facilities
Description Construct Tennis Courts
Justification (Need/Demand) Contribute $250,000 to City of Ellensburg’s tennis court
construction project in lieu of future fees for use.
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering $250,000 $250,000
Construction
TOTAL $250,000 $250,000
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund $250,000 $250,000
TOTAL $250,000 $250,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 59
Education – Ellensburg School District, TVF Support to Increased
Student Grown/30-Year Bus Replacement
Project Information and Selection Criteria
Location Transportation Dept., 1300 East Third Avenue
Links to Other Projects or Facilities
Description 30-year bus replacement cycle
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering
Purchase $261,363 $571,445 $832,808
TOTAL $261,363 $571,445 $832,808
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund Transfers $261,363 $571,445 $832,808
TOTAL $261,363 $571,445 $832,808
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 60
Education – Ellensburg School District, Valley View Elementary
Parking Lot Improvements
Project Information and Selection Criteria
Location Valley View Elementary, 1508 East Third Avenue
Links to Other Projects or Facilities
Description Improve parking lots to the north, south, and west sides of
Valley View Elementary.
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering
Construction $286,663 $286,663
TOTAL $286,663 $286,663
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund Transfer $286,663 $286,663
TOTAL $286,663 $286,663
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 61
Education – Ellensburg School District, Lincoln Elementary
Remodel/Addition
Project Information and Selection Criteria
Location Lincoln Elementary, 200 South Sampson Street
Links to Other Projects or
Facilities
Description Remodel/Addition
Justification (Need/Demand)
Upgrades to seismic, HVAC, addition of gym and elevator, remodel of
existing structure, removal of portables to bring all students into the
one building rather than temporary housing
Level of Service (LOS) /
Project Type
Comprehensive Plan
Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FY 2024-2028 Total
Design and Engineering
Construction $315,842 $315,842
Professional Services &
FF&E $100,000 $100,000
Contingencies $84,158 $84,158
TOTAL $500,000 $500,000
Funding Sources FY 2022-2023 FY 2024-2028 Total
Commissioner approved bond
State match $500,000 $500,000
Other sources (interest)
TOTAL $500,000 $500,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to
Project
Department Responsible for
Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 62
Education – Ellensburg School District, Lincoln Elementary
Roof Restoration
Project Information and Selection Criteria
Location Lincoln Elementary, 200 South Sampson Street
Links to Other Projects or Facilities
Description Roof Restoration
Justification (Need/Demand)
Restoration is a cost-effective, proactive process
designed to prolong the life of a functioning built-
up roof to the existing building’s roof. Upgrade the
performance of the existing roof and its components by
identifying and repairing defects, in addition to
providing a new top coat to restore waterproofing
continuity.
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Construction $654,628 $654,628
TOTAL $654,628 $654,628
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund Transfer $654,628 $654,628
TOTAL $654,628 $654,628
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 63
Education – Ellensburg School District, Valley View Elementary Blvd
Resurfacing
Project Information and Selection Criteria
Location Valley View Elementary, 1508 East Third Avenue
Links to Other Projects or Facilities
Description Valley View Blvd resurfacing
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering
Construction $321,997 $321,997
TOTAL $321,997 $321,997
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund transfer $321,997 $321,997
TOTAL $321,997 $321,997
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 64
Education – Ellensburg School District, Maintenance Warehouse
Project Information and Selection Criteria
Location Maintenance Dept., 1300 East Third Avenue
Links to Other Projects or Facilities
Description Construct Maintenance / Grounds Equipment Warehouse
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering $75,200 $75,200
Construction $250,000 $250,000
TOTAL $325,200 $325,200
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund transfers $325,200 $325,200
TOTAL $325,200 $325,200
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 65
Education – Ellensburg School District, New IT Mitigation Plan
Project Information and Selection Criteria
Location Information Technology Dept., 1300 East Third
Avenue
Links to Other Projects or Facilities
Description IT Mitigation
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations CF-G4, CF-P28
Capital Cost FY 2022-2023 FY 2024-2028 Total
Purchase $782,427 $4,989,000 $5,771,427
TOTAL $782,427 $4,989,000 $5,771,427
Funding Sources FY 2022-2023 FY 2024-2028 Total
Tech Levy $782,427 $4,989,000 $5,771,427
TOTAL $782,427 $4,989,000 $5,771,427
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for
Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 66
Education – Ellensburg School District Central Office HVAC
Project Information and Selection Criteria
Location District Central Office, 1300 East Third Avenue
Links to Other Projects or Facilities
Description Replace HVAC
Justification (Need/Demand) Replace HVAC for More Efficient System
Level of Service (LOS) / Project Type
Comprehensive Plan Citations
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering $50,000 $50,000
Construction $250,000 $250,000
TOTAL $300,000 $300,000
Funding Sources FY 2022-2023 FYs 2024-2028 Total
ESSER $300,000 $300,000
TOTAL $300,000 $300,000
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Education Page 67
Education – Ellensburg School District Mt. Stuart Elementary
Parking Lot Resurfacing
Project Information and Selection Criteria
Location Mt. Stuart Elementary, 705 West 15th Avenue
Links to Other Projects or Facilities
Description Mt. Stuart Elementary Resurfacing
Justification (Need/Demand)
Level of Service (LOS) / Project Type
Comprehensive Plan Citations
Capital Cost FY 2022-2023 FYs 2024-2028 Total
Design and Engineering
Construction $569,259 $569,259
TOTAL $569,259 $569,259
Funding Sources FY 2022-2023 FYs 2024-2028 Total
General Fund transfer $569,259 $569,259
TOTAL $569,259 $569,259
Annual Operations and Maintenance
Estimated Costs
Estimated Revenues
Anticipated Savings Due to Project
Department Responsible for Operations
Kittitas County Capital Improvement Program December 20, 2022
Water – Group A Systems Page 68
11. 12BWater - Group A Systems
This section includes an inventory of Water – Group A Systems facilities and a detailed
description of each facility improvement that is included in the six-year plan. The inventory of
facilities in Table 11 below also describes facility’s size in order to determine if it addresses the
County’s long-term community needs.
Table 11
Existing Public Facilities and Services
Water (Group A Systems)
Facility Provider Description Size
Ronald
Water
System
Kittitas County Water
District No. 2, Special
District Community
provider
Serves 227 persons with 119 connections,
150 total approved connections. Effective
since 1/1/1970.
125,000 gal
Thorp Water
System
Kittitas County Water
District No. 4, Special
District Community
provider
Serves 250 persons with 116 connections,
209 total approved connections. Effective
since 7/1/1987.
156,000 gal
Elk
Meadows
Water
System
Kittitas County Water
District No. 5,
Community provider
141 Swallow Ln, Cle Elum, serves 600
persons with 296 connections, 340 total
approved connections. Effective since
1/1/1970.
75,000 gal
Easton
Water
System
Easton Water District,
Community provider
141 Swallow Ln, Cle Elum, serves 250
residential persons with 211 connections,
405 total approved connections. Effective
since 1/1/1970.
195,000 gal
Sunlight
Waters
Water
System
Kittitas County Water
District No. 7, Special
District Community
provider
1710 Sunlight Dr., Cle Elum, serves 380
residential persons and 169 non-residential
persons with 225 connections, 267 total
approved connections. Effective since
1/1/1970.
200,000 gal
Vantage
Water
System
Vantage Water System,
Investor Community
provider
Serves 73 residential persons with 80
connections, 129 total approved connections.
Effective since 1/1/1970.
50,000 gal
Evergreen
Valley
Water
System
Evergreen Valley
Utilities, Investor
Community provider
Serves 35 residential persons and 5 non-
residential persons with 262 connections,
411 total approved connections. Effective
since 3/2/2004.
120,000 gal
Reservoir
Hill Water
System
Reservoir Hill
Maintenance Association,
Private Community
provider
South Cle Elum, serves 33 residential
persons with 20 connections, 25 total
approved connections. Effective since
2/25/1999.
20,000 gal
Kittitas County Capital Improvement Program December 20, 2022
Water – Group A Systems Page 69
Table 11 - Continued
Existing Public Facilities and Services
Water (Group A Systems)
Facility Provider Description Size
Central
Mobile
Home Park
Central Mobile Home
Park, Private Community
provider
Wilson Creek Rd. mobile home park, serves
110 residential persons with 52 connections,
52 total approved connections. Effective
since 1/1/1970.
2,100 gal
Snoqualmie
Pass
Private - Snoqualmie Pass
Utility District
Well capacity of 385 gallons per minute and
3 reservoirs storing 565,000 gallons. Serves
500 residential persons with 921 connections
and 2375 approved connections.
1,361 acres
Pine Loch
Sun Beach
Club Water
System
Private Community
provider
Serves 60 full time residents and 348 part
time residents with 409 calculated
connections, 439 total approved connections.
Effective date of 1/1/1970
137,000 gal
Sky
Meadows
Ranch
Country
Club WTR
Private Community
provider
Serves 30 residential persons with 354
calculated connections and 453 total
approved connections. Effective system date
of 1/1/1970
187,278 gal
Sun Country
Estates 1-2-
3 Water
System
Private Community
provider
Serves 219 residential persons with 217 total
calculated connections and 300 total
approved connections. Effective date of
1/1/1970.
258,600 gal
Swiftwater
Trailer Park
Swiftwater Trailer Park,
Private Community
provider
S. Cle Elum mobile home park, serves 30
residential persons with 19 total calculated
connections and 24 total approved
connections. Effective system date of
1/1/1970.
0 gal
Wildwood 2
& 3 Water
System
Private Community
Provider
Serves 45 residential persons with 51 total
calculated connections & 78 total approved
connections. Effective system date of
1/1/1970.
45,000 gal
Grasslands
Park
Private Community
Provider
Serves 29 residential persons with 14 total
calculated connections and 14 total approved
connections. Effective system date of
12/20/2006.
0 gal
Millpond
Mobile
Manor
Investor Community
Provider
Millpond Mobile Manor
Serves 245 residential persons with 105 total
calculated connections and 105 total
approved connections. Effective system date
of 1/1/1970.
0 gal
Suncadia
Resort
Investor Community
Provider
Serves 726 residential persons 992 active
connections and 1501 total approved
connections. Effective system date of
5/29/2008.
1,070,000
gal
Kittitas County Capital Improvement Program December 20, 2022
Water – Group A Systems Page 70
Table 11 - Continued
Existing Public Facilities and Services
Water (Group A Systems)
Facility Provider Description Size
Driftwood
Acres
Maintenance
Corporation
Association Community
Provider
Serves 60 residential persons with 134 total
calculated connections and 141 total
approved connections. Effective system date
of 1/1/1970.
100,000 gal
Sun Island
Maintenance
Assn.
Association Community
Provider
Serves 30 residential persons with 115 total
calculated connections and an undetermined
number of total connections. Effective
system date of 1/1/1970.
0 gal
Grasslands
Water
System
Association Community
Provider
Serves 260 residential persons with 76 total
calculated connections and 81 total approved
connections. Effective system date of
1/1/1970.
21,000 gal
Kittitas County Capital Improvement Program December 20, 2022
Sanitary Sewer Page 71
12. 13BSanitary Sewer
This section includes an inventory of Sanitary Sewer facilities and a detailed description of each
facility improvement that is included in the six-year plan. The inventory of facilities in Table 12
below also describes each facility’s size in order to determine if it addresses the County’s long-
term community needs.
Table 12
Existing Public Facilities and Services
Sanitary Sewer
Facility Provider Description Size
Ellensburg
treatment facilities
Kittitas County Utility
District
Serves within Ellensburg city limits
and has a capacity of 2.5 M – 3.5 M
gpd that flows to the Yakima River.
Ronald treatment
facilities
Kittitas County Water
District No. 2
Single lift station that conveys
wastewater flows from the Water
District area to the City of Roslyn
sewer system.
37 acres
Snoqualmie Pass
Utility District
Snoqualmie Pass Utility
District
Average daily flow approximately
170000 mgd., permitted treatment and
discharge capacity of 0.368 mgd. and
storage of excess flows of about 30
mill. Gal. Serving 700 customers total.
Lagoon normal storage is 10.5 MG
with an additional 10 MG emergency
storage.
1,799
acres
Vantage
wastewater
collection and
treatment system
Vantage Water District
No. 6
Serves Vantage LAMIRD, wastewater
collection and treatment system,
capacity of about 87,000 gpd. Major
upgrades completed in 2013.
80
residences
Upper Kittitas
County Regional
Wastewater
Treatment Facility
City of Cle Elum Sequential Batch Reactor Facility.
Capacity is 3.6 million gpd and can
take instantaneous flow of up to 10
million gpd.
Kittitas County Capital Improvement Program December 20, 2022
Flood Control Zone District Page 72
13. 6BKittitas County Flood Control Zone District
The Kittitas County’s Flood Control Zone District capital improvement plan is further detailed in
Appendix C. Appendix C provides a detailed description of the proposed projects, mapping of
the projects, and the funding plan.
Kittitas County Capital Improvement Program December 20, 2022
Frequently Asked Questions Page 73
14BFrequently Asked Questions
Question 1: How does the County determine priorities for the projects listed in the CFP?
Answer: This CFP provides general guidance on prioritizing public facility projects. Each
project proposal is reviewed by the CFP Task Force using the following criteria:
1. Improvements to obsolete or worn out existing public facilities that
achieve or maintain adopted levels of service.
2. New or expanded public facilities that achieve or maintain adopted levels
of service.
3. Improvements to existing public facilities or new public facilities that
eliminate hazards.
4. New or expanded public facilities that achieve or maintain adopted levels
of service as forecasted during the next six-years.
5. Improvements to existing public facilities or new public facilities that
reduce the operating cost of providing a public service or facility.
6. New facilities that provide excess capacity that will be needed beyond
the next six-years.
7. All other facilities the County is obligated to complete that do not meet
the criteria above.
8. Availability of funding.
The Board of County Commissioners make the final determination of the priority
order of the projects listed in the CFP.
Question 2: Are projects automatically given funding in priority order?
Answer: No, if grant funds are applied for and received, chances are good that the grant
funded project will become a priority. Grant funds awarded become new and
additional revenue to the County, above and beyond the County’s current
resources. The County continually looks for ways to reduce the reliance on
General Fund dollars for capital projects to stretch current resources.
Question 3: Will a project that is partially funded be listed in the CFP?
Answer: It depends. If the project is still in-progress, but no additional money is needed
beyond what has already been appropriated, it will not show up in the CFP in
future years. If the project does need additional funds appropriated beyond the
current level of funding, it will continue to show up in the CFP.
Question 4: Are all projects in the CFP completed within the next 6 years?
Answer: No, for several reasons. First, the CFP is annually reviewed and amended to
verify that fiscal resources are available. Second, the need for capital facilities is
generated by population growth, existing facility deficiencies, major facility
maintenance and repair needs, internal operations, and Comprehensive Plan goals
and policies. There is a need to continually assess which projects are affected
and should be considered a priority. As a result, project estimates and timelines
may change.
Kittitas County Capital Improvement Program December 20, 2022
Frequently Asked Questions Page 74
Question 5: What does level of service (LOS) mean?
Answer: The LOS is a quantifiable measure of the amount of public facilities that is
provided, such as acres of park land per capita, vehicle capacity of intersections,
or water pressure per square inch available for water system.
Question 6: What is concurrency?
Answer: All public facilities that are needed to serve new development or a growing
service area population, must be in place at the time of initial need. If the
facilities are not in place, a financial commitment must have been made to
provide the facilities within six-years of the time of the initial need and must
have the capacity to serve the new development or a growing service area
population without decreasing service levels below locally established minimum
standards.
Question 7: How do I get involved in the CFP process?
Answer: Information on the CFP process will be posted on the County’s website at the
following address: https://www.co.kittitas.wa.us/cds/land-use/default.aspx. To
receive email updates on when new information is posted, you can subscribe to
Kittitas County’s email notification subscription service for “Comprehensive
Plan Announcements.” All persons can provide written or verbal comments to
the Planning Commission and to the Commissioners, before or during the
scheduled public hearings.
APPENDIX A
Kittitas County Maintenance Shops,
Storage, Parking, Pits/Quarries
2023 Equipment Rental & Revolving Preliminary Budget
The Director of Public Works manages the Kittitas County Equipment Rental and Revolving (E. R. & R.) Fund. The E. R. & R.
The purpose of the fund is to account for the financing of goods and services provided primarily to the road fund.
The following Services are Provided by the ER&R Fund:
Administration-The Administration division provides financial management and administration for the divisions within the E. R.
& R. Fund. Services include asset management, developing rental rates and inventory management.
Pits and Quarries -The Pits & Quarries division manages the pits and stockpiles of rock owned by Kittitas County. The rock
stockpiled in these pits is purchased by the County Road Fund for use on county road maintenance and construction projects
and winter road sanding operations. In addition to county owned pits, we also solicit bids from private vendors for maintenan ce
rock used by the County Road Fund. Revenues are provided through sales of county owned rock primarily to the County Road
Fund.
Mechanic Shop - The Mechanical Shop division is responsible for maintaining the fleet of vehicles utilized by the County Road
Fund. This division also maintains the County mechan ical shop facilities. The division includes four mechanics and future plans
for a Fleet Manager. Kittitas County also sublets light duty vehicle preventive maintenance such as lube and oil changes to
local vendors.
Central Stores - The Central Stores maintains a supply of culvert pipe and guardrail used by the County Road Fund in the
event of unscheduled repairs. For scheduled construction projects culvert pipe and guardrail are purchased direct by the road
fund as these materials do not require storage. Revenues are provided through the sales of materials to the County Road
Fund.
Rental Services - The Equipment Rental Services accounts for the maintenance and operation of the vehicles and equipment
used primarily by the County Road Fund. Revenues are provided through adopted equipment rental rates. Rates are
established to cover the operating costs of the equipment (fuel, insurance, repairs) and a replacement factor to cover inflat ion.
Primary Goal for 2023 - The primary goal for ER&R for 2023 is to complete acquisition of land supporting relocation of the
Lower County Shop.
Estimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueEstimated CostEstimated RevenueProject TotalER&R Fund 501Airport Fund 101Flood Control Fund 107Federal Aviation Admin GrantBond SaleCAPITAL IMPROVEMENT PROJECT NAME
1
400
2
500 500
250 250
150 150
250 250
8,000 500 7,500
(500)(500)
3
4
250 125 125
1,500 1,500
5
500 0 500 1500 150 0 250 0 8000 -500 400 0 10400 Totals 1150 125 125 1500 7500
- - 1,500 -
150
500 2000 150
150
NET LOCAL FUNDS NEEDED 500 500
OTHER FUNDS (GRANTS,BONDS)(+)
500 2,000
Bond council and bond sale.
Final building and site design.
Ongoing Operations, On Capital Improvements Planned.
ANNUAL CAPITAL IMPROVEMENT TOTALS (-)
Other pits and quarries
Advanced mitigation evaluation and preliminary design
Ongoing Operations, On Capital Improvements Planned.
Final mitigation implementation of plan actions.
Building and Site construction.
Hansen Pit
Hyak Joint Maintenance Facility with SPUD
Final mitigation design and implementation of Phase 1
Surplus of existing facility.
202820232024
Land acquisition
Preliminary design complete supporting permitting and bond sale
formulation.
Automated wash bay design and construction
2025 2027
Lower County Maintenance Shop
Upper County Maintenance Shop
2026
KITTITAS COUNTY
2023-2028
SIX YEAR ROAD MAINTENANCE CAPITAL PLAN
400 250
250 -
- - 7,500
7,500 8,650 1,750 - 250 7500
3,200
400
3,200
1 of 1
APPENDIX B
Kittitas County Six-Year
Transportation Plan
Appendix B
Kittitas County Department of Public Works Capital Facility
Plan 2023-2028
Prepared on November 22, 2022
Introduction:
Annually Kittitas County Department of Public Works develops a listing of county road and bridge
improvements for Board of County Commission consideration. The listing is accompanied by a
public outreach effort. Public comments are evaluated, and staff adjusts the original proposal that
is then finalized and presented to the Board of County Commissioners during the annual County
budget process. Given the complexity of municipal engineering, environmental permitting, right
of way acquisition and construction; Public Works schedules projects an additional five years
beyond the first budget year. The planning schedule includes programmed funding amounts and
sources along with project forecast expenses. The schedule identifies the various projects
beginning in the first budget year (2023) extending to the last program year (2028).
2023-2028 Plan:
This plan is organized into three components for ease of understanding the various projects
contained in the six-year plan:
1 - Map identifying the general location of various projects around the County
2 -The six-year project listing and associated funding plan
3 - Project specific sheets listing specific project information including: County Road
Project Number (if assigned at the time of publication), priority number, title, project
description, project status, photos and funding sources
1- Manastash Rd Creek Bank Stab, and
Snow Park Improvement
2- Liberty Rd - Swauk Creek Bridge
3- Dickey Creek Bridge (16203) Replacement
FHWA Project
4- I-90 Widening (State Project)
5- Hungry Junction Road Widening
6- Cooke Canyon Bridge Replacement
7- Faust Road Bridge Over Town Ditch
Replacement
8- Intersection and Corridor Safety
Improvements
9- Bridge Rail Improvements Code 3 Phase 1
(MD A-F)
10- Vantage Hwy Over Cascade Canal (89342) Replacement
11- Airport Road Sidewalk
12- Progress Path Ph2 - Cle Elum
13- HSIP 2023 Awarded Project
14- Badger Pocket (Payne Rd) Improvement
15- Yellowstone Culvert Replacement
16- Denmark Road Improvement
17- Badger Pocket Area Road Improvements Phase 2
18- Airport Rd (Cle Elum) Culvert Replacement
19- Short Span Bridge Replacement - Phase 1
20- Badger Pocket Rd HMA
21- HSIP 2025 Awarded Projects
22- Reecer Creek Rd Bridge Over Town Ditch Replacement - Bridge Only
23- Lambert Rd Br 06345 Maintenance
24- Bender Rd Widening and Pedestrian Improvements
25- Sanders Road Improvements
26- Parke Creek Rd Turnaround
27- Pheasant Ln Turnaround
28- Bar 14 Rd Turnaround
29-34 - Gravel Road Upgrades (6)
Kittitas County
2023-2028
Six Year Transportation Improvement Plan
2
3
1
4
5 6
7
8 9
12
10
13
18
20
14
15
22
17
24
19
16
21
25
26
27
28
29-34
23
11
0 5 10 15 202.5
Miles
project numberCRP #Res. #designright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject TotalRoad# BMP EMP STIP
Advertise
CAPITAL IMPROVEMENT PROJECT NAME Grant - planned
1 Manastash Rd Creek Bank Stab, and Snow Park Impr.RC1573-E1 273-16 2016-099 30 100 70 1500
95301 10.65 11.01 WA-12576
2 RC2193-FL 306-21 2022-016 700 100 2407
38350 0.07 0.07 WA-14038
3 RC1594-B1 295-18 2019-163 400
FHWA project
4 RC2290-ST 500 250
State Project
5 RC2093-RP 304-20 2021-071 254 50 101 2177 67 1452
31510 0 1.74 State Funding
6 RC2194-BR 315-22 2022-156 695 100 10 274 40 1554
43883 0.24 0.24 WA-14791
7 RC2195-BR 316-22 2022-155 641 100 10 254 40 1487
34761 0.59 0.59 WA-14792
8 RC2196-HS 313-21 2022-018 15 50 317
VARIOUS WA-14039
9 RC2199-HS 314-21 2022-017 15 100 486
VARIOUS WA-14040
10 RC2292-G1 310-21 2021-202 65 184
94001 5.17 5.33 WA-14178
11 8 70
94001 1.35 1.85 local
RC2293-F1 311-21
12 110 30 270
13 100 50 100 900
VARIOUS
14 RC2291-L1 309-21 250 250 200 3000
63245 0 1.55
15 RC2197-C1 308-21 150 45 60 1500
10360 0.65 0.75
16 253 240 250 150 3717
63501 3.08 4.35
17 200 80 2500
VARIOUS
18 30 0 60 1200
23010 2.25 2.4
19 350 160 890
VARIOUS
20 80 60 1500
68910 0 0.57
21 50 20 30 350
VARIOUS
22 347 75 193 2119
93526 0.86 0.86
23 96 45 338
22512 0.67 0.67
24 RC1585-F1 285-18 2018-054 275 300 175 1550
93075 0 0.68
25 300 200
40315 0.13 0.25
Construction Jobs preformed by Maintenance Crew (County Force Work)
26 60 65 975
69370 5.79 11.64 Local
27 15 50 635
10431 0 2.04 Local
28 RC1583-G1 286-18 2018-054 25 0 25 150
Parke Creek Road Turnaround
1100Pheasant Lane Turnaround
700BRAC
Airport Road Culvert Replacement
1290Badger Pocket Road HMA
1640Lambert Road Br 06345 Maintenance
479BRAC
HSIP 2025 awarded project HSIP 450Short Span Bridge Replacement - Phase 1
1400Sanders Road Improvements
500 2300
Bender Road Widening and Pedestrian Improvements 2673HSIP 2023 awarded project
1150Yellowstone Culvert Replacement
1755HSIP
STBG
Cooke Canyon Bridge Replacement - Const by 25
Vantage Hwy over Cascade Canal (89342) Replacement
249Denmark Road Improvement (4014 requested with RAP)4610STBG
RAP
Badger Pocket Area Road Improvements Phase 2 2780Intersection and Corridor Safety Improvements
382Bridge Rail Improvements Code 3 Phase 1 (MD A-F)601Airport Road Sidewalk Replacement
RAP
BRAC
Progress Path Ph2 - Cle Elum
Safe Rts to Schools 410HSIP
Hungry Junction Road Widening 4101Full Funding not till 2024
Badger Pocket (PAYNE RD) Improvement
3700RAP
HSIP
Reecer Creek Rd Bridge over Town Ditch Replacement - Bridge Only
2734Faust Road Bridge over Town Ditch Replacement - const by 25 BRAC 2532Dickey Creek Bridge (16203) Replacement FHWA project
400I-90 Widening (State project)7502028
KITTITAS COUNTY
2023-2028
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
1700Liberty Rd Swauk Creek Bridge
3207programmed for CN 2024
FLAP
FLAP
2023 2024 2025 2026 2027
78Bar 14 Turnaround
2001 of 2
project numberCRP #Res. #designright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructiondesignright of wayConstruction Engineering (CE)constructionProject Total2028
KITTITAS COUNTY
2023-2028
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN
2023 2024 2025 2026 2027
42512 1.11 1.21 Local
29 650
30 700
31 750
32 800
33 850
34 900
2545 350 1213 3735 500 345 651 9720 883 0 427 7602 637 345 300 5690 416 300 373 7036 0 0 630 4823 48521
1,500 1,500
ADDITIONAL FUNDING NEEDED 1,326 984
REQUIRED FUNDING TO MAINTAIN RESERVES 1,500 1,500 1,500 1,500
2,532 174
TOTAL ROAD FUND BALANCE End of Year 6,532 4,767 2,532 174 3,230 516
TOTAL ROAD FUND BALANCE Beginning of Year 6,817 6,532 4,767 2,532
ANNUAL IMPACT TO FUND RESERVES (NO NEW REV)(285) (1,765) (2,235) (2,358) 698 342
Expected Annual Expense (Road Fund)11,903 12,716 13,329 13,265
Expected Annual Revenue (Road Fund)14,312 14,782 17,569 16,415 17,053 17,838
13,379 13,947
5,149 1,904
NET OF GRANTS 2,694 3,831 6,475 5,508 2,976 3,549
ANNUAL OTHER FUNDS (GRANTS,RID)(+)5,149 7,385 2,437 1,464
ANNUAL CAPITAL IMPROVEMENT TOTALS (-) 7,843 11,216 8,912 6,972 8,125 5,453
DESIGN/ROW/CONSTRUCTION TOTALS
2023 2024 2025 2026 2027 2028 750Gravel Road upgrade 28
900Gravel Road upgrade 26
Gravel Road upgrade 27
850 800
Gravel Road upgrade 25 200Gravel Road upgrade 23
650Gravel Road upgrade 24
7002 of 2
CRP/RC #: 273-16
Resolution #: 2016-099
Location: MP 10.65– MP 11.01
Last Updated: 8/29/2022
Manastash Rd Creek Bank
Stabilization & Snow Park
Improvements
Basis for Project: Roadway Safety, Repair, & Improvements Construction: 2023
Project Description:
Erosion caused by the South Fork Manastash Creek has caused bank instability undercutting the County road. The road is cur-
rently restricted to a single lane at this location. The road will need to be restored and the bank stabilized to provide two
lanes of trafÕc.
Status: Design phase with construction in 2023.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Project Number: RC1573-E1 Length: Approximately 0.36 miles
Funding Sources:
Planned
FLAP/FHWA
funds
$1,233,000
Local Funds $467,000
Total: $1,700,000
View downstream of eroded bank View downstream of lane closure
1
CRP/RC #: 306-21
RESOLUTION #: 2022-016
Location: MP 0.2 Liberty Road
Last Updated: 8/29/2022
Liberty Road - Swauk Creek
Bridge Replacement
Basis for Project: Bridge Replacement– Safety Construction: 2024
Project Description:
Swauk Creek bridge (No. 07101) on Liberty Road at mile post 0.02 crosses Swauk Creek. This load restricted bridge will be
replaced to improve access to the town of Liberty and provide access to the Okanogan-Wenatchee National Forest. A Federal
Lands Access Program grant has been secured in the amount of $2,458,000.
Status: Design phase 2022-2023 with construction in 2024.
TrafÕc Impacts: To be determined with design.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Sources:
Planned
FLAP/FHWA
funds
$2,718,000
Local Funds $489,000
Total: $3,207,000
Project Number: RC2193-FL Length: 0.12 miles
2
CRP/RC #: 295-18
RESOLUTION#: 2019-163
Location: North Fork Teanaway Rd
Last Updated: 8/29/2022 *FHWA project
Project Number: RC1594-B1 Length: 0.01 miles
Basis for Project: Bridge Replacement Construction: 2022-2023
Project Description:
This bridge has one of the lowest sufÕciency ratings in the County and is currently load restricted. Teanaway River has mi-
grated slowly across the Öoodplain and started erosion behind the abutment wall. The County placed large rocks to arrest the
erosion until a permanent Õx could be implemented. Work will include replacement of the bridge with a much larger structure
to meet current design standards and improved roadway alignment. The Federal Highway Administration is lead agency with
Kittitas County contributing local funds towards the near 8 million dollar project.
Status: Construction began late Summer/Fall of 2022 and begin again in Summer of 2023.
TrafÕc Impacts: Minimal; existing bridge will stay in place until construction is complete.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Dickey Creek Bridge
Replacement
Funding Sources:
Local Funds $400,000
Total: $400,000
3
CRP/RC #:
Location: Cle Elum to Easton
Last Updated: 8/29/2022
* WSDOT project
Project Number: RC2290-ST Length: Approximately 7.0 miles
Basis for Project: Improve Capacity and Safety Construction: TBD
Project Description:
High bypass trafÕc volumes through Upper County is a concern for residents and the condition of roads. This increase in traf-
Õc when I-90 is busy results in degraded roadways as well as increased safety concerns. In order to pursue funding, a project will need to be on the State Transportation Improvement Plan (STIP). This is initial funding to place the project on the plan
and allow for future federal funding.
Status: Feasibility study underway.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
Funds
$750,000
Total: $750,000
I-90 Widening– Eastbound
and Westbound 4
CRP/RC #: 304-20
Resolution #: 2021-071
Location: MP 0-MP 1.74 H Junction Rd, Ellensburg
Last Updated: 8/29/2022
Hungry Junction Road
Widening
Basis for Project: Reconstruction and Safety Construction: 2024
Project Description:
Hungry Junction Rd from US 97 to Reecer Creek Rd is narrow with having vertical curves that do not provide adequate sight
distance. The road has moderate truck trafÕc from a local hay processing facility. The work will include changing the vertical
curve proÕle to comply with WSDOT design manual, widening and paving the road to increase paving structure.
Status: Design and Right of Way phases 2022-2023, with construction in 2024-2025
TrafÕc Impacts: To be determined with design.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Project Number: RC2093-RP Length: 1.74 miles
Funding Sources:
Planned RAP
funds
$3,581,000
Local Funds $520,000
Total: $4,101,000
Hungry Junction looking east Hungry Junction Rd-Siphon
5
CRP/RC #: 315-22
Resolution #: 2022-156
Location: MP 0.24 Cooke Canyon Rd, Ellensburg
Last Updated: 8/29/2022
Cooke Canyon Rd Bridge
Replacement
Basis for Project: Bridge Replacement Construction: 2023-2024
Project Description:
Bridge #80181 on Cooke Canyon Road at MP 0.24 over the Hiline Canal is currently load restricted and structurally deÕcient.
Work will include replacement of the bridge with a much larger structure to meet current design standards.
Status: Design and Right of Way phases 2022-2023, with construction in 2023-2024
TrafÕc Impacts: To be determined with design.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Project Number: RC2194-BR Length: 0.01 mile
Funding Sources:
Local Bridge
Program
$2,312,000
Local Funds $361,000
Total: $2,673,000
Cooke Canyon Rd looking north Eroding concrete girder
6
CRP/RC #: 316-22
Resolution #: 2022-155
Location: MP 0.59 Faust Rd, Town Ditch, E-burg
Last Updated: 8/29/2022
Faust Rd Bridge
Replacement
Basis for Project: Bridge Replacement Construction: 2023-2024
Project Description:
Bridge #88212 on Faust Road over the Town Ditch is currently load restricted and structurally deÕcient. Work will include re-
placement of the bridge with a much larger structure to meet current design standards.
Status: Design and Right of Way phases 2022-2023, with construction in 2023-2024
TrafÕc Impacts: To be determined with design.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Project Number: RC2195-BR Length: 0.01 mile
Funding Sources:
Local Bridge
Program
$2,147,000
Local Funds $385,000
Total: $2,532,000
Faust Rd looking east Eroding concrete girder
7
CRP/RC #: 313-21
RESOLUTION #: 2022-018
Location: Various
Last Updated: 8/29/2022
Project Number: RC2196-HS Length: TBD
Basis for Project: Safety Improvements/Countermeasures Construction: 2022-2023
Project Description:
This project provides corridor and intersection countermeasures and improvements at unsignalized intersections and road
segments identiÕed as having insufÕcient, “out of date”, or non-effective safety measures based on accident data analysis and safety studies. Kittitas County recognizes that improvements to these corridors may provide beneÕt to a great number of local
residents, recreational travelers, and freight transit; and, any improvements that could reduce potential future crashes are beneÕcial.
Status: Funds to be awarded 2021-2022. Design and construction to span 2021-2023.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Intersection & Corridor Safety
Improvements
Funding Source:
HSIP
Local
funding
$330,000
$52,000
Total: $382,000
8
Depiction of current County rural intersection (left) and a proposed County rural intersection with improvements (right).
CRP/RC #: 314-21
RESOLUTION #: 2022-017
Location: Various
Last Updated: 8/29/2022
Project Number: RC2199-HS Length: TBD
Basis for Project: Safety Improvements/Countermeasures Construction: 2021-2023
Project Description:
There have been 60 bridges rated as Code 3; this rating reÖects bridges with timber railing or no railing at all. Of all the
bridges identiÕed with substandard rails, these bridges or structures have the highest vulnerability because they provide no protection for an errant vehicle. This project will install or replace bridge rails not meeting current speciÕcations.
Status: Funds to be awarded 2021-2022. Design and construction to span 2021-2023.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Bridge Rail Improvements–
Code 3: MD A-F
Funding Source:
HSIP
Local
funding
$520,000
$81,000
Total: $601,000
9
CRP/RC #: 310-21
RESOLUTION #: 2021-202
Location: MP 5.17–MP 5.33, Vantage Hwy
Last Updated: 8/29/2022
Project Number: RC2292-G1 Length: 0.16 miles
Basis for Project: Safety Improvements/Countermeasures Construction: 2023
Project Description:
Vantage Highway is an essential east-west roadway serving residential, agricultural, and commercial trafÕc. Bridge structure
#89342 is located approximately 0.3 miles west of Fairview Road. This structure consists of 16 treated wood stringers. Based
on calculations this was rated as load restricted in 2021. This structure was also damaged by a vehicle impact in 2021. Work
will include replacement of the bridge with a much larger structure to meet current design standards.
Status: Planned for design and Right of Way in 2022 and construction in 2023.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Vantage Hwy – Cascade Canal
Bridge Replacement
Funding Source:
STBG $249,000
Total: $249,000
10
CRP/RC #: 311-21
Location: MP 1.35– MP 1.85
Bowers Road, Ellensburg
Project Number: RC2293-F1 Length: 0.5 miles
Basis for Project: Improvements, increased drainage. Construction: 2022
Project Description:
Sidewalks provide an important transportation connection. As sidewalks deteriorate they become hazardous. It is also im-
portant to ensure connectivity from one sidewalk section to another. Multiple sections of sidewalk on Airport Road have buck-
led. Improvements will be made to the sidewalk on Airport Road to ensure connectivity, ADA compliance and repair deterio-
rated sidewalk segments. This sidewalk fronts County Airport property.
Status: Design and construction to occur in 2022.
TrafÕc Impacts: Minimal, but TBD.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local $65,000
Total: $65,000
Airport Road Sidewalk
Replacement 11
CRP/RC #:
Location: Cle Elum to Roslyn
Last Updated: 8/29/2022
Project Number: Length: 1.11 miles
Basis for Project: Safety Improvements/Countermeasures Construction: 2024
Project Description:
Develop a paved path that would extend from the existing paved path that currently ends at Cle Elum/Roslyn School. The
path would cross State Route 903 at the intersection of Alliance Road, travel along Shaft Street to E South Avenue in Roslyn.
This path will provide an increase in safety for pedestrians and cyclist.
Status: Planned for design and Right of Way in 2022-2023 and construction in 2024.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Mark Cook @ 509-962-7692 or mark.cook@co.kiƫtas.wa.us
Progress Path-Phase 2
Cle Elum To Roslyn
Funding Source:
Safe routes
to school
Local
$355,000
$55,000
Total: $410,000
12
CRP/RC #:
Location: Various TBD.
Last Updated: 8/26/2022
*HSIP is a WSDOT Grant
Project Number: Length: TBD
Basis for Project: Safety Construction: 2025
Project Description:
The Highway Safety Improvement Program (HSIP) is a federal program that allows states, and the local governments within
them, to target safety funds to their most critical safety needs. The goal of the program is to reduce fatal and serious injury
crashes following Washington State's Strategic Highway Safety Plan (Target Zero) and each agency's local road safety plan
(pdf 276 kb). WSDOT's programs for local governments include the County Safety Program, the City Safety Program, and the
Railway-Highway Crossing Program.
Status: Planned for design and Right of Way in 2024 and construction in 2025.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
HSIP
Local
funding
$995,000
$155,000
Total: $1,150,000
Highway Safety Improvement
Program 2023-2025 Award 13
CRP/RC #: 309-21
Location: MP 0.0-MP 1.55
Ellensburg
Last Updated: 8/29/2022
Project Number: RC2291-L1 Length: 1.55 miles
Basis for Project: Safety, Rehabilitation, & Improvements Construction: 2025
Project Description:
An increase in agricultural activities in the Badger Pocket area has brought issues to the surface concerning the road net-
work. Outdated roadway construction, geometrics, narrow right of way widths, impacts to existing irrigation franchises, and congestion are some of the items to be broken into phases as it affects many roads in the area. Priority roads to be deter-
mined prior to design.
Status: Planned for design and Right of Way in 2024 and construction in 2025.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Badger Pocket Area Road
Improvements Payne Rd– Phase 1
Funding Source:
Local
funding
$3,700,000
Total: $3,700,000
Payne Rd looking South Payne Rd and Thrall Rd intersection
14
CRP/RC #: 308-21
Location: MP 0.65-MP 0.75 Snoqualmie Pass
Last Updated: 8/29/2022
Project Number: RC2197-C1 Length: 0.10 miles
Basis for Project: Safety Construction: 2025
Project Description:
The Yellowstone Road culvert project will replace the existing undersized and deteriorating culvert with a larger culvert that
has the capacity to handle high water Öow and sediment that has been found in the Õsh bearing stream. This will prevent the washout of the county road as well as improve Õsh passage.
Status: Planned for design and Right of Way in 2024 and construction in 2025.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$1,755,000
Total: $1,755,000
Yellowstone Rd Culvert
Replacement 15
CRP/RC #:
Location: MP 3.08– MP 4.35
Last Updated: 8/29/2022
Project Number: Length: 1.27 miles
Basis for Project: Safety, Bridge Replacement, and Other Improvements Construction: 2027
Project Description:
Denmark Road serves as a local connector from nearby residential developments and agricultural activities. Improvements
are proposed to Denmark Road from Thrall Road to Fourth Parallel Road. Improvements include widening and replacement of the structure over Cascade Canal. Construction funding anticipated programmed 2027.
Status: Planned. Planned for design and Right of Way in 2025-2026 and construction in 2027.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Denmark Road Improvement
Funding Source:
RAP
Local
funding
$4,014,000
$596,000
Total: $4,610,000
16
CRP/RC #:
Location: Various
Last Updated: 8/29/2022
Project Number: Length: TBD
Basis for Project: Safety, Rehabilitation, & Improvements Construction: 2026
Project Description:
An increase in agricultural activities in the Badger Pocket area has brought issues to the surface of road network. Poor road-
way construction, geometrics, narrow right of way widths, impacts to existing irrigation franchises, and congestion are some of the items to be broken into phases as it affects many roads in the area. Priority roads to be determined prior to design.
Status: Planned for design 2025 and construction in 2026.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Badger Pocket Area Road
Improvements – Phase 2
Funding Source:
Local
funding
$2,780,000
Total: $2,780,000
Orchard Rd and Perry Rd
17
Thrall Rd and Sorenson Rd
CRP/RC #:
Location: MP 2.25– MP 2.4 Cle Elum
Last Updated: 8/29/2022
Project Number: Length: 0.15 miles
Basis for Project: Drainage Improvement/Flood Reduction Construction: 2028
Project Description:
Undersized irrigation culverts under Airport Road in Cle Elum have increased drainage issues in the area. Replacement of
these undersized culverts with larger, adequate culverts will decrease Öooding issues for nearby property owners while also protecting the roadway from damage. Construction funding anticipated in 2028.
Status: Planned. Planned for design and Right of Way in 2027 and construction in 2028.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$1,290,000
Total: $1,290,000
Airport Road (Cle Elum)
Culvert Replacement 18
CRP/RC #:
Location: Various
Last Updated: 8/29/2022
Project Number: Length: TBD
Basis for Project: Safety Construction: 2026
Project Description:
Kittitas County has 156 routinely inspected structures having a length under 20-feet. These structures are not eligible for
Bridge Replacement Advisory Committee (BRAC) funding, as such, it is the County’s responsibility to maintain or replace these structures with County Funds. Based on Õeld reviews many of these structures need signiÕcant repairs or to be re-
placed. This phase begins to address the need to repair or replace these structures. Multiple phases will be required to ad-dress all structures.
Status: Planned. Planned for design in 2025 and construction in 2026.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Planned
STBG
Local funding
$900,000
$500,000
Total: $1,400,00
0
Short Span Bridge Replacement-
Phase 1 19
CRP/RC #:
Location: MP 0.0 to MP 0.57 Ellensburg
Last Updated: 8/29/2022
Project Number: Length: 0.57 miles
Basis for Project: Rehabilitation and Maintenance Construction: 2026
Project Description:
Local hay pressing operations have deteriorated existing asphalt roadway resulting in pavement rutting conditions. An HMA
overlay will remediate the rutted condition and restore the roadway segment. The road segment will be widened to accommo-date the larger truck loads entering and exiting hay press facility.
Status: Planned. Planned for design in 2025 and construction in 2026.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$1,640,000
Total: $1,640,000
Badger Pocket Rd
HMA Overlay 20
CRP/RC #:
Location: Various TBD.
Last Updated: 8/29/2022
*HSIP is a WSDOT grant
Project Number: Length: TBD
Basis for Project: Safety Construction: 2026-2027
Project Description:
The Highway Safety Improvement Program (HSIP) is a federal program that allows states, and the local governments within
them, to target safety funds to their most critical safety needs. The goal of the program is to reduce fatal and serious injury
crashes, following Washington state's Strategic Highway Safety Plan (Target Zero) and each agency's local road safety plan
(pdf 276 kb). WSDOT's programs for local governments include the County Safety program, the City Safety program, and the
Railway-Highway Crossing program.
Status: Planned for design in 2026 and construction in 2027.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
HSIP
Local
funding
$389,000
$61,000
Total: $450,000
Highway Safety Improvement
Program 2025-2027 Award 21
CRP/RC #:
Location: MP 0.86 Reecer Creek Rd/Town Ditch
Last Updated: 8/29/2022
Reecer Creek Rd Bridge
Replacement
Basis for Project: Bridge Replacement Construction: 2027
Project Description:
Bridge #88212 on Reecer Creek Road over the Town Ditch is currently load restricted and structurally deÕcient. Work will in-
clude replacement of the bridge with a much larger structure to meet current design standards.
Status: Design and Right of Way phases 2026 with construction in 2027
TrafÕc Impacts: To be determined with design.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Project Number: Length: 0.01 mile
Funding Sources:
Local Bridge
Program
$2,365,000
Local Funds $369,000
Total: $2,734,000
Reecer Creek Rd looking South Overhead aerial
22
CRP/RC #:
Location: MP 0.67 over Teanaway River
Last Updated: 8/29/2022
Bridge # 06345
Project Number: Length: 0.01 miles
Basis for Project: Maintenance and Repairs Construction: TBD
Project Description:
The Lambert Rd Bridge spans the Teanaway River and is in need of preventative maintenance to extend the life of the bridge.
The original construction of the precast T-girders did not include an overlay, which allows water to inÕltrate between the ad-
jacent Öanges resulting in spalls, delamination and cracks at the weld tab locations. A deck overlay would allow for repairs
before adding deck membrane and modiÕed concrete overlay. Construction funding anticipated programmed 2028.
Status: Design and Right of Way phases 2027 with construction in 2028
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Lambert Road Bridge
Maintenance 23
Funding Sources:
Planned
BRAC funds
$414,000
Local Funds $65000
Total: $479,000
CRP/RC #: 285-18
Resolution #: 2018-054
Location: MP 0.0 to MP 0.68 Ellensburg
Last Updated: 8/29/2022
Project Number: RC1585-F1 Length: 0.68 miles
Basis for Project: New Construction and Improvements Construction: 2028
Project Description:
Widen Bender Road to accommodate the increase in trafÕc and to link future developments to the City of Ellensburg and pro-
vide space for bicyclist along the shoulder. Work includes shoulder widening and resurfacing the road, construction of side-walk, and installation of drainage structures. Sidewalk to be constructed on north side of roadway only.
Status: Design and Right of Way phases 2027 with construction in 2028
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Bender Rd Widening &
Pedestrian Improvements
Funding Source:
RAP
Local
funding
$2,070,000
$230,000
Total: $2,300,000
24
CRP/RC #:
Location: MP 0.13 to MP 0.25 Ellensburg
Last Updated: 8/29/2022
Project Number: Length: 0.12 miles
Basis for Project: Safety, Stormwater Drainage, and Roadway Improvement Construction: 2028
Project Description:
To accommodate the increase in trafÕc along Sanders Road and to link future developments to the City of Ellensburg, the
road will need to be widened. Non-motorized pathways will need to be constructed for pedestrian and bicycle use. This will allow for a uniform roadway from County to City limits. Work will include widening and paving the road, construction of side-
walk, and installation of drainage structures.
Status: Planned. Construction in 2028
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Sanders Rd Improvements
Funding Source:
Local
funding
$500,000.00
Total: $500,000.00
25
CRP/RC #:
Location: MP 5.79-MP 11.64 Parke Creek Rd,
Ellensburg
Last Updated: 8/29/2022
Project Number: Length: 5.85 miles
Basis for Project: Improvements and Increased Drainage Construction: TBD
Project Description:
Parke Creek Road provides access to State Lands for recreation and land management activities. Work will be to improve
roadway and drainage from the existing turn-around to the boundary line with State Lands, a distance of approximately 5.8 miles. Construction will include a turn-around at the State Lands boundary. Roadway surface will be gravel. Upon completion,
Parke Creek Road will be brought onto the County road network. Work will be completed by County Forces.
Status: Planned.
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$1,100,000
Total: $1,100,000
Parke Creek Rd Turnaround
Improvement 26
CRP/RC #:
Location: MP 0.0 to MP 2.04 Pheasant Lane, Ellensburg
Last Updated: 8/29/2022
Project Number: Length: 2.04 miles
Basis for Project: Road and Access Improvements Construction: 2028
Project Description:
Pheasant Lane provides access to Wenatchee National Forest for recreation and forest management activities. Work will be to
improve roadway and drainage from the Reecer Creek Road intersection to the boundary line with Wenatchee National Forest, a distance of approximately 4.2 miles. Construction will include a turn-around at the National Forest boundary. Roadway sur-
face will be gravel. Upon completion, Pheasant Lane will be brought onto the County road network. Work will be completed by County Forces. Construction funding anticipated programmed 2028.
Status: Design and Right of Way phases 2027 with construction in 2028
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$700,000
Total: $700,000
Pheasant Lane
Turnaround 27
CRP/RC #: 286-18
Resolution #: 2018-054
Location: MP 1.11-MP 1.21 Bar 14 Rd, Ellensburg
Last Updated: 8/29/2022
Project Number: RC1583-G1 Length: 0.5 miles
Basis for Project: Repair Flood Damage and School Bus Turnaround Construction: TBD
Project Description:
2017 Öood events caused water to overtop Bar 14 Road at Bridge #89041. Subsequent inspection found signiÕcant damage
to one of the girders. The County decided to remove the bridge and complete channel repair work to alleviate Öood problems. While the County plans to pursue funding to replace the bridge, the funding is competitive and Bar 14 Road does not see
much daily trafÕc. Since the likelihood of obtaining funds in the near future is remote, the county will build a turnaround at each dead end until funding is secured. Work will be done by County Forces.
Status: Planned
TrafÕc Impacts: Minimal, but TBD.
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$200,000
Total: $200,000
Bar 14 Road
Turnaround 28
Flood event of 2017; overtopping bridge. Bar 14 Rd with barricades after bridge removed.
CRP/RC #:
Location: Various locations throughout the County
Last Updated: 8/29/2022
Project Number: Length:
Basis for Project: Maintenance Construction: 2023-2028
Project Description:
Kittitas County gravel road upgrade will complete road maintenance projects and improvements on existing gravel roads.
Funding has been projected out through 2028 with a 5% increase per year.
Status: Planned
TrafÕc Impacts: TBD
For more informaƟon on this project, contact Darren Case @ 509-962-7523 or Darren.case@co.kiƫtas.wa.us
Funding Source:
Local
funding
$4,650,000
Total: $4,650,000
Gravel Road
Upgrades 29
APPENDIX C
Kittitas County Flood Control Zone District
Kittitas County Flood Control Zone District
Capital Facility Plan 2023-2028
November 23, 2022
Introduction
Every year, the Kittitas County Flood Control Zone District (“District”) develops a list of capital improvement projects for Board of
County Commission consideration. The proposal is presented to the Board of County Commissioners during the annual County
budget process. Given the complexity of flood hazard planning, engineering, environmental permitting, and construction, the Flood
Control Zone District schedules projects an additional five years behind the first budget year. The planning schedule includes
programmed funding amounts and sources along with project forecast expenses. The schedule identifies the various projects
beginning in the first budget year (2023) extending to the last year in program (2028).
This plan
This plan is organized into three major components for the ease of understanding the various projects contained in the six-year
plan:
1. Map identifying the various projects located around the County.
2. The six-year project listing and associated funding plan.
3. Project specific sheets listing specific project information including title, project description, project
status, photos and funding sources.
Acronyms
CIP Capital Improvement Project
CTP Cooperating Technical Partners Program
DOE Washington State Department of Ecology
EWC Ellensburg Water Company
FCAAP Flood Control Assistance Account Program
FCZD Flood Control Zone District
FEMA Federal Emergency Management Agency
SRFB Salmon Recovery Funding Board
WNC Wilson-Naneum-Cherry Watershed
YBIP Yakima Basin Integrated Plan
1a
3
5
7
8
10
6
11
12
1415
16
17
18
21
1b
20 22
Kittitas County GIS
Kittitas County
2023-2028
Six Year Floodplains Improvement Plan
Projects
1a- Flood Hazard Risk & Repetitive Loss Program
1b- Repetitive Loss: Easton Flood Study
3- Ringer Loop Property Improvements
5- Hanson Levee & Private Berm Removal
6- Reecer Creek Dollarway to University
7- Stream Gaging and Early Warning System (Multiple
Locations) 8- CTP Flood Studies (Multiple Locations)
10- Whiskey Creek at EWC Siphon
11- WNC - Phase 2 Whiskey Reroute Feasibility Study
12- WNC - Phase 3 Whiskey Reroute Design
14- Flow Conveyance Restoration, Site 2
15- Flow Conveyance Restoration, Site 3
16- Crystal Creek Conveyance Project
17- Manastash - Cove Road Replacement
18- Hazard Mitigation Plan Update
20- West Ellensburg Interchange
21- Fire District No. 7
22- Wilson Creek Reroute 0 2.5 5 7.5 101.25
Miles¯
Six Year Program Summary
*Costs are shown as thousands
641 691 710 764 784
12 12 12 12 12 12
3,956 6,809 1,951 2,913 5,320
2,421 6,766 2,023 2,713 5,231
806
$41
180
8
25
50
15
100
10
90
30
150
SUMMARY: 6-YEAR PROGRAM REVENUE, COSTS AND ENDING FUND AMOUNTS
3,508
804
4,312
1,193
24
29
2300
3547
(765)
TAX LEVY
OTHER INCOME
PERMITS
GRANTS / COST SHARE
TOTAL (COST) INCOME FOR
1,136
24
28
4,043
10 10
90
6,118 1,240
50 50 50
PROPERTY MAINTENANCE
100 100 100
TOTAL ADMINISTRATION AND
OPERATIONS COSTS
ADMINISTRATION
TRAINING/CONFERENCES
PERMIT PROCESSING
PUBLIC TECHNICAL
AGENCY COORDINATION
PUBLIC OUTREACH AND
FLOW CONVEYANCE
LEVEE MAINTENANCE
STORMWATER 90
30
150 150 150
25 26 27 27
935 982 1,031
30 30
21 22
1,440 5,737 943 1,581
180 180 180 180
2,1493,315
1,082
22 23
25
FCZD CAPITAL PROGRAM
PROJECT COSTS
100
10 10
1,095
72 (200)
$1,066 $1,022 $1,095 $895
(88)
895
$806ENDING FUND AMOUNT
60
30 30
30 60
150 150
2,600
(1,535) (43)
1,066
TOTAL ANNUAL INCOME
1,022
EMERGENCY RESPONSE
TOTAL ANNUAL COSTS
KITTITAS COUNTY BOARD OF
COUNTY COMMISSIONERS
PROJECT
BEGINNING FUND AMOUNT
25
YEAR 2023 2024 2025 2026 2027
180
4,536
8 8 8 8
25
2028
INFLATION 31 51 70 94 114 134
15 15 15 15
50
8
50
15
100
10
25 25
AREANon-Local Source2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2026 Non-Local2027 Local2027 Non-Local#1a FLOOD HAZARD RISK & REPETITIVE LOSS PROGRAM County Wide 10 40 40 30 110
#1b REP. LOSS: EASTON REACH FLOOD STUDY Yakima River FCAAP 80
#3 RINGER LOOP PROPERTY IMPROVEMENTS Ringer Reach IP 200 200 200 200
#5 HANSON LEVEE AND PRIVATE BERM REMOVAL Ringer Reach SRFB / IP 15 50 90 510 90 510
#6 REECER CREEK DOLARWAY TO UNIVERSITY WNC City of Ellensburg 850
#7 STREAM GAGING AND EARLY WARNING SYSTEM County-Wide 50 50 50 50 50
2023 site additions: Wilson Creek, Reecer Creek, Crystal Creek
#8 CTP FLOOD STUDIES General CTP 30 140 60 100 60 100 60 100
#10 WHISKEY CREEK AT EWC SIPHON WNC Private
#11 WNC-Phase 2 Whiskey Reroute Feasibility Study WNC 100
#12 WNC-Phase 3 Whiskey Reroute Design WNC FEMA / FCAAP 20 80 100 400
Implement capital recommendations from Phase 2 Feasibility Study
#14 FLOW CONVEYANCE RESTORATION - SITE 2 WNC Ecology 20 70 270
#15 FLOW CONVEYANCE RESTORATION - SITE 3 TBD Ecology 20 82 290
#16 CRYSTAL CREEK CONVEYANCE PROJECT Crystal Creek 20 100
Implement project identified through Crystal Creek CTP study
KITTITAS COUNTY FLOOD CONTROL ZONE 2023-2028
SIX YEAR CAPITAL IMPROVEMENT PLAN
Comprehensive Flood Planning and Repetitive Loss Hazard Assessment
Control for invasive species, riparian buffer plantings, and building decomissioning at County-owned properties
Implementation of preferred alternantive from Hanson Pits Restoration Plan and Design . 2023 SRFB design only
grant.
Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback
levees and construct second bridge alongg Dolarway Rd.
Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models and
channel migration zone mapping.
Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing
current EWC crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost-share.
Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate effects
of Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at proposed
railroad crossing, and within Reecer Creek floodplain site, and water needs downstream of proposed reroute site.
Implementation of project similar to Mercer at Helena flow conveyance project, site TBD
Implementation of project similar to Mercer at Helena flow conveyance project, site TBD
Costs are shown as thousands
AREANon-Local Source2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2026 Non-Local2027 Local2027 Non-LocalKITTITAS COUNTY FLOOD CONTROL ZONE 2023-2028
SIX YEAR CAPITAL IMPROVEMENT PLAN
#17 MANASTASH - COVE ROAD REPLACEMENT Manastash Road Fund 200
#18 HAZARD MITIGATION PLAN UPDATE County-Wide 200
#19 ADDITIONAL PROPERTY ACQUISITION Yakima River SRFB 500 5000
#20 WEST ELLENSBURG INTERCHANGE Reecer / Currier 100 3000
#21 FIRE DISTRICT NO. 7 Yakima River 1000
#22 WILSON CREEK RE-ROUTE Wilson Creek 300 450
1875 1440 370 5570 280 890 522 1450 440 3610
CAPITAL PROGRAM COSTS WITH 3% ANNUAL INFLATION 1875 1440 381.1 5737.1 296.8 943.4 568.98 1580.5 492.8 4043.2
Potential property acquistion in Ringer Road Vicinity
Implementation funding for proposal to relocate Wilson Creek in Brook Lane vicinity
Flood informed development effort in West Ellensburg Interchange. 2023: Testing design alternatives and impacts
and perpare a CLOMR application
Address critical facility at flood risk from Yakima River flooding. Construction cost estimates based on flood wall cost
estimate.
CAPITAL PROGRAM ANNUAL TOTAL (LOCAL AND NON-LOCAL AMOUNTS IDENTIFIED)
Replace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and flood flows.
2026: Design and Permitting
The Multi-jurisdictional Hazard Mitigation Plan needs to be updated every 5-years.
Costs are shown as thousands
Project Name: #1a Flood Hazard Risk & Repetitive Loss
Countywide
Last Updated: November 23, 2022
Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: Planning: 2022—2027
Project Description:
Unincorporated Kittitas County has 7 repetitive loss areas. Four of these areas are along the Yakima River, two are along the
Teanaway River, and one is along the Middle Fork Teanaway River. Kittitas County is conducting a detailed study for the Easton
Reach of the Yakima River under CIP Project 1b. Additional summarization and analysis of County-wide fiood damage data is
occurring under this project and will direct future, project speciflc Repetitive Loss planning efforts.
Status: In progress
Flood Impacts: Reduce impacts and costs associated with frequently fiooded properties.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• Future phases will be grant
eligible
Project Name: #1b Easton Reach Repetitive Loss and Flood Yakima River—Easton Reach
Last Updated: November 23, 2022
Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: Planning: 2023
Project Description:
The 11-mile Yakima River Easton Reach frequently fioods several repetitive loss area communities. Kittitas County proposes to
collect necessary data, conduct a fiood hazard analysis, and engage the local community to develop a reach -level plan informed
by natural processes. This planning effort supplements general recommendations for this fiood priority area identifled in our
Comprehensive Flood Hazard Plan and will bridge the gap needed to identify speciflc fiood hazard projects.
Status: In progress
Flood Impacts: Reduce impacts and costs associated with frequently fiooded properties.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCAAP
• FCZD Levy
• Future phases will be grant
eligible
Project Name: #3 Ringer Reach Property Improvements
Yakima River—Ringer Reach
Last Updated: November 23, 2022
Basis for Project: Yakima River Corridor Plan Schedule: 2022—2026
Project Description:
Control for invasive species, riparian buffer plantings, and building decommissioning at County-owned properties that were pur-
chased for fioodplain conservation and restoration. Initial planning efforts to manage site for fiood risk reduction, open s pace,
agricultural uses and habitat restoration will also be advanced.
Status: In progress
Flood Impacts: Decreased reliance on fiood control infrastructure and improved fioodplain function.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• Yakima Basin Integrated Plan
• FCZD Levy
• U,S. Bureau of Recreation In-
Kind Services
• Mid-Columbia Fisheries In-
Kind Services and grant fund-
ing
Project Name: #5 Hanson Levee and Private Berm Removal
Yakima River—Ringer Reach
Last Updated: November 23, 2022
Basis for Project: Yakima River Corridor Plan Schedule: 2023—2026
Project Description:
Design effort associated with remove failing Hanson Pit Levee and private berm located on Flood Control Zone District acquire d
property. Levee removal allow property purchased for fioodplain function to be used for this purposes, will reduce off-site fiood
elevations and will reduce long-term District O&M costs associated with the levee and berm.
Status: Conceptual Planning underway
Flood Impacts: Better managed fiood hazard risks and improved fioodplain function.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• Yakima River Basin Integrated
Plan (potential)
• Salmon Recovery Funding
Board (potential)
•
Project Name: #6 Reecer Creek Dolarway to University
Wilson-Naneum-Cherry Subbasin
Last Updated: November 23, 2022
Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2023
Project Description:
Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback levee s and
construct second bridge along Dolarway Rd to address Reecer Creek fiooding.
Status: In progress.
Flood Impacts: Decreased fiood risk to West Ellensburg Community and Dolarway Road
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
Project Name: #7 Stream Gaging and Early Warning System
County-Wide
Last Updated: November 23, 2022
Basis for Project: Wilson-Naneum-Cherry Assessment, Hazard Mitigation Plan Schedule: 2023—2027
Project Description:
Installation and annual maintenance costs of real time stream gage network. Current sites include: Naneum Creek before fiow
splits, Naneum Creek downstream of fiow split, Manastash Creek, and NF Teanaway River. Sites proposed to be added in 2023:
Wilson Creek, Reecer Creek, and Crystal Creek.
Status: In progress
Flood Impacts: Improved real-time fiood communication and development of a hydrologic dataset to inform future fiood
projects.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
Project Name: #8 CTP Flood Studies
County-Wide
Last Updated: November 23, 2022
Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: 2023—2027
Project Description:
Continued funding through the Federal Emergency Management Agency’s Cooperating Technical Partnership (CTP) program to
improve fiood models and channel migration zone mapping. In 2023 the North Fork Teanaway will be studied. In 2024 Wilson
Creek is proposed for study and in 2025 Manastash Creek is proposed.
Status: In progress
Flood Impacts: Improved fiood risk information
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• Community Technical Partner-
ship Program
• FCZD Levy
Project Name: #10 Whiskey Creek at EWC Siphon
Wilson-Naneum-Cherry
Last Updated: November 23, 2022
Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2028
Project Description:
Increase fiood conveyance, eliminate canal and creek intermingling, and address flsh passage barrier by replacing current the
Ellensburg Water Company crossing at Whiskey Creek with a siphon. Final design will be completed in 2022 and construction is
expected in 2028.
Status: Planned project
Flood Impacts: Decreased fiooding along Whiskey Creek.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy—design and con-
struction.
• Grant or partner support for
construction.
Project Name: #11 Wilson-Naneum-Cherry Phase 2
Wilson-Naneum-Cherry
Last Updated: June 21, 2021
Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2023
Project Description:
Hydrologic analysis with existing 2-D model to evaluate a potential Whiskey Creek tie-in at the Reecer Creek Floodplain project.
Evaluate the effects of Mercer Creek fiow routing north of the airport on hydrologic regime, determine the design speciflcations
needed at proposed railroad crossing, evaluate the available fiood capacity within Reecer Creek fioodplain site, and assess w ater
-right considerations downstream of the proposed reroute site.
Status: Planned project
Flood Impacts: Decreased fiood risk to the West Ellensburg Community.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
Project Name: #12 Wilson-Naneum-Cherry Phase 3
Wilson-Naneum-Cherry
Last Updated: June 21, 2021
Basis for Project: Wilson-Naneum-Cherry Assessment Schedule: 2025—2026
Project Description:
Implement capital recommendations from Phase 2 Feasibility Study (FCZD Project # 11)
Status: Planned project
Flood Impacts: Decreased fiood risk to the West Ellensburg Community.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• Flood control assistance
account program (potential)
Project Name: #14 Flow Conveyance Restoration (Site 2)
Based on need
Last Updated: November 22, 2022
Basis for Project: Recurring need Schedule: 2023—2024
Project Description:
Implement fiow conveyance restoration project that exceeds scope of annual fiow conveyance maintenance activities. Typically
these project require the removal of crack willow and associated sediment accumulations. Site to be determined.
Status: Planned project
Flood Impacts: Decreased fiood frequency.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• Ecology Centennial Clean
Water Grant (potential)
Project Name: #15 Flow Conveyance Restoration (Site 3)
Based on need
Last Updated: November 22, 2022
Basis for Project: Recurring need Schedule: 2025—2026
Project Description:
Implement fiow conveyance restoration project that exceeds scope of annual fiow conveyance maintenance activities. Typically
these project require the removal of crack willow and associated sediment accumulations. Site to be determined.
Status: Planned project
Flood Impacts: Decreased fiood frequency.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• Ecology Centennial Clean
Water Grant (potential)
Project Name: #16 Crystal Creek Conveyance Project
Crystal Creek Flood Study
Last Updated: September 30, 2020
Basis for Project: Crystal Creek Flood Study Schedule: 2023—2024
Project Description:
Implement Crystal Creek conveyance project identifled through current Crystal Creek fiood study. Site to be determined.
Status: Planned project
Flood Impacts: Decreased fiooding along Crystal Creek.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• Grant funding to be identifled
after project identiflcation.
Project Name: #17 Manastash Cove Road Replacement
Manastash
Last Updated: November 23, 2022
Basis for Project: Manastash Creek Corridor Plan Schedule: 2027-2028
Project Description:
Replace existing Cove Road bridge with bridge of sufflcient freeboard and span to pass sediment and fiood fiows.
Status: Future Project
Flood Impacts: Decreased fiood risk along the Manastash River alluvial fan during signiflcant fiood events.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• Road Fund
• Flood control assistance
account program (potential)
Project Name: #18 Hazard Mitigation Plan Update
County-wide
Last Updated: June 21, 2021
Basis for Project: Kittitas County Hazard Mitigation Plan Schedule: 2023
Project Description:
Kittitas County last updated its Multi-Jurisdictional Hazard Mitigation Plan in 2019. This plan must be updated every 5 -years. An
up-to-date mitigation plan that has been approved by the Federal Emergency Management Agency (FEMA) is required to be eli-
gible for mitigation grants, such as FEMA’s Pre-Disaster Mitigation Grant Program (PDM) and Hazard Mitigation Grant Program
(HMGP) .
Status: Future Project
Flood Impacts: Identify key fiood needs and maintain eligibility for Federal funding sources.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
Project Name: #19 Additional Property Acquisition
Yakima River Kittitas Reach
Last Updated: November 23, 2022
Basis for Project: Kittitas County Hazard Mitigation Plan; Yakima River Corridor Plan Schedule: 2023-2024
Project Description:
Property acquisition from willing sellers within the Kittitas Reach of the Yakima River for the purposes of decreasing relian ce on
fiood control infrastructure and improving fioodplain function.
Status: Future Project
Flood Impacts: Decreased reliance on fiood control infrastructure and improved fioodplain function.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• SRFB (Potential)
Project Name: #19 West Ellensburg Interchange
Reecer and Currier Creeks
Last Updated: November 23, 2022
Basis for Project: Staff Identifled Schedule: 2023-2024
Project Description:
Work with stakeholders to develop preferred alternatives for stream alignments and land uses and utilize available 2 -
dimensional fiow modeling evaluate environmental improvement and fiood risk reduction performance for preferred alternative.
Status: Future Project
Flood Impacts: Avoid future fiood losses in area with high commercial development potential.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
Project Name: #20 Fire District No. 7
Yakima River Easton Reach
Last Updated: November 23, 2022
Basis for Project: State & FEMA Community Assistance Visit Schedule: 2023
Project Description:
Fire District No. 7 station No. 73 does not meet fiood damage prevention requirements. Alternatives to ensure continuity of
operations during fiood emergencies will be identifled and evaluated and the preferred alternative will be advanced.
Status: Future Project
Flood Impacts: Ensure emergency services can be provided during fiooding conditions.
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
Project Name: #21 Wilson Creek Realignment
Wilson Creek
Last Updated: November 23, 2022
Basis for Project: City of Ellensburg Staff Schedule: 2026
Project Description:
The west branch of Wilson Creek will be relocated from its current location as a stream -side ditch along Brook Lane to Central
Washington University property, which can accommodate both the stream and an associated fioodplain. This re-alignment will
address frequent (50% annual chance) fiooding, associated water quality impacts, and improve aquatic and riparian habitat,
while also providing opportunities for public engagement and enjoyment.
Status: Future Project
Flood Impacts: Flood impacts will be reduced in the Brook Lane neighborhood of Ellensburg. Water quality impacts from fre-
quent
For more information on this project, contact Arden Thomas @ 509-962-7523 or arden.thomas@co.kittitas.wa.us
Funding
• FCZD Levy
• Ecology: Centennial Clean
Water Funding
APPENDIX D
Kittitas County Regional Parks and Trails
Appendix D
Kittitas County Department of Public Works Recreation
Capital Facility Plan 2023-2028
Prepared on November 28, 2022
2023 – 2028 Recreation Plan Narrative
Several new proposed recreation facilities are programmed in Public Works
2023 operating and capital budget. These new proposed facilities are:
• Manastash Trailhead Parking
• Dunford Interpretive Center.
Carry over recreational projects include:
• Vantage Boat Ramp Overflow Parking
• Gladmar Park Improvements
• Upper County All-Terrain Vehicle Trail(s)
• Ellensburg Rotary Indoor Soccer Facility
• Vantage River Walk
Detailed budgets for each project in the 2023 – 2028 Capital Facility Plan
are included in this Appendix.
Local CostNon-Local CostLocal CostNon-Local CostLocal CostNon-Local CostLocal CostNon-Local CostLocal CostNon-Local CostLocal CostNon-Local CostProject TotalCAPITAL IMPROVEMENT PROJECT NAME
1
200,000
60,000
339,260
2
240,000
Design parking lot improvements 50,000
617,895
3
50,000
Design restroom improvements 30,000
Construct acess and parking improvements 605,764
100,000
4
150,000
450,000
250,000
5
Secure DNR lease 15,000
200,000 300,000
500,000
500,000
6
2,000,000 2,000,000
7
250,000
750,000
945,764 200,000 957,895 - 789,260 - 465,000 300,000 2,250,000 500,000 2,750,000 500,000 9,043,659
LABOR
500,000 500,000
TOTAL ANNUAL INCOME 1,400,000 1,224,000 1,248,480 1,573,450 1,798,919 1,824,897
GRANT / COST SHARE 200,000 - - 300,000
111,251 100,763 102,778 104,834
-
TOTAL ANNUAL COSTS 1,060,673 1,246,527 894,094 871,931 2,859,069 3,361,251
TAX REVENUE 1,200,000 1,224,000 1,248,480 1,273,450 1,298,919 1,324,897
ANNUAL CAPITAL IMPROVEMENT TOTALS (-)3,250,000
322,553
789,260 1,145,764 957,895
SUMMARY: 6-YEAR PROGRAM REVENUE, COSTS AND ENDING FUND AMOUNTS
251,908 256,946 262,085 267,327 272,673 278,127
Gladmar Park (MC)
Vantage Boat Ramp Overflow Parking (LC)
Manastash Trailhead Parking Lot
Phase 1: Build Trails
2026
KITTITAS COUNTY
2023-2028
SIX YEAR PARKS AND TOURISM CAPITAL PLAN
Build Overflow Parking Lot
202820232024
Acquire WSDOT property
2025
Property Acquisition
Phase 1 Improvements: Design parking lot improvements
Phase 2 Improvements: Build parking lot
2027
599,260 1,000,000 Vantage River Walk (LC)
Prepare Development Plan
Phase 1 Improvements: Design and Construct Bridge Access
Upper County ATV Trail (UC)
Prepare Development Plan
Dunford Interpretive Center
Construct restroom improvements
Ellensburg Rotary Indoor Soccer (LC)
County Cost Share with Ellensburg
Phase 2 Improvements: Construct Island Improvements
Phase 2: Build Trails 907,895 1,500,000 850,000 785,764 4,000,000 Design access and parking improvements
Prepare Development Plan
Phase 1: Construction
322,553 (1,213,800) ENDING FUND BALANCE
10,000 163,473 326,799 681,185
163,473 326,799 681,185 1,382,704
765,000
106,931 109,069
2,750,000
1,382,704 BEGINNING FUND BALANCE
OTHER INCOME -
OPERATING COSTS
1 of 1